Loading...
HomeMy WebLinkAbout20070049.tiff (ittL".••;,), Weld County Referral D1 May 1, 2006 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Duke Energy Field Services Case Number USR-1561 Please Reply By May 30, 2006 Planner Kim Ogle Project Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility(Oil and Gas Processing Facility) in the A(Agricultural)Zone District. Legal Part SE4 SE4 of Section 10, T2N, R67W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22; 400 feet west of CR 21 Section Line. Parcel Number 1311 10 000011 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) July 18, 2006 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: 1`,A WW Q ciNyAc.� ct< @ rft(AA etc, n v, okt `l ta_ oh . Signature 5_5n(?)� Date 5-5nc Agency �h� ly' ` p Thin +Weld County Planning Dept. +4209 CR 24.5, Longmont,CO.80504 ❖(720)6524210 ext.8730 +(720)652-4 2007-0049 May 05 06 08: 46a Central Weld 9703535865 p. 1 it(t‘%\\D Weld County Referral 111 May 1, 2006 REM) C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Duke Energy Field Services Case Number USR-1561 Please Reply By May 30, 2006 Planner Kim Ogle Project Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support and Service Facility(Oil and Gas Processing Facility)in the A(Agricultural)Zone District. Legal Part SE4 SE4 of Section 10, T2N, R67W of the 6th P.M.,Weld County, Colorado. Location North of and adjacent to CR 22;400 feet west of CR 21 Section Line. Parcel Number 1311 10 000011 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information,please call the Department of Planning Services. Weld County Planning Commission Hearing(if applicable) July 18,2006 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments. II H O W a-t for 5 os Utz eftu s 44_4 . Signature .J LL d. ` a44 Gild t riet r Date / 4 0 L. Agency Cev.Av-4 tldti. (Du'c`k, � &i 0(StVLC4 f +Weld County Planning Dept. 44209 CR 24.5, Longmont,CO.80504 +(720)6524210 ext.8730 +(720)652-4211 fax Weld County Sheriff's Office M e mo To: Kim Ogle From: Ken Poncelow Date: May 17, 2006 Re: USR-1561 The Sheriffs Office approves this plan. Please notify the developer/owner that the Sheriffs Office would be willing to assist in the development of a security plan for the site free of charge. If this is of interest, please have them contact me. 1 Weld County Planning Department SOUTHWEST BUILDING _ 0 (4r' MEMORANDUMMAY 17 Zoos RECEIVEDAling TO: Kim Ogle, Planning Services DATE: May 12, 2006 CFROM: Donald Carroll, Engineering Administrator oft COLORADO• SUBJECT: USR-1561, Duke Energy Field Services The Weld County Public Works Department has reviewed this proposal. This project falls under the Use by Special Review Standard, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Our comments and requirements are as follows: COMMENTS: Weld County Road Classification Plan (FHU): (June 2002) WCR 22 is a local gravel road and requires a 60-foot right-of-way at full build out. There is presently a 60-foot right-of-way. This road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Zoning Ordinance (23-1-90), the required setback is measured from the future right-of-way line. —erection Line Access: (right-of-way) (WCR 21) Questionnaire: The applicant is identifying in Item No.5-f the type of vehicles to be used at the site will be pick-up trucks, approximately 2-6 per day. Verification is required on any additional large trucks utilizing the loading Area A and the number of trucks and frequency per day. REQUIREMENTS: Truck Traffic: Verification on numbers of large trucks utilizing the site on a daily basis is required. Off-street parking spaces including the access drive shall be surfaced with gravel, asphalt, concrete or the equivalent and shall be graded to prevent drainage problems. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. Storm Water Drainage: The applicant should apply with all State and Federal Regulations associated with any storm water run-off. pc: USR-1561 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1561.doc Weld County Planning Department SOUTHWEST BUILDING MEMORANDU MAY 3 2006 jfe RECEIVED TO: KIM OGLE, PLANNING SERVICES FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH Q, IIIDCSUBJECT:A USR-1561 DUKE ENERGY (MARILYN COMPRESSOR)TE:COLORADO CC: Environmental Health Services has reviewed this proposal for a mineral resource development facility. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. Submit an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application to the Air Pollution Control Division, Colorado Department of Health and Environment for emissions of criteria, hazardous or odorous air pollutants. 2. Submit a dust abatement plan to the Environmental Health Services, Weld County Department of Public Health & Environment, for approval prior to operation. 3. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including development standards: We recommend that the following requirements be incorporated into the permit as "development standards": 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, blowing debris, and other potential nuisance conditions. 4. Fugitive dust shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. 5. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as delineated in 25-12-103 C.R.S., as amended. 6. All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling. 7. The applicant shall operate in accordance with the approved "waste handling plan". 8. Bottled water shall be provided for employees that maintain the site. 9. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 2 DEPARTMENT OF BUILDING INSPECTION NORTH OFFICE 918 10TH STREET GREELEY CO, 80631 I PHONE (970)353-6100 ext 3540 WI FAX (970)304-6498 C. SOUTH OFFICE 4209 CR 24.5 COLORADO LONGMONT CO 80504 PHONE (720)652-4210 ext 8730 FAX (720)652-4211 May 26, 2006 Duke Energy Services AmUSR-256 Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility including an Oil and Gas Support Facility (Oil and Gas Processing Facility) in the A (Agricultural) Zone district. 1. A building permit shall be obtained prior to the construction or placement of the oil and gas equipment on the site. n2 Oil and gas equipment shall meet the required zoning setbacks as prescribed in the Weld County Code. o. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining compliance with the Bulk Requirements from Chapter 27 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection. 4. Provide letter of approval from Plateville-Gilcrest Fire Protection District prior to new construction. Please contact me for any further information regarding this project. Sinc ly, ,�/ ,� Rg IV/ Building Official Service,Teamwork,Integrity,Quality Hello