HomeMy WebLinkAbout20071840.tiff WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
CTL THOMPSON
DATED: June 13, 2007
Work Order Number: CTL-2
Project Title: Public Works WCR 52 from WCR 17 to Milliken: Subgrade Investigation
Commencement Date: June 25,2007
Completion Date: July 31, 2007
Limitations on compensation: Not to exceed$7,229.25
Project Description: Soils subgrade investigation needed for the design of roadway improvements.
Scope of Services: See attached Scope of Work dated June 11, 2007
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services Agreement
and this work order (including the attached By: / E
forms) the Professional Services Agreement Project Manager
shall control. Date: Col 10 (071
Professional By: A-7.7r-
DepartmentHeeaadd
CTL Thompson, Inc. Date: t/Y—�j OG'.A�` 7
351 Linden Street,Unit 140 J
Fort Collins, CO 80524 By:
Director of Finance and Administration
By: Date: 07/02/2007
Title: 4'6.t7C-Chlwir4 J)4oT rtC,&1_ By: -7,1- /
Pro-Tem Chairman,Weld County Commissioners
Date: t - 2o07_ Date: 07/02/2007
��� w~ ESTING TO BOARD OF COUNTY
�� /. /�J v�MISSIONER SIGNATURES ONLY
tt6tet a$ & 'ka
NTYCLfauli RKTOTFIRD
i�� Y CL 1K TO CM ,*a
�-c 00s6
07-e-7 (0 : 02007-ieyd
CTL I THOMPSON
June 11, 2007
Weld County Public Works
1111 H Street
P.O. Box 758
Greeley, Colorado 80632
Attention: Mr.Wayne Howard
Subject: Fee Estimate for Subgrade Investigation
WCR 52 from WCR 17 to Milliken
Weld County, Colorado
Proposal No. FC 07-0186 (Revised)
Mr. Howard:
At your request, CTL I Thompson, Inc. Is pleased to provide this fee estimate for
geotechnical engineering services for a subgrade investigation for the above
referenced project. For preparation of this proposal, you provided us a site map
delineating the project limits. We understand the County desires to obtain
information regarding the existing pavement system and underlying subgrade soils
for use in planning and design of the proposed improvements. Our services will be
limited to subgrade exploration and testing. No pavement design is requested for this
project.
Based on the provided site location map,the project covers approximately 6800 lineal
feet. We estimate drilling 14 exploratory borings along the roadway at a spacing of
approximately 500 feet. All borings will be drilled to a depth of 10 feet. We will collect
and test samples of the subgrade soils,as we deem necessary, in accordance with
Weld County street standards. You have requested Hveem (R-value) tests be
performed for this project. We understand that we will need to provide the necessary
utility locates and traffic control for this investigation.
We anticipate that the County will use our estimate for the basis of establishing a
budget for the project and to issue a purchase order for our services. Our estimated
scope of services and associated fees were prepared according to the terms of our
professional services agreement with Weld County for the year 2007.
351 Linden Street I Unit 140 I Fort Collins,Colorado 80524
Telephone:970-206-9455 Fax:970-206.9441
Our estimated fee for geotechnical services associated with the subgrade
investigation is $7,229.25. If we can be of further assistance, please contact us at
your convenience.
Very truly yours,
CTL (THOMPSON, INC.
.B. "Chip" Leadbetter, III, P.E.
Geotechnical Department Manager
WELD COUNTY PUBLIC WORKS
WCR 52 FROM WCR 17 TO MILLIKEN 2
CTL I T PROPOSAL NO.FC 07-0186(rev.6-11.07)
CTLITHOMPSON
FEE ESTIMATE I N C
FC-07-0186 (rev. 6-11-07)
WCR 52 from WCR17 to Milliken
Item Unit Quantity Unit Cost Amount
Traffic Control
Traffic Control Day 1 $431.00 $431.00
Sub-total $431.00
Drilling
Mobilization LS 1 $135.00 $135.00
Locates LS 2 $77.00 $154.00
Permit Application Hr 2 $60.00 $120.00
Rig Hr 10 $135.00 $1,350.00
Drilling Supervision Hr 10 $60.00 $600.00
Sub-total $2,359.00
Laboratory
Natural moisture/density Ea 14 $5.50 $77.00
Sieve Analysis w/Atterberg Limits Ea 4 $120.00 $480.00
Swell/consolidation Ea 4 $37.00 $148.00
Hveem "R" value Ea 4a $310.00 $1,240.00
std Proctor Ea 4 $75.00 $300.00
Sub-total $2,245.00
Engineering
Engineering Technician Hr 8 $45.00 $360.00
Sr. Engineering Technician Hr 8 $55.00 $440.00
Project engineer Hr 10 $75.00 $750.00
Associate Hr 3 $100.00 $300.00
Sub-total $1,850.00
Sub-Total $6,885.00
contingency $344.25
Total $7,229.25
NOTE on �� -c-t�V &._1/4.3p..k..\--K Asesv e
Voc �\\_. --c1/44-?k,-- k \� t , \JStb
BOARD OF COUNTY COMMISSIONERS
REVIEW/WORK SESSION REQUEST
RE: WCR 52, from WCR 17 to Milliken City Limits (1.25 miles)
DEPARTMENT: PUBLIC WORKS DATE: 6/19/07
PERSON REQUESTING: Wayne Howard, Engineering Division
Brief description of the problem/issue:
Public Works Department is currently working on designing road improvements to WCR 52. Improvements
include road paving, drainage, and vertical sight distance issues. In order to accurately calculate the pavement
design we are in need of existing soil boring information. PW has an existing On-Call contract with CTL
Thompson to provide the required geotechnical services necessary for the design. The scope of work and costs
for the services is shown in the attached Work Order No. 2. The proposed costs are not to exceed $7,229.25.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options)
The Board could either accept or not accept the cost associated with Work Order No. 2. Without this
information, a cost effective pavement design could not be calculated.
Recommendation to the Board:
I recommend approval for Work Order No. 2 to CTL Thompson. These costs are consistent with other costs for
projects similar in scope of work.
Approve Schedule
Recommendation Work Session Other
David E. Long
William H. Jerke
William F. Garcia
Robert D. Masden
Douglas Rademacher
Attachments
pc:
M:\—Active Projects\WCR 52,from WCR 17 to Milliken\Design\Contracts\Work Session Request CTL.doc
( j \\
MEMORANDUM
TO: Clerk to the Board DATE: June 26, 2007
FROM: Wayne Howard, Public Works
COLORADO
SUBJECT: Consent Agenda Item
Work Order No. 2 with CTL Thompson for the WCR 52 from WCR 17 to Milliken city limits
subggrade investigation not to exceed$7,229.25