HomeMy WebLinkAbout20060284.tiff EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FARNSWORTH GROUP INC. DATED: January 12, 2005 Work Order Number: Survey 040.01 Purchase Order Number: Project Title: WCR 74 @ WCR 19 Commencement Date: January 23, 2006 Completion Date: May 23, 2006 Limitations on compensation: (time and reimbursable direct costs): $34,300 Project Description: Right of Way Plans and Staking of ROW Acquisitions Scope of Services: SEE ATTACHED EXHIBIT "B" Professional agrees to perform the services The attached forms consisting of_ (4) pages identified above and on the attached forms in are hereby accepted and incorporated herein, by accordance with the terms and conditions this reference, and Notice to Proceed is hereby contained herein and in the Professional given. Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement By: and this work order (including the attached Project Mana forms) the Professional Services Agreement Date: shall control. By: Professional De ea I BY Date: b;' David C. DiFulvio, Principal Date: /-/Z -aoj By: 4 Direct f Fina c and Administration ,,��`` Date: 01/25/ s ilk.f a irman, eld Coib unt Commissioners I ssa 1h 01 /5/06 it fee WELD COUNTY CLERK TO THE BOARD on BY:C ,tual< i,1 �1�,R L1 -Nevi D uty Clstk to the Bbrd 3tc & _ c -� ey Exhibit B WCR 74 @ WCR 19 Surveying Scope of Work and Fee Estimate Right of Way and Topographic Design Surveys January 12, 2006 • Farnsworth Group will offset the new right of way line based upon the centerline information you have provided. The right of way will be 140' wide, 70' on each side of centerline on 74 (east-west) and 80', 40' on each side of section line on 19. Prior to us starting to prepare the property descriptions we will send an electronic drawing showing the parcel configurations for your approval. • The proposed fees assume that thirteen (13) ownership parcels will be affected and that 13 property descriptions and 13 exhibit maps will be prepared for right of way acquisition. We will also prepare two additional property descriptions and exhibits maps for the land swap between property owners needed due to the new right of way alignment. This service also includes preparing a photomap of each property on 11" by 17" sheet showing the existing and proposed right of way line and the property lines along with the area. We will also prepare an overall photomap of the 13 properties on a 24" x 36" sheet at a suitable scale to be determined later. This service includes one revision per legal and exhibit based upon County comments. • Farnsworth group will order and review thirteen (13) title commitments for the project. We propose to utilize Land Title Guarantee Company to perform this service. We will add supporting easements contained in the title commitment to the right of way drawing. • Provide coordination with Client and Title Company. • Prepare right of way plans at a scale of 1" = 100' on an 11" x 17" sheet. The right of way drawings will be set up similar to the Colorado Department of Transportation right of way plan requirements. The plans will consist of Title Sheet, Tabulation of Properties, Survey Control Diagram, Tabulation of Monumentation, Plan Sheets and Ownership Map. This service also includes two sets of minor revisions per County comments. • We have assumed two sets of minor revisions as stated above. Additional revisions as a result of multiple comments received at different times or changes as a result of Owner/ Engineer design changes, are not included in this scope of work and will be performed and billed as an additional service, if requested. • Farnsworth Group will set temporary survey points in the field of the proposed right of way lines. Stakes will be set at angle points and every 150 feet along both sides of the new right of way. The approximate total length being 11,350 feet long. For budgetary purpose we have estimated the setting of one hundred and eighty (180) points. This service includes six (6) trips to complete this phase based upon staking a minimum of two properties per trip. Mr. Cameron Parrott, P.E. Page 2 of 2 January 12, 2006 Deliverables: The deliverable for this project will be four sets of paper plots and a diskette with the electronic copy of the survey information, in AutoCAD format. Schedule: We anticipate completion of the entire right of way plans within 5 - 7 weeks from receipt of your written acceptance of this proposal. The staking of the right of way will be completed within one week from the time of the request. We will submit the overall photo map, small photo map, the legal and exhibits maps for the two parcels just west of WCR 19 within the first two weeks and other will be sent on an on-going basis for your use. Proposed Fees: Farnsworth Group will perform the above-noted Services on an hourly basis not exceed $34,300, to be billed in accordance with our 2005 - 2006 Schedule of Fees contained in our current on-call Surveying Services Agreement, including reimbursable expenses for research costs, reproduction, messenger fees, etc. A more detailed breakdown of estimated maximum fees is provided on the Project Budget Worksheet, attached hereto for reference. It's anticipated that the two sets of revisions and that all of the right of way staking will not be needed to accomplish this project which in return the entire budget should not be needed. Farnsworth Group PROJECT BUDGET WORKSHEET-2005-2006 WELD COUNTY Rate Schedule Project Name: Weld County-WCR 74 @ WCR 19 Project Number: Project Manager: Steve Dynes ESTIMATED HOURS WORK TASK Task Start Task End Total Task _ —a. $ o f T. 4 f _�i. S ' u's '14,. .3 3 2 o Total TOTAL COST TASK GROUP Date Date Duration 1 0 '`, At„- , ... S .. --ex; 3 rn • i ,l`u ° _ o =u Hours SUMMARY SUMMARY TOTALS 33 s u I a s aN a a a 3 HOURt VRATES $128 9109 $94 $85 $54 $87 $82 $78 $68 $46 $92 $123 Prefect Initiation 0 $0 s1.221 Scope of wk&contract admin 2 2 1 5 5514 Work plan&resources logistics - 4 1 _ s 5514 Project team kick-off mug 1 1 2 $187 _ 0 10 Determine Right of Way Conliguratlon 0 $0 $1 060 Determine Right of Way 4 8 __ - 12 51,060 0 50 0, 30 Parcel Descriptions&Exhibit Maps 0 30 $0 730 Prepare 15 descriptions&exhibit maps 15 50 75 $6,315 check legals with ICO Map 1 8 9 $733 Revision per county comments 4 8 12 31,060 out put final descriptions and exhibits 2 4 2 8 $622 0 s0 Right of way Plans 0 $0 S1 1 4'93 order Title Commitments(13) 2 2 5218 review Title Commitments&add exceptions to dwg 2 30_ 32 52.558 prepare right of way drawings 5 80 85 56.765 revisions based upon county comments two sets of revisions 2 16 18 $1,466 output final drawings 2, 2 2 6 5466 Stake Proposed Right of Way 0 5O 0 50 S7.073 office calculations 1 8 9 5733 stake 18O points 4 48 52 56.340 Photomaps _ 0 SO prepare 13 photo maps 1 0 2 S+466 13 14 51.1233 overall photomap 1 3 4 5343 0 SO 0 50 $0 0 s0 0 10 0 sit 0 30 $0 - 0 S0 k 0 SO 0 s0 SUB TOTAL HOURS&FEES 2 53 0 0 0 0 0 242 0 5 0 48 350 $31,043 $31 043 Reimbursable Expenses,Outside Svcs,etc. research costs(Co.records et no cost) SO mileage 200 x 0.40 S80 SO plots &CD's $100 SO messenger services $77 Sub consultant-Land Tills Guarantee Company $3,000 Sub consultant- - SO SUB TOTAL REIMBURSABLE EXPS. I $3,257 TOTAL PROJECT FEES(without contingency) $34,300 Pi otess,ona Sermons Vee L$1, 31C Proieet Budget Worksheet WCR 74 IR WCR 19 revised 01-12-06 xis completed 01/12/06 "lige MEMORANDUM COLORADO TO: Clerk to the Board DATE: January 19, 2006 FROM: Perry Eisenach, Engineering Division Manager rlt SUBJECT: Request for Chair's Signature Work Order for Farnsworth Group on land surveying services for WCR 74 at WCR 19. The appropriate documentation is attached. Enclosures pc: Leon Sievers, Right-of-Way Agent M:Tranc i e W gen d-Leon.d oc 7 C/Cilte “-± ;Icy,' vicia_ 2006-0284 1 `a `�C(n l tA-Lil • BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: Work Order for Farnsworth Group (Land Surveying Services) DEPARTMENT: PUBLIC WORKS DATE: January 16, 2006 PERSON REQUESTING: Perry Eisenach, P.E., Engineering Division Manager Brief description of the problem/issue: Under the present Professional Services Agreement with the Farnsworth Group, Public Works is requesting Farnsworth Group to prepare the right-of-way plan, exhibit maps, legal descriptions, photo maps and stake the proposed right-of-way (13 property owners) along WCR 74 at WCR 19 intersection. This project is part of the Strategic Road system and is scheduled for construction this Fall. Farnsworth Group completed the initial surveying and topo work for this project. It is anticipated that the work will not exceed $34,300 and will most likely be less do to the number of parcels that may not require staking. This work is required to be completed prior to the commencement of the right-of-way acquisition process. The right-of-way process is anticipated to require six months for completion, thus requiring this work to begin shortly to meet the current schedule of completing construction this Fall. The Engineering Division is in the process of filling the two vacant survey positions(Engineering Tech II) and does not have the ability to complete this work in-house at this time. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The options are to approve this work order and begin the right-of-way process, or not approve the work order at this time which would most likely delay the construction start date and push construction into 2007. Recommendation to the Board: Due to the professionalism, high quality and proficiency of the work previously provided by the Farnsworth Group, Public Works Department recommends approval of this work order. Approve Schedule Recommendation Work Session Other Geile ' ✓ Vaad Jerke L� Long ✓ Masden N Attachments cc: ( ) 1v )--A 6 ENGINEERS ARCHITECTS I_-a r n swo r t h SURVEYORS SCIENTISTS GROUP January 12, 2006 Mr. Cameron Parrott, PE Weld County Public Works Department 1111 H Street Post Office Box 758 Greeley, CO 80632-0758 RE: Proposed Scope of Work and Fee Estimate - WCR 74 at WCR 19 Dear Cameron, Farnsworth Group Inc. is delighted to be of service to Weld County for this project. We have prepared a draft scope of work and associated fee estimate for your review and approval, based upon our discussions. The proposed scope of work and fee estimate is attached to this letter. Please also find attached a spreadsheet of our Project Budget Worksheet that provides a breakdown of work tasks and hours associated with the project. I would be happy to meet with you personally to review and discuss the proposed scope of work at your earliest convenience, if you prefer. We are anxious to work through this initial scoping process and get started on the project. Thank you for this opportunity to be of service to Weld County. Please do not hesitate to call if you have any questions or comments. We look forward to working with you on this survey. Sincerely, FARNSWORTH GROUP INC. Steven Dynes, PLS Project Manager 8055 East Tufts Avenue,Suite 850, Denver, CO 80237 / 303.692.8838 FAX 303.692.0470 / www.f-w.com Hello