Loading...
HomeMy WebLinkAbout20063221.tiff epColorado Interstate Gas an El Paso company November 17, 2006 Re: Colorado Interstate Gas Company A subsidiary of El Paso Corporation High Plains Natural Gas Pipeline Project Colorado Interstate Gas (CIG), in conjunction with Public Service Company of Colorado (PSCO), plans to construct a natural gas pipeline (referenced as High Plains) to transport additional volumes of natural gas throughout the Front Range area. CIG is proposing to construct four(4) segments of the High Plains Pipeline as follows: The proposed project will be comprised of four(4), 24 and 30-inch diameter pipeline segments totaling about 164 miles to be located in Adams, Morgan, and Weld counties in Colorado. • The first pipeline segment, is proposed to begin at CIG's existing Cheyenne Compressor Station located in Section 5,Township 11 North,Range 66 West, Weld County, Colorado and would extend south/southeasterly approximately 85 miles to intersect at a point located southeast of Prospect Valley in Section 17, Township 2 South,Range 62 West, Adams County, Colorado. • The second pipeline segment is proposed to begin at CIG's existing Watkins Compressor Station located in Section 31,Township 3 South, Range 65 West, Adams County, Colorado extending 58 miles northeast and terminating at a point at CIG's existing Fort Morgan Compressor Station located Section 36, Township 3 North, Range 58 West, Morgan County, Colorado. • The third pipeline segment is proposed to begin one mile north of the Hudson Power Plant in the Town of Hudson, Colorado and would extend approximately 14 miles west to a new interconnect location with PSCO's existing Tri-Town system located in Section 27,Township 2 North, Range 67 West,Weld County, Colorado. • The fourth segment is proposed to begin at CIG's Watkins Compressor Station located on Smith Road extending west approximately 6 miles, and terminating at CIG's existing East Denver measurement facility located on Chambers Road in Section 29, Township 3 South, Range 66 West, Adams County, Colorado. An environmental review of these projects will be conducted by the Federal Energy Regulatory Commission("FERC") as required by the National Environmental Policy Act(NEPA). Colorado Interstate Gas would like to invite you to attend one of three open house meetings to introduce the project to the public, and provide you with an opportunity to ask questions and learn more about our plans. At these meetings, CIG will provide information regarding the proposed project route crossing your property, answer questions, and will discuss any issues that you would like to have addressed during the project planning process. Colorado Interstate Gas 2 North Nevada Avenue Colorado Springs,Colorado 80903 PO Box 1087 Colorado Springs,Colorado 80944 tel 719.473 2300 (10 Pte) P_ 2006-3221 mM k it-//c/175 cit/S - _O If FERC officials are present, they will collect public comments on the scope of the environmental review and answer questions associated with the regulatory processes involved in evaluating this project. Open house meetings will be held at the following locations and times: Tuesday Wednesday Thursday November 28, 2006 November 29,2006 November 30, 2006 6:00 P.M. to 8:00 P.M. 6:00 P.M. to 8:00 P.M. 6:00 P.M.to 8:00 P.M. Ault High School Country Steak Out Bella Sera Event Center 208 W. 15` Street 19592 East 8'h Ave. 45 Strong Street Ault, Colorado Fort Morgan, Colorado Brighton, Colorado If you have any questions,please call me at(877) 598-5263. If I am not available,feel free to contact Jeff Voltattomi, Land Agent, at(719) 520-4279, or you can leave a voice message with your name and phone number and we will return your call promptly. Yours truly, C -Q. lzmon David R. Anderson Manager, Land Department Hello