Loading...
HomeMy WebLinkAbout20073939.tiff Page 1 of 1 Richard Deakins From: Michelle Martin Sent: Thursday, November 15, 2007 4:02 PM To: Richard Deakins Subject: FW:WCR 29 Miss-Labelingl Ylfezz Planner II 4209 CR 24.5 Longmont, CO 80504 mmartin@co.weld.co.us PHONE: (720)652-4210 x 8730 FAX: (720)652-4211 From: joeengelsdesign@comcast.net [mailto:joeengelsdesign@comcast.net] Sent: Thursday, November 15, 2007 10:25 AM To: Michelle Martin Subject: WCR 29 Miss-Labelingl Michelle, Per your request this morning, you may change the notation on the filing plat refering to Weld County Road 29. It was incorrectly noted as WCR 32 and not caught prior to release. Thank you for bringing it to our attention. Joe. 2.001-39 39 11/15/2007 PLt8eo Page 1 of 1 Michelle Martin From: Kim Ogle Sent: Thursday, November 15, 2007 8:43 AM To: Michelle Martin Subject: RE: Yes, there were no issues. I provided Don Dunker with a copy of the prepared memorandum Please call with additional questions Kim Ogle I Planning Manager From: Michelle Martin Sent: Thursday, November 15, 2007 8:34 AM To: Kim Ogle Subject: Did the collateral for USR-1578 get approved yesterday by the BOCC? Planner II 4209 CR 24.5 Longmont, CO 80504 mmartin@co.weld.co.us PHONE: (720)652-4210 x 8730 FAX: (720)652-4211 11/15/2007 Page 1 of 1 Michelle Martin From: Michelle Martin Sent: Monday, November 05, 2007 2:22 PM To: 'joeengelsdesign@comcast.net' Subject: RE: Ribbons and Rainbows Joe, The improvements agreement and the collateral have been forwarded to BOCC for a hearing I will let you know when the hearing will be. The attached plats look great with the exception of the trees in CR 29 ROW need to be removed. Planner II 4209 CR 24.5 Longmont, CO 80504 mmartin@co.weld.co.us PHONE: (720)652-4210 x 8730 FAX: (720)652-4211 From: joeengelsdesign@comcast.net [mailto:joeengelsdesign@comcast.net] Sent: Wednesday, October 24, 2007 8:48 AM To: Michelle Martin Subject: Ribbons and Rainbows Michelle, here are the final pdfs of Ribbons and Rainbows with the corrections made per your redlines. Thanks, Joe. 11/05/2007 Page 1 of 2 c_ Michelle Martin From: Michelle Martin Sent: Tuesday, October 23, 2007 2:10 PM To: 'joeengelsdesign@comcast.net' Subject: FW: WCR 29 right of way Hi Joe, Please see the attached email from the county surveyor regarding CR 29. Call me if you have any questions. Planner II 4209 CR 24.5 Longmont, CO 80504 mmartin@co.weld.co.us PHONE: (720)652-4210 x 8730 FAX: (720) 652-4211 From: Leon Sievers Sent: Tuesday, October 23, 2007 1:02 PM To: Michelle Martin Subject: WCR 29 right of way Michelle I have reviewed the right of way situation you presented on WCR 29, south of WCR 32 and this is what I found: The right of way in Section 20 (West half of road)did come to the County in 1889 as part of that Resolution, Bk 86 Page 273. Whether or not the road was ever constructed does not matter. The right of way (30') is ours.We have many unimproved right of way miles within the County. The right of way in Section 21 (East half or road)was not secured by the 1889 Resolution. It was a rail road section, meaning the Federal Government gave this section of land to the railroads. The Railroads only requirement was to file a map of the sections they wanted and they couldn't be adjoining sections. These maps were filed with the General Land Office and can now be seen at the BLM office in Lakewood. Generally, title to the land happened when the map was filed. Since most of the Railroad maps were filed in the 1860's, 1870's and early 1880's, this land was taken out of the public domain prior to the 1889 Resolution so the Resolution did not apply and Weld County does not have right of way based on the 1889 Resolution In 1890 a petition was filed to open this road. Land was acquired by that petition. Land in Section 20 was not secured because the County already had this right of way by the 1889 Resolution. The land in Section 21 was acquired with a payment of$1.00 to the Railroad, as indicated on the document. The document found in Book 48 at Page 334 indicates that the road was declared a public right of way. Whether or not the road was built is another matter. It may have been, and when the coal mining in the area subsided, the road was no longer maintained. Early roads in the County are not of the character that roads are built to today. Lack of road maintence could quickly remove traces of the road. Whether or not the road was even constructed is, again, of little consequence because of the road declaration. Lack of maintenance is not an abandonment. Vacations require documents. No vacation documents were 10/23/2007 Page 2 of 2 a found to indicated the road was vacated or legally abandoned. A title commitment may have indicated if a road vacation happened, but my quick research did not provide one. You could ask if the surveyor has a title commitment, but if he had one,this question probably would not have come up. In summary, Weld County has 30'of right of way in Section 20 under the 1889 Resolution found in Book 86 at Page 273. Weld County probably has right of way in Section 21 because of the road petition in 1890, found in Book 48 at Page 334 and because of the lack of a document vacating or abandoning the right of way. If the surveyor can produce the document, by either a title commitment or a title search, then Weld County would not have right of way in Section 21. I would recommend the survey indicate the County has right of way in Section 20 by the 1889 Resolution. If, after the surveyor has completed a title search, or reviewed the title commitment, and a vacation document was not discovered, then the survey could show right of way in Section 21 by Book 48 at Page 334. I hope this helps. Leon Sievers,PLS, SR/WA Right of Way Agent/Surveyor Weld County Public Works Dept. PO Box 758 Greeley, Co 80632 (970) 356-4000 x 3785 10/23/2007 Page 1 of 1 Michelle Martin From: Charlotte Davis Sent: Tuesday, October 02, 2007 2:52 PM To: Michelle Martin Subject: USR-1578 Michelle, I am in receipt of the following documents for USR 1578 conditions Prior to Recording the Plat: 1H Dust Abatement Plan 1 I Water Supply 1K Waste Handling Plan These documents have been reviewed by Environmental Health Services and are approved. These conditions have been satisfied. Condition 1J Colorado Primary Drinking Water requirements have not been resolved. A BOCC Hearing on Oct. 15, 2007 has been scheduled to discuss this condition. Best regards, Char Charlotte Davis, MPH Weld County Department of Public Health & Environment 1555 N. 17th Avenue Greeley, CO 80631 (970)304-6415 x2208 FAX (970) 304-6411 10/02/2007 • Page 1 DEPARTMENT OF PLANNING SERVICES BUILDING INSPECTION NORTH OFFICE 918 10th Street GREELEY, COLORADO 80631 III PHONE (970)353-6100, EXT.3540 Ilk FAX (970)304-6498 SOUTHWEST OFFICE COTL ri OR w DO 4209 CR 24.5 1J LONGMONT CO 80504 bhorgen@co.weld.co.us PHONE (720)652-4210 ext. 8741 FAX(720)652-4211 To Whom It May Concern: A site inspection was conducted on September 27, 2007, to determine the structural stability of the building under construction at 14016 CR 32. As a result of the inspection the Building Department agrees to temporarily lift the Stop Work order placed on the property in order to allow for additional bracing/support of the structure by installing the lower roof rafters to secure the center of the building. The only building permit issued at the above address is for the footings and foundation and no work is to proceed beyond the installation of the lower roof rafters until a full building permit is issued for the project. If work is done in excess of the above, an investigation fee will be assessed to the building permit as allowed per Appendix 5-K of the Weld County Code. Bryon Horgen Assistant Building official Glacier Page 1 of 1 Michelle Martin From: Bryon Horgen Sent: Wednesday, September 26, 2007 10:08 AM To: Michelle Martin Subject: USR-1578 Michelle The building department does not have any issues with changing the occupant load from 175 to 130 as long as the new occupant load is posted at the final inspection. If the planning department is going to release the building permit with conditions to be met before the C/O please list what those conditions are on the building permit so that the inspectors are aware. I will do a site inspection on Thursday to determine if the structure is safe until the stop work order can be lifted and the permit is released. I will let you know the results. Thanks Bryon 09/26/2007 Page 1 6 DEPARTMENT OF PLANNING SERVICES tivot 471; BUILDING INSPECTION NORTH OFFICE 918 10th Street GREELEY, COLORADO 80631 WinPHONE (970)353-6100, EXT.3540 O FAX (970)304-6498 SOUTHWEST OFFICE COLORADO 4209 CR 24.5 LONGMONT CO 80504 bhorgen@co.weld.co.us PHONE (720)652-4210 ext. 8741 FAX(720)652-4211 To Whom It May Concern: Based on the recommendation letter from Wernsman Engineering received on 10/18/07, the building department agrees to temporary lift the stop work order placed at 14016 CR 32. The stop work order is only lifted to allow the roof sheathing to be installed as requested by the engineer of record. No work is to proceed beyond that point without the appropriate building permits being issued. Bryon Horgen Assistant Building official Page 1 of 1 Michelle Martin From: Russ Kissler[rkissler@pgfpd.org] Sent: Tuesday, September 25, 2007 11:52 AM To: Michelle Martin Subject: Ribbons & Rainbows Center Michelle, I have been in contact with Mr. Joe Engels on several occasions in regards to this project. They have been very cooperative with me about the requirements from the fire district. If anything further is needed at this time please let me know. Thanks. Russell Kissler Fire Prevention Tech. Platteville/Gilcrest Fire Dist. 303 Main St. /POBox 407 Platteville, CO 80651 970-785-2232 970-785-0139 Fax 09/26/2007 Weld County Planning Department SVTH EST BUILDING SEP 2 4 2007 ENGELS RECEIVED Design Associates September 19,2007 SOUTH WELD COUNTY PLANNING AND ZONING Department of Planning services 4209 WCR 24 '/2 Longmont,Colorado 80504 Attn: Michelle Martin,Planner Project: "RIBBONS&RAINBOWS"Conference Center Platteville,Colorado Subject:U.S.R. 1578 Michelle: This letter is to acknowledge and confirm that all conditions and Referrals W/O Comments pertaining to Resolution for U.S.R. 1578 have been,and or will be,met prior to the release of a Certificate of Occupancy. Memorandum dated August 21',2006,prepared by Kim Ogle,Planning Manager have been,and or will be,met prior to the release of the Certificate of Occupancy. Please review attached memorandum for specific responses. Platteville/Gilcrest Fire protection District dated September 27th,2006,prepared by Russell Kissler,Fire Prevention Tech.has also been,and or will be,met prior to the release of a certificate of occupancy. Please refer to the final U.S.R.Filing Plat Sheet 2 of 3 for fire related requirements. The Farmers Reservoir and Irrigation Company has been satisfied. I have made several attempts to get them to produce a letter to this to no avail We did meet on site and Manuel Montoya had no concerns with what we were planning to do. Memorandum dated September 13th,2006,prepared by Donald Carroll,Engineering Administrator have been,and or will be,met prior to the release of the Certificate of Joseph R Engels 2521 West 4th Street Greeley,Colorado 80631 (970)304-9818 1 Occupancy. Please refer to the final U.S.R.Filing Plat Sheet 2 of 2 addressing specific comments. State of Colorado,Office of the State Engineer,Division of Water Resources,letter dated August 3e,2006,prepared by Kevin G.Rein,P.E.,Chief of Water Supply addresses the quality of the water supply. The water was going to be sent and tested once the construction of the pump and filtration system was constructed to the building. Quality Well and Pump is engineering a special pump system to draw water to be tested prior to this to satisfy the State testing requirement. It will meet State standards. Memorandum dated September 20th,2006,prepared by Charlotte Davis,Environmental Health Department have been,and or will be,met prior to the release of a Certificate of Occupancy. A letter is being prepared to clarify specific construction issues relating to parking and waste management that will satisfy final concern. Building Plans Examiner letter prepared by Robert Powell,dated August 30th,2006,has been,and or will be,met prior to the release of the Certificate of Occupancy. I hope this letter meets your requirement for early release. Please let me know if you need anything further. Sincere! Joseph P. gels, Sr. JPE: ce cc: Shawn Sarchett,Owner O----441# MEMORANDUM TO: Michelle Martin, Planner II O COLORADO DATE: August 21, 2006 FROM: Kim Ogle, Planning Manager SUBJECT: Use by Special Review, USR-1578 Landscape Referral Shawn Sarchet, Applicant The Department of Planning Services reviewed the above referenced Use by Special Review documentation and drawings and offers the following comments: The Use by Special Review Plat shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. In addition to these requirements,the plat scale shall be 1"=20 feet. The Vicinity Map scale of 1"=2000 feet scale accurately be delineated on the plat. COMMENT:ACKNOWLEDGED, REFER TO SHEETS 1,2,AND 3 OF 3 FILING PLATS This application shall be in compliance with Section 23-3-250 A. and B and is address in the following comments. COMMENT:ACKNOWLEDGED. Section 23-3-250A1 Stormwater Management. All users of land shall provide and maintain stormwater retention facilities designed to retain the stormwater runoff in excess of historic flow from the developed site. The stormwater retention facility on a developed site shall be designed for a one-hundred- year storm. The stormwater retention facility shall be designed and operated to release the retained water at a quantity and rate not to exceed the quantity and rate of a five-year storm falling on the undeveloped site. The application materials do not specifically address this issue. The applicant shall contact the Storm water Engineering Staff of the Weld County Department of Public Works, to further discuss this issue. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT: UNAPPLICABLE Section 23-3-250.A.2 Parking. Sufficient screened, off-street, paved parking areas shall be provided to meet the requirements of visitors and customers of the Uses Allowed by Right and Accessory Uses. Appendix 23-A describes the design requirements for parking spaces and Appendix 23-B delineates the number of parking spaces required by use for this property. COMMENT:ACKNOWLEDGED, REFER TO SHEET 2 OF 3 FILING PLAT. The proposed,facility is a single story structure of approximately 2000 SF. The application materials state there are no persons employed at this facility other than the persons of the caretaker's residence. COMMENT:ACKNOWLEDGED. Given the numbers of potential users to this facility, 175 persons as stated in their application materials, the Department of Planning Services Has determined that 88 spaces are required. Further the area delineated as"Future Parking"should be labeled as"Overflow Parking"and constructed at the time of the primary"Parking Area'as delineated on the supporting documents. USR-1578 Sachet,page 1 The facility will utilize catered food for all events. A minimum of ten parking spaces shall be reserved for the catering staff and support personnel. The total parking for events at this facility shall be 98 spaces. COMMENT: DUE TO THE MAXIMUM DAILY DISCHARGE FOR THE SEPTIC SYSTEM THE U.S.R. RESOLUTION WILL HAVE TO BE AMENDED FROM 175 PERSONS TO 130 PERSONS. THIS WOULD TECHNICALLY REDUCE THE REQUIRED PARKING SPACES FROM A TOTAL OF 98 TO 74 SPACES. Section 23-3-250.A.3 Street Access. Lots shall have safe access to an approved public or private street. The design designation of any street or highway as to type shall be in conformance with that shown on the county thoroughfare plan and/or the master plan of the affected municipality. Visual inspection of the USR Plat identifies two points of ingress and egress, one which is part of a gated private drive. The Further,the points of ingress and egress do not interconnect at a perpendicular angle with the County Road. The applicant shall delineate on the plat the proposed wheel stops and surface lighting as warranted. The applicant shall coordinate all transportation related activities with the Department of Public Works. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT:ACKNOWLEDGED REFER TO SHEET 2 OF 3 FILING PLAT WHICH ILLUSTRATES COMPLIANCE. The Fire District of record may require a second point of ingress and egress for this facility, including, potentially the upgrade and maintenance of County Road 32 right-of-way. All approved access roads shall be graded and drained to provide all weather access.Accesses shall be placed in such a location as to have adequate sight distance in both directions, shall not be placed below the crest of a hill or where physical obstructions are present. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT:ACKNOWLEDGED ALL FIRE DEPARTMENT ISSUES HAVE BEEN ADDRESSED AND SATISFIED. Section 23-3-250.A.4 Required Yards-Setback No use or accessory use may be located closer than twenty(20)feet to the existing or proposed (whichever represents the greater right-of-way width)highway or street right-of-way. Off-street parking areas may be permitted in the required setback area when the area is screened from direct view of persons on the public rights-of-way. Fences over six(6)feet in height are not required to comply with the minimum setback and may be located on the property line. Fences located on corner lots abutting public right-of-way shall not obstruct the view of vehicular traffic at an intersection. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT:ACKNOWLEDGED REFER TO SHEET 2 OF 3 FILING PLAT WHICH ILLUSTRATES COMPLIANCE. Section 23-3-250.A.4 Required Yards-Offset No use or accessory use may be located closer than ten (10)feet to its lot line. Off-street parking areas may be permitted in the required offset area when the area is screened from adjacent lots zoned R-1, R-2, R-3, R-4 or R-5. Fences over six (6)feet in height are not required to comply with the minimum Offset and may be located on the property line. Prior to the release of building permits, the offset shall be verified. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT:ACKNOWLEDGED REFER TO SHEET 2 OF 3 FILING PLAT WHICH ILLUSTRATES COMPLIANCE. USR-1578 Sachet,page 2 Section 23-3-250.A.5.A Required Landscaped Areas No more than eighty-five percent(85%) of the total area of a lot shall be covered. Land shall not be deemed covered if it is used for growing grass, shrubs, trees, plants or flowers or if covered by decorative gravel or wood chips, or if it is otherwise suitably Landscaped. There was a schematic Landscape and Screening Plan submitted with the application materials. The applicant shall address this issue and provide additional documentation including all proposed fencing, lighting, adjacent property screening and landscape treatment to meet this section of the Weld County Code. Further, given that the site is irrigated, the Department of Planning Services will require a plant material list to coincide with the submitted Landscape Plan. Staff will require an approved weed management plan and a reseeding/post construction plan to facilitate soil stabilization and plant material growth. COMMENT: ACKNOWLEDGED REFER TO SHEETS 2 AND 3 OF 3 FLUNG PLATS WHICH ILLUSTRATES COMPUANCE. Section 23-3-250.A.5.B That portion of a lot which abuts a public or private street right-of-way shall be landscaped for a distance of ten (10)feet, measured at a right angle from the lot line towards the interior of the lot. Driveways may pass through the required landscaped areas.Additional information is required prior to accepting the plat for recording. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT:ACKNOWLEDGED REFER TO SHEET 3 OF 3 FILING PLAT WHICH ILLUSTRATES COMPLIANCE. Section 23-3-250A.6 Areas used for trash collection shall be screened from public rights-of-way and all adjacent properties. These areas shall be designed and used in a manner that will prevent wind-or animal-scattered trash. The application materials did not identify the location of the dumpster on the plat. Future submittals shall address this issue as outlined in this Section of the Code. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT: ACKNOWLEDGED REFER TO SHEET 2 OF 2 FILING PLAT WHICH ILLUSTRATES COMPLIANCE. Section 23-3-250.A.7 Water Supply. Uses shall have an adequate source of potable water. The application materials state that water is provided via a Commercial Well. Further,the applicant provide written evidence that this well is for the sole use of this facility, and if it is a shared well, that the State Engineers Office recognizes that this well is permitted to provide water to other structures. The applicant shall meet the requirements of the Weld County Department of Public Health and Environment at all times. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT: ACKNOWLEDGED Section 23-3-250A8 Sewage Disposal. Uses shall have adequate sewage disposal facilities. The application materials state that individual sewage disposal systems(ISDS)will handle the effluent flow. Further, the applicant shall meet the requirements of the Weld County Department of Public Health and Environment. Written evidence of compliance shall be submitted to the Department of Planning Services. COMMENT: ACKNOWLEDGED Section 23-3-250A9 Outside Storage. Uses involving outdoor storage of vehicles, (including the parking of USR-1578 Sarchet,page 3 employee vehicles)equipment or materials when permitted shall be screened from public rights-of-way and all adjacent properties. The applicant shall submit documentation as to how the outside storage win be screened during the construction period, and for periods thereafter as applicable. COMMENT: ACKNOWLEDGED NO OUTSIDE STORAGE IS TO EXIST. Section 23-3-350.B. Operation Standards. Uses shall demonstrate conformance with the following operation standards to the extent that they are affected by location, layout and design prior to construction and operation. Further, the applicant shall submit to the Department of Planning Services written evidence of compliance with all Department of Building Inspection regulation. COMMENT:ACKNOWLEDGED Section 23-3-350.B.1 Noise. Uses and structures shall be located, designed and operated in accordance with the noise standards as established in Section 25-12-101 C.R.S. The applicant shall meet the established standards set by the Weld County Department of Public Health and Environment. COMMENT:ACKNOWLEDGED Section 23-3-250.8-2 Air Quality. Uses shall be located, designed and operated in accordance with the air quality standards established by the Colorado Air Pollution Control Commission. The applicant shall meet the established standards set by the Weld County Department of Public Health and Environment. COMMENT:ACKNOWLEDGED Section 23-2-250.B.3 Water Quality. Uses shall be located, designed and operated in accordance with the water quality control standards established by the Colorado Water Quality Control Commission. Additional information is requested specific to the pond and the use of irrigation water for this pond. The applicant shall meet the established standards set by the Weld County Department of Public Health and Environment and State Engineers Office as applicable,with written evidence provided to the Department of Planning Services. COMMENT:ACKNOWLEDGED APPLICATION FOR SHARES OF WATER HAVE BEEN APPLIED FOR AND RELEASED. POND DESIGN MEETS AND EXCEEDS STANDARDS PONDS ARE LINED AND FILTRATED. Section 23-2-250.8.4 Radiation and Radioactive Materials. The handling, use, storage and processing of radioactive materials shall be in accordance with the applicable regulations of the State and the United States government The application materials do not indicate this is applicable, should this not be the case, the applicant shall provide additional information to the Weld County Department of Public Health and Environment. COMMENT:ACKNOWLEDGED Section 23-2-250.B.5 Heat. Uses shall not emit heat in such an amount sufficient to raise the temperature of the air or of materials at or beyond the Lot line more than five (5) degrees Fahrenheit. The application materials do not indicate this is applicable, should this not be the case, the applicant shall provide additional information to the Weld County Department of Public Health and Environment and the Department of Building Inspection. Further, the applicant shall obtain a written approval from the jurisdictional Fire Protection District stating that the facility is in compliance with the Fire Code. COMMENT: ACKNOWLEDGED NOT APPLICABLE. USR-1578 Sarthet,page 4 Section 23-2-250.B.6 Light. Any lighting, including light from high temperature processes such as welding or combustion, shall be designed, located and operated in such as manner as to meet the following standards: sources of light shall be shielded so that beams or rays of light will not shine directly onto adjacent properties; neither the direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets; and no colored lights may be used which may be confused with or construed as traffic control devices. The application materials did not include a Lighting Plan. Should exterior lighting be a part of this facility, all light standards shall be delineated on the USR Plat. COMMENT:ACKNOWLEDGED REFER TO SHEET 2 OF 3 FOR PARKING LOT LIGHTING LAYOUT. Section 23-2-250.B.7 Property Maintenance. Property shall be maintained in such a manner that grasses and weeds are not permitted to grow taller than twelve(12) inches. In no event shall the property owners allow the growth of noxious weeds. The application materials do not address property maintenance. Future correspondence shall identify how the property will be in compliance with this Section of the County Code. COMMENT:ACKNOWLEDGED OWNER INTENDS TO CONTRACT WITH A PROPERTY MANAGEMENT COMPANY TO MAINTAIN PROPERTY. Section 23-4-50. Off Street Loading. The applicant shall delineate on the plat the location of the loading zone that is in compliance with this Section of the Code. There shall be parking or staging of trucks within the public rights-of way. Further, the applicant shall meet all requirements of the Department of Public Works concerning access and internal circulation of vehicles for this proposed facility. COMMENT:ACKNOWLEDGED REFER TO SHEET 2 OF 3 FILING PLAT FOR DESIGNATED LOADING AREA. Section 23-4-90 Signs. The application materials do not address the issue of on-site signs. The applicant shall provide written evidence that all proposed signs as requested are in compliance with this section of the Code. COMMENT:ACKNOWLEDGED REFER TO SHEET 2 OF 3 FILING PLAT. The applicant shall enter into an Improvements Agreement according to policy regarding collateral for improvements and post adequate collateral for all transportation (access drive, parking areas, etcetera) and non-transportation (plant materials, fencing, screening,etcetera). The agreement and form of collateral shall be reviewed by County Staff and accepted by the Board of County Commissioners prior to recording the USR plat. COMMENT:ACKNOWLEDGED End Memorandum. USR-1578 Sanfiet,page 5 county Planning Departrn. t atit � SOUTHWEST BUILDING I SEP 2 4 2007 ; IVED ENGELS Design Associates September 18,2007 SOUTH WELD COUNTY PLANNING AND ZONING Department of Planning services 4209 WCR 24 %2 Longmont,Colorado 80504 Attn: Michelle Martin,Planner Project: "RIBBONS &RAINBOWS"Conference Center Platteville, Colorado Subject: U.S.R. 1578 Michelle: I would like to extend my deepest apology to you and your staff if I have made you feel personally attacked over the past few days. I have had some physical problems the past few months that put me in the hospital the end of last week through the weekend and the medications and stress with that has made me not myself to say the least. For this I do want you to know my comments about the inner coordination of departments,and melt- downs,in addressing the U.S.R.issues were not to be taken as a personal attack on you or your professional abilities. As you know we have been working on this for a very long time now and you have been instrumental in getting us this far. The pressures from all parties involved along with my physical problems have been quite overwhelming. You and I both know our primary goal is to finalize the U.S.R.and that is my only interest. Your conversations with me today,again were very enlightening in a step towards that goal,for that thank you. I will produce a letter addressing the developers compliance with the issues of the resolution along with the submittal of the filing plats for your review and go on from there. I am forwarding this letter to all parties involved so it is well known of my intentions,and beliefs. Joseph P.Engles 2521 West 4*Street Greeley,Colorado 80634 (970)304-9818 • As to the meeting with staff this week I would like to push it to next week due to my health situation. I hope this will be okay. Please let me know. Again,I would like to extend my deepest thanks to you and your staff for your help in getting the project to this point and look forward to your assistance in getting the final submittal signed off and recorded..A hard copy of this letter will follow. Sin , Joseph P.E s,Sr. JPE: cc cc: Shawn Sarchett,Owner Russel Kissler,Fire Prevention Tech. Jacklffi Hatch,Weld County Planning Kim Ogle,Planning Manager,Weld County Planning Charlotte Davis,Public Health and Development AAgeA.gok Weld County Planning Department SOUTHWEST BUILDING MAY 1 8 2007 RECEIVED ENGELS Design Associates May 13, 2007 SOUTH WELD COUNTY PLANNING AND ZONING Department of Planning services 4209 WCR 24 '/2 Longmont,Colorado 80504 Attn: Michelle Martin,Planner Project: "RIBBONS &RAINBOWS"Conference Center Platteville,Colorado Subject: Amendment to the U.S.R. # 1578 Michelle: This letter is to request that the Use by Special Review Permit# 1578 be amended by modifying line(19)nineteen of the development standards as follows: As indicated by the application material,the number of employees and guests per event shall not exceed 130. The need for the change from 175 to 130 is due to the design standards set by the Weld County Health Department for septic system design. The septic system must be designed to stay under a flow rate of 2,000 gallons per day,i.e. 15 gallons per person time's 130 people equals 1950 gallons per day. We appreciate your addressing this issue and please do not hesitate to call me with any further questions or needed information regarding this matter. Sincerely, J4� J P. Engels/747 JPE: ce cc: Shawn Sarchett, Owner Joseph P.Engels 2521 West 4th Street, Greeley,Colorado 80631 (970)304-9818 Weld County Planning Department '���� SOUTHWEST BUILDING MAY 1 6 2007 IMF RECEIVED ENGELS Design Associates April 28,2007 SOUTH WELD COUNTY PLANNING AND ZONING Department of Planning services 4209 WCR 24 %2 Longmont,Colorado 80504 Attn: Michelle Martin,Planner Project: "RIBBONS&RAINBOWS"Conference Center Platteville,Colorado Subject: Early Release Request Michelle: This letter is a request for early release of the footing and foundation permit to allow construction to begin on the Ribbons and Rainbow Conference Center. Per our conversation,this early release is only for the release of the Building Permit and we are fully aware that all prior issues,need to be satisfied to finalize the Use by Special Review Permit#1578 before a Certificate of Occupancy will be issued. I would like to extend my deepest thanks to you for your help in getting the project to this point and look forward to your assistance in putting together the final submittal for the e U. S. R.. I hope this letter meets your requirement for early release. Please let me know if you need anything further. Sincerely, )42 Jo . ngels JPE: cc cc: Shawn Sarchett,Owner Joseph R Engels 2521 West 4th Street Greeley,Colorado 80631 (970)304-9818 Alp IbiZer41111\ IM ENGELS Design Associates May 13,2007 SOUTH WELD COUNTY PLANNING AND ZONING Department of Planning services 4209 WCR 24 'A Longmont,Colorado 80504 Attn: Michelle Martin,Planner Project: "RIBBONS&RAINBOWS"Conference Center Platteville,Colorado Subject: Amendment to the U.S.R.# 1578 Michelle: This letter is to request that the Use by Special Review Permit# 1578 be amended by adding the following requirement: In the event that there would be more than 100 people in attendance at any given event,there would be additional portable toilet facilities provided on site. This requirement came to light through the review process of the Weld County Health Department in processing the septic permit. The Weld County Health Department was going off the preliminary narrative describing the projected occupancy load to be 75 people,and not the current 175 people. Please do not hesitate to call me with any further questions or needed information regarding this matter. _ S • Josep els JPE. ce cc: Shawn Sarchett,Owner Joseph P Engels 2521 West 4th Street Greeley,Colorado 80631 (970)304-9818 DENVER CO 80 ( .h , :�O 7-PM 3 T # �r` MAY 4-y 1 SI ENGELS Design Associates SOUTH WELD COUNTY PLANNI`TG AN.0 ZONING Dep ar-Jacnt -of 1 Pn.n.i_n.Of qi'-.rV1_.;.?.� 4209 WCR 241 /2 Longmont, Colorado 80504 Attn: Michelle Martin 2521 West 4th Street Greeley,Colorado 80631 soso4+94ie it„1,11,,,,1,1,11,,,,1„11,1,,,1„1,,,111„1,11 idds,,,1,11 Michelle Martin From: Joe Engels [joeengelsdesign@comcast.net] Sent: Wednesday, April 11, 2007 11:02 AM To: Michelle Martin Subject: Fw: PSCO Mineral Ownership Michelle, I also received this e-mail. Thanks Joe Original Message From: "Burns-Fink, Barbra" <Barbra.BurnsFink@xcelenergy.com> To: <joeengelsdesign@comcast.net> Sent: Wednesday, April 11, 2007 10 :12 AM Subject: PSCO Mineral Ownership Joe, To the best of its knowledge, Public Service Company of Colorado does not have any mineral ownership in the NW/4 of Section 21, T3N, R66W, except for a pooling interest. Please contact Virginia Varga or myself if you have any questions. Sincerely, Barbra Burns-Fink Real Estate Specialist Corporate Real Estate Xcel Energy Services, Inc. 550 15th Street, Suite 1000 Denver, Colorado 80202 Phone: 303-571-7676 Facsimile: 303-571-7880 E-mail: barbra.burnsfink@xcelenergy.com «mailto:barbra.burnsfink@xcelenergy.com» 1 Michelle Martin From: Joe Engels [joeengelsdesign@comcast.net] Sent: Wednesday, April 11, 2007 10:59 AM To: Michelle Martin Subject: Fw: Ribbons & Rainbows Mineral Right Service Agreement Michelle, I received this when I got back from the meeting. Enjoy Joe Original Message From: "Manuel Montoya" <Manuel@farmersres.com> To: "Joe Engels" <joeengelsdesign@comcast.net> Sent: Wednesday, April 11, 2007 9:48 AM Subject: RE: Ribbons & Rainbows Mineral Right Service Agreement Joe I am still out in the field on an emergency so I am attempting to respond from a mobile unit which has slow dial up. In response to your plans FRICO does not have any concerns regarding your plans. I will try to reply in a more formal manner when I get back to the office. I hope the County is ok with this short e-mail for now. Manuel Montoya, General Manager From: Joe Engels [mailto:joeengelsdesign@comcast.net] Sent: Tue 4/10/2007 3 :20 PM To: Manuel Montoya Subject: Ribbons & Rainbows Mineral Right Service Agreement Manuel this is the letter I had previously sent to you and I would greatly appreciate your immediate attention also attached is the site plan I had mention. thanks Joe 1 APR-9-2007 08:38R FROM: TO:*3117206524211 P:2 �sW�1 ENELS • Design Associates February 26,2007 Linda Joanne Ryan 337-D Kalama Street Kailua,Hawaii 96734 RE: Ribbons&Rainbows Mineral Rights Surface Agreement Dear Linda; This letter requests that all mineral owner/operators stipulate that the oil and gas activities have been adequately incorporated into the design of the proposed site plan of a convention center known as Ribbons&Rainbows to be built on property located at ]4016 WCR 32,Platteville,Colorado. 1:1y signing this letter,you agree with'the proposed site layout and see no conflicts with any future oil and gas activities that may occur on this site. Please sign a copy of this agreement and return it in the enclosed self-addressed envelope. Shawn and I would like to extend our sincere thanks and appreciation for your consideration. ly, .v.7‘7 Jo ' p .Engels,Sr. er's Agent) 1,Linda Joanne Ryan,as a mineral rights owner,agree to allow the development of the conference center known as Ribbons&Rainbows as it is proposed. Dated: \-\:-‘47 Lin Joanne Ryan Joseph P Engels my moon Shoe! °Witty,Colorado BOW (975)3O!•98f8 MAR-27-2007 07:52A FROM: TO:*3117206524211 P:2 AM:* -40 wr+ ENGELS Design Associates February 26,2007 ' ... .......-:bran Rea Wait Trust-.. . . . .... . . .. ._. _. Sherri Donbrowski,Trustee 812 East County Road 8 Berthoud,CO 80513 RE: Ribbons&Rainbows Mineral Rights Surface Agreement Dear Ms. Donbrowski: • • This letter requests that all mineral owner/operators stipulate that the oil and gas activities have been adequately incorpo ted into''the.desiggn of the proposed site plan of a' • • convention center known as Ribbons&Rainbows to be built on property loceed'at 14016 WCR 32,Platteville,Colorado. By signing this letter,you agree with the proposed site layout and see no conflicts with any future oil and gas activities that may occur on this site. Please sign a copy of this agreement and return it in the enclosed self-addressed envelope. • ,. . Shawn and 1 would like to ke nd.our . _. ..sincere thanks and appreciation consideration. aPP m for your Sincerely, ,,,f;agC37) Joscp . ngcls,Sr.( er's Agent) • 1,'Sherri Donbrowski, Trustee for the Nancy Rea.Wait Trust,as a mineral rights owner, agree•to allow the development of the conference ctnter'known as Ribbons&Rainbows as it is proposed. Dated; 31/ herri onbrowski Joseph P.Engels tot Wiwi4tl.aim Graft Cada&WW1 poro)aw rare._ Hello