Loading...
HomeMy WebLinkAbout20071415.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant: Marcum Midstream 1995-2 Business Trust Case USR-1604 Conquest Oil Company Number Submitted or Prepared Prior to At Hearing Hearing N 1 Staff Comments X Department of Planning Services Field Check Form X Planning Commissioner Spitzer Field Check Form Letter to Applicant X Affadavit of sign posting X Legal Notifications X 2 Application X Maps X Surrounding Property/Mineral Owners X Utilities X 3 Referral List X 4 Referrals without comment Platte Valley Conservation District, referral dated 2-21-2007, 3-21-2007 X 5 Referrals with comments X Weld County Code Compliance, referral received 2-9-2007, 3-8-2007 Platteville Gilcrest Fire Protection District, referral received 2-12-2007 X State of Colorado, Office of the State Engineer, referral dated 2-14-2007 X Weld County Department of Building Inspection, referral dated 2-16-2007 X Weld County Sheriff's Office, referral dated 2-25-2007 (?) X State of Colorado, Division of Wildlife, referral dated 3-5-2007 X Weld County Department of Public Health and Environment, referral dated 3-9- X 2007 Weld County Department of Public Works, referral dated 3-15-2007, 3-28-2007 6 PC Exhibits 'Faesimile Letter from Kerr-McGee Anadarko dated April 11, 2007 X Email from Frase Consulting, representative for SPO, dated April 14,2007 X Email from T. Enright, Kerr-McGee Anadarko dated April 15, 2007 X Email from T. Enright, Kerr-McGee Anadarko dated April 16, 2007 X I EXHIBIT _Ti-LI'[5l' 2007-1415 I hereby certify that the 6 items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commissioners hearing. Kim Ogle 4. -nn=r csttri , LAND USE APPLICATION COLORADO SUMMARY SHEET Case Hearing Date: April 17, 2007 Number: USR-1604 Applicant: Marcum Midstream 1995-2 Business Trust/Conquest Oil Company 303 East 171h Avenue, Suite 660, Denver, CO 80203 Request: Site Specific Development Plan and Special Review Permit for an Oil and Gas Support Facility (Class II Oilfield Waste Disposal Facility - Saltwater Injection Facility) in the A (Agricultural)Zone District. Legal Description: S2 SE4 of Section 30, T3N, R65W of the 6th P.M., Weld County, Colorado Location: West of and adjacent to County Road 39; approximately 2 miles south of County Road 32 Size of Parcel: 80 +/-acres Area of USR: Lot A of RE-4612 POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received responses from the following agencies: • Weld County Code Compliance, referral dated 2-9-2007, 3-8-2007 • Platteville-Gilcrest Fire Protection District referral dated 2-12-2007 • State of Colorado, Office of the State Engineer, referral dated 2-14-2007 • Weld County Department of Building Inspection, referral dated 2-16-2007 • Platte Valley Soil Conservation District, referral dated 2-21-2007, 3-21-2007 • Weld County Sheriffs Office, referral dated 2-25-2007 • State of Colorado, Division of Wildlife, referral dated 3-5-2007 • Weld County Department of Public Health and Environment, referral dated 3-9-2007 • Weld County Department of Public Works, referral dated 3-15-2007; 3-28-2007 The Department of Planning Services' staff has not received responses from the following agencies: • State of Colorado, Oil & Gas Conservation Commission USR-1604,CONQUEST OIL COMPANY, page 1 EXHIBIT I c SPECIAL REVIEW PERM ADMINISTRATIVE REVIEW COLORADO • Planner: Kim Ogle Case Hearing Date: April 17, 2007 Number: USR-1604 Applicant: Marcum Midstream 1995-2 Business Trust/Conquest Oil Company 303 East 17th Avenue, Suite 660,Denver, CO 80203 Request: Site Specific Development Plan and Special Review Permit for an Oil and Gas Support Facility (Class II Oilfield Waste Disposal Facility - Saltwater Injection Facility) in the A (Agricultural)Zone District. Legal Description: S2 SE4 of Section 30, T3N, R65W of the 6th P.M., Weld County, Colorado Location: West of and adjacent to County Road 39; approximately 2 miles south of County Road 32 Size of Parcel: 80 +/-acres Area of USR: Lot A of RE-4612 Parcel Number: 1213-30-400014 THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services'staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-5-100.A(OG.Goal 5. )states "Oil and gas support facilities decisions which do not rely on geology for locations shall be subjected to review...." This proposal has been reviewed by the appropriate referral agencies and it has been determined that the attached Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of the health, safety and welfare of the inhabitants of the neighborhood and county. Section 22-2-60.D A.Goal 4 states:"Conversion of agricultural land to urban scale residential, commercial, and industrial uses will be considered when the subject site is in an area that can support such development. Such development shall attempt to be compatible with the region. This goal is intended to address conversion of agricultural land to non-urban uses. Once converted, this land is less conducive to agricultural production." The site consists of eighty (80) acres and the U.S.D.A. Soils Maps of Prime Farmlands of Weld County dated USR-1604,CONQUEST OIL COMPANY, page 2 1997 indicate that the soils on this property as"other",with the USR area occurring within Lot A of RE-4612. The surrounding properties are primarily agricultural with single family homes. The applicant is proposing an on-site septic system and the water will be provided by an individual well, permit number 272956. B. Section 23-2-220.A.2 --The proposed use is consistent with the intent of the A (Agricultural)Zone District. Section 23-3-40.A.2 of the Weld County Code provides for Oil and Gas Support and Service as a Use by Special Review in the A(Agricultural)Zone District. C. Section 23-2-220.A.3 --The uses which will be permitted will be compatible with the existing surrounding land uses. The site is bordered by agricultural uses. Single family residences are located on properties to the north and southeast of the site. Development Standards and Conditions of Approval will ensure that this use will be compatible with surrounding land uses. D. Section 23-2-220.A.4 --The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is not located within three miles of a municipality. The applicant is requesting a sign that complies with the Commercial Zone District of the Weld County Code. The applicant is proposing to have a sign to be located in the north west corner of the intersection of County Road 39 and County Road 28, section line road. Further, the applicant states there will be 60-70 truck trips per day to this facility. County Road 39 is utilized for truck traffic for the nearby dairy, oil and gas facilities and existing commercial and industrial facilities all permitted under an Use by Special Review Permits. [(North) SUP-243 unknown number Turkey Farm; (East) USR-1201, 6000 head Dairy; (South)SUP-128 100,000 head Turkey Farm, USR-1311 Salvage Yard, AmUSR-1232 Commercial Junkyard, AmUSR-842 Tire Mountain, and AmSPR-297, Patina E+P Waste Facility]. E. Section 23-2-220.A.5--The site does not lie within any Overlay Districts. Effective January 1, 2003, Building Permits issued on the subject site will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11) Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) F. Section 23-2-220.A.6 --The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The U.S.D.A. Soils Maps of Prime Farmlands of Weld County dated 1979 designated the soils on this property as "other". G. Section 23-2-220.A.7 --The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. USR-1604,CONQUEST OIL COMPANY, page 3 This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services'staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. The plat shall be prepared per Section 23-2-260.D of the Weld County Code. (Department of Planning Services) B. All sheets of the plat shall be labeled USR-1604 (Department of Planning Services) C. The plat shall be amended to delineate the following: 1) The attached Development Standards. (Department of Planning Services) 2) The approved Screening Plan, to address the outdoor storage of materials, including the trash dumpster associated with this facility shall be screened from adjacent properties, including the public rights-of-way. (Department of Planning Services) 3) County Road 39 is designated on the Weld County Road Classification Plan as a collector road, which requires 80 feet of right-of-way at full build out. There is presently 60 feet of right-of-way. An additional ten feet shall be delineated on the plat as future County Road 39 right-of-way. All setbacks shall be measured from the edge of future right-of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is maintained by Weld County. (Department of Public Works) 4) Based on background traffic and future use of the site the applicant will be required to add acceleration/deceleration lanes and a left turn lane to County Road 39. A detail of the entrance and with the improvements shall be delineated on the plat. (Department of Public Works) 5) The applicant shall delineate the 30 feet of right-of-way along the south edge of Section 30, T3N, R65W. No right-of-way exists along the north edge of Section 31, T3N, R65W. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is not maintained by Weld County. (Department of Public Works) 6) The applicant shall delineate the 40-foot easement across Lot A for the benefit of Lot B of RE-4612. This easement shall be granted by the RE-4612 Recorded Exemption plat. Section Line accesses are considered private lanes with no county maintenance. (Department of Public Works) 7) The applicant shall delineate the proposed access drive to County Road 39. The internal drive shall be paved and provide adequate access to the parking for the office building. (Department of Public Works) 8) All parking for this site must be off street and internal and delineated on the plot plan map. Each parking space shall be equipped with wheel guards or curb blocks to prevent vehicles from coming into contact with walls or other structures. (Department of Public Works) 9) The boundary of the USR shall include only Lot A of RE-4612 (the subject of this USR)that comprises the eastern 34.5 acres of the eighty acre tract. (Department of Planning Services) USR-1604,CONQUEST OIL COMPANY, page 4 D. The applicant shall submit to the Department of Public Works a detailed drawing delineating the entrance and clearly showing the acceleration/deceleration lanes and left- turn lane, if required, along County Road 39 for review and approval. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services (Department of Public Works) E. The applicant shall submit to the Department of Public Works a detailed drawing delineating the Circulation and Parking Plan for review and approval. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services (Department of Public Works) F. The applicant shall submit to the Department of Public Works a detailed drawing delineating the proposed entrance design to the site. The proposed entrance design causes safety issues regarding vehicle staging and sight distance. The applicant shall submit a new design with the entrance having the approach at a 90' angle to County Road 39 for a minimum distance of three (3)truck lengths. (Department of Public Works) G. The applicant shall attempt to address the requirements (concerns)of Platteville-Gilcrest Fire Protection District, as stated in the referral response dated February 12, 2007. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Platteville-Gilcrest Fire Protection District, Department of Planning Services) H. The applicant shall address the requirements of the Weld County Sheriffs Office as stated in the referral response dated February 25, 2007. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Weld County Sheriff's Office) The applicant shall attempt to address the requirements (concerns) of Colorado Division of Wildlife, as stated in the referral response dated March 5, 2007. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Colorado Division of Wildlife) J. The applicant shall submit written evidence of compliance with all of the Department of Public Work's stipulations and requirements as stated herein. Written evidence shall be submitted to the Department of Planning Services. (Department of Planning Services) K. All required Air Emissions Permits must be obtained from the Air Pollution Control Division, Colorado Department of Public Health and Environment. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) L. A Ground Water Monitoring Plan shall be submitted to the Weld County Health Department of Public Health and Environment for review and approval. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) M. If appropriate, a Storm Water Discharge Plan shall be submitted to the Weld County Department of Public Health and Environment and Colorado Department of Public Health and Environment for review and approval. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) USR-1604,CONQUEST OIL COMPANY, page 5 N. The applicant shall enter into a Long-Term Maintenance and Improvements agreement for County Road 39 associated with the designated haul route. The designated haul route shall be on County Road with the agreement 1 mile north on County Road 39 and extending 1 mile east on County Road 28. The agreement shall include any intersection improvements, acceleration and deceleration lanes and adequate turning radiuses associated with the heavy hauling to the proposed facility. Evidence of Department of Public Works approval shall be submitted in writing to the Weld County Department of Planning Services. (Department of Public Works) O. The applicant shall submit a Screening Plan to the Department of Planning Services for review and approval. With approval, the Screening Plan information shall be graphically delineated on the USR Plat. (Department of Planning Services) P. The applicant shall submit written evidence of compliance with all of the Department of Public Health and Environment's stipulations and requirements. Written evidence shall be submitted to the Department of Planning Services. (Department of Planning Services) Q. The applicant shall either submit a copy of an agreement with the property's mineral owner/operators stipulating that the oil and gas activities have been adequately incorporated into the design of the site or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operators. Drill envelopes can be delineated on the plat in accordance with the State requirements as an attempt to mitigate concerns. The plat shall be amended to include any possible future drilling sites. (Department of Planning Services) R. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 2. Upon completion of 1. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services'Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty (30)days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to maps(a�co.weld.co.us. (Department of Planning Services) 4. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required sixty(60) days from the date the Board of County Commissioners approval was signed a $50.00 recording continuance charge may be added for each additional 3 month period. (Department of Planning Services) 5. Prior to the Release of Building Permits: A. A building permit shall be obtained prior to the construction of any new building, tanks or support facilities. (Department of Building Inspection) USR-1604,CONQUEST OIL COMPANY, page 6 B. A plan review is required for each building for which a building permit is required. Plans shall include a floor plan. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. Include a Code Analysis Data sheet provided by the Weld County Building Department with each Building permit application. (Department of Building Inspection) C. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; and the 2002 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) D. The Future office building will be classified as B occupancy. Contact Plateville-Gilcrest Fire Protection District for their requirements. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by Chapter 23 of the Weld County Code. (Department of Building Inspection) E. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. (Department of Building Inspection) F. A concrete secondary containment structure (floor and walls) surrounding each tank or battery of tanks shall be constructed. The volume retained by the structure shall be 150% greater than the volume of the largest tank inside the structure. A registered professional engineer shall design the structure. The structure shall prevent any release from the tank system from reaching land or waters outside of the containment area. The operator shall provide evidence from the engineer to the Weld County Department of Public Health and Environment and Planning Services that the structure has been constructed to meet this criterion. (Department of Public Health and Environment) G. A detailed design of the"concrete unloading pad"shall be submitted to the Weld County Department of Public Health & Environment shall be submitted for review and approval. The design shall demonstrate how all spilled waste, stormwater, and wash down water will be contained within the receiving area and concrete sump. The"concrete unloading pad"shall be constructed and operated in accordance with the approved design. (Department of Public Health and Environment) H. The applicant shall submit evidence to the Weld County Departments of Public Health and Environment and Planning Services and the Colorado Oil and Gas Conservation Commission that the facility was constructed in accordance with the application materials. (Department of Public Health and Environment) A copy of the drilling log shall be submitted to the Weld County Department of Public Health and Environment. (Department of Public Health and Environment) USR-1604,CONQUEST OIL COMPANY, page 7 J. Solids and sediment will accumulate in the storage tanks. The facility shall submit a detailed plan that describes the method those solids will be removed, including all on-site handling procedures. The plan shall provide a commitment to notify the Department of Public Health and Environment, in writing, in the event the plan is amended. The plan shall be reviewed and approved by the Department of Public Health and Environment. (Department of Public Health and Environment) K. A detailed closure plan shall be submitted to the Department of Public Health and Environment and the Colorado Oil and Gas Conservation Commission. The closure plan shall include a description of the manner in which the well will be plugged and abandoned, as well as specific details regarding reclamation of the property. No structures or equipment associated with the facility shall remain on the property following closure. (Department of Public Health and Environment) L. The facility shall post financial assurance with the Colorado Oil and Gas Conservation Commission (COGCC). The financial assurance shall be adequate to cover a third-party closure of the facility, including the plugging and abandonment of the well, in accordance with industry standards, and the removal of all structure (including concrete) on the facility. The site shall be returned to its original grade. In the event the COGCC does not have the authority to require financial assurance for the entire cost required for third-party closure, the facility shall post the remainder of the financial assurance with Weld County. The facility shall submit evidence to the Weld County Departments of Public Health and Environment and Planning Services that the appropriate financial assurance has been obtained. (Department of Public Health and Environment) M. Provide evidence to the Weld County Department of Public Health & Environment that a well has been appropriately permitted and dug to provide for sanitary use for the facility. (Department of Public Health and Environment) N. A letter of approval shall be provided from the Platteville-Gilcrest Fire Protection District. (Department of Building Inspection/Platteville-Gilcrest Fire Protection District) 5. Prior to Operation: A. The applicant shall contact the office of the Weld County Sheriff to schedule a walk- through of the site for the purposes of implementing the program "Crime Prevention through Environmental Design". This program reduces the likelihood of criminal activity at a specific location by"hardening" it to crime. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Sheriff's Office) USR-1604,CONQUEST OIL COMPANY, page 8 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS CONQUEST OIL COMPANY (Marcum Midstream 1995-2 Business Trust) USR-1604 1. The Site Specific Development Plan and Special Review Permit for an Oil and Gas Support Facility(Class II Oilfield Waste Disposal Facility) in the A(Agricultural)Zone District, as indicated in the application materials on file and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The facility shall be constructed and operated to ensure that contamination of soil and groundwater does not occur. (Department of Public Health and Environment) 4. A manager, knowledgeable in operating an injection well, shall be on site when the facility is receiving waste. (Department of Public Health and Environment) 5. A safe and adequate sewage disposal system shall be available on the facility premises. (Department of Public Health and Environment) 6. A safe and adequate fresh water supply[Well Permit number 272956] shall be available on the facility premises. (Department of Public Health and Environment) 7. No disposal of waste other than Class II, as defined by the Environmental Protection Agency, is permitted. Any changes from the approved Class II use would require an amendment to this Special Review permit. (Department of Public Health and Environment) 8. Any wastes generated on the facility shall be disposed in accordance with the Colorado solid Waste Act, Section 30-20-100.5, C.R.S., or other appropriate rule, regulation, or law. (Department of Public Health and Environment) 9. The maximum permissible noise level shall not exceed the industrial limit of 70 dB(A), as measured according to Section 25-12-102, CRS. (Department of Public Health and Environment) 10. Fugitive dust and fugitive particulate emissions shall be controlled on this site. (Department of Public Health and Environment) 11. All chemicals stored on-site must be in locked buildings, on an impervious surface, provided manufacturer recommendations for safe storage and handling are in accord. In any event, USR-1604,CONQUEST OIL COMPANY, page 9 manufacturer recommendations will take precedence. (Department of Public Health and Environment) 12. The facility shall comply with any required air emissions permit from the Air Pollution Control Division, Colorado Department of Public Health and Environment. (Department of Public Health and Environment) 13. All liquid wastes received at the facility shall be unloaded on the unloading pad. The concrete unloading pad shall be cleaned at a frequency that prevents oils and other wastes from building up on the pad. At a minimum, the pad shall be washed daily, with a jet hose to remove any waste build-up. During winter months, the facility shall maintain the unloading pad free of ice. (Department of Public Health and Environment) 14. Any analysis of waste shall be forwarded to the Weld County Health Department, Environmental Health Services Division. The Division reserves the right to require additional, more extensive monitoring at a later date. (Department of Public Health and Environment) 15. The facility must comply with the laws, standards, rules and regulations of the Air Quality Control Commission, the Water Quality Control Commission, the Hazardous Materials and Solid Waste Division, the Colorado Oil and Gas Conservation Commission, any other applicable agency, and all applicable Weld County Code. (Department of Public Health and Environment) 16. Any liquid or solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20- 100.5, C.R.S., as amended)shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 17. Any petroleum-contaminated soils on the facility shall be removed, treated or disposed in accordance with all applicable rules and regulations. (Department of Public Health and Environment) 18. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Public Health and Environment) 19. The facility shall comply with the approved groundwater monitoring plan. (Department of Public Health and Environment) 20. All storm water, which has come into contact with waste materials on the site, shall be confined on the site. In the event that storm water is not adequately controlled on the site, upon written notification from the Weld County Department of Public Health and Environment or the Colorado Department of Public Health and Environment, a comprehensive site-wide storm water plan shall be developed and implemented. The plan must be approved, in writing prior to implementation by the Weld County Department of Public Health and Environment and the Colorado Department of Public Health and Environment. (Department of Public Health and Environment) 21. All contaminated soils shall be stored on an impervious surface where any stormwater that comes into contact with the soils would be contained. (Department of Public Health and Environment) USR-1604,CONQUEST OIL COMPANY, page 10 22. A permitted individual sewage disposal system shall be installed to serve the facility. In accordance with the Weld County ISDS Regulations, the system must be designed by a registered professional engineer. The design must be submitted to the Weld County Department of Public Health and Environment for review and approval prior to installation. (Department of Public Health and Environment) 23. Access to the site shall be from County Road 39. The designated haul route shall be on County Road with the agreement 1 mile north on County Road 39 and extending 1 mile east on County Road 28. Transport trucks weighing up to 40 tons will visit the site approximately 60-70 times daily and less on weekends. (Department of Public Works) 24. The off-street parking spaces including the access drive shall be surfaced with gravel or the equivalent and shall be graded to prevent drainage problems. There is an existing concrete loading pad. Utilize the existing access and departure points. (Department of Planning Services) 25. The historical flow patterns and run-off amounts will be maintained on site in such a manner that will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. (Department of Public Works) 26. All structures shall require building permits. (Department of Building Inspection) 27. Any lighting, including light from high temperature processes such as welding or combustion, shall be designed, located and operated in such as manner as to meet the following standards: sources of light shall be shielded so that beams or rays of light will not shine directly onto adjacent properties; neither the direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets; and no colored lights may be used which may be confused with or construed as traffic control devices. The application materials did not include a Lighting Plan. Should exterior lighting be a part of this facility, all light standards shall be delineated on the USR Plat. (Department of Planning Services) 28. Hours of operation, acceptance of waste water, are limited to 7:00AM until 10:00PM daily as stated in the application materials. (Department of Planning Services) 29. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County wide Road Impact Fee Program. (Department of Planning Services) 30. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 31. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. (Department of Planning Services) 32. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. (Department of Planning Services) 33. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the USR-1604,CONQUEST OIL COMPANY, page 11 Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 34. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Department of Planning Services) 35. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) USR-1604,CONQUEST OIL COMPANY, page 12 a DEPARTMENT OF PLANNING SERVICES 6t, NORTH OFFICE 918 10TH Street GREELEY, CO 80631 PHONE: (970) 353-6100, Ext. 3540 FAX: (970)304-6498 WIIDc COLORADO February 8, 2007 Marcum Midstream 1995-2 Business Trust c/o Dale Butcher, Trustee 8203 W 20 St Ste A Greeley CO 80634 Subject: USR-1604- Request for a Site Specific Development Plan and Special Review Permit for an Oil and Gas Support Facility(Class II Oilfield Waste Disposal Facility and a Solids Recovery System) in the A (Agricultural)Zone District on a parcel of land described as S2 SE4 of Section 30, T3N, R65W of the 6th P.M., Weld County, Colorado. Dear Applicant: • Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for April 17, 2007, at 1:30 p.m. This meeting will take place in the Hearing Room, Weld County Planning Department, 4209 CR 24.5, Longmont, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property is located within the comprehensive planning area of a town or municipality. Therefore, our office has forwarded a copy of the submitted materials to the Planning Commission for their review and comments. Please call for further details regarding the date, time, and place of this meeting. It is recommended that you and/or a representative be in attendance at the Planning Commission meeting to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date,and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. espectf Ily, Kim O Planner PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS APRIL 6, 2007 THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING FOR A SITE SPECIFIC DEVELOPMENT PLAN AND SPECIAL REVIEW PERMIT FOR AN OIL AND GAS SUPPORT FACILITY (CLASS II OILFIELD WASTE DISPOSAL FACILITY - SALTWATER INJECTION FACILITY) IN THE A (AGRICULTURAL) ZONE DISTRICT. KIM OGLE Name of Person Posting Sign Signatur&Qf ferson Posting Sign STATE OF COLORADO )ss. COUNTY OF WELD The foregoing instrument was subscribed and sworn to me this 1 I day of L2,ZL�. , 2007. WITNESS my hand and official seal. al S.t w a„-, K Eitix. a�' "� ' %" Notary Public My Commission Expires: IC)1H r :'-1, ••• • 'CFO EXHIBIT . . a 44 NOTICE46 ^i ,. COLORADO Wl�pc. . `s a � • � COLORADO � " A PUBLIC HEARING CONCERNING .� :.>> THIS PROPERTY WILL BE HELD AT: . . earwtwEsT sezvIce con. . 4201 cR 24,E ,: ON APRIL l , 2001 AT 13t? . NAME S OIL OOMPAni - _ S%GI4t. Wevtew P4M T REQUEST OIL+4,6,545QPF�T ' CASE NO. ("SR \‘ob4 & �- ACRES . FOR MORE INFORMATION CALL :: WELD COUNTY DEPARTMENT OF PLANNING SERVICES AT � �r.`` ( 970 )3531100 ext. 3540 , '"' T(.z i II '. .,? _ M... `I e t ri -ti tom Y• i I.. _ _? '.�,. �'."'�'� „ - ,v • Y,f y,Y1 w . ^ i'M•tT 4 •,. 6'f ;fzit . ( <5 t t. M T w.-. rt Y+ ary t i .t `. S: r l t }' __ ,. . �. t • t y' Per ' a..tit k •'7.'`41 '„ t F } I 1 } V 4 .+ F, trit .1'. 11c'i; i,•• ttr F F P ` .. • :. ..4.4Yt t • ,}�{Ir- ') -' i Y! ,�[ \ t* `; !((j 'fi ;..♦ti) ,•tjt .1 i.. ~r ,q, � t` kt 1 Lf� r'AA:, L�� �yi ) 'f(Wb!J ` � ii Ct.� MAY/ jp 1 1 'tL•'�. - W > .(.s �`1� + (\ ,(, } 7 t ti t iA t .^-a .1 < " t , l 1 t -y„. � r-44 .Sf - tri l -. \'‘. ` �, •`' tf J;. `? y ,r.,:q '• EY i . .ill _ 46., i1,h ;CJI' � „1`_,..�-`.ti lt,,}� ..i. �.@i�.. .� � q � .I. a i1. 15..`r ♦ . " ,r 1 1M�\. 4 I. e 4115' +>llw'�] itiV • _ - V , •-.1 • i .� ' -t. %lit ..._ - . i#K+ - _ •• a , `` yam- a awr. _. yr ..,y r`,F'er " kitka it l '5-� SAY- -�' • • `�-� -ice - • • SC` JL�-. r'L.r • x � •:,1�` -,* -„ ' • ` _ . C r t Vo tie' ' i111G. :ii- • o .:_ - , •` '- l .J C wi4 . 't':--'..'./...:".. _ _ .' '[ .fir fI. a I ! y` • 4—le.- 4 ..rre, ><.1 �a '- . vj1.---,‘ � �.J ', ��v.,,r ^'�: �'r��- ♦ 1�� � _Y' Jam~ .�� 1 �. ter • i ar - � � 4 ., rx . - X,f�..c •••....�YY� f�'�•�i$''rf J���a'�.Sf•�i y.�.,SYv )y� 4.. M'.' J- /.t ni>Y Y i . r t.x •1 F .ate+ `wr {r .. utArtk w • f �v ! ,;,\...�� i.)'It r�.1� Y�ly�C.' � ��{'R"leiS ,c • i' r• • '''... �•yy!�r *C` f li.. '3,1.o ,ca j}-1i'� .. 440'0 r�.,�,, ••.e .-4th ��A" ^'>j,% . '. • i• .�,it"ti- * ` .4'y�{;., e 4 `,E .: rye �.. .r., .` sr, .. 'n :r.�r y'//. r t ^! e .r. I' .,Y el� ILL • yX� `J F s t ,I. i. - i, 4., •fw!_nsP '...Y � t r:7'". c :1,.(l ,, r ' yye t1 T if'! A LV •w te`f. % .*j --, Ye tTu . 'vg •1:- ),� w,�PF trt It 64 { '1';.•., W b 'YS' "-i' : .r .:.r- r ,y' •'tr t F, _ N �k17,� C% r s• i it. r e'er < la ' K` al71 I , J •. 4 e ky !� ," , .n ' a. h w ;1.. rt?j `/�A1 �. �{�'r ♦ • b.. • ,r 'S 1f♦ .k�"'�"- u7`1. 1 �"'l1 ` • .� ~Ia. 1 •i� A�Z , •+� •S IF , ••,, 't� l_' l • uu • ID f 'O F' ,l t.4. ♦ .00: - ` aid S. • 4A�� 1 '1'x•:{ ,' y��.�`� I p�� 'S-.1 *4044'4 ....'y FIELD CHECK inspection date: March 27, 2007 Case Number: USR-1604 Applicant: Marcum Midstream 1995-2 Business Trust/ Conquest Oil Company 303 East 17th Avenue, Suite 660, Denver, CO 80203 Request: Site Specific Development Plan and Special Review Permit for an Oil and Gas Support Facility (Class II Oilfield Waste Disposal Facility - Saltwater Injection Facility) in the A (Agricultural) Zone District. Legal Description: S2 SE4 of Section 30, T3N, R65W of the 6th P.M., Weld County, Colorado Location: West of and adjacent to County Road 39; approximately 2 miles south of County Road 32 Size of Parcel: 80 +/- acres Zoning Land Use N A (Agricultural) N Prairie - Sage Pasture - Dryland with House on Large Lot E A (Agricultural) E Dryland Pasture S A (Agricultural) S Dryland Pasture - Tire Mountain Salvage Yard W A (Agricultural) W Dryland Pasture COMMENTS: Dryland Pasture - Wide open area with no improvements. Oil and Gas is on site Access is from CR 39. Section Line Access adjacent at CR 28 to South Property lies higher on east side and slopes to west One residence in close proximity, SE4 CR 28/ CR 39 Kldi Ogle, Planner Hello