HomeMy WebLinkAbout840232.tiff ""^- CHANCE ORDER
CHANGE ORDER NO. 1 (Final )
DATE: December 13, 1984
PROJECT: Bridge 17/40A
Replace with concrete box culvert - by agreement with farmers
Extension Ditch Co . PROJECT NO. _ .
TO (CONTRACTOR) : Dumar Contractors
JUSTIFICATION: The center portion of the old timber bridge was supported
by a massive concrete abutment. This was unknown prior to demolition work.
You are directed to make the following changes in the work. All other
terms and conditions of the Contract not expressly modified hereby shall
remain in full force and effect:
Item No. Description Est. Qty. Unit Unit Cost Amount
See attached itemization of extra labor & equipment.
The original Contract sum was ., $ 23.772.50 .. -
' Net change by previous Change orders $ -0-
The Contract Sum prior to this Change Order was $ 23,772.50
The. Contract Sum will be (increased) latarnaistitialt fitaby2 ,567�°'
this Change Order
The Contract Sum including this Change Order will be $ 26,440.34
The new Contract Time will be Cd(dertX40$011X Od(6(CXXiln XIN (unchanged)
by { ) Days.
The Date of Completion as of the date of this Change Order
therefore is December 1 , 19 8a .
ACCE • ORDERED BY:
( sac)THE BOARD OF WELD COUNTY COMMISSIONED
TRACTOR
ItioNtli SA P. O. Box 758
)ddrsss Address
Greeley, Colorado 80632
arts._4/9.r."�� By By Chairman of the Board
�9.b�1s� �s_ 840232
CGAs Date Date /2 6 'es�
M /A %
CONTRACTORS
—Concrete s
November 26, 1984
Farmers Ext. Ditch Company
P.O. BOX 550
Johnstown, CO. 80534
Extra work to remove concrete wall and dowel rebar.
Labor 1,-5.03.00 /.336. .32
Backhoe 7 hours 196.00
2 Ea. Compressors 220.52
Remove Concrete from job site : 955.0010"-
)(BP 11 Tons 7t0.00
Total: 43,o44-3E- 347.744-
Deduct From Job:
Existing wall
12" x 5 ' x 16' 3 c/yds @ 220.00 660.00
60 c/yds Road Base @ 2.50 150.00
Total: $810.00
Balance Due on Extra Work: $2,334.52 2.46784
Extra Work & Materials (No Charge)
12" x 20' Culvert Pipe 360.00
19 3/4 Yds Concrete @ 1,025.82
Total: $1,385.82
•
(303) 356-5660 — P.O. Box 532 — 102 N.8th Avenue — Greeley, Colorado 80632 •
IT
CONTRACTORS
—caiaae Specialists—
December 4, 1984
To whom it may concern:
This is a cover letter concerning our rentals . Dumar used its
own compressor 1 day on the structure removal, along with the rentals.
Breakdown Labor Hours Rate Total
Labor -68' $O 13.92 1,253.80 ///3-
2
0% 050.c4 ZZZ. 72-
TOTAL 1 S03 IA. /336. 3 z
,r
(303) 356.5880 - P.O. Box 532 — 102 N.8th Avenue — Greeley, Colorado 80632
•
•
r
u } , r • a �A1 •
'�
h
a• s z tie r,t ',.
[ '
L
y0. Z fr-A.C . - s Cu ..
C t ? :.?
4Ic
' 1 � �
• u ' L
7 i ,fs
i IL
c !t �� 1r •11 : ! 3 s j
g ! r3 °< 5
I' ric
x 4t i1sis i - i r .51
I a .. 3 ii
�' S ° .. iii
12 w • 5 �•.a 2 El
a •G s ; � .
1
.r.IC 3/4) ,�
A < w i
W i. a , , .. t 7. L , ....., ,, .., : ,L: .,., , : 7 ., A 7 5? : ,...4 ' ' '4 — •-
i
„. sR 7 .
r .
§ zI
a a I , i lg. ;
ED y t p ? oi
ai N
,- , 1 if It I 02 L'.., ' , ., . Iasi ' i ziii
-i a, ,i > ! ii1 a I ,iii
I ' ,. i I ff. !".
!E 1' _ i I ` 6l 6
his = d " k E14
ig g i. ` W <. `'
i ,.... vi 4 gp .‘ i IV% : .
i it I 8 ; w 441 i g Y ii I
- Qiu
'k t 'ail C " N 3: o
co �• 7 = m s
i tf ... ' . : - , .... S
a
t p
a- .4 Hit , s.. ii ...... .��1sa ;��'.ik:x .- ,,F. ki. ''k. r dz
r-,
�! BEST WAY PAVING CO. A1`,
B • rry
Feeteti3Pone!303N?S3m65 —D-everePone(303)623-94369 INVOICE
(An E.uat Ooportwu.r Ernpicyer) CUSTOMER # 26871 3
DATE 11-16-84 A 3517
7 SOLD TO 7 r LOCATION IF DIFFERENT FROM SOLD TO
Dumar Contractors Johnstown Bridge
P.O. Box 532 31/2 Miles South of Johnstown
Greeley, Colorado 80632
L _J L J
SOLD BY OI IR WURu h0�^<sr r,.CEP Ni; I CtiH CHARGE QgEO'T F=rpqCC' TERMS DUE AND PAYABLE UPON .--�T DATE ENTERED
84050 i X
DESCRIPTION
AMOUNT
11-15-84 Transport Tractor Trailor
with Driver 2.00 hours @ $60.00/hr $ 120.00
966 Loader with Operator 5.50 hours @ $70.00/hr $ 385.00
Tractor with Driver and
Trash Trailer 11 .00 hours @ $50.00/hr $ 550.00
$ 1 ,055.00
- 100.00
$ 955.00
•
•
CITY
TAX
�.--.�. STATE -----
• ,r TAX mervire
TOTAL
95$.00
NOTE: Service char;6 addeC'nC^!Hy c j .a r due acco ERV. CH AR< s on outed by a Per odic-Rate"of P4%per month(pr a m r".um, 9 31 cr,�er g,rJ 0)
NI" ^'.sa ANN JAL PCRCENTAQE PAT'ter acpi;e'tc ar ,eeuf cede cL Jr!rrer�nevneis and/or Grey!a.
THANK YOU -WE APPRECIATE YOUR BUSINESS.
er 1. 1
AGREEMENT
THIS AGREEMENT, made and entered into this 15th day of October
1984, by and between the COUNTY OF WELD, State of Colorado, hereinafter called
"County" and the FARMERS EXTENSION DITCH CO. , hereinafter called "Ditch
Company."
WHEREAS, Bridge 17/40A carries traffic over the Farmers Extension
Ditch on Weld County Road 17 between Weld County Roads 40 and 42, and •
WHEREAS, the existing bridge restricts the maintenance of the ditch
underneath, and
WHEREAS, the Ditch Company is requesting to replace the existing bridge
with a concrete box culvert to better the maintenance of the ditch.
For and in consideration of the mutual covenants and conditions herein-
after set forth, the parties mutually agree as follows :
1. The Ditch Company will engage a contractor to construct a new
concrete box culvert and upon satisfactory completion, Weld County
will pay the Ditch Company the sum of TWENTY THREE THOUSAND SEVEN
HUNDRED SEVENTY TWO AND 50/100 DOLLARS ($23,772.50) for said
improvements .
2. The new concrete box culvert shall be forty feet long and have
inside dimensions of twelve feet wide and four feet high.
3. All work shall conform to the Colorado Highway Department Standards
M-601-B C1.
—4. Weld County will have the right to inspect construction and test
materials used for construction.
5. The Ditch Company acknowledges the shape and size of the new concrete
box culvert will adequately handle waters carried in the ditch and
- that no claims will be made against Weld County in the future for
{'r cleaning debris or sediment in the existing ditch or the new concrete
box culvert.
6. The Ditch Company shall notify the County at least ten (10) days
in advance of starting construction for the purposes of coordinating
inspection schedules and road closures.
7. The Ditch Company will keep County Road 17 open to local traffic,
only, from either side of the ditch. No detour through the immediate
• construction project area is required. Signing and barricades will be
provided by the County.
8. The Ditch Company and its contractor shall be considered to be
independent contractors with respect to the County. Indemnitor,
Ditch Company, hereby agrees to indemnify Indemnitee, the County of
Weld, from any and all liability, loss , or damage, Indemnitee may
suffer as a result of claims, demands , costs or judgments against
it arising out of the construction or maintenance of the above
described culvert, whether the liability, loss, or damage is caused by,
arises out of, the negligence of Indemnitee or its officers, agents,
employees , or otherwise, except for the liability, loss , or damage
arising from intentional torts or the gross negligence of Indemnitee
or its employees while acting within the course of their employment.
9. Parties agree that once construction has commenced time is of the
essence and County Road 17 shall be reopened to through traffic within
thirty (30) days .
IN WITNESS WHEREOF, the parties hereto have duly executed the agreement
and day and year first above written.
FARMERS EXTENSION DITCH CO. WELD O COUNTY, COLORADO
D OF OUNYCOMMISSIONERS
By: � � €A4k ` By:
e f Norman Carlson, Chairman
Title: �y,� _„
L / ATTEST:f`I p t _,un,o •
Address: !v
n Weld County Cl erk and Recorder
!N ! and Clerk to the Board
gd5'3 y-
y• •
Deputy
Hello