HomeMy WebLinkAbout20061599.tiff RESOLUTION
RE: REGULATING, WARNING AND GUIDING TRAFFIC DURING THE TEMPORARY
CLOSURE OF PORTIONS OF WELD COUNTY ROADS40.5 AND 5 FOR SEVENTEEN
WEEKS, FOR ROAD CONSTRUCTION PROJECT
WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to
Colorado statute and the Weld County Home Rule Charter, is vested with the authority of
administering the affairs of Weld County, Colorado, and
WHEREAS,pursuant to Section 42-4-410(6)(a), C.R.S.:
"...local authorities, with their respective jurisdiction may, for the
purpose of road construction and maintenance,temporarily close to
through traffic or to all vehicular traffic any highway or portion thereof
for a period not to exceed a specified number of work days for project
completion and shall, in conjunction with any such road closure
establish appropriate detours or provide for an alternative routing of
the traffic affected...", and
WHEREAS,the Board, pursuant to said statute and upon the basis of traffic and personal
investigations, has determined that conditions exist which make it necessary to temporarily close
to through traffic and to regulate,warn and guide vehicular traffic on said County roads by posting
signs thereon.
NOW,THEREFORE,BE IT RESOLVED that the Board of County Commissioners of Weld
County,Colorado,deems it necessary to regulate,warn and guide vehicular traffic on County roads
and any intersections thereof, and it hereby authorizes and orders the posting of such traffic control
devices as shall be reasonably necessary to regulate, warn and/or guide traffic thereon for the
safety of the general public and that said traffic control devices shall conform to the Federal Manual
on Uniform Traffic Control Devices.
BE IT FURTHER RESOLVED that the Board of County Commissioners of Weld County,
Colorado, does declare and establish that Weld County Road 40.5, between Weld County
Roads 3 and 5; and Weld County Road 5, between Weld County Road 40.5 and State Highway 56
be temporarily closed,with said closure being effective June 26, 2006,for approximately seventeen
weeks for a road construction project, and further,that standard official traffic control devices shall
be erected at said closure giving notice of the restrictions.
2006-1599
CO Aix), Se emit c-S P EG0024
0 % - irZ -Cif
ROAD CLOSURE - PORTIONS OF WCRS 40.5 AND 5
PAGE 2
The above and foregoing Resolution was,on motion duly made and seconded,adopted by
the following vote on the 14th day of June, A.D., 2006.
ti I . / 4 4sBOARD OF COUNTY COMMISSIONERS
J ` ELD COUNTY, ORADO
ATTEST:
"Y • . . eile, Chair
Weld County Clerk to the B ?K
UNit
�� �� David E. Long, Pro-Tem
BY:
Dep Cler o the Board '
Will' H. Jerke
AP D AS TO •
Robe D. Masde/n/
my Att pap _
Glynn Vaad 1
Date of signature: 710 0(49
2006-1599
EG0024
re:ct7S. :,
MEMORANDUM
I C. TO: Clerk to the Board DATE: 6/12/2006
COLORADO FROM: Frank B. Hempen, Jr., P.E.
Director of Public Works/County Engineer
SUBJECT: Agenda Item
Road closures:
WCR 40.5 between WCR 3 and WCR 5
and
WCR 5 between 40.5 and State Highway 56 will both be closed from 6/26/2006 to 10/20/2006
for a road construction project.
The appropriate documentation is attached.
Enclosures
pc: Dale Elliott, Bridge Supervisor
Dean Dreher, Maintenance Support Supervisor
M:\Francie\Agenda Item.doc
2006-1599
WELD COUNTY PUBLIC WORKS?KS DE 1i'k
ROAD cLo_suRE PLAN
FOR
WCR? S at 4O.51 (4'1'I't
une W NWCR 3 AND HWY GO 1w
WELD COUNTY wino Or.
" , j_:
v■w min - 1 COLORADO
-___r--I"--1- t
Wil onaliligs _ ----6
•J �.�a■ amL 1.• Si NI
III 1111 ________ ill
aw■ fill ■ Filail NMI lei - --"IL_ ,
Milli ( _
_ __
A,ill 1 ..■.■
■f1� !MINIUM*"
MO IUf
�
�a�a■a■ f�i/a■■ 11■a - ■�■ •a ■ II�Pe1Saaa..,..a■=■waa■■1� ■ ■ri • ■
r ■a■�aaaa�■■ aw ■■
-�1111:1:aaa��■ala �Ir■al� '
■aa ■aB■■..■■■■a MP. - C
Irwi��a■�aa■a■a aa■ - -- L ■ ill �k vv� �i-Q , “,,
II.�: .. , m,4..-
v ..kv i : �■ll
�i■ :'9a'aJa/�'
1
liMmmi r igo` 1I
,.Fa�1::h111 glgunilA1g —
itituaN = "'lla
•sw�■,�.ri��� i cl
■ ■■a - �tJ
....o.raaaaw ��■ c
_ id s i r�sawa.engumlvemiumWI N�ame7/��._ U Ut
■mum „=MilEM i I HWY 56 i
trabhuillifilamiarism. .:Aligir• i
WCR 40.: ,r, N-
WCR 40 0 3
WCR 38
PROJECT VICINITY MAP
- ,
,I
PROJECT LOCATION DATE CLOSED:6-26 thru 10-20 -
RD 40.&RD 5 BETWEEN HWY 56 AND RD 3
GRAVEL SURFACE ADT=221(2005) PROJECT LOCATION
PROJECT DESCRIPTION: 1 g
NEW CONSTRUCTION
LIGHTED MESSAGE BOARDS NEEDED
®YES µp DATE SET: 6-19 THRU 6-26
LIN. FT. MILES 13 ` --Z.-A
PROJECT LENGTH 15.1340 I 3 f , 1-Z
fl
W i ≤ Vg
li
Liii
i i a
olia
i
m
R 4 A k k k k n n n w J Z ~ �.- _. p 1f a
W i� k �u k >a k la k a 71 ; 1 3' s" Ems? ₹e �Y $Ca i 0 'r "
qq Wragv gS 8s 2 j
°& NW UvS C ct E e
g 7v !!l> i (D' I Ili 3- ,?, t2 .na''' 0 2 N2 N
i hIf
Z ° ¢p¢=i py B� d J• iJ ¢i o n g ;o 0 0 2 e U x
gi, RR w .,.., fi Nti li 1 1 l u_ .
pW �r8
any nz Y
_O 8 - 1y� 4 j ` n 4 H J 4 pp 4 y a O
= e n n ' 'i i i 3 I •n ci$ W pF�n"1n a; � € Q
- 3 3 3 3 77J 1
nn W-W y... u Y € li 4L
of XiFVVV iridi4i4 t3
D
—4 I (1 d 6
•
i 1 pp
r
V a
hil Si -J g 24i
CI a
LIOM ;EA g
I '
n N #
i
IV I a € 1 d
i o
s No m1
10ArO21d I.
I In
I
ill '( V o
__. -- a Z O000
S NOM r._._._
cc o: 9:46 co
M E
in ` d U1 Uy c i 1 6
W
O >
6. ar
Hello