HomeMy WebLinkAbout20071518.tiff . EXHIBIT "A" WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND FARNSWORTH GROUP INC. DATED: May 7, 2007 Work Order Number: Survey 10.01 Purchase Order Number: Project Title: WCR 52 Commencement Date: May 22, 2007 Completion Date: June 26, 2007 Limitations on compensation: (time and reimbursable direct costs): $18,600 Project Description: Provide topographic surveying on WCR 52 Scope of Services: SEE ATTACHED EXHIBIT "B" Professional agrees to perform the services The attached forms consisting of_ (6) pages identified above and on the attached forms in are hereby accepted and incorporated herein, by accordance with the terms and conditions this reference, and Notice to Proceed is hereby contained herein and in the Professional given. Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement By: f�„1 and this work order (including the attached Project Ma ager forms) the Professional Services Agreement Date: S-1 3 -O"7 shall control. BY: a7-- : 1.--e ProfessionalL'� ` Department Head i By Date: S" !-2j - ^j David C. Di cif- , Principal o y� Date: S f-�7 By: ti Direc or of Finance and Administration Date: By: Chairman, Weld County 2U issw:� 0/ Date: 33 UU UU// ATTEST: �/ Fa "Th WELD COUNTY CLERK Ef?u -a ;7 ; I DEPJ7 Y CLL4,r. i THE E %�� o� (1'() /204 0 aoo7-/sib Exhibit B WCR 52, from WCR 17 to East of WCR 19 and Intersecting Drainage Way Mapping Surveying Scope of Work and Fee Estimate Topographic Survey and Right of Way Control April 23, 2007 The project limits of this survey are identified on the attached aerial map and generally include a strip of land 400 ft. wide centered on WCR 52, from approximately 700 ft. west of the intersection with WCR 17, extending east approximately 8400 ft. In addition, a second srtip of land 750 ft. wide centered on the drainage way intersecting WCR 52, from just south of the railroad tracks, north for approximately 5000 ft. • Farnsworth Group will perform research typically required for location of the land corners along WCR 52 in the project area and east to the next land corner position. • We will perform field surveys to locate the aliquot land corners required to establish the existing rights of way in the project area. The establishment of rights of ways is not included in this scope of work and is expected to be performed by Weld County. • Establish horizontal and vertical project control based upon the CDOT HARN 83/92 Network. The control information will be noted on the survey drawings with their description, coordinated and elevations. • Aerial Mapping —We propose to use the photogrammetric mapping firm of Kucera International as our sub consultant for this project. The aerial mapping will output at scale of 1" = 40 ft. with one foot contour intervals. The limits of the mapping will be as noted above for the project limits. A digital ortho photo will also be provided, with a pixel resolution of approximately 0.2 -0.3 ft. that will cover the entire mapping area. • Set approximately 10 aerial photo control points and tie into the control network. • Perform limited supplemental design surveys as necessary to supplement the aerial mapping, along with related office support for obtaining miscellaneous data needed for completing the design services. The supplemental survey data includes culvert and bridge information for pipe sizes and invert elevations, top of railroad track elevations, top of ground at drainage crossings, and misc. other information requested. This data will be merged into the overall drawing. For budgetary purposes, we have included one day of survey crew time for this effort. • Provide coordination with Client and aerial mapping sub-consultant. Our proposed fees includes up to 4 hours of coordination time. • This scope of work does not include research or surveys of utility information. WCR 52, from WCR 17 to East of WCR 19 and Intersecting Drainage Way Mapping Page 2 of 2 April 23, 2007 • This scope of work does not include the coordination with the Utility Notification Center to have underground utilities marked. • Prepare overall base map drawing at a scale of 1" = 40'. The base map will contain the control information and land corner information and will be output on 11" x 17" sheet size. • Prepare permission to enter forms, and process to obtain access permission on private property. This effort will be coordinated closely with Weld County. Deliverables: • The deliverable for this project will be one set of paper plots and a CD with the electronic copy of the survey information, in AutoCAD format based upon the Farnsworth Group Layering System. In addition, we will provide a file with Farnsworth's CAD standards for surveying that will have the layers, line types, symbols, etc. that are used by our surveying sections. The surface model will also be provided in Eagle Point format, if requested. Schedule: We shall commence our fieldwork for the aerial mapping portion within one week of noticed to proceed and shall complete the project within five weeks after notice to proceed subject to any adverse weather constraints. This schedule assumes that access permission can be obtained within one week for those properties requiring access for setting photo control panel points. Proposed Fee: Farnsworth Group will perform the above-noted Services on an hourly basis not to exceed $18,600, to be billed in accordance with our Weld County Approved Rate Schedule. Note: The proposed scope of work does not include re-setting section corners, one-quarter corners and one-sixteenth corners or replacing those corners, if necessary to comply with State Board of Registration monumentation rules. If those services are required, you will be notified immediately and the fee estimate revised accordingly. This proposal assumes that average survey/boundary conditions exist in the area to be surveyed. It is not uncommon to have conflicting monumentation and/or lines of title. These are normally"worked out" during the process of the survey if not excessive. Occasionally major conflicts and/or discrepancies exist that require time and effort beyond "average survey/boundary conditions". If this occurs, you will be immediately notified, the problems discussed, and an appropriate course of action determined (with the owners input) to complete the survey. u rs No , �, , /.y i y / t i^lU-N-TY ROAD 17 1 y P I n ,/ � / . / '''-----tr,_ // .., L"" D 9U ;TYI---RO A 41 Y1 ,,; I IA ✓a \ imir 11 1 � - r. ' -• , 4 t- `-- • �� -''w: " u BOARD OF COUNTY COMMISSIONERS R✓ RS REVIEW/WORK SESSION REQUEST OS ; 3 g: CC.: FAc&e &L RE: Work Order for Farnsworth Group (Land Surveying Services) DEPARTMENT: PUBLIC WORKS DATE: May 7, 2007 PERSON REQUESTING: Leon Sievers,Right of Way Agent,Public Works 7r'SL Brief description of the problem/issue: Under the present Professional Services Agreement with the Farnsworth Group, Public Works is requesting Farnsworth Group to complete a topographic survey from aerial photography for our WCR 52 road improvements project. The anticipated work will not exceed $18,600. This work is required to be completed before the design can begin. Construction is scheduled for the summer of next year. The topographic surveying will be performed using aerial methods, in which the Engineering Division does not have the capability to complete. What options exist for the Board? (Include consequences,impacts, costs,etc. of options) Option #1: Approve the work order. This approval would allow for the design process to begin under the current schedule of next year's construction. Option#2: Not approve the work order. The Operations Division is currently planning on this construction project as part of their work plan for next year and they would need to make adjustments to their plan if not approved. Recommendation to the Board: Public Works recommends approval of this Work Order and requests signature on the enclosed Exhibit "A" Work Order form. Thank you for your consideration. Approve Schedule Recommendation Work Session Other Long J U a O r p I Jerke f ,g5 (to Garcia t' v)0!i jYV'Masden Rademacher elk VVV Attachments m:\aeon/workorderrequest52 4111t ‘i," , MEMORANDUM III C TO: Clerk to the Board DATE: 5/23/2007 FROM: Leon Sievers, Right-of-Way Agent COLORADO SUBJECT: Consent Agenda Item Submit for Chair's signature: Work Order dated May 7, 2007, to provide topographic surveying for improvements to WCR 52 with Farnsworth Group. Enclosed are two, duplicate original Work Order Forms, Survey 10.01. Please return one original to Public Works as soon as it is signed. Enclosures M:\Fancie\Agend-Leon.doc N O o OS F`1 am C -c ar— m o ff, r\-) Z-6co n o fl 13 It rn C CY 20-‹ w in 2007-1518 Hello