CASE NUMBER: PF-1114 HEARING DATE: March 28, 2007
APPLICANT: Pyrenees Properties LLC
ADDRESS: do Todd Hodges Design LLC, 1269 N. Cleveland Avenue, Loveland, CO 80537
REQUEST: PUD Final Plat for 8 residential lots with Estate Zone District uses, one 116 acre
residential lot with Agricultural Zone District uses, and two non-buildable outlots,
Hollis Crossing Estates PUD
LEGAL: Lot C, RE-3058; being a part of the Section 15, Township 7 North, Range 67
West of the 6th P.M., Weld County, CO
LOCATION: North of and adjacent to County Road 80, 0.5 mile East of County Road 19
ACRES: 153.11 +/- PARCEL NUMBER: 0705-15-000003
POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS
The Department of Planning Services' staff has received responses from the following agencies:
• Weld County Code Compliance, referral received February 12, 2007
• Weld County Department of Building Inspection, referral received February 15, 2007
• Larimer County Planning, referral received February 15, 2007
• Colorado Division of Water Resources, referral received February 20, 2007
• Weld County School District RE-4, referral received February 23, 2007
• Weld County Sheriff's Office, referral received February 25, 2007
• Kerr-McGee Oil &Gas Onshore, LP, referral received February 26, 2007
• West Greeley Soil Conservation District, referral received February 26, 2007
• County Department of Public Works, referral received March 5, 2007
• Weld County Department of Public Health & Environment, referral received March 5, 2007
• State of Colorado, Division of Wildlife, referral received March 12, 2007
The Department of Planning Services'staff has not received responses from the following agencies:
• Town of Severance
• Windsor/Severance Fire Protection District
2007-0763
PF-1114,Hollis Crossing Estates PUD,Page 1
41111'10-6
LAND USE APPLICATION
COLORADO SUMMARY SHEET
PLANNED UNIT DEVELOPMENT FINAL PLAT
PLANNER: Kim Ogle
CASE NUMBER: PF-1114 HEARING DATE: March 28, 2007
APPLICANT: Pyrenees Properties LLC
ADDRESS: c/o Todd Hodges Design LLC, 1269 N. Cleveland Avenue, Loveland, CO 80537
REQUEST: PUD Final Plat for 8 residential lots with Estate Zone District uses, one 116 acre
residential lot with Agricultural Zone District uses, and two non-buildable outlots,
Hollis Crossing Estates PUD
LEGAL: Lot C, RE-3058; being a part of the Section 15, Township 7 North, Range 67
West of the 6th P.M., Weld County, CO
LOCATION: North of and adjacent to County Road 80, 0.5 mile East of County Road 19
ACRES: 153.11 +/- PARCEL NUMBER: 0705-15-000003
THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMENDS THAT THIS REQUEST BE
APPROVED FOR THE FOLLOWING REASONS:
1. The submitted materials are in compliance with the application requirements of Section 27-7-30
of the Weld County Code.
2. The request is in conformance with Section 27-7-40.C of the Weld County Code, as follows:
A. Section 27-7-40.C.1--That the proposal is consistent with Chapters 19, 22, 23, 24 and 26
of the Weld County Code and any intergovernmental agreement in effect influencing the
PUD.
1. Section 22-3-50.8.1:P.Goal 2--Require adequate facilities and services to assure
the health, safety and general welfare of the present and future residents of the
County." The proposed PUD will be serviced by North Weld County Water District
and Individual Sewage Disposal Systems that will handle the effluent flow.
2. Section 27-2-140: Nonurban scale development. Nonurban scale developments are
developments comprised of nine (9) or fewer residential lots, located in a nonurban
area as defined in Chapter 22 of this Code, not adjacent to other PUDs, subdivisions,
municipal boundaries or urban growth corridors. Nonurban scale development shall
also include land used, or capable of being used, for agricultural purposes and
including development which combines clustered residential uses and agricultural
uses in a manner that the agricultural lands are suitable for farming and ranching
operations for the next forty(40)years. Nonurban scale development on public water
and septic systems may have a minimum lot size of one (1) acre and an overall gross
density of two and one-half (24) acres per septic system. Nonurban scale
development proposing individual, private wells and septic systems shall have a
minimum lot size of two and one-half (2M) acres per lot. Nonurban scale
PF-1114,Hollis Crossing Estates PUD,Page 2
developments located outside the MUD area are not subject to the common open
space requirement. This definition does not affect or apply to those coordinated
planning agreements between the County and municipalities which are in effect as of
May 14, 2001. (Weld County Code Ordinance 2001-1; Weld County Code Ordinance
2003-10; Weld County Code Ordinance 2006-2)
The site is not located within an IGA, UGB, MUD, urban development node, or
adjacent to other PUDs, subdivision, municipal boundaries, or urban growth
corridors. As such, it is considered a rural subdivision that is not subject to urban
scale development standards. The common open space requirements of Section 27-
2-60 do not apply, nor do the automatic paved internal road requirement of Section
27-2-190 of the Weld County Code. The proposed design includes a lot that is
sufficient in size and proposed for Agricultural District uses so as to be suitable for
farming and ranching operation for the next forty years, per the policies of Section 27-
2-140 of the Weld County Code.
B. Section 27-7-40.C.2--That the uses which would be allowed in the proposed PUD will
conform with the performance standards of the PUD Zone District contained in Article II,
Chapter 27 of the Weld County Code. An approved on-site Improvements Agreement will
be required prior to recording the plat. All other Performance Standards have been
addressed prior to the Final Plan application submittal. The applicant has chosen to
adhere to the bulk requirements of the E (Estate) Zone District for the residential lots and
the single residential A (Agricultural) Lot. Outlot A and Outlot B does not allow for
residential development.
C. Section 27-7-40.C.3--That the uses which would be permitted will be compatible with the
existing or future development of the surrounding area as permitted by the existing
zoning, and with the future development as projected by Chapter 22 of the Weld County
Code or master plans of affected municipalities. The proposed site is within the three
mile referral area for the Town of Severance and Larimer County. The Town of
Severance did not respond to the referral request, and Larimer County, in their referral
dated February 15, 2007, indicated no conflict with their interests. The surrounding uses
are agricultural in nature with the following approved Use by Special Review's: AmUSR-
803 for a 150,000 head lambing operation, USR-1025 for a second dwelling, USR-1091
for a 2000 head dairy and USR-801 for a lambing operation. There are also two
subdivisions within the Town of Severance within one mile of this PUD. The Department
of Planning Services believes that the granting of this PUD Final Plan will have a minimal
impact on the surrounding land uses.
D. Section 27-7-40.C.4 --That adequate water and sewer service will be made available to
the site to serve the uses permitted within the proposed PUD in compliance with the
performance standards in Article II, Chapter 27 of the Weld County Code. The residential
lots will be serviced by North Weld County Water District. The Weld County Attorney's
Office has indicated that the water agreement submitted by the applicant was adequate
for the Change of Zone. The Weld County Department of Public Health and Environment
indicated in the Change of Zone referral response dated September 12, 2006 that the
application has satisfied Chapter 27 of the Weld County Code in regard to water and
sewer service.
E. Section 27-7-40.C.5 -- That street or highway facilities providing access to the property
are adequate in functional classification, width, and structural capacity to meet the traffic
requirements of the uses of the proposed PUD Zone District. The Weld County Public
Works Department reviewed this request and indicated in their referral dated March 5,
2007 that the applicant will still need to address the drainage and the construction of the
road. The applicants have submitted a Private Improvements Agreement According
Policy Regarding Collateral for Improvements. A finalized Improvements Agreements will
be required for review and acceptance by the Weld County Board of County
Commissioners prior to recording the PUD final plat.
F. Section 27-7-40.C.6 — In the event the street or highway facilities are not adequate, the
applicant shall supply information which demonstrates the willingness and financial
capacity to upgrade the street or highway facilities in conformance with the
PF-1114,Hollis Crossing Estates PUD,Page 3
Transportation Sections of Chapters 22, 24 and 26, if applicable. The Weld County
Department of Public Works has indicated in their referral dated March 5, 2007 a traffic
study for the proposed subdivision was not required and no off-site improvements are
required for County Road 80. County Road 80 is classified by the County as a local
gravel road with existing 60-foot right-of-way, per Book 48 at Page 280.
G. Section 27-7-40.C.7-- That there has been compliance with the applicable requirements
contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial
mineral deposits, and soil conditions on the subject site. The eastern portion of the site
lies within the 100-year floodplain, as depicted on FIRM Community Panel #080266
0475D dated September 22, 1999. Areas located within the floodplain are depicted on
the draft Change of Zone plat as no-build zones. The site does not lie within any other
overlay districts. The Weld County Department of Building Inspection has indicated that
each building will require an engineered foundation based on a site-specific geotechnical
report or an open-hole inspection performed by a Colorado registered engineer.
In a referral response dated March 8, 2006, the Colorado Geological Survey (C.G.S.)
recommended all items identified by the applicant's Geologic and Preliminary
Geotechnical Investigation (CTL Thompson) be addressed. Proposed Conditions of
Approval and Development Standards ensure that all issues concerning the floodplain,
shallow groundwater, oil and gas operations, and existing fill piles are addressed.
Effective January 1, 2003, Building Permits issued on the proposed lots will be required
to adhere to the fee structure of the County Road Impact Program.
Effective August 1, 2005, Building Permits issued on the proposed lots will be required to
adhere to the fee structure of the Capital Expansion Impact Fee and the
Stormwater/Drainage Impact Fee.
H. Section 27-7-40.C.8--If compatibility exists between the proposed uses and criteria listed
in the development guide, and the final plan exactly conforms to the development guide.
The proposed PUD Final Plan uses are compatible with the criteria listed in the
developmental guide included in the application materials.
This recommendation is based, in part, upon a review of the application materials submitted by
the applicant, other relevant information regarding the request, and responses from referral
agencies.
The Department of Planning Services' Staff recommendation for approval is conditional upon the
following:
1. Prior to Recording the PUD Final Plat:
A. The Board of County Commissioners shall review and approve the signed and dated
Improvements Agreement According to Policy Regarding Collateral for Improvements
including the form of collateral. The security for the Agreement shall be tendered and
accepted by the Board of County Commissioners. (Departments of Public Works and
Planning Services)
B. The applicant shall submit to the Weld County Department of Planning Services a bid for
the proposed landscaping listing the itemized materials and labor costs as outlined in the
Improvements Agreement for the entry traffic island and development sign. The
applicant shall make the appropriate changes to the Improvements Agreements as stated
by the Department of Public Works in their referral dated March 5, 2007 and then
resubmit copies of the Agreement for final approval by the Weld County Department of
Public Works and the Weld County Department of Planning Services. (Department of
Planning Services)
PF-1114,Hollis Crossing Estates PUD,Page 4
r�
C. The applicant shall submit evidence that the Weld County Attorney's Office has reviewed
and approved the Restrictive Covenants and Home Owners Association Incorporation
paperwork for the Hollis Crossing Estates PUD. Any changes requested by the Weld
County Attorney's Office and Planning Department shall be incorporated. (Department of
Planning Services)
D. The applicant shall submit finalized copies and the appropriate fee ($6 for the first page
and $5 for each additional page)to the Department of Planning Services for recording the
Restrictive Covenants for Hollis Crossing Estates PUD in the Office of the Clerk and
Recorder. (Department of Planning Services)
E. The applicant shall provide written evidence from all applicable service agencies
including Windsor /Severance Fire Protection District, the Weld County Sheriffs Office,
Ambulance provider, and the Post Office to the Department of Planning Services
indicating that the proposed street names are in compliance with their
identification/naming protocol/addressing. (Department of Planning Services)
F. The applicant shall submit evidence to the Department of Planning Services that the
Home Owners Association has been recorded with the Secretary of the State.
(Department of Planning Services)
G. The applicant shall submit deeds to the Department of Planning Services for recording of
the outlots and open space areas deeding them to Hollis Crossing Estates Home Owners
Association. (Department of Planning Services)
H. The applicant shall address the requirements of Weld County Public Works Department,
as stated in the referral responses dated March 5, 2007. Evidence of their approval shall
be submitted in writing to the Weld County Department of Planning Services.
(Department of Public Works Department)
The applicant shall address the requirements of Weld County School District RE-4 as
stated in the referral response dated February 23, 2007. Evidence of such shall be
submitted in writing to the Weld County Department of Planning Services. (School
District RE-4)
J. The applicant shall attempt to address the concerns of the Weld County Sheriffs Office
as stated in the referral response dated February 25, 2007. Evidence of such shall be
submitted in writing to the Weld County Department of Planning Services. (Weld County
Sheriff's Office)
K. The West Greeley Soil Conservation District has provided information regarding the soils
on the site. The applicant shall review the information and use it to positively manage on-
site soils. Evidence of such shall be submitted in writing to the Weld County Department
of Planning Services. (West Greeley Soil Conservation District)
L. The applicant shall address the requirements of the Office of the State Engineer, Division
of Water Resources, as stated in the referral response dated February 14, 2007.
Evidence of such shall be submitted in writing to the Weld County Department of
Planning Services. (Office of the State Engineer, Division of Water Resources)
M. The applicant shall address the concerns of the Colorado Division of Wildlife as stated in
i-� the referral response dated March 12, 2007. Evidence of such shall be submitted in
writing to the Weld County Department of Planning Services. (Colorado Division of
Wildlife)
PF-1114, Hollis Crossing Estates PUD,Page 5
N. The applicant shall provide the Weld County Department of Planning Services with a
Statement of Taxes from the Weld County Treasurer showing no delinquent taxes exist
for the original parcel. (Department of Planning Services)
O. The applicant shall submit to the Weld County Department of Planning Services a signed
Final water service agreement with North Weld County Water District. (Department of
Planning Services)
P. The Private Improvements Agreement for Hollis Crossing Estates PUD has been
submitted and is acceptable with the following revisions:
1) The following revision shall be made to the erosion Control Cost Estimate: Turf
Reinforcement Mat(TRM)shall be updated for permanent erosion control.
2) The following revision shall be made to the Detention Pond Structures cost
estimate: The Pond I overflow weir shall be updated to provide erosion
protection. (Department of Public Works)
3) The following revision shall be made to the Landscape cost estimate: An
itemized bid for all plant material and associated landscape preparation and
materials.
4) The following revision shall be made to the Landscape cost estimate: An
itemized bid for the development sign, including labor and materials.
5) The following revision shall be made to the Landscape cost estimate: The cost
of including the electrical lighting component to the development sign.
6) The following revision shall be made to the Landscape cost estimate: The cost of
the centralized delivery mailbox, including concrete pad. (Department of
Planning Services)
Q. Any abandoned septic system must comply with the Weld County Code Section 30-4-20
.D. The applicant should contact the Department to update existing septic permits for
those systems that have been abandoned. (Department of Public Health and
Environment)
R. The applicant shall submit a digital file of all drawings associated with the Final Plan
application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable
GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format
type is .e00. The preferred format for Images is .tif (Group 4). (Group 6 is not
acceptable). (Department of Planning Services)
S. The Plat shall be amended to include the following:
1) All sheets of the plat shall be labeled PF-1114. (Department of Planning
Services)
2) The Weld County's Right to Farm Statement shall be placed on the plat per
Appendix 22-E of the Weld County Code. (Department of Planning Services)
3) The applicant shall delineate the primary and secondary septic system
envelopes. (Department of Public Health and Environment)
4) The applicant shall delineate the building envelopes on lots having floodplain
issues as delineated on the FIRM Community Panel Map #080266 0475D dated
September 22, 1999. (Department of Planning Services)
5) County Road 80 is classified by the County (Weld County Roadway
Classification Plan, June 2002) as a local gravel roadway, which requires 60 feet
of right-of-way at full build out. The applicant shall verify the existing right-of-way
PF-1114,Hollis Crossing Estates PUD,Page 6
r
and the documents creating the right-of-way. If the right-of-way can not be
verified, it shall be dedicated. The plat shall delineate the existing right-of-way
and the documents which created it along with any additional future right-of-way
required. (Department of Public Works)
5) The Typical Road Cross Section shall be amended to show a 6" minimum Class
5 Road Base. (Department of Public Works)
6) The plat shall be amended per the Utility Board hearing on March 8, 2007,
including the deletion of all notes stating "proposed". (Department of Planning
Services)
7) The plat shall include a utility and drainage service block per section 27-9-40.8 of
the Weld County Code. (Department of Planning Services)
8) The sign shall adhere to Article IV Division 2 of the Weld County Code and its
location and design shall be delineated on the plat. (Department of Planning
Services)
9) Intersection sight distance triangles at the development entrance will be required
to be shown on the plat. All landscaping within the triangles must be less then 3
'/z feet in height a maturity. (Department of Public Works)
10) The plat certificates shall adhere to Section 27-9-20.M and Appendix 26-P of the
Weld County Code. (Department of Planning Services)
11) The applicant shall delineate the location of the mail kiosk and development sign.
(Department of Planning Services)
12) The applicant shall show the location of all approved fire hydrants by the Windsor
Severance Fire Protection District. (Department of Planning Services)
13) The applicant shall show how the landscaping within the open space will be
irrigated. (Department of Planning Services)
14) The Landscape areas within Outlot A and Outlot B shall be dedicated to the
HOA. (Department of Planning Services)
15) The applicant shall designate building envelopes on Lots 6-8 that meets the
setback requirements of Section 23-3-440 of the Weld County Code.
(Department of Planning Services)
16) The shading for Flood Zone A shall be removed. The dotted line and notation
are adequate. (Department of Public Works)
17) Primary and secondary septic envelopes shall be placed on each lot. All septic
system envelopes must meet all setbacks, including the 100-foot setback to the
100-year Flood Plain boundary and 25 feet to the detention pond. (Department of
Public Health and Environment)
18) The applicant shall delineate building envelopes on all Lots encumbered by the
Floodplain. (Department of Planning Services)
2. The Final Plat is conditional upon the following and that each be placed on the Final Plat as notes
prior to recording:
PF-1114,Hollis Crossing Estates PUD,Page 7
A. PUD Final Plat for 8 residential lots with Estate Zone District uses, one 116 acre
residential lot with Agricultural Zone District uses, and two non-buildable outlots, Hollis
Crossing Estates PUD. (Department of Planning Services)
B. The eight residential lots shall adhere to the bulk standards of the(E) Estate Zone District
except for the minimum lot size, and the one residential lot shall adhere to the (A)
Agricultural Zone District. (Department of Planning Services)
C. A Homeowner's Association shall be established prior to the sale of any lot. Membership
in the Association is mandatory for each parcel owner. The Association is responsible for
liability insurance, taxes and maintenance of open space, streets, private utilities and
other facilities. Open space restrictions are permanent. (Department of Planning
Services)
D. Water service shall be obtained from North Weld County Water District. (Department of
Public Health and Environment)
E. This subdivision is in rural Weld County and is not served by a municipal sanitary sewer
system. Sewage disposal shall be by septic systems designed in accordance with the
regulations of the Colorado Department of Public Health and Environment, Water Quality
Control Division and the Weld County Code in effect at the time of construction, repair,
replacement, or modification of the system. (Department of Public Health and
Environment)
F. Language for the preservation and/or protection of the absorption field envelopes shall be
placed in the development covenants. The covenants shall state that activities such as
permanent landscaping, structures, dirt mounds or other items are expressly prohibited in
the absorption field site. (Department of Public Health and Environment)
G. A stormwater discharge permit may be required for a development/redevelopment
/construction site where a contiguous or non-contiguous land disturbance is greater than
or equal to one acre in area. Contact the Water Quality Control Division of the Colorado
Department of Public Health and the Environment at
www.cdphe.state.co.us/wo/PermitsUnit for more information. (Department of Public
Health and Environment)
H. During development of the site, all land disturbances shall be conducted so that nuisance
conditions are not created. If dust emissions create nuisance conditions, at the request
of the Weld County Health Department, a fugitive dust control plan must be submitted.
(Department of Public Health and Environment)
In accordance with the Regulations of the Colorado Air Quality Control Commission any
development that disturbs more than 5 acres of land must incorporate all available and
practical methods that are technologically feasible and economically reasonable in order
to minimize dust emissions. (Department of Public Health and Environment)
J. If land development creates more than a 25-acre contiguous disturbance, or exceeds 6
months in duration, the responsible party shall prepare a fugitive dust control plan, submit
an air pollution emissions notice, and apply for a permit from the Colorado Department of
Public Health and Environment. (Department of Public Health and Environment)
K. 'Weld County's Right to Farm" as provided in Appendix 22-E of the Weld County Code
shall be placed on any recorded plat. (Department of Public Health and Environment)
L. A separate building permit shall be obtained prior to the construction of any structure
including the mail kiosk and development sign. (Department of Building Inspection)
PF-1114,Hollis Crossing Estates PUD,Page 8
M. A plan review is required for each building for which a building permit is required. Two
complete sets of plans are required when applying for each permit. Residential building
plans may be required to bear the wet stamp of a Colorado registered architect or
engineer. (Department of Building Inspection)
N. Buildings shall conform to the requirements of the codes adopted by Weld County at the
time of permit application. Current adopted codes include the 2003 International
Residential Code; 2003 International Building Code; 2003 International Mechanical Code;
2003 International Plumbing Code; 2003 International Fuel Gas Code; 2002 National
Electrical Code and Chapter 29 of the Weld County Code. (Department of Building
Inspection)
O. Each residential building will require an engineered foundation based on a site-specific
geotechnical report or an open hole inspection performed by a Colorado registered
engineer. Engineered foundations shall be designed by a Colorado registered engineer.
(Department of Building Inspection)
P. Fire resistance of walls and openings, construction requirements, maximum building
height and allowable areas will be reviewed at the plan review. Setback and offset
distances shall be determined by the County Code. (Department of Building Inspection)
Q. Building height shall be measured in accordance with the 2003 International Building
Code for the purpose of determining the maximum building size and height for various
uses and types of construction and to determine compliance with the Bulk Requirements
from Chapter 27 of the Weld County Code. Building height shall be measured in
accordance with Chapter 27 of the Weld County Code in order to determine compliance
with offset and setback requirements. When measuring buildings to determine offset and
setback requirements, buildings are measured to the farthest projection from the building.
Property lines shall be clearly identified and all property pins shall be staked prior to the
first site inspection. (Department of Building Inspection)
R. Provide letter of approval from Windsor/Severance Fire Protection District prior to new
residential construction. (Department of Building Inspection)
S. All signs including entrance signs shall require building permits. Signs shall adhere to
Section 23-4-60 and following of the Weld County Code. These requirements shall apply
to all temporary and permanent signs. (Department of Planning Services)
T. Effective January 1, 2003, Building Permits issued on the proposed lots will be required
to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11)
(Department of Planning Services)
U. Effective August 1, 2005, Building Permits issued on the proposed lots will be required to
adhere to the fee structure of the Capital Expansion Impact Fee and the
Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) (Department of
Planning Services)
V. Floodplain areas of Lots 6, 7, and 8 are considered non-buildable. (Department of Public
Works)
W. Site falls within Flood Zone A and Flood Zone C as per current effective FEMA FIRM
panel. The approximate Flood Zone shown hereon is per FIRM Community Panel
Number 080226 0475 D, revision dated September 22, 1999. (Department of Public
Works)
Z. Weld County does not maintain drainage related facilities. (Department of Public Works)
PF-1114, Hollis Crossing Estates PUD,Page 9
r
AA. Any future subdivision of Lot 9 must meet Weld County Code for drainage requirements.
(Department of Public Works)
AB. Consideration of high groundwater levels will be required for basement design and
construction, all recommendations from the Final Geotechnical Investigation shall be
followed. (Department of Public Works)
AC. No development activity shall commence, nor shall any building permits be issued on the
property until the final plan has been approved and recorded. (Department of Planning
Services)
AD. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code.
(Department of Planning Services)
AE. The property owner shall be responsible for complying with the Performance Standards
of Chapter 27, Article II and Article VIII, of the Weld County Code. (Department of
Planning Services)
AF Weld County personnel shall be granted access onto the property at any reasonable time
in order to ensure the activities carried out on the property comply with the Development
Standards stated herein and all applicable Weld County Regulations. (Department of
Planning Services)
AG. The site shall maintain compliance at all times with the requirements of the Weld County
Departments of Public Works, Public Health and the Environment, and Planning
Services, and adopted Weld County Code and Policies. (Department of Planning
Services)
AH. Section 27-8-70 of the Weld County Code - Failure to Commence a Planned Unit
Development Final Plan - If no construction has begun or no USE established in the
PUD within one (1) year of the date of the approval of the PUD Final Plan, the Board of
County Commissioners may require the landowner to appear before the it and present
evidence substantiating that the PUD Final Plan has not been abandoned and that the
applicant possesses the willingness and ability to continue the PUD. The Board may
extend the date for initiation of the PUD construction and shall annually require the
applicant to demonstrate that the PUD has not been abandoned. If the Board determines
that conditions supporting the original approval of the PUD Final Plan have changed or
that the landowner cannot implement the PUD Final Plan, the Board may, after a public
hearing, revoke the PUD Final Plan and order the recorded PUD Plan vacated.
Al. Section 27-8-80.A of the Weld County Code - Failure to Comply with the PUD Final Plan
- The Board of County Commissioners may serve written notice upon such organization
or upon the owners or residents of the PUD setting forth that the organization has failed
to comply with the PUD Final Plan. Said notice shall include a demand that such
deficiencies of maintenance be cured within thirty (30) days thereof. A hearing shall be
held by the Board within fifteen (15) days of the issuance of such notice, setting forth the
item, date and place of the hearing. The Board may modify the terms of the original
notice as to deficiencies and may give an extension of time within which they shall be
rectified.
AJ. Section 27-8-80.B of the Weld County Code -Any PUD Zone District approved in a Final
Plan shall be considered as being in compliance with Chapter 24 of the Weld County
Code and Section 30-28-101, et seq., CRS.
3. Upon completion of 1 and 2 above, the applicant shall submit two (2) paper copies of the plat for
preliminary approval to the Weld County Department of Planning Services. Upon approval of the
paper copies the applicant shall submit a Mylar plat along with all other documentation required
PF-1114, Hollis Crossing Estates PUD,Page 10
as conditions of approval. The Mylar plat shall be recorded in the office of the Weld County Clerk
and Recorder by Department of Planning Services' Staff. The plat shall be prepared in
accordance with the requirements of Section 27-9-20 of the Weld County Code. The Mylar plat
and additional requirements shall be submitted within thirty (30) days from the date the
Administrative Review was signed. The applicant shall be responsible for paying the recording
fee.
4. Section 27-8-60 of the Weld County Code - Failure to Record a Planned Unit Development Final
Plan - If a Final Plan plat has not been recorded within one(1)year of the date of the approval of
the PUD Final Plan, or within a date specified by the Board of County Commissioners, the Board
may require the landowner to appear before it and present evidence substantiating that the PUD
Final Plan has not been abandoned and that the applicant possesses the willingness and ability
to record the PUD Final Plan plat. The Board may extend the date for recording the plat. If the
Board determines that conditions supporting the original approval of the PUD Final Plan cannot
be met, the Board may, after a public hearing, revoke the PUD Final Plan.
5. In accordance with Weld County Code Ordinance 2005-7, approved June 1, 2005, should the plat
not be recorded within the required thirty (30) days from the date of the Board of County
Commissioners Resolution, a $50.00 recording continuance charge may be added for each
additional three(3) month period.
Date: March 28, 2007
Kim O I. ner
r-�
PF-1114,Hollis Crossing Estates PUD,Page 11
DEPARTMENT OF PLANNING SERVICES
6 NORTH OFFICE 04.1\1( OR 10'" Street
GREELEY, CO 83541
PHONE: (970) 353-61O1O 0, Ext. 3540
FAX: (970) 304-6498
ViDc.
COLORADO
February 6, 2007
Pyrenees Properties PUD
do Todd Hodges Design LLC
1269 N Cleveland Av
Loveland CO 80537
Subject: PF-1114- Request for a Final Plat for eight(8)Residential(Estate Zone)Lots,one(1)Residential
Lot with Agricultural Zone District Uses, and one (1) non-buildable outlot. on a parcel of land
described as Lot C of RE-3058, part of Section 15, T7N, R67W of the 6th P.M., Weld County,
Colorado.
Dear Applicants:
Your application and related materials for the request described above are complete and in order at the
present time. I have scheduled a meeting with the Weld County Utilities Advisory Committee for Thursday,
March 8, 2007, at 10:00 a.m. This meeting will take place in the Hearing Room, Weld County Department
of Planning, 918 10th Street, Greeley, Colorado.
If you have any questions concerning this matter, please feel free to call me.
Respectfully,
Kiln✓O'glG-�
Planner
NOTICE OF PUBLIC HEARING
BOARD OF COUNTY COMMISSIONERS' SIGN POSTING
CERTIFICATE
THE LAST DAY TO POST THE SIGN IS MARCH 13, 2007. THE SIGN SHALL BE POSTED
ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY.
IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT
ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT
OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON
THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY
(ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY.
I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS
POSTED ON THE PROPERTY AT LEAST FIFTEEN DAYS BEFORE THE BOARD OF
COUNTY COMMISSIONERS HEARING FOR A FINAL PLAT APPLICATION FOR HOLLIS
CROSSING ESTATES PUD (PF-1114).
J
Kim Og
V M1 !lol
Signature of Person Posting Sign
STATE OF COLORADO
)ss.
COUNTY OF WELD
The foregoing instrument was subscribed and sworn to me th' /day of l7, ,�(n , 2007.
WITNESS my hand and official seal.
BILLIE J. MOORE
Notary Public NOTARY PUBLIC
STATE OF COLORADO
I My Commission Expires: /0/99/i D
r
L
a
4611i, iiiiii\
• 'live NOTICE Wine
OLOII♦no
A PUBLIC HEARING CONCERNING . - _
THIS PROPERTY WILL BE HELD AT:
.... .-- 49 I 7 'H SST •
6RE.Cl-EY, co ' _
c - _
. .`' - ON MAP-CH SS , 20 0 AT Io :csAMsr
setiart '¢ ; ` p -QaNC�S PRo�ams List-Ii 7.
} NAME % �1GDo }DES 9E'S1&M LLL
' ' - FINML PAD PLAN Foa. . ••e
s a 8
' _ REQUEST estym 20146 borS4. 1 AG
:42,-7. bor ( $Ows t 'sSw46 ESDNTE5) .� .,,,�-
F<4. y "e-, � CASE NO. PF ) 119- ISj+/ ACRESs 'i "•%_. �
rit;, .77:,t,;:::‘,3.-ft FOR MORE INFORMATION CALL ; '1+•t
T r. WELD COUNTY DEPARTMENT OF
PLANNING SERVICES AT 03 /08 / 2007
°- , ./-4o fa ( 970 )353 -6100 ext . 3540
t
` t
w Mons EA - - ! 1
+a--
IIIY
f
03 /08/2007
C _ • ' . ..ty '14�M--e. •d`r 'y .'� 4 •
MIIIIIIIIIIIPEIr
1
03/08/ 2007
Or
i ;t
b
-
03/08/ 2007
03/08 / 2007
,7 �y
\ "- II • Sd
1 . 4, 1
-
� ,
-,-
1 ....i ( l
!. _r ••4
-e
-
� •
`' .y .
.� -- • -, _ -
•
A.. 'S, .
}W
',`
b
.- t. 1S s ,y. � ,¢3�i ��5 d
lit
f.
A I- . 'I-p, ,
aiiiillZ...;,!..: 41;1 4
•
"' F �� ,:r7a..—.__- -- IT-- - .
- _
•�g�, , •
et'; j�• ''eitL�' %Y i re • • ... • II 9
J
:. .. n.a. :F r i' -..am . ..
4.1.ft....<•.:_.1. r=, rergle. CA. att.'«:
_
•
�', - - '.
h` " ,1 a ` 03/08/20
n
c -
FIELD CHECK inspection date: March 9, 2007
APPLICANT: Pyrenees Properties LLC
CASE#: PF-1114
REQUEST: Final Plat for eight (8) Residential (Estate Zone) Lots, one (1) Residential Lot with
Agricultural Zone District Uses, and two (2) non-buildable outlots
LEGAL: Lot C of RE-3058, part of Section 15, T7N, R67W of the 6th P.M., Weld County, Colorado
LOCATION: North of and adjacent to CR 80; 1/2 mile east of CR 19.
PARCEL ID#: 0705 15 000003
ACRES: 153 +/-
Zonino Land Use
N Agriculture N Agricultural, residence to Northeast
E Agriculture E Agricultural, Ag Irrigation Pond, now dry
S Agriculture S Agricultural, Residence
W Agriculture W Agricultural
COMMENTS:
Site is clear of improvements,
The land has been planted in a row crop
Center pivot to north of CR 80
Entrance access to proposed development is staked
Access to development is at crest of hill with good visual in east-west direction (CR 80).
Access is aligned to not direct headlights onto neighbors residence to South
Sign
H - House DV - Derelict Vehicles D - Ditch
O -Outbuilding NCJ - Noncommercial Junkyard T-Topography -Slopes to SE
A-Access to property IS -Irrigation Sprinkler
W - Wetlands C -Crops -Drilled Row Crop
MH - Mobile homes OG -Oil and Gas structures
Note any commercial business/commercial vehicles that are operating from the site.
Note if there is a site distance problem with the access
Hello