HomeMy WebLinkAbout20073233.tiff •
AGREEMENT
C-
THIS AGREEMENT,made this /5 day of tOdo4e r ,20 07 ,by and
between Weld County, Colorado,hereinafter called"Owner" and
MOun4atn (nnS7ruC +nr) nr . doing
business as(an individual,) or (a partnership,) or (a corporation)hereinafter called"Contractor".
WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned:
1.The Contractor will commence and complete the following: The roadway improvements of WCR 13 from WCR 8 to
SH 52,Road Improvements,as described in the Invitation for Bids,Bid No.B0700132
2. The Contractor will furnish all of the material, supplies, tools, equipment, labor and other services necessary for the
construction and completion of the Project described herein.
3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after the
date of the Notice to Proceed and will complete Weld County Road 13 From WCR 8 to SH 52, Road Improvements,
within 139 working days (no time will be charged due to winter shut down from December 1S' through March 31St)
unless the period for completion is extended otherwise by the Contract Documents.
4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms
therein for the sum of$2,631,742.9, or as shown in the Bid Schedule.
5. The term"Contract Documents" means and includes the following:
(A) Invitation for Bids
(B) Instructions to Bidders
(C) Bid Proposal
(D) Bid Bond
(E) Statement of Qualifications and Subcontractors
(F) Required Project Forms
(G) Agreement
(H) Labor and Materials Payment Bond
(I) Performance Bond
(J) Notice of Award
(K) Notice to Proceed
(L) Change Order
(M) Certificate of Substantial Completion
(N) Lien Waiver
(O) Notice of Acceptance
(P) Drawings prepared by FHU,titled"Weld County Road 13 WCR 8 to SH 52".
(Q) Specifications prepared or issued by the Weld County Public Works Department.
(R) Colorado Department of Transportation"Standard Specifications for Road and Bridge Construction"
(S) Colorado Department of Transportation Standard Plans"M&S Standards"
(T) Addenda:
No. 1 ,dated SEPTEMBER 5 ,2007
No. 2 ,dated SEPTEMBER 5 ,2007
No. 3 ,dated SEPTEMBER 5 ,2007
6. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents, or
otherwise agreed upon in writing.
ale?-30?
AGREEMENT(Continued)
7. This Agreement shall be binding upon all parties hereto and their respective heirs, executors, administrators,
successors,and assigns.
8. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this
Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional
compensable work to be performed, which work causes the aggregate amount payable under the Contract to exceed the
amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor, in
writing, that lawful appropriations to cover the costs of the additional work has been made or unless such work is
covered under a remedy-granting provision contained in the Contract.
IN WITNESS WHEREOF,the parties hereto have executed,or caused to be executed by their duly authorized
officials,this Agreement in three(3)copies each of which shall be deemed an original on the date first above written.
ORDERED BY: CEPTED BY:
THE BOA OF WELD COUNTY COMMISSIONERS CONTRAC OR
d\��\\Jlam
BY Uvj, e BY
NAME David E. Lon NAME Pamela Duncan
(Please Print)
TITLE Chair TITLE Vice President
DATE OCT 1 5 2007 ADDRESS 622 Main Street
P.O. Box 405
r , - Platteville, CO 80651 hr e rz4L, (7,2
a]
tar -
. .
A, w .,
,,
0,, ig,„, 4
✓ (SEAL)
aiATTEST: #vJvL; /tf . ;ga ATTEST:
Weld County Clerk to the Board JCW,SA_, ans
BY O6 4 JLr'i1?5 BY Sandy Arends
�`*� (Please Type)
?oo7-3x33
Kiti6;"),
MEMORANDUM
TO: Clerk to the Board DATE: October 8, 2007
CFROM: Bob Patrick, Project Manager
COLORADO SUBJECT: Consent Agenda Item
Agreement with Mountain Constructors, Inc. on the WCR 13 From WCR 8 to SH 52 Roadway
Improvement project.
Enclosed are five (5) Original agreements for the Chair's signature. Upon signing please keep
one for the Board, send one to Purchasing and the remaining 3 copies to Public Works as soon
as possible.
pc: Bob Patrick
Mona Weidenkeller
4,
co Ni
DJ
01
CUJ
{ fIJ
M:\-Active Projects\Strategic Corridor\WCR 13, from WCRB to SH 52+\WCR 8 TO SH 52\contracts\10-08-07 Memo to Board
contractor's signed agreements.DOC
E& aslo
2007-3233
Hello