HomeMy WebLinkAbout20073436.tiff CHANGE ORDER NO.2
Weld County On-Call Engineering
Date:
Project: Weld County On-Call General Engineering generally consisting of transportation engineering including road&bridge
design,traffic engineering,surveying,environmental studies,construction management and material testing.
Owner: Weld County Public Works Department.PO Box 758,Greeley,Colorado 80632
Consultant: Short Elliott Hendrickson, Colorado Center. Tower One, 2000 S. Colorado BLVD, Suite 6000
Denver,CO 80222-7900
The following change is hereby made to the Contract Documents:
Contract Time Extension: The original Agreement for Professional Services is extended one full year as permitted by
the contract. This extension is the third year of the four year term limit
Change to Original Rate Schedule: The 2005 Rate Schedule as shown on Exhibit B of the original contract shall be
replaced with the attached Exhibit B, 2007 Rate Schedule. The limit of increase
does not exceed the Denver Boulder CPI per the contract requirements.
CHANGE TO CONTRACT PRICE:
See attached Exhibit B,2007Rate Schedule
The limit of$50,000 compensation per work order is not modified by this change order and remains in effect.
CHANGE TO CONTRACT TIME:
The Contract time will be increased by 365 calendar days.
RECOMMENDED:
Owner Representative: C Date: NOV 0 5 2007
David E. ng,Chair
Engineer: � / Date: /D//�7
APPROVALS:
Consultant: Sho lion Hen r. on
r
By: Date ii . O Z. O 7
�J /J
Title: I4/n/G/14¢L, /frc'we44 46k e,9r/ei/S prtiesteiSteirOee
fG COOS
Get%- 3s/,3�
//-t -v7 /�63:A`1-0
• EXHIBIT B,2007-2008
SEH Personnel Rates
Project Principal $172.00
Project Manager 2 $159.00
Project Manager 1 $146.00
Engineer 2 $138.00
Engineer 1 $124.00
Design Engineer 3 $120.00
Design Engineer 2 $104.00
Design Engineer 1 $94.00
Traffic Engineer $88.00
Design Technician 3 $88.00
Design Technician 2 $82.00
Design Technician 1 $72.00
Clerical/Administrative $51.00
Construction Professional $130.00
Construction Technician 4 $90.00
Construction Technician 3 $85.00
Construction Technician 2 $79.00
Construction Technician 1 $62.00
SEH Reimbursable Expenses
Production Run Copies 1 At cost
Overnight Shipping At cost
SEH Vehicle Hourly Rate2 $4.50 per hour
Personal Vehicle Mileage Rate2 $0.485 per mile
Other Reimbursables3 At cost
1 Courtesy copies at no cost
2 Either SEH hourly vehicle or personal vehicle mileage charges(not both)apply for a given vehicle
Other reimbursables will be pre-approved by Weld County on an as needed basis
Wilkinson Personnel Rates
Engineer(Principal) $84.00
Technician $64.00
Clerical/Administrative $32.00
Wilkinson Reimbursable Expenses
Mileage $0.485 per mile
Other Reimbu sables 1 At cost
Other reimbursables will be pre-approved by Weld County on an as needed basis
1 of 3
EXHIBIT B,2007-2008
Kumar& Associates Personnel Rates
Principal Engineer $110.00 to $154.00/hr
Senior Project Engineer/Geologist/Manager $100.00 to $133.00/hr
Project Engineer/Geologist/Scientist $80.00 to $113.00/hr
Staff Engineer/Geologist/Scientist $60.00 to$82.00/hr
Project Supervisor $70.00 to$82.00/hr
Exploration Field Engineer/Technician/Geologist $50.00 to $67.00/hr
Construction Materials Testing Technicians:
• Soils, Concrete,Reinforcing Steel, Asphalt $42.00 to$51.00/hr
• Piers, Masonry,Fireproofing $48.00 to $56.00/hr
• Structural Steel $50.00 to $62.00/hr
• Floor Flatness $70.00 to $82.00/hr
Word Processing $38.00 to $46.00/hr
Drafting $50.00 to $62.00/hr
Litigation/Expert Witness/Deposition $140.00 to$205.00/hr
Kumar& Associates Reimbursable Expenses
Auto or Pickup Mileage $0.60/mile
Out of Town Expenses,Travel, Rental Etc. Cost+ 15%
Expedited Laboratory Services: 1.35 x Test Price
Kumar&Associates Subsurface Exploration,Sampling,Monitoring Well
4-Wheeler ATV Drill Rig (Includes Operator) $120.00/hr.
Exploration Subcontractor Subconsultant's Cost+ 15%
Materials/Equipment Rental/Outsourced Laboratory/Subs Cost+ 15%
Falling Weight Deflectometer(Includes Operator) $175.00/hr
Concrete and Asphalt Coring $75.00/hr
Photoionization Detector $100.00/Day
LEL/CO/H2S/O2 Meter $100.00/Day
Conductivity,Temperature,pH Tester $25.00/Day
Personal Protective Equipment Rates Quoted on Project Basis
Kumar& Associates Laboratory Tests
Moisture Content&Density(ASTM D-2216) $15.00 ea
Gradation(ASTM D-422) $70.00 ea
Gradation with Hydrometer Analysis(ASTM D-422) $125.00 ea
Percent Less than#200 Sieve (ASTM D-1140) $20.00 ea
Atterberg Limits (ASTM D-4318) $40.00 ea
Standard Proctor Compaction(ASTM D-698) $70.00 ea
Modified Proctor Compaction(ASTM D-1557) $80.00 ea
R-Value(ASTM D-2844) $250.00 ea
California Bearing Ratio (ASTM D-1883) 1-Pt. $140.00 ea
California Bearing Ratio (ASTM D-1883) 3-Pt. $330.00 ea
'Other Testing Available Upon Request
2 of 3
EXHIBIT B,2007-2008
Special Rates. Extensive effort has been made to provide position classifications that
closely reflect actual personnel rates. In the event that an given individual's rate does not
closely match the position classifications listed above,both SEH and Weld County agree
that it is in the best interest of both parties to assign a special hourly rate.
3 of 3
Kit cf,\ ;titHe- .
MEMORANDUM
TO: Clerk to the Board DATE: October 31, 2007
11 e
• FROM: Wayne Howard, Chief Senior Engineer, Public Works
COLORADO
SUBJECT: Consent Agenda Item
Change Order No.2 with Short Elliott Hendrickson for a contract time extension of one year for On-
Call Professional Engineering Services.
M:\Francie\Agenda Wayne Howard.doc
-
C `1
U)
U
! J .._.i
r':,
C) U
ta0O.s6
2007-3436
•
BOARD OF COUNTY COMMISSIONERS
REVIEW/WORK SESSION REQUEST
RE: On-Call Engineering Contracts
DEPARTMENT: PUBLIC WORKS DATE: October 5, 2007
PERSON REQUESTING: Wayne Howard,P.E., Chief Sr Engineer
Brief description of the problem/issue:
Weld County Public Works currently has two contracts for On-Call Professional Engineering services. The
contracts are held with Felsburg Holt&Ulliveg and Short Elliot Hendrickson. Both contracts were signed in 2005
and are limited to one year,renewable up to four years. The contracts expired on July 27,2007. Provisions in the
contract allow the consultants to increase their billable rates based upon the Denver-Boulder-Greeley Consumer
Price Index(CPI). The allowable rate of increase is 2.50%based upon the comparison of the 2006 CPI and the 2007
CPI. Change Order#2 extends both contracts for an additional year and includes new 2007 hourly rate schedules.
This is the second of the three extensions allowable in the contract.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options)
The Board can accept the change order which renews both contracts for an additional year with the allowable rate
increases or not accept the change order. Acceptance would permit the Public Works Department to continue to
utilize engineering services for smaller projects such as environmental clearances, development traffic study
reviews, etc. To date,FHU has performed 9 work orders totaling$212,028 and SEH has performed 5 work orders
totaling $169,039. Work Orders are limited to a maximum total of$50,000.
Recommendation to the Board:
I recommend the approval of both Change Orders extending the contracts for FHU and SEH for an additional year.
Initial: Approve Schedule
Recommendation Work Session Comments
David E.Long
William H.Jerke II OOrr
William F. Garcia L.A. �+ 5 i, I/A_L 5J 0.t - calk C_ .
Robert D.Masden
Douglas Rademacher Aeg__,--7%.
pc:
M:\—Active Projects\Engineering On-Call Services\Work Session Request Form CO 2.doc
Hello