Loading...
HomeMy WebLinkAbout841205.tiff RESOLUTION RE: APPROVAL TO SUBMIT ENERGY IMPACT ASSISTANCE GRANTS AND AUTHORIZATION FOR CHAIRMAN TO SIGN SAME. WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado Statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS , applications for energy impact assistance have been prepared to be submitted to the Division of Energy and Mineral Impact, 1313 Sherman Street, Room 518 , Denver, Colorado, 80203 , copies of which are attached hereto and incorporated herein by reference, and WHEREAS , after careful study and review, the Board deems it in the best interests of the citizens of Weld County to approve said applications. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County that the applications for energy impact assistance be, and hereby are, approved for submittal to the Division of Energy and Mineral Impact. BE IT FURTHER RESOLVED by the Board of County Commissioners that the Chairman be, and hereby is, authorized to sign said applications. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 27th day of June, A.D. , 1984 . � BOARD OF COUNTY COMMISSIONERS ATTEST a-' (2n.wtTT WELD COUNTY, COLORADO Weld County Clerk and Recorder and Clerk to the Board Norman Carlson, Chairman FJsrv� BY: � acgtlinahnson, Pro-Tem Deput Coun' Clerk EXCUSED APPROVED AS TO FORM: Gen Br tner C: -->C2‘1, C uck Carlson County Attorney hn Martin Reso . by F .O. gro oeS-- 841205 OFFICE OF BOARD OF COUNTY COMMISSIONERS PHONE(303)356-4000. EXT. 4200 PO. BOX 758 GREELEY.COLORADO 80532 COLORADO June 26, 1984 Office of Impact Assistance 1313 Sherman Street Room 523 Denver CO 80203 Dear Sirs: The Board of County Commissioners of Weld County are submitting the five enclosed Energy Impact Assistance Grants for your consideration. The Board and Local Impact, Team have restricted the submission to five high priority grant requests. Within the high priority category the requests are ranked as follows: Priority Title 1 Hazardous Material Team Equipment 2 Fire Marshall 3 Oil and Gas Information System 4 Pavement Management Program 5 Road Grader Sheds Your favorable consideration of the requests will be appreciated by Weld County. Should you have any questions please do not hesitate to contact Board members or the contact person listed at 356-4000. Very truly yours, Norm Carlson, Chairman Weld County Commissioners NC/ac a EIAF #, Received: IMPACT ASSISTANCE APPLICATION 1. Applicant Agency: Name County of Weld Contact Person Donald D. Warden Telephone 356-4000, Ext. 4218 Address P.O. Box 758 (Street or Box Number) Greeley, CO 8O631 (City, Zip Code) 2. Local Government Sponsor: (Required if Applicant is not local government) Name Same Contact Person Telephone 3. Project Title: Hazardous Materials Team Equipment • 4. Funding Sources: . Impact Assistance Fund Request: $82,758 Local Share 30.000 (if in-kind, describe in narrative) : Local staff of 16 to man Hazardous Material Team Other Funding: Source: Amount _0_ Source: Amount _O_ TOTAL PROJECT COST: $112,758 Page 2 5. Project Narrative: (Describe the project. (a) What will be accom- plished and how will it be done? , (b) Provide a specific project budget with detailed expenditure categories. (c) If multiple funding sources are invloved, show what each will finance. (d) If preliminary planning, feasibility studies or design has been done, describe it. (e) If the project is a construction project, in- clude a map showing the location of the construction site.) A. The project is the formation of a Hazardous Material Emergency Response Team. A Hazardous materials Response Team will provide on-scene expertise to �,.__� - __ ._ . ,.� ener,... industry whether on-site or in transport. It will provide training for the numerous volunteer fire departments as first responders. It will super- vise the oil and gas industry in clean up operations and disposal when required. The project includes equipment, vehicle and training for approximately 16 persons from law enforcement (4) , health department (5) , Road and Bridge (6) , and OEM (1) . B. Summary. (See attached detail listings) Personal Protective Equipment $ 28,750 Detection and Identification 2,074 Containment and Scene Control Equipment 18,773 Pick-up and Disposition Equipment 930 First Aid and Decontamination 1,736 Other Specialized Equipment 12,959 Sub-Total Equipment $ 65,222 Training 17,536 Vehicle 30,000 GRAND TOTAL OF COSTS $112,758 Revenue: Local $ 30,000 Impact Assistance 82,758 TOTAL REVENUE $112,758 C. The project is a complete but on-going process. Recovery costs will be assumed by the responsible parties. The training will, of necessity, be on-going, hopefully through existing sources. (Continued) Page 2A 5. Project Narrative (Continued) D. Design work has been done by various municipal entities, the budget breakdown is a collaborative project of Weld County Health Department, Weld County Sheriff's Office, and Greeley Fire Department. E. No construction is required. Page 3 6. Describe the relationship of the project to energy/mineral develop- ment. What energy/mineral projects affect the community? How many employees of energy/mineral companies reside in the Applicant's juris- diction or service area? What are the population and workforce pro- jections for the community or area (provide source of information). Weld County has experienced problems of hazardous materials response relative to the oil and gas industry. A lack of trained personnel and equipment has endangered its citizens because of this need. The proximity of drilling and production to populations has created a risk to life and property. Because the energy industry appears to be here for an extended, unknown period, it is imperative that the county be prepared to respond to emergencies intrinsic to this industry. 7. List the efforts made to secure alternative financing for the project. Cite efforts to secure funding from user fees, local government bud- get, industry/private sources, federal sources, and other State sources. • The need for the specialized equipment and extensive specialized training is a direct cause of the threat created by the oil and gas activity in Weld County. The resources needed to accommodate incidents should not detract from other county programs and priorities when the need for equipment and training is limited to energy industry related incidents. Industry has been cooperative during emergency situations, but the companies lack the specialized equipment and training also. Page 4 8. Financial Status of the Applicant: - Current Annual Budget $42,000,629 Current Assessed Valuation $870,453,500 Current Mill Levy 17.369 Current Overlapping Jurisdiction 78.508 Mill Levy Sales/Use Tax 0 % Annual Revenue 0 Water Tap Fee n/a User Charge n/a (residential monthly average) Sewer Tap Fee n/a User Charge n/a (residential monthly average) Existing In-Debtedness none G.O. Bonds —0— Revenue Bonds —0— Maximum Legal Debt Limitation $26,113,605 (Home Rule 3% of A.V.) Annual Debt Service -0- -0- -0- (Current) (Next Year) (Following Year) List major capital improvements projects and cost in the last two and/or next two budget years: Current Year Social Services Building ($707,300) Jail Remodel ($200,000) Next Fiscal Year Jail Remodel (S200.000) Following Fiscal Year Jail Remodel ($100.000) Road Readanarrers ($100,00 Does the Applicant have a capital reserve fund? If yes, give balance. 6/22/84 Balance $3,735.23 What was previous year' s general budget end-of-year surplus/deficit? $1,074,350 Page 5 If applicable, what are enterprise fund year-end balances? Water n/a Sewer n/a Other Utilities n/a Indicate why the project cannot be locally funded. Local agencies will provide personnel to staff the hazardous material team, but do not have the resources to acquire all the necessary equipment and training caused by the need to be able to respond to oil and gas incidents. The vehicle to support the team will be provided by local resources. If applicable, did the Applicant take the full 107% property tax revenue increase for the current budget year? Yes x No Weld County's Home Rule Charter only allows a 5% property tax increase annually. 9. If the project will require on-going operational funds, what is the Applicant's plan for securing continuing funding? Local agencies will continue to provide staff resources and maintain the training and equipment after acquired in the first year. 10. Please identify any facility or service plans in which the proposed project has been identified as a priority or scheduled expenditure. n/a Page 6 11. Other comments: (If additional space is needed add an addendum. ) Weld County has had a series of critical incidents in the last six months that have been life threatening to the public and public safety personnel. The possibility of future occurrences exists and a team of properly trained and equipment experts in this area need to be readily available in Weld County to respond immediately. Applicant's Signature* Chairman Board of County Commissioners Iitle/Ufflce June 27. 1984 Date * Application must be signed by the presiding elected official of the local unit of government acting as the Applicant and/or sponsor. Five (5) copies of application are required (check to indicate mailing) : 3 copies to be mailed to: Office of Impact Assistance 1313 Sherman Street, Room 523 Denver, CO 80203 (or: Office of Impact Assistance 2800 D Road Grand Junction, CO 81501) 1 copy to the local Council of Governments or Regional Planning Commission 1 copy to the local county impact team. DIVISION a fra, June 21 , 1984 ��' ,ti , � HAZARDOUS MATERIALS RESPONSE TEAM , • \ /; F ��• TRAINING NEEDS '4. NATIONAL FIRE ACADEMY, "The Chemistry of Hazardous Materials" Three @ $1 , 000 each = $ 3 , 000 TEXAS A & M, "Five-day Hazardous Materials Control" (fc, ,4''u-., (h0j) Three @ $1 ,250 each = $ 3 , 750 SAFETY SYSTEMS , INC. (Florida) , "Five-day Leak, Spill and Fire Control" Three @ $1 , 250 each = $ 3 , 750 UNIVERSITY OF TENNESSEE , "Hazardous Materials I" (2-week) Three @ $1 , 850 each = $ 5 , 550 Miscellaneous Local Hazardous Materials Seminars (Not Yet Scheduled) = $ 1 , 000 HazMat Awareness ( CTI ) 16 hours , Road & Bridge , Sheriff ' s Office , Health Department , Office of Emergency Management , F . M . = $ 25 . 00 HazMat ( CTI ) 80 hours , Sheriff ' s Office , Health Department , F . M . = $ 400 . 00 Fire Command School ( EMI ) 2 weeks , F . M . , Sheriff ' s Office _- $ 28 . 00 HazMat I , II , (Aims ) 3 credits , F . M . , Sheriff ' s Office , Health Department = $ 33 . 00 each Page 2 - NASTEP, ETfnt PNENT 11T PERSONAL PROTECTIVE EQUIPMENT Personal protection is necessary to ensure that a favorable outcome to a hazardous materials emergency is achieved . Research has shown that four levels of protective equipment are required to provide maximum personal protection . The four levels are structural firefighting clothing , non-encapsulating ( splash suits ) , encapsulating, and specialized pro- tective equipment . Our recommendations for purchase of equipment is based on these four levels . STRUCTURAL FIREFIGHTING CLOTHING ine L,VUrable OULLOWe of a nazaruous materials emerged.., can greatly enhanced by the first arriving units ( incident control will require involvement by all fire department personnel ) . It is our recommendation that the department begin a program to replace all structural firefighting clothing with bunker gear that will provide a greater degree of protection to all fire- fighters . This may be accomplished through normal replacement 'of old bunker gear. We have developed specifications that we feel will provide the maximum protection available . ENCAPSULATING / NON-ENCAPSULATING Hazardous materials emergencies may require personnel to work in extremely toxic environments . These substances can enter the body in any of four ways - inhalation, ingestion, injection, and skin absorbsion. Both encapsulating and non-encapsulating types of suits are required to provide protection to firefighters working in toxic areas . The various suits listed will ensure compatibility with most hazardous substances likely to be encountered . The twelve ( 12 ) Saranex encapsulating suits may be used by support personnel (police , ambulance , heavy equipment operators , etc . ) We also recommend three ( 3 ) additional self-contained breathing apparatus with composite ( lightweight ) cylinders and six ( 6 ) spare composite cylinders . Eliminating excess weight while in the en- capsulating suits will reduce the physical stress on personnel . SPECIALIZED PROTECTIVE EQUIPMENT Firefighters may be required to work in areas of extremely high heat to bring a hazardous materials incident to a conclusion. Proximity suits are recommended for this situation. Hazardous Materials Response Team Page 3 PERSONAL PROTECTIVE EQUIPMENT ITEM COMMENT COST SCBA 60 min w/composite cylinder $ 4, 500 3 w/6 bottles * Ecapsulating suits 2 butyl , 1 Chlorepel , 12 , 840 4 Acidmaster * Proximity suits 700 Series ( 2 ) 1 , 600 * Exterior flash suits 4 1 , 600 * Nomex jump suits 6 w/radio pockets 600 Disposable suits Economy scrub apparel , 100 24 sets Splash suits PVC coated polyester, 1,044 one-pc . ( 18 sets ) Bunker gear 12 sets , see specs . 5, 500 Neoprene gloves #2002- 1 dozen 20 Other rubber gloves PRSD 5525 green polyette , 102 1 dozen Disposable latex gloves #2001 22 Disposable PVC gloves 100 pr. 8 Leather outer gloves 1 dozen @7 . 50 ea . 90 Insulating glove liners 2 dozen 12 Hard hats 4 Norton #410 w/face shield 92 Goggles 1 dz. @ $2 24 Encapsulating suits Saranex, 12 sets 360 Boots 12 pr . industrial , chemical 216 resistant * Nomex hoods Included in bunker specs . Hearing protection Earplugs 20 TOTAL $28,750 Hazardous Materials Response Team Page 4 DETECTION AND IDENTIFICATION When responding to an emergency, the first concern of an incident commander is to "size-up" the situation so that subsequent actions will be correct . At an incident involving hazardous materials , this operation may be confounded by the fact that the exact nature of the problem material is not readily apparent in most cases . Warning signs may be inadequate or not visible , a responsible party may be injured or otherwise unavail- able , or the dangerous nature of the material itself might make it impossible to approach the scene . It is necessary then, to have some means of detecting and identifying hazardous materials at an incident beyond the use of eyes and ears . The equipment listed in this section is intended to aid an incident commander and other respondifl ; -'nr anne1 ' v revealing the nature and r the hazard= at a nen be made regarding how to approach the scene , how to protect personnel , and whether or not to evacuate . Detection equipment such as the gas meter and chemical classification kit will help focus in on the type of material being dealt with, while jars and other equipment will allow the taking of samples of more precise analysis . ITEM COMMENT COST Gas detector 1 oxygen/combustible 1 ,038 gas MSA 260 CD radiometric kit May obtain from Weld Co. -0- Civil Defense Chemical classification Draeger tube kit 800 kit (Replacement tubes are $500 per set ) pH meter 125 Litmus test kit 0-14 litmus kit #565262 , 20 9 Mason jars 24 jars 17 Glass tube baster 6 25 • Glass funnel 6 60 TOTAL $2,074 Hazardous Materials Response Team Page 5 CONTAINMENT AND SCENE CONTROL A primary responsibility of the Hazardous Materials Response Team will be scene stabilization and product containment . It is essential to have the proper tools , equipment , and materials in order to work on the wide range of possible hazardous materials incidents that may occur in our area . The variety of equipment listed below will allow the Hazardous Materials Team to control a release of hazardous substances at an incident and to contain that substance in as small an area as possible . ITEM COMMENT COST Non-sparking tool kit AMPC0 2 , 200 Standard tool kit 500 Cordless drill w/wood and metal bits Chlorine ABC kits Chlorine Institute 3,000 Dome clamp kit Materials to build 60 Containment booms 200 ft . oil , 6 in. 1 ,850 Absorbant booms 100 ft . 300 Absorbent pads 4 bales , 18" x 18" 880 4 bales , 36" x 36" Soda ash - 100# 100 Hail screen ) Chicken wire ) Bailing wire ) Lead wool Sheet parafin ) 100 Floor dry 40# 50 Lime 50# 8 * Plug n Dike 50# Mountains in Minutes /I -- 50 Foam in a Can 10 Banding kit and rubber Materials to build & 200 patches 3/4 T Come-a-long Plugging kit Asst . bolts , nuts , rubber stoppers 50 Gas pipe clamps Visqueen 30' x 100' 6 mill 96 Plumber' s test balls Chern brand 115 Duct tape 25 rolls 150 Electrical tape 25 rolls 10 Web straps 2" x 12 ' 2 ply 4800# test , 2 110 Push brooms 4 Jeromes 42 Mops 4 32 Mop buckets 2 metal 72 Squeegees 4 - 24" 60 Sand scoop shovels 4 aluminum • 120 Foam 250 gal . 7 ,500 Foam nozzle 300 No-Flash compound * Barricade tape 30 Traffic vests Hazardous Materials Response Team Page 6 Containment and Scene Control (continued ) ITEM COMMENT COST Engineer ' s tape Asst . colors 15 Traffic cones Fence posts and driver 30 fiberglass T posts 80 16 ' 2 section ladder w/A-frame capability 365 Grounding stake Copper 25 12" booster cable 1 set 25 Tire pump 1 set for plumber' s test balls 15 Straw brooms 2 11 Camera Polaroid and 2 film 80 Megaphone 20 watt 150 Spade shovels 2 42 TOTAL $18,773 tiCn-Up AND DISPUSIIIUN In order to bring a hazardous materials incident to a conclusion , it may be necessary to collect the hazardous substance . Many incidents may be mitigated or controlled by simply picking up the hazardous material , for example , removing gasoline at a traffic accident . These listed materials will give the Hazardous Materials Team the ability to handle most of the pick-up necessary in these situations . The team can then see that the material is secured until it can be disposed of properly . ITEM COMMENT COST Hand pump Stainless steel 200 Recovery drums 2 - 85 gal . ; 2 - 30 gal . 240 55 gal . drums Plastic buckets W/lids 18 Trash can liners 100-55 gal . , 2 mil 16 Mop wringer 2 Jeromes 56 Pitch fork 2 50 Salvage covers 3 14' x 18 ' vinyl nylon, 350 #J859 Darley. Co . TOTAL $ 930 FIRST AID AND DECONTAMINATION First aid and decontamination equipment is imperative for proper treatment of victims of hazardous materials incidents . Initial treatment with the proper equipment can mean the difference between life and death. Since injuries often accompany hazardous materials incidents , we need to treat these injuries immediately on scene . First aid equip- ment carried on the Haz-Mat vehicle will make this treatment available . Decontamination equipment is important because in most cases , the victim cannot be touched until the material has been washed off or neutralized . The better we are equipped to decontaminate victims and ourselves , the less likely contamination will extend to the ambulance or hospital equipment or personnel . Hazardous Materials Response Team a Page 7 First Aid and Decontamination (continued ) ITEM COMMENT COST Jump kit Dyna-Med 398 Oxygen kit 198 Specific treatment drugs For ambulance service Disinfectant soaps Blankets and sheets Portable eyewash unit Econ. Mod . 1020 HAC 850 Decontamination shower Materials to build 200 Scrub brushes 4 10 Holding tank 80 TOTAL $1 , 736 OTHER SPECIALIZED EQUIPMENT There are certain items listed that are needed for the safe and efficient performance of the Haz Mat Team. Some of these items serve a specific purpose ; some are used with various other equipment . To list all the items and reasons for each item would be volumous . A few of the major tools include such things as a weather station for monitoring wind direction and speed . This will enable us to approach a scene at a safe distance and from the proper direction; it will also assist the police with evacuation plans . Some of the other items are a port-a-power and an air chisel for extrication of trapped people , special communications equipment which will give us the vital link from the encapsulated suit to encapsulated suit or to the Command Post . We need a generator for the lights , power tools , Command Post , etc . These are but a few of the items required at an incident . There are many more. Only the nature of the incident can dictate the amount and type of equipment that will be needed. In addition, there will have to be some funds made available for replacement of small items used in training. This list will be a start in the right direction. ITEM COMMENT COST • Binoculars * Spotting scopes 400 Explosion-proof flashlights Everready #1259-15 90 Safety line Polypropylene 600 ' 324 Cyalume sticks 20 50 Weather station Heathkit Mod . #1290 150 * Air bags Need additional bags @ $1800 1 , 300 Cribbing 50 Air chisel 300 Porta-power Blackhawk 695 Communications equipment Portables 4 Bone mikes 4 5 , 200 640 2-way FM radios ; 4 200 Class D extinguisher Ansul 300 ABC extinguisher 50 Pressurized water exting. With AFFF ( foam) 50 Hazardous Materials Response Team Page 8 Other Specialized Equipment (continued ) ITEM COMMENT COST Generator Honda 6500 watt 2, 260 Rope bags 100 Plexiglass sheet 4 ' x 8 ' 1/4" thick 150 Regulator and hose To fill fire hose with air 100 Cassette recorder/player 50 Training literature To be purchased as needed 500 TOTAL $ 12 , 959 VEHICLE EQUIPMENT In order to make the bus whith was donated by the Public Department into a functional Haz Mat response vehicle , it wiii be necessary to modify it inside and out . This will consist of putting warning devices ( lights and siren) on the vehicle and changing the interior to allow us to carry the special equipment . The radio on this vehicle will need to have the capability of communicating on both VHF and UHF. This is because of the many different frequencies that are being used by emergency and non-emergency agencies in our area and our need to communicate with them. ITEM COMMENT COST Siren 500 Light bar 600 Back action lights Two 200 Electric horn 350 Telescoping floodlight Two Appleton Mod . #6-500N 385 Interior lights 100 Shelving material 500 Paint and markings 2 ,000 Wilson 10 channel radios 3 ,000 • Vehicle 22 , 365 TOTAL $30 , 000 EIAF 4 Received: IMPACT ASSISTANCE APPLICATION 1. Applicant Agency: Name County of Weld Contact Person Donald D. Warden Telephone 356-4000, Ext. 4218 Address P.O. Box 758 (Street or Box Number) Greeley, CO 80631 (City, Zip Code) 2. Local Government Sponsor: (Required if Applicant is not local government) ' Name Same Contact Person Telephone 3. Project Title: Fire Marshall 4. Funding Sources: . Impact Assistance Fund Request: $36,300 Local Share -0- (if in-kind, describe in narrative) office, telephone,: 6,000 support services. Other Funding: Source: Amount Source: Amount TOTAL PROJECT COST: $42,300 Page 2 5. Project Narrative: (Describe the project. (a) What will be accom- plished and how will it be done?.-. (b) Provide a specific project budget with detailed expenditure categories. (c) If multiple funding sources are invloved, show what each will finance. (d) If preliminary planning, feasibility studies or design has been done, describe it. (e) If the project is a construction project, in- clude a map showing the location of the construction site.) It is the intent of this project to be funded for one (1) year using energy impact funds. During the first year of the project, the main thrust of the program will be solving energy related problems. Also during the first year, the benefits of the County Fire Marshall Program should be established so that Count and Fire District funding can continue the program indefinitely. The first year budget breakdown is as follows: 1. Salary & Benefits $ 25,000 2. Educational Materials 2,000 3. Associations & Industry Participation 1,000 4. _ Training, Seminars & Equipment 5,000 5. Specialized Resources & Materials 800 6. Mileage & Trave Expenses 2,500 (i.e. seminars, site inspections, consultation service) TOTAL $ 36,300 In-kind services (local) Office, phones, support services 6,000 TOTAL $ 42,300 Page 3 6. Describe the relationship of the project to energy/mineral develop- ment. What energy/mineral projects affect the community? How many employees of energy/mineral companies reside in the Applicant's juris- diction or service area? What are the population and workforce pro- jections for the community or area (provide source of information) . The County Fire Marshall program will assist in the collective efforts of the twenty-three (23) Fire Districts and three (3) Municipal Fire Departments servicing Weld County. This assistance will include; 1. Consultation with fire departments to insure inspections of oil and gas wells and related equipment are performed uniformly throughout Weld County. 2. Assist Fire Districts in adopting the Uniform Fire Code. 3. Provide the expertise for inspections of complex energy facilities. 4. Ensure that training in gas and oil related problems are made available to fire personnel. 5. Provide training in the use of specialized equipment employed in suppressing gas and oil fires. 6. Assist in public education and awareness towards gas and oil hazards as well as safety measures. 7. Coordinate the procurement and strategic placement of Hazardous Materials suppression equipment. (CONTINUED) 7. List the efforts made to secure alternative financing for the project. Cite efforts to secure funding from user fees, local government bud- get, industry/private sources, federal sources, and other State sources. Fire districts have been approached to pay a pro-rata share of the costs, but because of their own budget constraints are unwilling to provide support until the program is established and benefits are evident. Therefore, first year funding is necessary to get the program established. The gas and oil industry will be solicited for donations to acquire equipment and training aids for dealing with gas and oil related problems. The industry should also make available to response personnel; site tours, descriptions of operations, and lists of current equipment and hazardous materials used during production. Page 3A 6. (CONTINUED) The above mentioned project will address the current need for uniform inspections and training on a county wide basis. The projected impact of this project will be to mitigate future problems related to gas and oil. There is currently no agency or group dealing with the collective efforts that this project will address. Page 4 8. Financial Status of the Applicant: - Current Annual Budget $42,000,629 Current Assessed Valuation $870,453,500 Current Mill Levy 17.369 Current Overlapping Jurisdiction 78.508 Mill Levy Sales/Use Tax 0 % Annual Revenue 0 Water Tap Fee n/a User Charge n/a (residential monthly average) Sewer Tap Fee n/a User Charge n/a • (residential monthly average) - Existing In-Debtedness nnna G.O. Bonds —0— Revenue Bonds —0— Maximum Legal Debt Limitation $26,113,605 (Home Rule 3% of A.V.) Annual Debt Service -0- -0- -0- (Current) (Next Year) (Following Year) List major capital improvements projects and cost in the last two and/or next two budget years: Current Year Social Services Building (S707,300) Jail Remodel ($200,000; Next Fiscal Year Jail Remodel (S200,000) Following Fiscal Year Jail Remodel (S100.000) Road Headquarters ($100,0( Does the Applicant have a capital reserve fund? If yes, give balance. 6/22/84 Balance $3,735.23 What was previous year's general budget end-of-year surplus/deficit? $1,074,350 Page 5 If applicable, what are enterprise fund year-end balances? Water . n/a Sewer n/a Other Utilities n/a Indicate why the project cannot be locally funded. The initial tasks of the fire marshall are viewed as a county responsibility created by the oil and gas impact. No fee or permit structure exists to fund the service and resources are not available with the county's general fund with the 5% property tax limit of the Home Rule Charter. If applicable, did the Applicant take the full 107% property tax revenue increase for the current budget year? Yes X No Weld County's Home Rule Charter only allows a 5% property tax increase annually. 9. If the project will require on-going operational funds, what is the Applicant's plan for securing continuing funding? After the first year it is anticipated that on-going costs will be provided on a pro-rata basis by all the participating fire districts. 10. Please identify any facility or service plans in which the proposed project has been identified as a priority or scheduled expenditure. n/a Page 6 11. Other comments: (If additional space is needed add an addendum. ) The diversification of oil and gas wells throughout the county virtually impact each of the fire districts with many of them being totally volunteer. The volunteer departments can cope with normal fire services within the districts, but lack the sophistication to deal with the threats and complications associated with oil and gas well inspections and incidents. Applicant's Signature* Chairman, Board of County Commissioners title/Ottice June 27, 1984 Date * Application must be signed by the presiding elected official of the local unit of government acting as the Applicant and/or sponsor. Five (5) copies of application are required (check to indicate mailing) : 3 copies to be mailed to: Office of Impact Assistance 1313 Sherman Street, Room 523 Denver, CO 80203 (or: Office of Impact Assistance 2800 D Road Grand Junction, CO 81501) 1 copy to the local Council of Governments or Regional Planning Commission 1 copy to the local county impact team. EIAF # Received: IMPACT ASSISTANCE APPLICATION 1. Applicant Agency: Name County of Weld Contact Person Donald D. Warden Telephone 356-4000, Ext. 4218 Address P.o. Box 758 (Street or Box Number) Greeley, CO 80631 (City, Zip Code) 2. Local Government Sponsor: (Required if Applicant is not local government) Name Same Contact Person Telephone 3. Project Title: Oil and Gas Well Information System 4. Funding Sources: . Impact Assistance Fund Request: $30,639 Local Share • L20,000 (if in-kind, describe in narrative) • n -0- Other Funding: Source: Amount -0- Source: Amount -0- TOTAL PROJECT COST: $50,639 Page 2 5. Project Narrative: (Describe the project. (a) What will be accom- plished and how will it be done? (b) Provide a specific project budget with detailed expenditure categories. (c) If multiple funding sources are invloved, show what each will finance. (d) If preliminary planning, feasibility studies or design has been done, describe it. (e) If the project is a construction project, in- clude a map showing the location of the construction site.) A. The purpose of this project is to develop and maintain an automated Oil and Gas Information System. This will entail systems analysis and design, programming, training, and user consultation. Additionally, the implementation of the system will require increased mainframe can c . and the purchase - -;ddition;l teleorocessi-: - gent for the Office of Emergency Management. An automated Oil and Gas Information System will provide a central repository of oil and gas data. This system would be used to facilitate the collecting of segmented information that is currently captured and filed by various county departments, and storing of it for future reference or analysis by other county departments and affected agencies. The intent is to capture pertinent information at the point that it is first known. It is anticipated that data will be captured for the system from the County Planning, Building Inspection, Health, Assessor, Sheriff, and Road and Bridge departments, Fire Districts, the Oil and Gas Commis- sion, and the oil companies. Information pertaining to the site could then be made available via the teleprocessing network to agencies with a need-to-know. Access to data related to site demographics, well ownership, surface ownership, well operation, responsible parties for activity, responsible parties in case of emergency, type of well, production status, and incident reports would be instantaneous and current. Multiple agencies could be reviewing the same data at any given time, thus increasing the amount of common knowledge. Summary information could translate into graphs and scattergrams for analysis. The initial data base would be created by consolidating data that resides in various automated and manual files. The bulk of this work will be manual. As the data base is being loaded, new information can be added. The initial step in the collection process will be the recording of the "Notice of Intent" in the Planning Department. This will provide the following information: 1. Name, address, and phone number of each owner of a working interest in a well. 2. Name, address, and phone number of the person or firm in charge of the operation and maintenance of a well. 3. Name, address, and phone number of the person or firm in charge of work to be done on a well. 4. Name, address, and phone number of the surface property owner . 5. Access information. (Continued) Page 2A 5. Project Narrative (Continued) Follow-up data will be capturedto collect and maintain information pertinent to emergency response. As incidents occur that are known to Building Inspections, Sheriff, Health, and Road and Bridge, the data will be entered into the system. The information that is made available will enhance the County's reactive and proactive posture with respect to Oil and Gas impacts. B. Cost data: 1. System Design and Implementation: Personnel: 10 Manager Days @ $263.68/day $ 2,637 40 Analyst Dats @ $179.44/day 7,178 80 Programmer Days @ $128.96/day 10,317 TOTAL PERSONNEL COSTS $ 20,132 Additional Teleprocessing Hardware: OEM Terminal -- one 3178 $ 1,800 Upgrade Mainframe 20,000 TOTAL IMPLEMENTATION $ 41,932 2. System Maintenance (1 year) : Computer Usage (Machine Time) @ $300/mo $ 3,600 Personnel: 2 Manager Days @ $263.68/day $ 527 6 Analyst Days 2 $179.44/day 1,077 24 Programmer Days @ $128.96/day 3,095 TOTAL PERSONNEL COSTS $ 4,699 Disk Storage: 4.0 M characters @ $.055/1000/yr $ 220 Tape Costs: 15 Tapes @ $12.50/each $ 188 TOTAL ANNUAL MAINTENANCE $ 8,707 C. Weld County would pay for the mainframe upgrade to accommodate the system ($20,000) and assume the cost of the system maintenance after the first year. Impact Assistance funds are requested for the development ($20,132) , one terminal ($1,800) , and first year maintenance costs ($8,707) . D. System design is included in the overall project. E. No construction will be required. • Page 3 6. Describe the relationship of the project to energy/mineral develop- ment. What energy/mineral projects _affect the community? How many employees of energy/mineral companies reside in the Applicant's juris- diction or service area? What are the population and workforce pro- jections for the community or area (provide source of information) . The most significant projects affecting Weld County to date are related to oil and gas production. The impacts are felt throughout the region as a whole, however, and are not found exclusively in a community or neighborhood condition. Weld County currently has over 3,200 active wells. Oil and gas exploration continues in Weld County. It is estimated that - -,'0 additional we' '_ be drilled _n 1984. Weld County has 212 oil and gas producers per the assessment rolls. Although there is no available data providing the exact number of employees when all support functions (e.g. engineering, drilling, fracing, fluid disposal, maintenance, etc.) are considered, there are several hundred employees in Weld County associated with the oil industry. 7. List the efforts made to secure alternative financing for the project. Cite efforts to secure funding from user fees, local government bud- get, industry/private sources, federal sources, and other State sources. The need for the system is totally a result of the significant oil and gas activity in Weld County. The creation of the system to cope with oil and gas impact should not detract from other county programs and priorities when its service is limited to industry related incidents. User fees are not applicable. Page 4 8. Financial Status of the Applicant: - Current Annual Budget $42,000,629 • Current Assessed Valuation $870,453,500 Current Mill Levy 17.369 Current Overlapping Jurisdiction 78.508 Mill Levy Sales/Use Tax 0 % Annual Revenue 0 Water Tap Fee n/a User Charge n/a (residential monthly average) Sewer Tap Fee n/a User Charge n/a (residential monthly average) - Existing In-Debtedness nnne G.O. Bonds -0- Revenue Bonds -0- Maximum Legal Debt Limitation $26,113,605 (Home Rule 3% of A.V.) Annual Debt Service —0— —0— —0— (Current) (Next Year) (Following Year) List major capital improvements projects and cost in the last two and/or next two budget years: Current Year Social Services Building (S707,300) Jail Remodel ($200,000) Next Fiscal Year Jail Remodel (S200.000) Following Fiscal Year Jail Remodel ($100.000) Road Headquarters ($100,00 Does the Applicant have a capital reserve fund? If yes, give balance. 6/22/84 Balance $3,735.23 What was previous year's general budget end-of-year surplus/deficit? $1,074,350 Page 5 If applicable, what are enterprise fund year-end balances? Water . n/a Sewer n/a Other Utilities n/a Indicate why the project cannot be locally funded. With the Home Rule Charter 5% property tax limitation, resources do not exist to develop a system totally caused by the oil and gas activity that will facilitate responding to oil and gas well incidents. If applicable, did the Applicant take the full 107% property tax revenue increase for the current budget year? Yes x No Weld County's Home Rule Charter only allows a 5% property tax increase annually. 9. If the project will require on-going operational funds, what is the Applicant's plan for securing continuing funding? After the system is developed and installed Weld County will maintain it as part of its data processing budget in future years. • 10. Please identify any facility or service plans in which the proposed project has been identified as a priority or scheduled expenditure. n/a Page 6 11. Other comments: (If additional space is needed add an addendum. ) Information related to oil and gas activities is at best fragmented and incomplete in Weld County. There is no central repository for oil and gas information and no way for multiple agencies with a need-to-know to have access to the same information. Incomplete, outdated, and hard to locate information on wells hampers emergency response and follow-up activity. In general, a combined, coordinated effort in the areas of collection and dissemination of useful information is severely crippled. This problem is readily apparent in times of emergency when the acquisition of timely information is critical. Determining the owner or operator of a well has taken many hours because the coordination of information resources has been minimal. Applicant's Signature* Chairman, Board of County Commissioners Iit1e/Uttice June 27, 1984 Date * Application must be signed by the presiding elected official of the local unit of government acting as the Applicant and/or sponsor. Five (5) copies of application are required (check to indicate mailing) : 3 copies to be mailed to: Office of Impact Assistance 1313 Sherman Street, Room 523 Denver, CO 80203 (or: Office of Impact Assistance 2800 0 Road Grand Junction, CO 81501) 1 copy to the local Council of Governments or Regional Planning Commission 1 copy to the local county impact team. EIAF # Received: IMPACT ASSISTANCE APPLICATION 1. Applicant Agency: Name County of Weld Contact Person Donald D. Warden Telephone 356-4000, Ext. 4218 Address P.O. Box 758 (Street or Box Number) Greeley, CO 80631 (City, Zip Code) 2. Local Government Sponsor: (Required if Applicant is not local government) Name Same Contact Person Telephone 3. Project Title: Pavement Management Program 4. Funding Sources: Impact Assistance Fund Request: $279,360 Local Share 51,840 (if in-kind, describe in narrative) 18,000 Other Funding: Source: Amount Source: Amount TOTAL PROJECT COST: S349.200 Page 2 5. Project Narrative: (Describe the project. (a) What will be accom- plished and how will it be done?_ (b) Provide a specific project budget with detailed expenditure categories. (c) If multiple funding sources are invloved, show what each will finance. (d) If preliminary planning, feasibility studies or design has been done, describe it. (e) If the project is a construction project, in- clude a map showing the location of the construction site.) A. The project will analyze the 552 mile paved road system in Weld County to develop a pavement management program to assist the county in coping with the energy impact on the system by: -- Ident__- ing current pavement operational characters-::tic -- Identifying present pavement conditions by non-destructive deflection testing, pavement roughness analysis, surface condition ratings, and pavement core analysis. -- Analyzing the data collected and provide indexes for each pavement section of structural adequacy, riding comfort, surface deficiencies, and overall pavement quality. -- Identifying rehabilitation needs. -- Analyzing rehabilitation alternatives. -- Preparing a ten-year priority program showing recommended rehabilitation alternatives with respect to budget forecasts. The project will provide the data and system that will allow the county: -- To provide an objective method of prioritizing rehabilitation. -- To assess needs. -- To determine maintenance priorities -- To determine maintenance requirements by maintenance area. -- To know where within the system problems exist (posting of roads or rerouting) -- To assess the adequacy of the county's maintenance approach. -- To provide a measure of service level. -- To provide a measure of the adequacy of budget levels. B. The project requests funds to examine the entire 552 miles of paved roads at one time at the cost of $600/mile ($331,200) plus in-kind staff costs ($18,000) . C. n/a D. See attached articles on program. E. N/a Page 3 6. Describe the relationship of the project to energy/mineral develop- ment. What energy/mineral projects _affect the community? How many employees of energy/mineral companies reside in the Applicant's juris- diction or service area? What are the population and workforce pro- jections for the community or area (provide source of information) . Weld County has over 3,200 oil and gas wells dispersed throughout the county. • The county's road system of 3,559 miles is used by the oil industry to access the well sites. The drilling and servicing of the wells involves heavy traffic counts and in most cases, overweight vehicles that do extraordinary damage to the road and bridge system. The impact of the energy activity has contributed to the rapid deterioation of the 552 miles of paved roads. With the limited resources available for road construction and maintenance, escalating costs and rapid deterioation of the system, Weld County needs assistance in the form of information to assess the system to maximize the resources spent and minimize deterioation by controlling use by posting roads and re-routing traffic. An inventory of bridges has allowed Weld County to post weight limits and redirect overweight oil and gas related vehicles to minimize damage and prioritize restoration of bridges. A similar system needs to be done with the paved road system. (Continued on Back of Page) 7. List the efforts made to secure alternative financing for the project. Cite efforts to secure funding from user fees, local government bud- get, industry/private sources, federal sources, and other State sources. . Because the road problem is diversified throughout the county it cannot be identified to any specific company, but is a generalized problem. Therefore, there is no energy industry assistance except $500 for overweight moving permits for each rig move. Page 3A a 6. (CONTINUED) A pavement management program is a planning strategy to help deal with the problem. The data developed in the complete study will enable Weld County to make sound managerial decisions in establishing a restoration program of paved roads; aid in setting specifications; help schedule restoration programs; help re-route overweight oil and gas vehicles; and act as a viable tool to support planning decisions to help cope with the energy impact on the road system in Weld County. Weld County has 212 oil and gas producers per the assessment rolls. Al- though there is no available data providing the exact number of employees when all support functions (e.g. , engineering, drilling, tracing, fluid disposal, maintenance, etc.) are considered, there are several hundred employees in Weld County associated with the total industry. Page 4 8. Financial Status of the Applicant: Current Annual Budget $42,000,629 Current Assessed Valuation $870,453,500 Current Mill Levy 17.369 Current Overlapping Jurisdiction 78.508 Mill Levy Sales/Use Tax 0 % Annual Revenue 0 Water Tap Fee n/a User Charge n/a (residential monthly average) Sewer Tap Fee n/a User Charge n/a (residential monthly average) Existing In-Debtedness nnna G.O. Bonds —0— Revenue Bonds —0— Maximum Legal Debt Limitation $26,113,605 (Home Rule 3% of A.V.) Annual Debt Service -0- -0- -0- (Current) (Next Year) (Following Year) List major capital improvements projects and cost in the last two and/or next two budget years: Current Year Social Services Building ($707,300) Jail Remodel ($200,000) Next Fiscal Year Jail Remodel ($200.000) Following Fiscal Year Jail Remodel ($100.000) Road Headquarters ($100,000) Does the Applicant have a capital reserve fund? If yes, give balance. 6/22/84 Balance $3,735.23 What was previous year's general budget end-of-year surplus/deficit? $1,074,350 Page 5 If applicable, what are enterprise fund- year-end balances? Water . n/a Sewer n/a Other Utilities n/a Indicate why the project cannot be locally funded. In 1984 Weld County is spending $8.5 million on roads and bridges. In October, 1983, a $20 million bond issue for road and bridge projects failed, in part due to the public's sentiment that the oil and gas industry has done the damage and the residents should not have to pay. The Weld County Home Rule Charter limits property tax to a 5% annual increase, which limits resources for roads. Averweight moving permits are at $500/move. An oil industry committee objected to any increase. If applicable, did the Applicant take the full 107% property tax revenue increase for the current budget year? Yes X No Weld County's Home Rule Charter only allows a 5% property tax increase annually. 9. If the project will require on-going operational funds, what is the Applicant's plan for securing continuing funding? Study is a one time expenditure. 10. Please identify any facility or service plans in which the proposed project has been identified as a priority or scheduled expenditure. n/a .l • .. } Page 6 11. Other comments: (If additional space is needed add an addendum. ) See attached data. Applicant's Signature* Chairman, Board of County Commissioners Iltle/Ottice June 27, 2984 Date * Application must be signed by the presiding elected official of the local unit of government acting as the Applicant and/or sponsor. Five (5) copies of application are required (check to indicate mailing) : 3 copies to be mailed to: Office of Impact Assistance 1313 Sherman Street, Room 523 Denver, CO 80203 (or: Office of Impact Assistance 2800 D Road Grand Junction, CO 81501) 1 copy to the local Council of Governments or Regional Planning Commission 1 copy to the local county impact team. Sound C ionEL for Pavement Management RICHARD W. LEMKE, P.E. section of structural adequacy. riding intervals for each street section. A de- Director of Public Works comfort, surface deficiencies, and tailed surface distress report for earn and Engineering, overall pavement quality. street section was produced i Fi_ure Green River, Wyoming • Identify rehabilitation needs. II and a surface distress index ISDI, ♦ Analyze rehabilitation aiterna- teas calculated for each section. THE maintenance. resurfacing, re- tives. Riding Quality habilitation. or reconstruction of • Prepare a ten-year priority oro- street systems are among the most gram showing recommended re- The r:ding duality of each section critical and often the most controver- habilitation alternatives with respect was dotermined using the ARAN. siai decisions that public works pro- to budget forecasts. The machine nu:n be rs we re con- tessionats must face annually. More The firm subdivided the city's 50 t erted to riding_comfort indexes iRCI, often than not. these decisions are miles of streets into 237 sections. Each with the assistance of a panel of pro based on ones personal experiences section represented either a deferent vate citizens from Green River. The and intuition rather than on sound- street, a different pavement strut- panel had 30 sections assigned to it. engineering. In many communities-. tural section. or a different opera- panel members were to drive over the decisions can also he affected by tional characteristic. Identification each section and rate it very poor. Incai pmiucs. numbers were assigned to the sec- poor. fair. good. or very good, and - T.:,.. whether or not Novt felt the tcmptec to develop a live-year resur- ii.- essed b,, using art Automatic Road r.ntet:, the city was a pit' Lo inctcuv facing plan. but quickly realized that Analyzer IARAiN i. Twelve different members of the local media on the our pavement deficiencies involved types of surface distress, along with panel and. as a result, received some more than surface appearance. Past their severity and extent, were re- excellent public relations and support experiences showed us that we were corded at approximately 50-foot for the entire project. often-spinning our wheels"by resur- facing street sections that really were in need of base course reconstruction. or spending money on streets that Table 1 — Detailed Description of Recommended Program could have been left for a number of years. Section Street Rehabilitation Percent Capital Deciding that we needed something Year Number Name Strategy Implementation Cost (S) better, Green River turned to the concept of pavement management. 1983 1072 E Second N. — 2-overlay 53.7 16,305 We realized that managing our streets W. Second N. system would demand much more in- 3051 Wilkes Dr. 2" overlay 100 24.945 formation about our pavements than 5191 Astle Ave. 2"overlay 100 38.261 was available. Data was needed to 6021 Shoshone Ave. sicoverlay 100 77.702 show the existing surface and subsur- 7121 Bridger Dr. 2"overlay 100 33.626 face conditions in order to evaluate 8062 E. Teton Blvd. 2"overlay 100 59.161 our current needs, and to enable us to Subtotal 250.000 predict the future performance of our streets. 1984 3012 Riverview Dr. 2"overlay 100 30.760 Recognizing that the development 7181 Hitching Post Dr. 2" overlay 100 78.600 of a comprehensive pavement man- 1201 S. Fourth W. 8" AC-RC 70.8 150.640 agement program was beyond the Subtotal 250.000 city's capability, we prepared a re- quest for proposal in April, 1982. 1965 1072 E. Second N. — 2 overlay 46.3 14.034 Seven proposals were received and W. Second N. 2" overlay reviewed. In June. 1982. the city 2012 W. Second S. 2" overlay 100 51.239 council approved a contract with 3011 Riverview Dr. 2"overlay 70.8 60.696 Pavement Management Systems 3171 Hutton St. 2"overlay 100 39.720 IPMSI Group. Lakewood, Colorado. 7081 Shoshone Ave. 2- overlay 100 34 890 The company was to: 8061 E. Teton Blvd. 2" overlay 10 37.418 • Identity current pavement oper- 1201 S. Fourth W. 8'"AC-RC 29 2 62.003 ational characteristics. Total - 300.000 • Identify present pavement con- Note.This table shows the method and sequence of street rehabilitation tc be performed during ditions by non-destructive deflection the first three years of the ten-year program,based upon the anticipated capital budget'evels testing, pavement roughness PMS.Inc advises that individual sections may be delayed oracceierated tie to two years without analysis, surface condition ratings. drasucaily altering the optimized rehabilitation strategy.This maybe necessary to accommodate and pavement core analysis. • Analyze the data collected and untorseen conditions or construction schedule concocts provide indexes for each pavement PUBLIC WORKS,hr Jr:nanry. ,y,:4 y r P N Q ♦ �IIP y,I1Gl A ,_ _ „1-1- P F $ Q ♦ ti C C _ � -:- C rt_ � � 4 ' �cA � _ LA: .L A {t c Improvements. GI r - ' River. like creme-•. PC c c' _ r many other comlr.t I.I. cs. experi- enced a serious decrease in revenues pea+-. 55 Inc 33 loo CO 00 ICC CO titCr,, oc ICC during the 1982 fiscal :ear. The 1983 cC2+?' SE 100 3.3 ICC 25 S. S C C C_ loo rep oO C.C. Coe fiscal year budget reflected the 003+40 5.6 100 3.3 IC.O 2.5 _ CO OC 100 10.' 00 Of IOC economy- and many items were Ono+00 B6 IG.O 3.3 CO 2.5 OG ICS 00 !SO Icy ISS, CO CO pp4+5C Be 100 39 'tOC 25 0.. OJ CO . .. pp downs]zedor eliminated. The study 035+0C 75 !CO 33 ICC 25 10.0 0.0 0S. 0P ISO to.0 IE ICC pointed out the lmplrtancc and 005+5C 79 100 57 CC 2.5 CO 0.0 0.0 OC IOC CO 1.6 CO necessity of maintaining adequate 000-P. 7O CC 57 10.0 2 5 LCC 00 I01 OS (1 ICC 16 10:: funding for streets. S O7-6C P5 CS 5 10.0 25 10.0 00 CC 00 IOC C 10.0 c.,T- Ic e3 'c' 57 10.0 z �.C 5 c CO loo 00 1>_0 CS 2 s- oeS • Detour routes for a sanitary " ^"r replacement project along a FIGURE 1 Sample report shows an itemized rating for twelve types of pavement motor thoroughfare were chosen to surface distress and the distress index. The low numbers indicate severe distress. Impact street conditions minimally. Two detour routes were under con- Deflection surveys were performed ings. pavement thicknesses, and sub- sideration.hut one was ruled out after using a Dynaflect machine. Tests grade strengths. This information was the study showed that the pavement were taken in each street section at based upon past city records and the co.tld not handle an increase in heavy the rate of at least 10 tests per mile. experience of the city's staff. An traffic.Had the city used this detour.a The city provided pavement core data example of this input is shown in Fig- major street reconstruction would to the company for 100 locations tire 2.The city also identified rehabili- have been necessary to restore the tnrouchout the cuy-s street system. A tation criteria. i.e., what is the pavement conditions. structural adcdquacv rating (SARI minimum acceptable PQI. what life • Scheduling of pothole repair . a. - tr v eloped for each section. r xpectancy are we demanding from ci'ev.s was simplified by referring to TiC' SDI. RCI. and SAP, were coo- Inc- rehabilitation. and when types of the airfare distress inventory. Crews billed to produce an overall Pave- rehabilitation .viii we consider' would be dispatched to streets on a ment Quality Index IPQL for each The city selected five different priority system. rather than merely section. Separate reports ranked the types of surface treatments—ranging chasing complaints. section. from worst to best based on from a single seal coat to a 2-inch :IS- • Reconstruction of three street each of the four parameters: SDI. phalt overiay—and one reconstruc- sections was performed after review- RCI. SAR. and PQI. These tour pa- tion alternate as its rehabilitation inc the study. These streets had been rarneters are not related and- there- strategies. Local cost data for each originally scheduled only for patching fore. cannot be correlated. This com- type of rehabi In a0 on and estimated after the sewer replacement protect. pleted the first phase of the project budget constraints for street reilabilm- Thu study showed conclusively that and provided the city with a detailed tation for the ten-year study program money spent on patching would have assessment of its streets system condi- were provided to the company. been wasted. and that reconstruction tion. •The firm performed an opumiza- was necessary. Citing the results of Second Phase tion analysis using these constraints to the study. the city was able to obtain determine maximum benefits for the additional grant money for the recon- In the second phase of the protect. given budget estimates. A sample of struction. the management plan was developed. the recommended priority program is We have been very impressed with This was accomplished by close coor- shown in Table 1. The pavement management concept. duration between the city and PMS. The entire program was developed The information it has provided to We started by developing perfor- for a total cost of S31,176.including the Green River is quite valuable and use- mance curves for different types of pavement coring. The city has ful Already our expectations have streets. which considered traffic load- realized benefits from the project that been surpassed- =_� ■ FIGURE 2. Pavement performance curves over time consider traffic loadings, pavement thickness and suhgrade strengths. - C Hv( THICKNESS TRAFFIC CURVE THICKNESS TRAFFIC ' ::RA ?RICH"SS TRAFFIC CURVE 'SICKNESS TRAFFIC L THIN LeA E THICK LOW C THIS LOW 0 THICK LIM B THIN HIGH F THICK HIGH THIN HIGH H THICK HIGH . / EKCELLENI / I I I EXCELLENT I I I ' Goo:. / I Jcr coop FAIR <c I AAF \E FAIR A�� • a P NG I 1 :` \ T H 1 1II n P009 . IBV ht I I cr POOR4 7 1 ; y hRY Rry,R C �: �. .. VERY MANI \I C _ Ic it. 2C 30 C 4 8 12 16 20 20 TIME (TEARS) TIME ISEARS' PAVEMENT PMS MANAGEMENT P.O. Box 15804 Lakewood. Colorado 80215 SYSTEMS, INC. (303)232-2207 PAVEMENT PMS MANAGEMENT SYSTEMS, INC. June 21, 1984 Board of County Commissioners Weld County P.O. Box 758 Greeley, CO 80631 Dear Commissioners: 2-kJter streets ana roads are constructed, construction and other heavy .00n traffic tend to accelerate the life expectancy and rapid deterioration of the pavement structure. With Dynaflect testing, Weld County can assure that the existing pavement is as structurally sound as it was before heavy loads were placed on it. Also, PMS can determine what damage has been done and what type of rehabilitation is needed to elevate the pavement to its original condition. In addition, PMS can also develop costs and maintenance strategies to distribute the County's capital outlay to the proper area and minimize rehabilitation costs caused by heavy loads. With the information that PMS can supply the Board, County management can then require agencies applying heavy loads to participate in the restoration costs. PMS has been involved in similar studies for Exxon in Moab, Utah where Exxon drove an extremely heavy drilling rig over County roads; and in Littleton, Colorado, where the Talley Corp. is sending 35,000 loads weighing 85,000 pounds each over City streets. Also, PMS is now becoming involved in studies of pavement damage caused by the moving of MX Missiles in Wyoming. PMS is excited about its capabilities to do heavy load studies on multilayered pavement sections and feels confident that Weld County will benefit from PMS's services. Sincerely, clisu� �� Thomas McDonald TM/dap ju; • J: 1 P.O.Box 15804 Engineoring RsaarttriCi 9 Lakewood,Colorado 80215 (303)232-2207 r -J EIAF Received: IMPACT ASSISTANCE APPLICATION 1 . Applicant Agency: Name County of Weld Contact Person Donald D. Warden Telephone 356-4000, Ext. 4218 Address P.O. Box 758 (Street or Box Number) Greeley, CO 80631 (City, Zip Code) 2. Local Government Sponsor: (Required if Applicant is not local government) ' Name Same Contact Person Telephone 3. Project Title: Road Grader Sheds 4. Funding Sources: . Impact Assistance Fund Request: $100,000 Local Share 35,000 (if in-kind, describe in narrative) see note *County to provide land, utilities, septic system, Other Funding: & site preparation Source: Amount _0- Source: Amount -0- TOTAL PROJECT COST: $135,000 plus in-kind * Page 2 5. Project Narrative: (Describe the project. (a) What will be accom- plished and how will it be done? (b) Provide a specific project budget with detailed expenditure categories. (c) If multiple funding sources are invloved, show what each will finance. (d) If preliminary planning, feasibility studies or design has been done, describe it. (e) If the project is a construction project, in- clude a map showing the location of the construction site.) A. Construction of grader sheds at the following locations 1. Mead 2. Briggsdale 3. Kiowa 4. CilcresL 5. Keenesburg Sheds will accommodate graders in areas with inadequate facilities to better service areas impacted by oil and gas activity. B. Each shed is estimated to cost $27,000. County would provide land, water, utility hook-ups, septic systems, site preparation, and $7,000. Request $20,000 funding for each shed from Impact Assistance monies. C. N/A D. See attached model grader shed. E. See attached map. Page 3 6. Describe the relationship of the project to energy/mineral develop- ment. What energy/mineral projects _affect the community? How many employees of energy/mineral companies reside in the Applicant's juris- diction or service area? What are the population and workforce pro- jections for the community or area (provide source of information) . Weld County has over 3,200 oil and gas wells dispersed throughout the county. The county's road system of 3,559 miles is used by the oil industry to access the well sites. The drilling and servicing of the wells involves heavy traffic counts and in most cases, overweight vehicles that do extraordinary damage to the road and bridge system. The impact of the energy activity has contributed to the rapid deterioation of the 552 miles of paved roads. With the limited resources available for road construction and maintenance, escalating costs and rapid deterioation of the system, Weld County needs assistance in the form of information to assess the system to maximize the resources spent and minimize deterioation by controlling use by posting roads and re-routing traffic. An inventory of bridges has allowed Weld County to post weight limits and redirect overweight oil and gas related vehicles to minimize damage and prioritize restoration of bridges. A similar system needs to be done with the paved road system. (Continued on Back of Page) 7. List the efforts made to secure alternative financing for the project. Cite efforts to secure funding from user fees, local government bud- get, industry/private sources, federal sources, and other State sources. Because the road problem is diversified throughout the county it cannot be identified to any specific company, but is a generalized problem. Therefore, there is no energy industry assistance except $500 for overweight moving permits for each rig move. Page 4 8. Financial Status of the Applicant: - Current Annual Budget $42,000,629 Current Assessed Valuation $870,453,500 Current Mill Levy 17.369 Current Overlapping Jurisdiction 78.508 Mill Levy Sales/Use Tax 0 % Annual Revenue 0 Water Tap Fee n/a User Charge n/a (residential monthly average) Sewer Tap Fee n/a User Charge n/a (residential monthly average) Existing In-Debtedness nnna G.O. Bonds —0— Revenue Bonds —0— Maximum Legal Debt Limitation $26,113,605 (Home Rule 3% of A.V.) Annual Debt Service -0- -0- -0- (Current) (Next Year) (Following Year) List major capital improvements projects and cost in the last two and/or next two budget years: Current Year Social Services Building ($707,300) Jail Remodel ($200,000) Next Fiscal Year Jail Remodel ($200,000) Following Fiscal Year Jail Remodel ($100.000) Road Headquarters ($100,000) • Does the Applicant have a capital reserve fund? If yes, give balance. 6/22/84 Balance $3,735.23 What was previous year's general budget end-of-year surplus/deficit? $1,074,350 Page 5 If applicable, what are enterprise fund year-end balances? Water n/a Sewer n/a Other Utilities n/a Indicate why the project cannot be locally funded. In 1984 Weld County is spending $8.5 million on roads and bridges. In October, 1983, a $20 million bond issue for road and bridge projects failed, in part due to the public's sentiment that the oil and gas industry has done the damage and the residents should not have to pay. The Weld County Home Rule Charter limits property tax to a 5% annual increase, which limits resources for roads. Overweight moving permits are at $500/move. An oil industry committee objected to any increase. If applicable, did the Applicant take the full 107% property tax revenue increase for the current budget year? Yes X No Weld County's Home Rule Charter only allows a 5% property tax increase annually. 9. If the project will require on-going operational funds, what is the Applicant's plan for securing continuing funding? One time capital expenditure. 10. Please identify any facility or service plans in which the proposed project has been identified as a priority or scheduled expenditure. n/a Page 6 11. Other comments: (If additional space is needed add an addendum. ) n/a Applicant's Signature* Chairman Board of County Commissioners Iitle/Ottice June 27, 1984 Date * Application must be signed by the presiding elected official of the local unit of government acting as the Applicant and/or sponsor. Five (5) copies of application are required (check to indicate mailing) : 3 copies to be mailed to: Office of Impact Assistance 1313 Sherman Street, Room 523 Denver, CO 80203 (or: Office of Impact Assistance 2800 D Road Grand Junction, CO 81501) 1 copy to the local Council of Governments or Regional Planning Commission 1 copy to the local county impact team. • REQUEST FOR PROPOSAL METAL BUILDING ( POST AND BEAM OR STEEL ) DESCRIPTION: This item shall consist of furnishing all labor, materials , and equip- ment necessary to complete the grader shed as described herein. SPECIFICATIONS: The specifications are intended to be general enough to permit proposals from all vendors who are regularly engaged in the erection of pre-engineered- type post-and-beam or steel buildings . Except where minimums are given, approximations to overall dimensions will be acceptable. It is the responsibility of each vendor to furnish all necessary drawings, descriptions, and specifications intended to be a part of his proposal . Attached as a part of the request for proposals is a schematic site plan showing building location, site information, and desired dimensions. AWARD: The award of the contract will be based on the proposal determined as most advantageous by the Board of Commissioners of Weld County. It may not necessarily be the lowest cost proposal . Vendors are encouraged to provide any and all information which may assist the Board in analyzing the relative merits of each proposal and arriving at a decision. Single shed approximately 25' x 50' with pitched roof, 16' eave height minimum. (1) 16' wide x 14' high overhead door, 24 gauge steel , insulated, electric opener, single control operated from inside, weather stripped, (no windows) . ( 1) 3068 service door, 20 gauge steel , heavy duty lock set with dead bolt, (no windows) . 3' X 3' concrete door stoop. (4) skylite panels in walls. 5" , 3750 pound concrete floor slab with 6" x 6" x 10 gauge wire mesh with slope to drain out of the overhead doorway; construction joints at 12' intervals . Concrete approach ramp, 5' x 16' x 5" (with mesh) . Live loads for design will be 30 lbs ./s.f. snow and 25 lbs ./s .f. wind. Steel siding, 29 gauge (approximate) , galvanized or painted. Insultation - sides and top minimum in accordance with current EPA Model Energy Code. (Styrofoam Insulation Type) -2- Contractor will supply Weld County, certified designs and drawings within 10 days after Notice of Award. Completion date will be 30 calendar days after Notice to Proceed. Weld County will furnish the agreement format. Contractor will be required to get Weld County Building and Health Department Permit. Contractor will include any and all warranties as part of the proposal . Weld County will provide site preparation, including elevated building pad. Contractor will locate and stake out building in accordance with attached plan. Weld County will provide temporary power. (Pine Bluff Rural Electric, Pine Bluff, Wyoming 307 - 245-3261) Contractor :,iil all -cutlets and fixtures ; complete and ready cor use. Contractor will supply and install in building: (1) Bathroom light fixture (1) Yard light (4) 8-foot wall mounted fluorescent fixtures (2) 8-foot overhead fluorescent fixtures (2) 4-foot overhead fluorescent fixtures (All fluorescent fixtures will be two (2) bulb. ) (6) 120 V Inside outlets (1) 240 V Outlet (2) 120 V Waterproof outlets ( 1) Power box complete (1) Unit heater propane 120,000 BTU with line outside, stub off. Thermostat to hang from unit heater. (1) Bathroom sink (white) (1) Bathroom stool (white) (1) Bathroom electric heater ( 1) Septic Tank (1000 Gal . ) Absorption trench septic area 125 S.Y./FT. Min. (See detail sheet. ) Plumbing for water line will be installed within the building, but will be stubbed off outside. (1) Hose Bib (inside) (1) Hose Bib (outside) weather proof All construction material will meet Weld County Building code; complete and ready for use. Bathroom to be 5° W x 6° L X 8° H and boxed in with 3/4 plywood outside and 1/2 dry wall inside (painted finish-white enamel ) . Shed to be lined with 3/4" plywood AC 4° x 8° sheets , 4° feet high 3 sides around the inside to act as a bumper pad. Plywood to be the finished side out. Weld County will supply door and snow plow stops ; Contractor will install in the concrete. Concrete Maintenance Pad: (2) 2'-0" wide x 70' -0" long x 4" thick (See detail for location) . Fencing: See fencing sheet for quantities. PROPOSALS : Sealed proposals are to be submitted to Ms . Bette Rhoden, Director of Purchasing, 915-10th Street, Room #343, Greeley, Colorado 80631, in accordance with the Bidder's Instructions. Hello