Loading...
HomeMy WebLinkAbout20070133.tiff a MEMORANDUM ' TO: Clerk to the Board DATE: December 12, 2006 • FROM: Bob Patrick, Project Managev92 COLORADO SUBJECT: Request to record BOCC action. Attached are original copies of Change Order No. 1 for Work Order # 4 — WCR 74 and SH 257 Intersection Improvements — Construction Inspection, and Change Order No. 1 Work Order# 5 — WCR 74 and SH 257 Intersection Improvements Materials Testing Administration.These have been approved and signed by the Chair of the BOCC. Please record these with the above referenced Work Orders Commission Action#2006-1105 (WO #4) and 2006-1106 (WO #5) Enclosures pc: File Robert Patrick, Project Manager M:\—Active Projects Strategic Corridor\WCR 74,Traffic Signal\Construction\Contracts\CONSULTANTS\12-12-06 to Clerk and recorder CO#1 for WO 4&5.doc .EC Cc) ec.i. 2007-0133 )�IG� 7 CHANGE ORDER NO. 1 Work Order#4 SH 257 and Weld County Road 74 953 Date: November 29, 2006 Project: SH 257 and Weld County Road 74 Intersection Improvement. The project is located at the intersection of SH 257 and WCR 74 north of Windsor and is funded by CDOT, HES Grant, Weld County, Town of Severance and the Town of Windsor. The engineering consulting firm Felsburg, Holt and Ullevig (FHU) was selected as the consultant for the project to provide engineering construction management services. Owner: Weld County,Colorado Consultant: Felsburg,Holt and Ullevig, 6300 South Syracuse Way, Suite 600, Centennial,CO 80111 The following change is hereby made to the Contract Documents: o Additional services to the original Scope of Work were required. Additional services included: Construction time extension required additional time to complete scope of work $2,233.56 Total Increase Cost $2,233.56 CHANGE TO CONTRACT PRICE: Original Contract Price: $ 49,515.00 Current Contract Price adjusted by previous Change Order: $ 49,515.00 The Contract Price due to this Change Order will be increased by: $ 2,233.56 The new Contract Price, including this Change Order, will be$ 51,748.56 CHANGE TO CONTRACT TIME: The Contract time will be increased by 6 calendar days. RECOMMENDED: Owner Representative: Date: /2- -/I- o /Jed✓M. J. Geile,Chair 'vv Ni 1 0 nu/ AEngineer: w .f / Date: it -e-.04. APPROVALS: Consultant: Fel burg,Holt RAJ; By: (. t<i Date: 1Z'S- o6 Title: ptrl^Ct P 6I M:\—Active Projects\Strategic Corridor\WCR 74,Traffic Signal\Construction\Contracts\CONSULTANTS\I 1-17-06 WO#4 CHANGE ORDER No I.doc 1111111 11111 VIII IIIII IIII! 11111 1111111 1II 11111 1111 1111 3441953 12/14/2006 01:25P Weld County, CO 1 of 1 R 0.00 D 0.00 Steve Moreno Clerk& Recorder x''/33 CHANGE ORDER NO. 1 Work Order#5 SH 257 and Weld County Road 74 9,0 Date: November 29, 2006 Project: SH 257 and Weld County Road 74 Intersection Improvement. The project is located at the intersection of SH 257 and WCR 74 north of Windsor and is funded by CDOT, HES Grant, Weld County, Town of Severance and the Town of Windsor. The engineering consulting firm Felsburg, Holt and Ullevig (FHU) was selected as the consultant for the project to provide engineering construction management and material testing services. Owner: Weld County,Colorado Consultant: Felsburg,Holt and Ullevig, 6300 South Syracuse Way, Suite 600, Centennial,CO 80111 The following change is hereby made to the Contract Documents: o Additional services to the original Scope of Work were required. Additional services included: Additional materials testing and construction management. $4,531.45 Total Increase Cost $4,531.45 CHANGE TO CONTRACT PRICE: Original Contract Price: $ 38,268.75 Current Contract Price adjusted by previous Change Order: $ 38,268.75 The Contract Price due to this Change Order will be increased by: $4,531.45 The new Contract Price, including this Change Order, will be$ 42,800.20 CHANGE TO CONTRACT TIME: The Contract time will be increased by 0 calendar days. RECOMMENDED: Owner Representative: �dsi��� —eat/ Date: /2-—//—0 6 M. J. Geile, Chair dAtA i. U LvJ/ Engineer: friir iVICDate: it "I-vL APPROVALS: • Consultant: Felsb rg,Holt and Ullevig(FH ) By: .(1 ( I �^ �4 Date: L 2 —S—O6 Title: PYt11Ce5 M:\—Active Projects\Strategic Corridor\WCR 74,Traffic Signal\Construction\Contracts\CONSUI.TANTS\11-17-06 WO#4 CHANGE ORDER No I.doc 111111111111 1111 11111 11111 11111 111II 11111111111111 3441954 12/14/2006 01:25P Weld County, CO 1 of 1 R 0.00 D 0.00 Steve Moreno Clerk& Recorder Hello