Loading...
HomeMy WebLinkAbout820803.tiff RESOLUTION RE: APPROVAL OF AGREEMENT BETWEEN WELD COUNTY AND THE CONTIN- ENTAL PIPELINE COMPANY FOR IMPROVEMENTS TO WELD COUNTY ROAD 181 AND AUTHORIZATION FOR CHAIRMAN TO SIGN WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, an agreement between Weld County and the Contin- ental Pipeline Company for improvements to Weld County Road 18'/2 has been presented to the Board of County Commissioners, and WHEREAS, said agreement provides for Weld County to pay for 50% of the total cost up to a maximum of $1500. 00, and WHEREAS, said agreement, being attached hereto and incor- porated herein by reference, provides that after completion and inspection, Weld County will make payment to Continental Pipeline Company within thirty days of receipt of invoice, and WHEREAS, the Board has studied said agreement and deems it advisable to approve same. NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado that the agreement between Weld County and the Continental Pipeline Company for improvements to Weld County Road 18# be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chairman be, and hereby is, authorized to sign said agreement. The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 18th day of October, A.D. , 1982. -}}-- BOARD OF COUNTY COMMISSIONERS ATTEST: '1/4711 4F.(.tP/o0/�P/in/ WELD COUNTY, COLORADO i Weld County Clerk and Recorder and Clerk to the Board_ John T. Martin, C�man BY : i ^ .a —,�1( l ,. il/ Deputy County Clerk h ci— Carlson, ro-Tem APPROVED AS TO FORM: ���� Norman Carlson /f C ?XsL> &0•°;'w`� EXCUSED County Attorney . . Kirby s , ne K. Steinmark 820803 DATE PRESENTED: October 20, 1982 U _ .. i21/gz AGREEMENT THIS AGREEMENT, made and entered into this /87+day of 2c lobe r , 1982, by and between the COUNTY OF WELD, STATE OF COLORADO, hereinafter called "County" and THE CONTINENTAL PIPELINE COMPANY, here- inafter called "Continental" . WHEREAS, Continental desires to improve Weld County Road 18 . 5 from U. S. Highway 85 east to Continental ' s truck unloading facility, and WHEREAS, the County has reviewed the proposed improvements and acknowledges they will enhance the accessibility and safety of that portion of Weld County Road 18 . 5 . For and in consideration of the mutual covenants and conditions hereinafter set forth, the parties mutually agree as follows : 1. Continental will contract the installation of six (6) inches of new base course and three (3) inches of new asphalt on County Road 18 . 5 in accordance with the attached drawing labeled "Exhibit A" . 2 . Weld County will bear one-half the cost of the new base and asphalt up to a maximum of $1500 . 00 for that portion on Road 18 . 5 that would be the normal 24 foot wide through lanes. 3. Continental will be responsible for all utility relocations and construction along U. S. 85, in accordance with Exhibit A. 1. 4 . All construction and material shall conform to the "State Department of Highways, Division of Highways , State of Colorado, Standard Specifications for Road and Bridge Construction" dated 1976 . 5. Weld County will have the right to inspect the work and the ability to reject any material or construction not meeting specifica- tion. 6 . After construction has been completed, Continental will invoice the County and the County will make payment within thirty (30) days of receipt of invoice. 7 . After receipt of the County ' s payment, Continental will deed additional right-of-way on Road 18 . 5 to accomodate the proposed improvements . IN WITNESS WHEREOF, the parties hereto have duly executed the agreement the day and year first-above written. CONTINENTAL PIPELINE COMPANY BOARD OF COUNTY COMMISSIONERS WELD COUNTY , COLORADO BY: ni JOhn Martin, Chairman Title: //.t5 7,..-^•G A .f�. ATTEST: an . l;,�nn, ' tuLftQ/ ,r.J r Weld County Clerk and Recorder and Clerk to the Board L Deputy County Clerk This document prepared and typed by County Engineer' s office. _ , CONTINENTAL PIPELINE , _, I CflPANY FORT LUPT 0 N i ! a \ TRUCK POINT r; J OI PP. PP. I 1O R to n oi � North Lire `� X \ I29.5 \ I 45W i/4,eec 2 _ ' R V{/y� NW Corner as.( ea.5 SW I/4,Sec.20 i o GtovCi O o — 0 in P V Gut \'wire a6.i N 89° 55'51 W — T_ .cu,/ \ Contains 744 sq. ft. I/ \' `,\ '. n,36° 56'08" \ R= 97.50 vI II \ \' \ L = 62.85 of I \ ( Ch Eeors N 48°13'42- E JAI/ Proposed 9jS" 7/L`41� i h i "1 A" \ . O.W. Le - 260 jj I 45.0 I w / i c0 xtn coVI u • . Gay 127 - 7/<,. - „.% I • j I; i II j o. I uJ11" .. _. / t I, SUI: in a 1 'cc''cc' 1�..- i7 16- , sa . . I - con ficu:nr a. a distanc0 t l I - curve to t! ?be Rid _t._ Hello