Loading...
HomeMy WebLinkAbout20070976.tiff REFERRAL LIST Name: New Hope Family Christian Church Case#: USR-1574 County Towns & Cities Fire Districts Attorney _Ault _Ault F-1 O Health Department _Berthoud _Berthoud F-2 _Extension Office Brighton _Briggsdale F-24 Emergency Mgt Office- Ed Herring 0 Dacono _Brighton F-3 0 Sheriffs Office _Eaton Eaton F-4 0 Public Works _Erie 0 Fort Lupton F-5 _Housing Authority _Evans _Galeton F-6 _Airport Authority 0 Firestone Hudson F-7 _ O Building Inspection _Fort Lupton _Johnstown F-8 O Code Compliance Ann_Beth 0 Frederick _LaSalle F-9 _Kim Ogle (Landscape Plans) _Garden City _Mountain View F-10 _Lin (Addressing Change of Zone) _Gilcrest _Milliken F-11 Ambulance Services _Greeley _Nunn F-12 _Grover _Pawnee F-22 State _Hudson _Platteville F-13 Div. of Water Resources _Johnstown _Platte Valley F-14 _Geological Survey Keenesburg _Poudre Valley F-15 _Department of Health _Kersey _Raymer F-2 _Department of Transportation _LaSalle _Southeast Weld F-16 _Historical Society _Lochbuie _Union Colony F-20 _Water Conservation Board _Longmont _Wiggins F-18 _Oil &Gas Conservation Commission _Mead _Windsor/Severance F-17 _Milliken Division of Wildlife _New Raymer 0 South Hwy 66 (Loveland) _Northglenn _North Hwy 66 (Greeley) _Nunn _Division of Minerals/Geology _Pierce _Platteville Soil Conservation Districts _Severance Commissioner _Big Thompson/FTC _Thornton 0 Fitzgerald _0_Boulder Valley/Longmont _Windsor _Brighton/SE Weld _Centennial Counties Greeley/West Greeley _Adams _Platte Valley _Boulder _West Adams _Broomfield _ Thompson _Little Larimer Federal Government Agencies Other US Army Corps of Engrs 0 School District RE-8 _USDA-APHIS Vet Service _Central Colo. Water Cons _Federal Aviation Admin _RR (Structures over 200 ft or w/in _Ditch Company 20000 ft of Pub Airport _Art Elmquist (MUD Area) _Federal Communications Comm 0 Central Weld County Water District a-- EXHIBIT I ___L__ 2007-0976 .1 (vett ......N:x\6 Weld County Referral Wi lli August '10, 2006 C COLORADO fa ,, , The Weld County Department of Planning Services has received the following item for review: Applicant New Hope Family Christian Case Number USR-1574 Church Please Reply By September 7, 2006 Planner Kim Ogle Project Site Specific Development Plan and a Special Review Permit for a church, childcare center,and private school in the A(Agricultural)Zone District. Legal Lot A of RE-4300 being part of the N2 NW4 of Section 28,T2N, R67W of the 6th P.M.,Weld County, Colorado. Location South of and adjacent to CR 18 and east of and adjacent to CR 17. — Parcel Number 1311 28 200006 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information,please call the Department of Planning Services. Weld County Planning Commission Hearing(if applicable) October 17,2006 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: nn (( l q \ ' 1 11 `�¢.ac'k.rCv.ca. r yc yevAri f CtivYev�-t-} �vu SeVu-2d L`7 0. ,S�nrt -4rO1 . � m� �o—c_it- -b1 f4'« y \0.‘ny Y` 1`'I :v'a ). Q`,o-CQ 1t Q�T V2-1t�\WC t� 0.LI.A CoSjt-S- Signature J �.- q` y` cA- LUSIn«�ate f3/i (, 1 0 C, Agency C vv..)va-1 t.a�U CO.,...-Al L-`aA-c,r +s 5-\rL^ 4HIBIT +Weld County Planning Dept. +4209 CR 24.5,Longmont,CO.80504 +(720)6524210 ext. }18730 +(720)652-4. 7F E 'd S98SESE0LS plan le.raua3 dist1TO 90 91 2ny Weld ^r„nty Planning Department SOUTHWEST BUILDING I‘Hee AUG 18 2006 Weld County Fj nik, IAugust 10, 2006 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant New Hope Family Christian Case Number USR-1574 Church Please Reply By September 7, 2006 Planner Kim Ogle Project Site Specific Development Plan and a Special Review Permit for a church, childcare center, and private school in the A(Agricultural)Zone District. Legal Lot A of RE-4300 being part of the N2 NW4 of Section 28, T2N, R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to CR 18 and east of and adjacent to CR 17. Parcel Number 1311 28 200006 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 17, 2006 O We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: ? 11,fit/ j Lc,"c c_ Lf :�-� i/4 .C�.� •SC%ti..e T1rL� /ef1/: ,f'iq, /En,' .Prc/1. -/1i.4. c? G%l.'/14:444c/ (7)9ssiowA Signature lG/ti i' c Date � .: / b G � Agency j` . 2/.7/1-04 2 Ali? /2/z57. .Weld County Planning Dept. .4209 CR 24.5, Longmont,CO.80504 4(720)652-4210 ext.8730 4(720)652-4211 fax Kletift Weld County Referral Weld County Planning Department Illip GREELEY OFFICE C August 10, 2006 AUG 1 5 2006 COLORADO RECEIVED The Weld County Department of Planning Services has received the following item for review: Applicant New Hope Family Christian Case Number USR-1574 Church Please Reply By September 7, 2006 Planner Kim Ogle Project Site Specific Development Plan and a Special Review Permit for a church, childcare center, and private school in the A(Agricultural)Zone District. Legal Lot A of RE-4300 being part of the N2 NW4 of Section 28, T2N, R67W of the 6th P.M., Weld County, Colorado. Location South of and adjacent to CR 18 and east of and adjacent to CR 17. Parcel Number 1311 28 200006 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) October 17, 2006 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan la, We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: ThA t k riaiNe �l to e 'n`llp x i- ri (1G \ivol XtDYnc_m kpeR , f1/7{CLL Signature n Date 4Z-' ra0 Agency 7.15Yv+l Yw ( 'I1{�A i C1fY 0 4Weld County Planning Dept. 44209 CR 24.5,Longmont,CO.80504 4(720)652-4210 ext.8730 ❖(720)652-4211 fax 08/18/2006 09:41 TOWN OF FREDERICK 4 17206524211 NO.149 1702 TOWN OF FREDERICK • f it P.O. BOX 436 • FREDERICK, CO 80630 • PHONE: (303)833.2388 FAX: (303)833-3817 T-7;s3. August 18. 2006 Kim Ogle, Planner Weld County Planning Dept 918 10th St. Greeley, CO 80631 RE: Case USR-1574 New Hope Family Christian Church Dear Mr. Ogle, Thank you for the referral regarding the proposed New Hope Family Christian Church. The proposed development is located at the southeast corner of the intersection of WCRs 18 and 17. Please note that the Town has annexed WCR 17 in the south half of sections 32 and 33 T2N R67W and has plans to annex WCR's 15 and 17 up to the south half of sections 28 and 29 T2N R67W as shown in the Comprehensive Plan. The parking associated with the proposed development suggests that It will generate around 200 vehicular trips per day. This may adversely impact the neighboring road system. Note that portions the neighboring roads have been annexed to the Town including and not limited to WCRs 16 and 17. To ensure adequate measures are employed for health and safety and determine the impact of this development on the surrounding transportation system, including any potentially required improvements such as dust suppression, paving and the like. Please provide a copy of the traffic report for review by the Town Engineer prior to further consideration of the proposed development. Please also note that improvements to the impacted roadways may be warranted and or required as a result of this proposal, particularly along WCR 17. Please call if you have any questions. el Sin'�P Todd Tucker AICP CC: Rev. Jackson B. Sherwood, Town of Frederick Engineering Reform;Response to Weld Counly_Dockets New Hope Family Christian Church5.doc Page 1 of I Weld County Planning Department GREELEY OFFICE r MEMORANDUM AUG 29 2000 , � RECEIVED TO: Kim Ogle, Planning Services DATE: August 28, 2006 FROM: Donald Carroll, Engineering Administrator Ofe WI I k SUBJECT: USR-1574, New Hope Family Christian Church COLORADO The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of the Use by Special Standards, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Our comments and requirements are as follows: COMMENTS: Weld County Road Classification Plan (FHU): (June 2002) WCRs 17 and 18 adjacent to the proposed USR are local gravel roads and require a 60-foot right-of-way at full build out. There is presently a 60-foot right-of-way. These roads are maintained by Weld County. Pursuant to —the definition of SETBACK in the Weld County Zoning Ordinance (23-1-90), the required setback is measured om the future right-of-way line. At the intersection of WCR 18 and WCR 17 west of the intersection, the Town of Firestone has annexed and has jurisdiction over that section of road. ADT: Our most current traffic count for WCR 18 is 165 to 190 vehicles per day taken in 2003, and WCR 17 at this location has an ADT of 112 to 160 also taken in 2003. REQUIREMENTS: Access/ Parking: The applicant has identified two accesses to the facility. The existing access is from WCR 18 and the future access is from WCR 17. The appropriate signing is required at each access point including the egress and ingress (one-way) with a stop sign at the appropriate location before entering on to WCR 17. Parking: The applicant is indicating that Phase I will utilize an existing grass parking lot to accommodate 16 cars and one handicap parking space. The handicap parking space shall conform to all standards with The Americans with Disability Act. This parking space shall be hard-surfaced and appropriately signed. Wheel guards or curb stops shall designate appropriate parking spaces. Phase II: The applicant is identifying an additional 75 parking spaces with road base. The Weld County Public Works Department recommends using recycled asphalt for the road base. Wheel stops or curb guards shall also be a part of the Phase II parking area with additional ADA designated hard-surfaced parking locations. ._Dust Suppressant: With the additional impact to the proposed USR facility (church, daycare, and private chool) location, additional traffic will justify dust concerns for the area. The Weld County Public Works Department recommends that dust suppressant be placed on WCR 17. The dust suppressant shall be placed in front of the residence of Justin Westmoreland, 7812 WCR 17, for approximately 300 feet. The dust Kim Ogle, Planning Services USR-1574, New Hope Family Christian Church ugust 28, 2006 Page 2 suppressant (magnesium chloride or calcium chloride) shall be placed no less than twice a year or more often as designated by the Weld County Public Works Department, Grader Division Supervisor. Both ingress and egress and exist points should be dust abated also. Storm Water Drainage: In accordance with Section 23,-2-240, Design Standards (5 A and B), the applicant needs to provide additional storm water documentation calculations for review and approval with the Dave Bauer, Weld Count Public Works, Drainage Division at 970-204-6496, extension 3739. There may be an additional storm water permit fee associated with review and approval through the Drainage Division. pc: USR-1574 M:\PLANNING—DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1574.DOC t- 6 DEPARTMENT OF PLANNING SERVICES BUILDING INSPECTION NORTH OFFICE I918 10'"Street C GREELEY, COLORADO 80631 PHONE (970)353-6100, EXT.3540 FAX (9(970) 304-304-6498 COLORADO SOUTHWEST OFFICE 4209 CR 24.5 LONGMONT CO 80504 PHONE (720)652-4210 ext. 8730 FAX (720)652-4211 September 6, 2006 New Hope Christian Church Site Specific Development Plan and Special Review Permit fora church, childcare center,and a private school in the A(Agricultural)Zone. USR-1574 1. A building permit shall be obtained prior to the construction of structures. 2. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer.Two complete sets of plans are required when applying for each permit. Include a Code Analysis Data sheet provided by the Weld County Building Department with each Building permit application. 3. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; and the 2005 National Electrical Code and Chapter 29 of the Weld County Code. 4. The office will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. 5. The building will be classified as A-3 (Church) and E (Educational) occupancy. This building will be required to have an automatic fire sprinkler system. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Zoning Ordinance. 6. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. When measuring buildings to determine offset and setback requirements,buildings are measured to the farthest projection from the building. Property lines shall be clearly identified and all property pins shall be staked prior to the first site inspection. 7. Provide letter of approval from Fort Lupton Fire protection District prior to construction of any structure. 8. There are two permits on record, BCS-060275 is active. SP-9700006 has a final status. Sinnyely, Reger V gil Buildin Offici I Weld County Planning Department c"rr! ry OFFICE MEMORANDUM `'` zooe /ED TO: KIM OGLE, PLANNING SERVICES � FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH (.37 ISUBJECT:USR-1574 NEW HOPE FAMILY CHRISTIAN CHURCH C. DATE: 09/06/2006 COLORADO CC: Environmental Health Services has reviewed this proposal for a church, childcare center and private school. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall submit a dust abatement plan for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. 2. The applicant shall provide current evidence that the facility has an adequate water supply (i.e., well or community water system). 3. The septic system serving the home shall be reviewed by a Colorado Registered Professional Engineer. The review shall consist of observation of the system and a technical review describing the systems ability to handle the proposed hydraulic load (church, etc). The review shall be submitted to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. In the event the system is found to be inadequately sized or constructed the system shall be brought into compliance with current Regulations. 4. The septic system design shall comply with all County and State Laws, Regulations and Policies. In the event the septic system requires a design capacity of over 2,000 gallons of sewage per day the applicants shall provide evidence that all requirements of the Water Quality Control Division (WQCD) of the Colorado Department of Public Health and Environment (specifically Policies WQSA-6 and WQSA-8 ) have been satisfied. Evidence of compliance shall be provided to the Weld County Department of Public Health and Environment. Alternately, the applicant can provide evidence from the WQCD that they are not subject to these requirements. We recommend that the following requirements be incorporated into the permit as conditions that must be met one month prior to construction activities: 1. A stormwater discharge permit may be required for a development/redevelopment construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. 5. This facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as delineated in 25-12-103 C.R.S., as amended. 6. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 7. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the church. 8. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 2 • 9. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 10.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 3 MEMORANDUM TO: KIM OGLE,PLANNING SERVICES I FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH C. SUBJECT:USR-1574 NEW HOPE FAMILY CHRISTIAN CHURCH DATE: COLORADO cc: Environmental Health Services has reviewed this proposal for a church, childcare center and private school. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall submit a dust abatement plan for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. 2. The applicant shall provide current evidence that the facility has an adequate water supply (i.e., well or community water system). 3. The septic system serving the home shall be reviewed by a Colorado Registered Professional Engineer. The review shall consist of observation of the system and a technical review describing the systems ability to handle the proposed hydraulic load (church, etc). The review shall be submitted to the Environmental Health Services Division of the Weld County Department of Public Health and Environment. In the event the system is found to be inadequately sized or constructed the system shall be brought into compliance with current Regulations. 4. The septic system design shall comply with all County and State Laws, Regulations and Policies. In the event the septic system requires a design capacity of over 2,000 gallons of sewage per day the applicants shall provide evidence that all requirements of the Water Quality Control Division (WQCD) of the Colorado Department of Public Health and Environment (specifically Policies WQSA-6 and WQSA-8 ) have been satisfied. Evidence of compliance shall be provided to the Weld County Department of Public Health and Environment. Alternately, the applicant can provide evidence from the WQCD that they are not subject to these requirements. We recommend that the following requirements be incorporated into the permit as conditions that must be met one month prior to construction activities: 1. A stormwater discharge permit may be required for a development/redevelopment construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. 5. This facility shall adhere to the maximum permissible noise levels allowed in the Residential Zone as delineated in 25-12-103 C.R.S., as amended. 6. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 7. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the church. 8. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 2 9. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 10.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 3 Hello