HomeMy WebLinkAbout20072788.tiff WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
TERRACON
DATED: August 6, 2007
Work Order Number: TERRACON-2
Project Title: Public Works WCR 13 From WCR 8 to SH 52
Commencement Date: September 30, 2007
Completion Date: June 30, 2008
Limitations on compensation: Not to exceed$20,645.00
Project Description: Provide materials testing and inspection services.
Scope of Services: See attached Scope of Work dated July 31, 2007
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services dig A eement
e/����
and this work order (including the attached By:
forms) the Professional Services Agreement Proj ct Manager
shall control. Date: _., Tr-. efr
Professional By: �_�/� //
Department Head
Terracon Consulting Engi rs Date: F -.to -67
1289 First Avenue
Greeley CO 0631 By:
Director of Finance and Administration
By: Date: 08/29/2007
Title: 1°/v/��/ ( By: t- 'l ��✓�
�� / Pro—Tem Chairman, Weld County Commissioners
� D
Date: Date: OR/79/2007
Ea De se,
02007- 78cf
Or` /7 c (/ 9- d9- ao0.
- E C_JE_ _ LI W E,_rn
lierracon
�I
J V AUG 1 5 2007 i Consulting Engineers&Scientists
July 31, 2007 1242 Bramwood Place
Longmont,Colorado 80501
WELD COUNTY PUBLIC WORKS DEPT Phone 303.776.3921
Fax 303.776.4041
Weld County Public Works www.terracon.com
PO Box 758
1111 H Street
Greeley, CO 80632
To: Mr. Bob Patrick
Re: Material Testing and Inspection Services
Weld County Road 13: WCR 8 to HWY 52
Weld County, Colorado
Terracon Proposal # C2207082
Dear Mr. Patrick,
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to
provide material testing and inspection services relative to the above-referenced site. Our
proposal includes an outline of the project information provided to us, the proposed scope of
services and our estimated fees based upon guidelines set forth by Weld County Public Works.
These fees include quality control testing for asphalt paving.
PROPOSED CONSTRUCTION
We understand the project will involve approximately 23,647 cubic yards of aggregate base
course, 21,832 tons of asphalt, and 15,600 cubic yards of embankment fill. There are also 360
linear feet of curb and gutter, splash aprons and numerous box culverts. It is our understanding
that the project will commence October of 2007 with a projected finish date of July of 2008.
Based upon our understanding of the project, the following quality assurance material testing
services may be required for the proposed construction:
• Field density-compaction testing and laboratory evaluation of soils for embankment
backfill, pavement sub-grade, and structure backfill;
• Field and laboratory testing of concrete;
• Field and laboratory testing of asphalt-concrete.
Delivering Success for Clients and Employees Since 1965
More Than 90 Offices Nationwide
Weld County Road 13: WCR 8 to HWY 52
Material Testing and Inspection Services Terracon
Proposal No. C2207082
Field Density—Compaction Testing: An engineering technician will be provided on a part-time
or as-requested basis to perform materials testing services for earthwork. We understand
testing will consist of moisture-density relationships, one point checks, gradations, Atterberg
Limits and compaction testing with a nuclear density gauge. The testing frequency will be in
accordance with the current Colorado Department of Transportation (CDOT) Field Materials
Manual Quality Control Schedule.
Concrete: An engineering technician will be provided on a part-time or as requested basis to
sample fresh concrete used during construction. The concrete will be tested for slump, air
content, unit weight, and temperature at the time of placement during construction.
Compressive strength testing will be performed to determine compliance with project
specifications. Test results will be provided in the field for your review and compressive
strength test results will be conveyed as available. The testing frequency will be daily and as
scheduled per the contractor's request. The areas that shall be addressed are curb and gutter,
splash aprons, and box culverts.
Asphalt: Field density-compaction testing by nuclear methods and coring will be provided by
an engineering technician, on an as-scheduled basis, during the placement of asphalt concrete
at the project. Test samples will be taken to supplement the quality control testing being
performed by the asphalt supplier. A Terracon representative will also obtain samples for
laboratory tests as required. Daily reports of test results will be available on-site for your
review.
Engineering, Supervision and Clerical: Engineering, supervision and clerical services will be
provided as required to manage the project and prepare formal reports.
Compensation: We understand the project will be completed in approximately 139 working
days. We anticipate one technician will be required on an on-call basis, and that the average
technician work day will consist of two to four hours with a five-day work week being typical.
These hours may increase during heightened activity depending on the amount of inspection
services that are requested. Our estimated fees for testing are as follows:
2
Weld County Road 13: WCR 8 to HWY 52
Material Testing and Inspection Services Terracon
Proposal No. C2207082
EARTHWORK, CONCRETE, AND ASPHALT TESTING:
Earthwork:
Engineering Technician: 2.5 hours/day for 50 days @ $45.00/hour for nuclear testing,
embankment fill observation and one-point field curves: $5,625.00
Laboratory Technician: (SEE CHART BELOW)
Description Tests Rate Subtotal
Classification (Embankment) 8 $115.00 /test $920.00
Atterberg (Agg. Base Course) 12 $70.00 /test $840.00
Gradation (Agg. Base Course) 12 $45.00 /test $540.00
Proctor (Standard) 4 $115.00 /test $460.00
Procter (Modified) 2 $125.00 /test $250.00
• Subtotal $3,010.00
Concrete:
Engineering Technician: 12 tests @ $220.00 / (set of 4) for curb and gutter, culverts, and slope
and ditch concrete paving: $2,640.00
Asphalt:
Engineering Technician: 4 hours/day for 14 days @ $45/hour for road construction, nuclear
density testing, coring and sampling: $2,520.00
One Laboratory Technician: (SEE CHART BELOW)
Description Tests/Hours Rate Subtotal
Extraction / Gradation 11 $180.00/test $1,980.00
Extraction 11 $120.00/test $1,320.00
Determining Density of Cores 18 $45.00/hour $810.00
Maximum Theoretical Specific Gravity 15 $85.00/test $1,275.00
Specific Gravity Rip Rap 1 $65.00/test $65.00
Subtotal $5,450.00
Support
Project Manager: 20 hours @ $70.00 / hour: $1,400.00
TOTAL ESTIMATED SERVICES: $20,645.00
3
Weld County Road 13: WCR 8 to HWY 52
Material Testing and Inspection Services Terracon
Proposal No. C2207082
The fee and hourly based worksheets above were generated with the understanding that
Terracon Consultants, Inc. would be performing the duties of QA on the jobsite. The fees are
based upon our understanding and requirements of the project, CDOT specifications, and our
experience on similar projects. If services performed exceed the work described above,
additional costs will be invoiced at the respective unit rates after receiving written authorization
from the client. The unit rate for services required beyond the scope presented above will be in
accordance with 2007 Terracon Consultants, Inc. rate agreement with Weld County Public
Works.
We appreciate the opportunity of submitting this proposal, and are available to discuss the
details with you. We appreciate your consideration of Terracon for this work, and look forward
to working as your materials engineering consultant on this and future projects.
Sincerely,
Terracon Consultants, Inc.
G;lkyrerk
Scott M. Gruenberger Edward J. Paas, P.E.
Project Manager Principal
4
BOARD OF COUNTY COMMISSIONERS
REVIEW/WORK SESSION REQUEST
RE: Terracon Contract Work Orders 2 & 3 for Materials Testing and Inspection on WCR 13
DEPARTMENT: PUBLIC WORKS DATE: 8/16/07
•
PERSON REQUESTING: Wayne Howard, P.E., Chief Sr. Engineer
Brief description of the problem/issue: Public Works is proceeding with WCR 13 Road Project from WCR 8
and SH 52; and project SH 52 and WCR 13 Intersection Improvements. These projects will be active at the
same time and will require materials testing and inspection.
We have selected Terracon to perform these services under the On-Call Geotechnical Contract. Terracon has
submitted proposals and a not to exceed cost to complete the requested services. These services are required to
ensure materials used during construction meet contract specifications for embankment, gravel, concrete and
asphalt. Attached are Work Orders No. 2 and 3 outlining the scope of work and costs to complete the work.
Terracon estimates the cost for the WCR 13 from 8 to SH 52 to be $20,645.00 and for SH 52 and WCR 13 to be
$13,107.50
What options exist for the Board? (Include consequences,impacts, costs, etc. of options)
BOCC can either approve Work Orders No. 2 and 3 and continue proceeding with the work or deny approval
for Work Orders No. 2.
Recommendation to the Board: I recommend approval of Work Orders No. 2 and 3 for Terracon under On-
Call Geotechnical Contract.
Approve Schedule
Recommendation Work Session
David E. Long J -...
William H. Jerke
t/
William F. Garcia
`'� AUG 2 3 -'
Robert D. Masden
Douglas Rademacher—%� —
Attachments: Work Order Form No. 1, Scope of Work
pc: Mona Weidenkeller, Public Works
M\--Active Projects\Engineering On-Call Scrvices\Geotcclmical OM1CaII\Tcrracon\WO 2-WCR 13 8 TO SH 52\Work Session Request WO 2&3.doc
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
TERRACON
DATED: August 6, 2007
Work Order Number: TERRACON - 3
Project Title: Public Works STA 052A-027, SH 52 & WCR 13 Intersection Improvements
Commencement Date: October 30, 2007
Completion Date: July 30, 2008
Limitations on compensation: Not to exceed $13,107.50
Project Description: Provide materials testing and inspection services.
Scope of Services: See attached Scope of Work dated July 31, 2007
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services Agreement y�
and this work order (including the attached By: j4,1�i✓A.
forms) the Professional Services Agreement Project Manag r
shall control. Date: P7 /t 7
Professional By: 1— c . —
Department Head
Terracon Consulting Enginee Date: $'_0 - 07
1289 First Avenue
Greeley, CO 80631 By:
Director of Finance and Administration
By: Date: 088/29/2007
Title: YR lP 0/ PAL By: �t�`,.✓
/ / Pro-Tehairman, Weld County Commissioners
Date: 0/ C/e 7 Date: 08/29/2007
e ` Pu..)( is ul) 6,007-a9cPf
0 ?- ot9- ,70O7
•
lierracon
Consulting Engineers&Scientists
July 31, 2007 1242 Bramwood Place
Longmont, Colorado 80501
Phone 303.776.3921
Fax 303.776.4041
Weld County Public Works www.terracon.com
PO Box 758
1111 H Street
Greeley, CO 80632
To: Mr. Bob Patrick
Re: Material Testing and Inspection Services
HWY 52 Road Widening
Weld County, Colorado
Terracon Proposal # C2207084
Dear Mr. Patrick,
Terracon Consultants, Inc. (Terracon) appreciates the opportunity to submit this proposal to
provide material testing and inspection services relative to the above-referenced site. Our
proposal includes an outline of the project information provided to us, the proposed scope of
services and our estimated fees based upon guidelines set forth by Weld County Public Works.
These fees include quality control testing for asphalt paving.
PROPOSED CONSTRUCTION
We understand the project will involve approximately 7,547 tons of aggregate base course;
7,233 tons of asphalt, and 15,036 cubic yards of embankment fill. There are also 240 linear feet
of curb and gutter, and sidewalk, curb ramps. It is our understanding that the project will
commence October of 2007 with a projected finish date of January of 2008.
Based upon our understanding of the project, the following materials testing services may be
required for the proposed construction:
• Field density-compaction testing and laboratory evaluation of soils for embankment
backfill, pavement sub-grade, and structure backfill;
• Field and laboratory testing of concrete;
• Field and laboratory testing of asphalt-concrete.
Delivering Success for Clients and Employees Since 1965
More Than 90 Offices Nationwide
SH 52 North Road Widening
Material Testing and Inspection Services Terracon
Proposal No. C2207084
Field Density—Compaction Testing: An engineering technician will be provided on a part-time
or as-requested basis to perform materials testing services for earthwork. We understand
testing will consist of moisture-density relationships, one point checks, gradations, Atterberg
Limits and compaction testing with a nuclear density gauge. The testing frequency will be in
accordance with the current Colorado Department of Transportation (CDOT) Field Materials
Manual Quality Control Schedule.
Concrete: An engineering technician will be provided on a part-time or as requested basis to
sample fresh concrete used during construction. The concrete will be tested for slump, air
content, unit weight, and temperature at the time of placement during construction.
Compressive strength testing will be performed to determine compliance with project
specifications. Test results will be provided in the field for your review and compressive
strength test results will be conveyed as available. The testing frequency will be daily and as
scheduled per the contractor's request. The areas that shall be addressed are curb and gutter,
splash aprons, and box culverts.
Asphalt: Field density-compaction testing by nuclear methods and coring will be provided by
an engineering technician, on an as-scheduled basis, during the placement of asphalt concrete
at the project. Test samples will be taken to supplement the quality control testing being
performed by the asphalt supplier. A Terracon representative will also obtain samples for
laboratory tests as required. Daily reports of test results will be available on-site for your
review.
Engineering, Supervision and Clerical: Engineering, supervision and clerical services will be
provided as required to manage the project and prepare formal reports.
Compensation: We understand the project will be completed in approximately 60 working
days. We anticipate one technician will be required on an on-call basis, and that the average
technician work day will consist of two to four hours with a five-day work week being typical.
These hours may increase during heightened activity depending on the amount of inspection
services that are requested. Our estimated fees for testing are as follows:
2
• SH 52 North Road Widening
Material Testing and Inspection Services Terracon
Proposal No. C2207084
EARTHWORK, CONCRETE, AND ASPHALT TESTING:
Earthwork:
Engineering Technician: 2.5 hours/day for 25 days @ $45.00/hour for nuclear testing,
embankment fill observation and one-point field curves: $2,812.50
Laboratory Technician: (SEE CHART BELOW)
Description Tests Rate Subtotal
Classification (Embankment) 2 $115.00 /test $230.00
Atterberg (Agg. Base Course) 4 $70.00 /test $280.00
Gradation (Agg. Base Course) 4 $45.00 /test $180.00
Proctor (Standard) 3 $115.00 /test $345.00
Procter (Modified) 1 $125.00 /test $125.00
Subtotal $1,160.00
Concrete:
Engineering Technician: 10 tests @ $220.00 / (set of 4) for curb and gutter, culverts, and slope
and ditch concrete paving: $2,200.00
Asphalt:
Engineering Technician: 4 hours/day for 14 days @ $45/hour for highway construction:
$2,520.00
Laboratory Technician: (SEE CHART BELOW)
Description Tests/Hours Rate Subtotal
Extraction/Gradation 14 $180.00/test $2,520.00
(*based on daily testing)
Determining Density of Cores 6 $45.00/hour $270.00
Maximum Theoretical Specific Gravity 6 $85.00/test $510.00
Specific Gravity Rip Rap 1 $65.00/test $65.00
Subtotal $3,365.00
Support
Project Manager: 15 hours @ $70.00 / hour: $1,050.00
TOTAL ESTIMATED SERVICES: $13,107.50
3
SH 52 North Road Widening
Material Testing and Inspection Services Terracon
Proposal No. C2207084
The fee and hourly based worksheets above were generated with the understanding that
Terracon Consultants, Inc. would be performing the duties of QA on the jobsite. The fees are
based upon our understanding and requirements of the project, CDOT specifications, and our
experience on similar projects. If services performed exceed the work described above,
additional costs will be invoiced at the respective unit rates after receiving written authorization
from the client. The unit rate for services required beyond the scope presented above will be in
accordance with 2007 Terracon Consultants, Inc. rate agreement with Weld County Public
Works.
We appreciate the opportunity of submitting this proposal, and are available to discuss the
details with you. We appreciate your consideration of Terracon for this work, and look forward
to working as your materials engineering consultant on this and future projects.
Sincerely,
Terracon Consultants, Inc.
047
--2 AAA. CCW
Scott M. Gd�enberger Edward J. Paas, .E.
Project Manager Principal
4
a
MEMORANDUM
WI TO: Clerk to the Board DATE: August 27, 2007 1 D
• FROM: Wayne Howard, Public Works
COLORADO
SUBJECT: Agenda Item
Please submit these items on the next Board agenda.
Work Order Forms with Terracon:
• Work Order No. 2 not to exceed $20,645.00
• Work Order No. 3 not to exceed $13,107.50
Two duplicate, original Work Orders are attached. Please send one original Work Order 2 and one
original Work Order 3 to Public Works.
M:\Francie\Agenda Item.doc