Loading...
HomeMy WebLinkAbout20071840.tiff WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CTL THOMPSON DATED: June 13, 2007 Work Order Number: CTL-2 Project Title: Public Works WCR 52 from WCR 17 to Milliken: Subgrade Investigation Commencement Date: June 25,2007 Completion Date: July 31, 2007 Limitations on compensation: Not to exceed$7,229.25 Project Description: Soils subgrade investigation needed for the design of roadway improvements. Scope of Services: See attached Scope of Work dated June 11, 2007 Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein, by this reference, and accordance with the terms and conditions Notice to Proceed is hereby given. contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement and this work order (including the attached By: / E forms) the Professional Services Agreement Project Manager shall control. Date: Col 10 (071 Professional By: A-7.7r- DepartmentHeeaadd CTL Thompson, Inc. Date: t/Y—�j OG'.A�` 7 351 Linden Street,Unit 140 J Fort Collins, CO 80524 By: Director of Finance and Administration By: Date: 07/02/2007 Title: 4'6.t7C-Chlwir4 J)4oT rtC,&1_ By: -7,1- / Pro-Tem Chairman,Weld County Commissioners Date: t - 2o07_ Date: 07/02/2007 ��� w~ ESTING TO BOARD OF COUNTY �� /. /�J v�MISSIONER SIGNATURES ONLY tt6tet a$ & 'ka NTYCLfauli RKTOTFIRD i�� Y CL 1K TO CM ,*a �-c 00s6 07-e-7 (0 : 02007-ieyd CTL I THOMPSON June 11, 2007 Weld County Public Works 1111 H Street P.O. Box 758 Greeley, Colorado 80632 Attention: Mr.Wayne Howard Subject: Fee Estimate for Subgrade Investigation WCR 52 from WCR 17 to Milliken Weld County, Colorado Proposal No. FC 07-0186 (Revised) Mr. Howard: At your request, CTL I Thompson, Inc. Is pleased to provide this fee estimate for geotechnical engineering services for a subgrade investigation for the above referenced project. For preparation of this proposal, you provided us a site map delineating the project limits. We understand the County desires to obtain information regarding the existing pavement system and underlying subgrade soils for use in planning and design of the proposed improvements. Our services will be limited to subgrade exploration and testing. No pavement design is requested for this project. Based on the provided site location map,the project covers approximately 6800 lineal feet. We estimate drilling 14 exploratory borings along the roadway at a spacing of approximately 500 feet. All borings will be drilled to a depth of 10 feet. We will collect and test samples of the subgrade soils,as we deem necessary, in accordance with Weld County street standards. You have requested Hveem (R-value) tests be performed for this project. We understand that we will need to provide the necessary utility locates and traffic control for this investigation. We anticipate that the County will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms of our professional services agreement with Weld County for the year 2007. 351 Linden Street I Unit 140 I Fort Collins,Colorado 80524 Telephone:970-206-9455 Fax:970-206.9441 Our estimated fee for geotechnical services associated with the subgrade investigation is $7,229.25. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL (THOMPSON, INC. .B. "Chip" Leadbetter, III, P.E. Geotechnical Department Manager WELD COUNTY PUBLIC WORKS WCR 52 FROM WCR 17 TO MILLIKEN 2 CTL I T PROPOSAL NO.FC 07-0186(rev.6-11.07) CTLITHOMPSON FEE ESTIMATE I N C FC-07-0186 (rev. 6-11-07) WCR 52 from WCR17 to Milliken Item Unit Quantity Unit Cost Amount Traffic Control Traffic Control Day 1 $431.00 $431.00 Sub-total $431.00 Drilling Mobilization LS 1 $135.00 $135.00 Locates LS 2 $77.00 $154.00 Permit Application Hr 2 $60.00 $120.00 Rig Hr 10 $135.00 $1,350.00 Drilling Supervision Hr 10 $60.00 $600.00 Sub-total $2,359.00 Laboratory Natural moisture/density Ea 14 $5.50 $77.00 Sieve Analysis w/Atterberg Limits Ea 4 $120.00 $480.00 Swell/consolidation Ea 4 $37.00 $148.00 Hveem "R" value Ea 4a $310.00 $1,240.00 std Proctor Ea 4 $75.00 $300.00 Sub-total $2,245.00 Engineering Engineering Technician Hr 8 $45.00 $360.00 Sr. Engineering Technician Hr 8 $55.00 $440.00 Project engineer Hr 10 $75.00 $750.00 Associate Hr 3 $100.00 $300.00 Sub-total $1,850.00 Sub-Total $6,885.00 contingency $344.25 Total $7,229.25 NOTE on �� -c-t�V &._1/4.3p..k..\--K Asesv e Voc �\\_. --c1/44-?k,-- k \� t , \JStb BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: WCR 52, from WCR 17 to Milliken City Limits (1.25 miles) DEPARTMENT: PUBLIC WORKS DATE: 6/19/07 PERSON REQUESTING: Wayne Howard, Engineering Division Brief description of the problem/issue: Public Works Department is currently working on designing road improvements to WCR 52. Improvements include road paving, drainage, and vertical sight distance issues. In order to accurately calculate the pavement design we are in need of existing soil boring information. PW has an existing On-Call contract with CTL Thompson to provide the required geotechnical services necessary for the design. The scope of work and costs for the services is shown in the attached Work Order No. 2. The proposed costs are not to exceed $7,229.25. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The Board could either accept or not accept the cost associated with Work Order No. 2. Without this information, a cost effective pavement design could not be calculated. Recommendation to the Board: I recommend approval for Work Order No. 2 to CTL Thompson. These costs are consistent with other costs for projects similar in scope of work. Approve Schedule Recommendation Work Session Other David E. Long William H. Jerke William F. Garcia Robert D. Masden Douglas Rademacher Attachments pc: M:\—Active Projects\WCR 52,from WCR 17 to Milliken\Design\Contracts\Work Session Request CTL.doc ( j \\ MEMORANDUM TO: Clerk to the Board DATE: June 26, 2007 FROM: Wayne Howard, Public Works COLORADO SUBJECT: Consent Agenda Item Work Order No. 2 with CTL Thompson for the WCR 52 from WCR 17 to Milliken city limits subggrade investigation not to exceed$7,229.25 Enclosed is one original Work Order. M:\Francie\4gendaChairSignature.doc CD r•l C� c : rr -= U) --O 2: ui 0056 C,c'nst enda 2007-1840 ()v b . jdcc'7 Hello