Loading...
HomeMy WebLinkAbout20071781.tiff WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CTL THOMPSON DATED: June 21st,2007 Work Order Number: CTL-1 Project Title: Public Works Operations Overlay Material Testing Commencement Date: June 2S� 2O07 Completion Date:November 301 2O07 Limitations on compensation: Not to exceed$17,405.00 Project Description: Materials testing of private vendor purchased HMA for the use of overlay and paving operations conducted by Weld County Public Works Pavement Management Division. Location of work to be determined by project inspector. Scope of Services: See attached Scope of Work Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein, by this reference, and accordance with the terms and conditions Notice to Proceed is hereby given. contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld Co terms of the Professional Services Agreement 72 and this work order (including the attached By: ' forms) the Professional Services Agreement Project Manager / shall control. Date: �� Professional By: 7c.."- Department Head CTL Thompson, Inc. Date: I 11/ 351 Linden Street,Unit 140 Fort Collins,CO 80524 By: 7 9 Director of Finance and Administration By:6 Date: 06/25/2007 Title: 76f985' l/W$&5 By: c).0—2A &. IND Acting Pro—TenChairman, Weld County Commissioners Date: 6 -20-07 Date: 06/25/2007 e. T: aid del Atire O v, y���UNTY CLERK TO THE BOARD 1t61 '� / ,;1/28 Q. .�� F /aid ,`� ��� Y CLEF TO THE $ RD 04 2-4 c17 OG E�D175� �s-C) 7 (7 O : 07-/289/ CTL I THOMPSON INCORPORATED June 20,2007 Weld County Public Works Department 1111 H Street P.O. Box 758 Greeley,Colorado 80632-0758 Attention: Mr.Tracy A. Dyer Lead Construction Inspector Subject: Estimated Test Frequencies and Fee Estimate for Asphalt Testing Services Maintenance Overlay Projects Weld County, Colorado Proposal No. FC 07-0226; Project No. FC04101-355 Thank you for your time on Friday morning,June 15,2007 to discuss the scope of work you anticipate for year 2007. At your request, CTLIThompson, Inc. is pleased to provide our estimated test frequencies and fee estimate for asphalt testing services for various maintenance overlay projects located throughout Weld County,Colorado. You provided us with the 07 Paving Schedule for our use in developing our estimated test frequencies of services and fee estimate. The 07 Paving Schedule indicated approximately 47,560 tons of asphalt is planned beginning on June 25,2007 and extending the remainder of year 2007. We understand our scope of services for asphalt testing will consist of field density testing as well as laboratory testing. Our engineering technicians will be available on an on-call basis as needed to support the Weld County field staff to perform field compaction testing of asphalt.For the purpose of our fee estimate,we have assumed 15 nuclear field density tests per week to supplement density testing performed by Weld County. In general,we anticipate our services for asphalt testing will consist of the following. Item No. Description Assumed Test Total No. Total Fee Frequency of Tests 301 Sieve Analysis 1 Test/1000 Tons 48 $1,920 (Plus#4 Material) 302 Sieve Analysis 1 Test/1000 Tons 48 $1,440 (Minus#4 Material) 306 Fractured Face 1 Test/Large Project 3 $600 Determination 308 Maximum Theoretical Specific 1 Test/Week 18 $1,530 Gravity(RICE) 309 Lottman (TSR)Test 1 Test/Large Project 3 $1,050 310 Mix Design Bulk Unit Weight and 1 Test/Large Project 3 $615 Hveem Stability Verification 1113 AC Content by Ignition Oven 1 Test/1000 Tons 48 $4,080 314 Core Field Samples 3 Hours/Large Project 3 $900 311 Extraction/Gradation on RAP 1 Test/Month 5 $950_ 313 Nuclear Field Density Tests 15 Test/Week 270 $4,320 TOTAL ESTIMATED FEE: $17,405 351 Linden Street I Suite 140 l Fort Collins,Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 We anticipate that Weld County will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our asphalt testing services. Our work performed,estimated scope of services and associated fees will be conducted according to the terms and conditions of our professional services agreement with Weld County Public Works Department(Weld County Proposal No.B07-00069;executed April 17,2007)as well as the Amended Fee Schedule(letter dated June 11,2007). Our total estimated fee for asphalt testing is 517,405.00. It should be emphasized that this estimate is based upon assumptions of actual quantities and contractor's schedule. The fee will be charged only for the actual hours and unit rates presented for tests and observations requested by the owner,contractor or subcontractors who schedule the services. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON,INC. Eric D. Bernhardt, PE Manager of Field Services 2 WELD COUNTY PUSLJC WORKS DEPARTMENT SCOPE AND FEE EETMATE FOR ASPHALT TESTING CTL I T PROPOSAL NO.FC A-022E 2007 Public Works Operations HMA Paving / Overlay Locations These are the overlay projects that would be candidates for testing by the geotechnical firm CTL Thompson for the summer 2007 season. List locations identified by Operations Division. Project Location Tonnage 1. RD 53 from Hwy 34 to RD 60.5 4500 tons 2. O st to 66 1200 tons 3. RD 77 2000' N HWY 14 to 100 8900 tons 4. RD 34 from RD 5 to Mead 2000 tons 5. RD 34 from RD 13 to Mead 2300 tons 6. RD 3.5 from HWY 119 to RD EOP 1000 tons 7. Turner Blvd 350 tons 8. RD 16 from HWY 85 to RD 31 2400 tons 9. RD 3 from HWY 52 to 1.5 8255 tons 10. Hudson frontage Rd 2000 tons 11. RD 47 from I-76 Frontage Rd to N end 400 tons 12. RD 394 from HWY 85 to RD 35 2675 tons 13. Balsom Ave 750 tons 14. RD 41 from HWY 85 to Hwy 392 5230 tons 15. RD 19 from RD 70 to RD 74 5450 tons 16. TCOM & HST at Pw Facility 500 tons The total tonnage for the testing firm would be 47,010 tons from the date of June 22n° 2007 to the end of the cycle. el al 71 73 le 77 79 el e3 Be 97 99 9I 93 36 97 99 lel 103 We 421 6013 a 15�x II x, n v n . a y x n . u o .a a .e 51 m x m \ 2007 PAVING PLAN :® 104 530 3. 94 m Era m Roads being paved n • ~ ■•1�1 rt��-�_-_.. tea` rt - ice, ,x y o a a nx • y Ai 1. MEMORANDUM TO: Clerk to the Board DATE: June 21, 2007 COLORADO FROM: Tracy Dyer, Public Works SUBJECT: Agenda Item Work Order with CTL/Thompson for Public Works Operations paving material testing in the amount not to exceed $17,405. The appropriate documentation is attached. M:AFrancieAAgenda Iteni doe _ r r+.f a Cam) zrn C;. .a; fir, N U)- _.. cn n —O rn P rn C2: w N Cn 0 2007-1781 Hello