Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20070352.tiff
RESOLUTION RE: APPROVE CHANGE ORDER NO. 3 TO THE STANDARD FORM OF AGREEMENT FOR THE WELD COUNTY NORTH JAIL COMPLEX, PHASE III PROJECT, AND AUTHORIZE CHAIR TO SIGN - ROCHE CONSTRUCTORS, INC. WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,the Board has been presented with Change Order No.3 to the Standard Form of Agreement for the Weld County North Jail Complex, Phase III Project, between the County of Weld, State of Colorado,by and through the Board of County Commissioners of Weld County,and Roche Constructors, Inc., commencing upon full execution, and ending, with further terms and conditions being as stated in said change order, and WHEREAS,after review,the Board deems it advisable to approve said change order,a copy of which is attached hereto and incorporated herein by reference. NOW,THEREFORE,BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that Change Order No.3 to the Standard Form of Agreement for the Weld County North Jail Complex, Phase III Project, between the County of Weld, State of Colorado, by and through the Board of County Commissioners of Weld County, and Roche Constructors, Inc., be, and hereby is, approved. BE IT FURTHER RESOLVED by the Board that the Chair be, and hereby is, authorized to sign said change order. The above and foregoing Resolution was,on motion duly made and seconded, adopted by the following vote on the 7th day of February, A.D., 2007. BOARD OF COUNTY COMMISSIONERS 1���� WE OUNTY, 77O ATTEST: "" / I�f m f id E. Long, Chair U/r Weld County Clerk to the Bo at6i �� \A C"� ;1, BY: 0/21 "-"7 -+ I W IHa l ,-Pro-Lern 7- Deputy Clerk to the Board ` H Wil ' m F. Garcia �(�� APP AS V" Robert D. Masde_r— / ounty Attorney /, , /aDate of signature: a/o7 —D gas a cher 2007-0352 CP; RL CI0-0 PR0029 S� mz/air/G7 • It'll Greeley,Colorado Las Vegas, Nevada Westminster, Colorado Constructors, Inc. TRANSMITTAL February 1, 2007 TO: Bley Associates PROJECT: RCI Project No. 0615CO • 5312 W. 9th Street Drive Weld County North Jail Complex Phase III Greeley, CO 80631 2110 O. Street Greeley, CO 80631 FROM: Ryan Strub TRANSMITTED FOR: Approval and Signature Project Manager ORIGINATOR: ROCHE CONSTRUCTORS, INC. • SENT VIA: ❑ Regular Mail/ ❑ Fedex/ /® Hand Delivery/❑ Pick Up/❑ Other: NO. COPIES DRAWING NO. DESCRIPTION 3 Originals I Change Order No. 03 • • I j i l REMARKS:_ cc: Pat Sherin Note to fabricators/manufacturer's representatives: Approval of the material transmitted hereby, whether by the contractor, the Owner. or the Owner's Authorized Agent,shall under no circumstances alter the requirements of the original drawings,specifications,contract documents,subcontract documents or purchase agreement for quality. quantity, finish, dimension, design, configuration or manufacturer; nor shall such approval constitute acceptance by the contractor of any method,material or equipment not ultimately acceptable to the Owner or the Owner's Authorized Agent. 1222 Office(303)920-5555 Fax(303)920-5556 1235 W.124"'Avenue.Suite 100,Westminster,Colorado 80234 www.rocheconstructars.com 2007-0352 CHANGE OWNER [f RCI Project#0615CO ORDER ARCHITECT X CONTRACTOR ❑ A/A DOCUMENT G701 FIELD ❑ OTHER ❑ PROJECT: Weld County North Jail Complex Phase 3 CHANGE ORDER NUMBER: 03 2110 O Street Greeley,CO 80631 DATE: 2/1/2007 TO CONTRACTOR: ROCHE CONSTRUCTORS, INC. ARCHITECT'S PROJECT NO: Post Office Box 1727 Greeley,CO 80632 CONTRACT DATE: 9/22/2006 CONTRACT FOR: Construction of new building The Contract is changed as follows: COR#003 -Over Excavation and Soil Stabilization $27,942 COR#004-Metal Shoring $57,558 $85,500 Not valid until signed by Owner, Architect, and Contractor The original(Contract Sum)(Guaranteed Maximum Price)was $10,650,017.00 Net change by previously-authorized Change Orders $9,073.00 The(Contract Sum)(Guaranteed Maximum Price)prior to this Change Order was $10,659,090.00 The(Contract Sum)(Guaranteed Maximum Price)will be by this Change Order in the amount of $85,500.00 The new(Contract Sum)(Guaranteed Maximum Price) including this Change Order will be $10,744,590.00 The Contract Time will be unchanged. The date of Substantial Completion as of the date of this Change Order thereof is November 3, 2007 NOTE: This summary does not reflect changes in the Contract Sum,Contract Time,or Guaranteed Maximum Price which have been authorized by Construction Change Directive. ��j�y �� ROCHE CONSTRUCTORS, INC. WELD COUNTY, COLORADO ARCHITECT CONTRACTOR � (P. O. Box 1727 v' �{7 Greeley, CO 80632 � , i►1 � By � By , ,,,,B$©--.F _ a — B� er to the Bo Date Q2.d/1, Date 2/1/2007 Date 011 /2007 AIA DOCUMENT 701 • CHANGE ORDER • 1987 EDITION • AIA® • ©1987 • THE AMERICAN INSTITUTE OF ARCHITECTS, 1735 NEW YORK AVE.,NW., WASHINGTON, D.C. 20006 G701-1987 OLi& - G 5a- roc hec. s `4a.: t:; •°r3 Exceeding Your Expectations Since 1971 Change Order Request Weld County Jail North Complex Phase 3 Greeley, CO Project No.:0615CO Date: January 31, 2007 COR No.: 003 Description of Change: Over-excavation and subgrade stabilization at building pad per the direction of Northern Colorado Geo- Tech. Documented per RFI #18. Contractor and Supplier Breakdown: Company Amount Duran Excavating 26,867.00 Sub-Total $ 26,867.00 Roche Constructors Breakdown: Material Sub/Equip Labor Sub-Totals $ 0.00 $ 0.00 $ 0.00 Taxes ( %marl; %labor) C.C,) 0.00 0.00 Sub-Total $ 0.00 $ 0.00 $ 0.00 RCI Total $ 0.00 Summary: Subcontractor Totals $ 26,867.00 RCI Work $ 0.00 Mark-Up on Sub/ RCI Work (4%) $ 1.075,00 Sub-Total 22,942.00 General Liability Insurance 0.)0 Payment and Performance Bond (if applicable) $ 0 CX) Total: $ 27,942.00 This price is good for seven (7) days. Time extension required for this work:5 days. Corporate Office'36L 71st Avenue(80634)•Post Office Box 1727(80632)-Greeley,Colorado (970) 356-3611 -Fax(970)356-3619 -Denver Metro(303)534-3716 ^1/$:),. Roche Constructors.Enc. Rwisetl 5/29/02 www.rocheconstructors.com 1111 Greeley,Colorado Las Vegas,Nevada Westminster, Constructors, Inc. REQUEST FOR INFORMATION Project: Weld Co. Jail Phase Ill Expansion RCI RFI No.: 018 Project Address: 2110 O Street Sub RFI No.: Greeley, CO 80631 RCI Job No.: 0615CO Date Issued: 11-14-06 Subcontractor (if applicable): Roche Constructors Subject: unforeseen soil conditions Reply Req'd By: 11/17/06 ® Schedule Impact ® Cost Impact Dwg/Spec No.: Detail/Sec. No.: Problem: On 11-7-06 Northern Colorado Geo-tech was on site to observe soil conditions after scarify and recompaction of the pad had been completed and subgrade excavation along the north wall line had been done and noted the area "pumping", density tests performed indicated acceptable compactions were met but the area was still pumping. Doug Lefgren with Northern Colorado Geo-tech is investigating possible amendments. It was discussed that overexcavation of the footing subgrade and installation of 3/4" rock or recycled concrete may be required below the footing. One caution is if rock is placed under the footing the foundation drain indicated on structural, Architectual, and Civil drawings may not perform as designed. Due to time constraints and scheduling of UG plumbing etc. a solution is required immediately. Please provide a recommendation by 11-17-06 Proposed Solution By: Date: Reviewed By: Response by Architect/Engineer: Refer to attached letter Solution By: Date: Reviewed By: Date: '111 Office(303)920-5555 Fax(303)920-5556 1235 W.124°Avenue.Suite 100.Westminster.Colorado 80234 www.rocheconstructors.com Revised 6/7/02 Northern IISNL Colorado Geotech December 1, 2006 2956 29th Street, Unit 21 Greeley,Colorado 80631 Phone: (970)506-9244 Fax: (970)506-9242 Weld County Purchasing 915 10th Street Greeley, Colorado 80631 Attn: Mr. Pat Persichino Re: Subgrade Stability Jail Addition Phase 3 Greeley, Colorado Northern Colorado Geotech Project No. c222-06 Northern Colorado Geotech has observed the subgrade soils along the northern portion of the 3rd phase of the jail addition in Greeley, Colorado. Unstable foundation subgrade soils were encountered along the cut-slope at the northern portion of the excavation. We observed subgrade pumping of approximately 6 to 12 inches. The pumping appeared to be worse over the area of a storm drain pipe that bisects the area. It is our opinion that the unstable subgrade soils should be removed and replaced with recycled concrete to a minimum depth of 12 inches. In the vicinity of the storm drain, it may be necessary to replace up to 18 inches of the subgrade soil, although this decision will need to be made as the excavation of the subgrade is taking place. Roche Constructors has expressed a concern about the perimeter drain that will be placed around the exterior of the foundation. Their concern is that this drain will not be effective to removing excess moisture that may migrate up under the foundation and be trapped in the relatively granular recycled concrete. However, after reviewing plans and similar situations, it is our opinion that the original intent of the perimeter drain was to intercept moisture that may try to infiltrate around the north side of the foundation after running off the adjacent parking lot, etc. In addition, the granular nature of the recycled concrete is designed to maintain its stability even if the moisture content of the soil is increased. Therefore, it is our opinion that the perimeter drain that is to be placed around the exterior perimeter of the building may be placed on top of the recycled concrete and still function as intended. If you have any questions or if we may be of further assistance, please do not hesitate to contact us at (970) 506-9244. Sincerely, NORTHERN COLORADO GEOTECH Doug Leafgren, P.G. President cc: Addressee (1) Bley and Assoc— Mr. Loren Bley (1) Roche Constructors— Mr. Pat Sherin (1) KBN Engineers— Mr. Steve Butherus (1) Ryan Strub From: Pat Sherin Sent: Friday, November 17, 2006 12:54 PM To: 'Pat Persichino' Cc: Ryan Strub; Ryan Callaway Subject: parking lot subgrade Pat, We are in the process of patching back the asphalt over the new storm line and are running into subgrade issues, not so much directly over the line but in existing undisturbed parking areas . We have a portion of the subgrade (about half) that is over optimum moisture by about 5% but it does not seem to be pumping, we will know better within about an hour or so. It may be that this portion (if it does not pump too bad during proof roll), may just require a thicker asphalt section 7" +1- is what is there now. The east end of the patch however is pumping very bad. Northern Colorado Geo-Tech is on site as well as LaFarge and are leaning to over ex of 18 to 20" using a geogrid matt with recycled concrete to stabilize the subgrade (this is similar to what we had to do to the lot behind the sheriffs dept. (I mean Sheriffs Office building) parking lot. I do not have exact quantities yet but wanted to give notice and request we proceed with best practice determined by Northern , LaFarge and Roche in order to get the asphalt back in this afternoon. Let me know you take on this Pat Sherin 303-598-6700 11/28/2006 Ryan Strub From: Pat Sherin Sent: Friday, November 17, 2006 9:00 AM To: 'Doug Leafgren' Cc: Ryan Strub; Ryan Callaway Subject: RE: letter regarding the unstable subgrade Doug, Just to clarify, your letter regarding unstable subgrade, not only refers to the front wall foundation but quite possibly a sizable portion of the north end of the building. Would you be available to meet me or have Dave meet me and get some limits plotted on a plan that we cold attach to your letter in order to quantify and get pricing as well as set up a schedule for the work? We are anticipating UG plumbing start just after the Thanksgiving weekend so any remediation needs to take place next week so as not to further impact the schedule. Thanks Pat From: Doug Leafgren [mailto:dleafgren@msn.com] Sent: Wednesday, November 15, 2006 1:53 PM To: Pat Sherin Subject: letter regarding the unstable subgrade Pat, Let me know if you need anything else. Thanks, Doug. 11/28/2006 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 02 E :s...i aran rim xcavating Inc. January 10, 2007 Roche Constructors 361 71n Ave Greeley Colorado 80634 Re: Weld County Jail Phase III Final Over Excavate Under Building Attn: Ryan Strub Dear Mr. Strub The following is a cost breakdown to over excavate unsuitable soils and replace with recycled concrete. This will replace letter November 28. 2006. 12/4/2006 Excavator K-220 3 hrs x 125.00 = 375.00 Loader 3 hrs x 110.00= 330.00 Truck 3 hrs x 58.00= 174.00 Labor 2 hrs x 25.00= 50.00 Supervision 1 hrs x 45.00 = 45.00 Total 974.00 12/5/2006 Excavator K-220 9 hrs x 125.00 = 1,125.00 Loader 2 hrs x 110.00 = 220.00 Skid Loader 2 hrs x 95.00 = 190.00 Truck 9 hrs x 58.00 = 522.00 Supervision 4 hrs x 45.00 = 180&0 Total 2,237.00 12/6/2006 Excavator K-220 9 hrs x 125.00= 1.125.00 Loader 4 hrs x 110.00 = 440.00 Skid Loader 8 hrs x 95.00= 760.00 Moxy off Road Truck 9 hrs x 110.00= 990.00 Truck 7.5 hrs x 58.00 = 435.00 Labor 9 hrs x 25.00= 225.00 Supervision 4 hrs x 45.00= 180.00 41 B N. 9th Avenue• Greeley,Colorado 80631 (970) 351-0192 01/31/2007 10: 10 9703789532 DURAN EXCAVATING PAGE 02 Total 4.155.00 12/7/2006 Excavator K-220 7 hrs x 125.00= 875.00 Skid Loader 2 hrs x 95.00 = 190.00 Moxy off Road Truck 7 hrs x 110.00 = 770.00 Truck 13.5 hrs x 58.00 — 783.00 Labor 7 hrs x 25.00= 175 00 Supervision 3 hrs x 45.00 = 135.00 Total 2.92 8.00 12/8/2006 Skid Loader 8 hrs x 95.00 = 760.00 Compactor 5 .hrs x 95.00= 475.00 Water Truck 8 hrs x 85.00= 680.00 Truck 15 hrs x 58.00 = 870.00 Labor 11 hrs x 25.00 = 275.00 Supervision 4 hrs x 43.00 = 180.00 Total 3,240.00 12/12/2006 Excavator K-220 3 tin x 125.00= 375.00 Loader 3 hrs x 110.00 = 330.00 Compactor 1 hrs x 95.00= 95.00 Water Truck 1 hrs x 85.00= 85.00 Supervision 1 hrs x 45.00 = 45.00 Total 930.00 12/13/2006 Excavator K-220 9 hrs x 125.00= 1.125.00 Loader 2 hrs x 110.00 = 220.00 Truck 8 hrs x 58.00= 464.00 Supervision 4 hrs x 45.00= 180.00 Total 1,989.00 12/14/2006 Excavator K-220 3 hrs x 125.00= 375.00 Water Truck 1 hrs x 85.00= 85.00 Supervision 1 hrs x 45.00 = 45.00 Total 505.00 01/31/2007 SH:10 9703789532 DURAN EXCAVATING PAGE 04 �i Recycles Concrete 12/4/2006 76.13 tn x 5.50 = 418.72 Recycles Concrete 12/5/2006 138.93 m x 5.50 = 764.12 Recycles Concrete 12/6/2006 70.40 tn x 5.50= 387.20 Recycles Concrete 12/7/2006 57.57 In x 5.50= 3 .6216 .64 Recycles Concrete 12/7/2006 236.84 to x 5.50 = 1 Recycles Concrete 12/8/2006 245.80 In x 5.50 = 1,351.90 Recycles Concrete 12/8/2006 222.82 m x 5.50= 1.225.51 Recycles Concrete 12/13/2006 42.42 m x 5.50= 233.31 Recycles Concrete 12/13/2006 73.62 m x 5.50 = 404.91 Total 6.405.00 Total 23363.00 Mark-Up 3.504.00 Grand Total $26,867.00 Sincerely ,r "Ernest E. Duran DURAN EXCAVATING PAGE 05 01!31/'2007 10: 10 9703/39532 p24- fi:At.-' ^w. "r.�,4*-4 a r+y�.�t 'ham t4 ' r d1Ar-r "N t 4 .Y,.r• � • L".' 1 ^ '.^X'1* s- , 'l'ff Itrf` iYi"7."-4'ab'.. c`klen Enterprises ?r ORDER t { D.0-1 323... vjr°r a • s3>r'a ark ,m.. — 804 NORTH 26th AVENUE ..} - . . 3. y, �1� { i• GREELEY.COLORADO 80631 Y a ORDERED' 1714/3005 , • 44',---#N- -,4c1,‘` . e:3_1.;h• ..r•. fly._>,., ACCOUNTS- DURAN E .,, Phone 1970)35.{•0720 t, _ • ., Dime(1309)823-8259 ' -= la 'p ' .._ . . TAKEN by febin ' ORDERED by Driver DURAN EXCAVATING, INC. , LOCATION: County Jail i. 418 NORTH 9TH AVENUE 0 Street GRECL5T, CO 80531 t„ EQUIPMENT '^' r . 1' . GRAVEL 1 OTHER '! I , ' ',!..ifj•J 1 i4. .a. °` UNIT EXTENDED ITEM N0. ITEM DESCRIPTION GUDE DATE -_. • - - _ - COST $AMOU 9T t START STOP L DOWN NET . GROSS TARE' ET. FJ1CH TIME TIME TIME HOURS POUNDS POUNDS PONS ` ` ' ..: CCU! • Cn afe0 Coo. Base PU 12WAE 13.54, ' at 5 C t 1551 ' va 03 $5.% 186 9I5 GCCB Crushed Can. Rasa PU 12.O4,96 14:2s 3E U 5 .23COC , .15.10 VW $E`+C 1 .w GCCB Cruaffed Con. Base PU 121134/06 15:05 156EW '"..mix ,15.9 10.00 $3% Vi5. i GCCB Crushed Con 52ee PU 12/04A35 '1523 61980 mom . 14.55 W. ) S`SCW^ �' . GCCCDC)] Cruofed Con.5364 PU 12/12/01.26M. "i6:00 WIC a`� 536e0 ..15.02 3AUD ``C 322. 1 1 1 TERMS: 3Grevel-Deevsry) Buoaloe Enterprises and employees assumes no debility for )5.15 S�11 al airy damage to personal properly when customes request'and directs truck beyond curb Una.Signed receipt of wave?acanodedgee ownership and owner SO 00 -- smuts muting of same b a separate flagellated traneac1ion between miller and 76.1 S Tons Delivered C 50.00 /Ton (E4uIpner. I approved b Rental)Any a In the tousled on this 00v must 0e SALES TAX 50100 bepnnedtry when veer fied.Enterprises.Ono half hour web and any d0VT °will Miniwum Carney Charge is tO00 be adjusted when lodges All irwobe9 are due the 10th of the fodowing month.By end of month unpaid accounts are placed on COD TOTAL ORDER 541$ `and Al'4%Manes charge,which Is an annual isle of 18%will be applied. r Idle accounts.$1.00 rebilling all bie attorney tees end court coat for collection II necessary Page 1 of 1 Dr-- - ~-' Customers Signature Driven Signature DELIVERY COPY 01/ DURAN EXCAVATING PAGE 06 31/2007 10:10 9703789532 �_,1/4" :, .. A;'h,1.1i�ii.„--,,� �'•Cw Jt+ :t..:,;?:..;,,,,,;;,,,,,,' ;,:s Buckfen �'IttZti?` ,g.iLt'iak 'o. a y s b { i -.. • ,} r Enterprises oaoEaa 33st� P.0.4 3.23-9003:4 1L ' _ 90d NORTH 251h AVENUE &:', .. s-1.yil � GREELEY COLORADO 00631 ue Ica, ORDERED: 12/5/2006 '.6.4-1.-:.......i.: - • i Phone(S70)353-0720 ACCOUNTS: DURAN E Denver(303)623-0299 ` TAKEN by Robin ORDERED by AL GRAY DURAN EXCAVATING, INC LOCATION: 3erl 418 NORTH 91}1 AVENUE Huilod by Daroe Trudcin9. GREEEY, CO 60531 EQUIPMENT y AGGRVEL}Y}Cj OTHER ,_ ., TRucK UNIT EXTEN6NT rram NO. ITEM DESCRIPTION COOS DATE S COST $AMOW ED START STOP TIME NET CaROSS TARE •'NET EACH ', .• Doe TIME L TIME HOURS POUtUS 90UN0S TONS GCCE CRAW)Con. Base PU 12A6,t6 715 sato] 2'3300 : }3.90 50.00 $5SC 376145 t'-•, GCCB Cruaned Con. Base PU 12.05,06 7:53 5.1700 2S?OC r 14.00 ED.OD 35.50 37700 GCCB cnjjlled Con. Base PU 1205426 824 SSD0 25300 .1410 EO.W ES.9C $7755 GCCB [mined Can.Dace PU 12.050 8:53 • 6d.SG0 pa 14.03 $0.W ES.% 37116 GCCB [milled COP. 8a9e PU 'I2A5AF 9:'.13 81600 .'2830[ ,1astE wit E5.5C F'a3^c GCCB Crueller:Con Base PU 1205A? 9'49 5 28,30 14.00 Se's 85 SC r7 ,, GCCB ciuslad Con. ease PU 1 c6 10:11 539[10 '25304 /l30 30. t ES=C 378X65 GCCB Cruaned Con. Base PU 12kt3tC6 10:36 - : .54C00 25300 ;14.th 50.00 55,50 pa GCCB Crusnad Con. Case PU 12RE/06 15'CC fl 2;000 131x` E(I.t7± 55.3: P3 GCCB Cnl;ned Con. edit) PV 12m.ci 15:19 S 13 ?5300 13.79 SS 00 ES Cc $75.E2 TERMS:(GmveFDesvery) Sucluen Enterprises and employees assumes no lability for 1389: 17Ei.03 any damage to personal property whop customer requests and difects truck beyond cut line.Signed receipt of gravel acknowledges ownership and owner attests Nana of came Is a separate negotiated iransacoen between saver and 1389TTona OBlivered® SO 00 /Ton SOAO owner, (Equipment Rental)Any pr loss In the hours totaled on Ibis hvoice must be approved by Deaden Enterterpnaea,One half hour lunch and any down time will Mama=Oak wY C hx8a to coact SALES TAX SOX) be edjuatcd when verified. Mama= .. ens implore'IS%Nance data°,which Is an a//nnnual rate Ofing month. 10 end of month. appiiead acoounm are placed on COO TOTAL ORDER t764 f:0 Idle accounts.$1.00 retlieng charge 8; 0 reasgna attorney twee and court cost for coiloctlon tf necessary. Pagel or „2/-1-----_ "-t->l<01,--f , -__j, -- /l<3,4 t / • _ (axtorneee Slgnah+re Odvafs Signature / DELNRRY COPY 01/31:2007 10:10 9703789532 DURAN EXCAVATING PAGE 07 ; a Buckles • q l-,«k..'_y^ C� Enterprises . "'ORDER 5�4" PD.* 332-400➢-1 ao4 NORTH 25th AVENVE, { "' 1� GREELEY,COLORADO S0631erst-m` tt ORDERED: 12/6/2cC6 Phone (970)353-0720 ACCOUNT*: DURAN E . Denver(303)67- S9 - . TAKEN by:Mike ORDERED by DURAN EXCAVATING, INC LOCATION! Jail 415 NORTh 3TH AVENUE C4EELEY, CO 505=1 - • EOUIPMENT C3RAVEL .. ' OTHER TRUCK - COST $AMOUNT REM NO. ITEM DESCRIPTION cDDE DATE COST EXTENDED AMOUNT START STOP L DOWN NET GROSS TARE NET EACH TIME TIME TIME HOURS POUNDS POUNDS TONS GCCE entailed Con Sae PU 12$X 7.:25 53030 25300 13.85 A).00 ;5.5, 175,17 GC C9 Crufle3 Coo. 8356 PU 12106006 12:4E $3900 23CC 14.30 Mir 15.SC vets GCC9 CNsneo con. Pace PU 'X6.33 13:16 54600 2530C 14.0£ 10.05 i5'5C 190.57 GCCE crushed Coe Eaea PU 1213S/CE 14:12 51SOD 25305 13.3E ID CG 1!P :731:1 CC CO CnUsned C2n, Base Pu 12T&Gs 14:39 53gCC ?5.300 14.30 S0.O: ;S.C.. 77,:r 65 • \O\ch41 TERMS: (Gravel-Delivery) Sudden Enterprises and employees asaumea no liability for TO 4347 19 any damage to personal properly when customer requests end dreras Mica - beyond cum line.Signed receipt M gravel acknowledges owearahip and owner - • attests naunng of same Is a separate negotiated transaction between seller and 70 41 Tons Delivered 0 SO4p0 /To t0iC0 owner, (Equipment Rental)My alterations in the haws totdad on this Invoice must be approved by 9udtlen Enterprises.Ono hart horn Itmch and any down time Mn tvllnlrrtrm Den erY Charge 17 S0.c0 SALES TAX y` be adlusted whom verified C All Invoices are duo Me loth a are ronowutg month.By end of month.unpaid accounts aro placed on COD TOTAL ORDER ' and al X%finance charge,which is annual r�te 0118%wit be applied. Idle accounts.51.00 reolM a a , and ai4J, noble attorney lees aria court cost for collection n necessary. Rage I ,g; <:ti, C.-!-"1 ----------.. Customer's Signature pdvar'e Signature n=1 IVCri•!CT/pv . 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 08 ' . Buoklen •.• Enterprises CIRDEa a 33575"-----. P.0.6 323 H 25t_ SO4 NORTh AVENUE GREELEY,,COLORADO 80637 ORDERED: 12/?/2006 w es ear .. Phone (970}353-0720 ACCOUNTW DURAN E Denver(303)62S-8259 TAKEN by. Robin ORDERED by Driver DURAN EXCAVSI1NG, :NC LOCATION; County it'll 418 NORTH 9111 AVENUE 0 Street GRE-ELiY, CO SC.31 • EQUIPMENT GRAVEL - - OTHER • rnuDK •• UNIT EXTENDED ITEM NO. ITEM DESCRIPTION CODE OATS COST $AMOUNT START SLOP L DOWN NET GROSS E NET EACH TIME TIME TIME HOURS POUNDS POUNDS TONS GC CD CM1{el!ed Con. a5ee - Pu 12F.,705-• 14'7 55340 251171 15.12 Kit) w.c.'- +:o;tr GC CB =sue 333e PL! 12/C7/C6 1,1;4; 53800 25100 1435 V03 $S.5C $31:20 GCCH CNsned Con. P,a3e PU 12/ZI7R6 1ECR. Sal'00 7Sta 13.60 WY:: S5.e-: V3�17 GCCB CNSned Con es ? PU IZE7it 15:34 53600 2510E 14.25 S0.X U.2 SS:,F4 • TERMS: (Grovel-Delivery) Buckler, Enterprises and employees assumes no liability for 5757 S315bi any damage to personal properly when customer requests and directs truck 1 beyond curb lint Signed receipt of gravel acknowledges pwnershfp and owner • attests hauling of earns Is a separete negodued transaction between seller end SoDC 57.57 Tons Delivered W 10.00 rTon owner. appoved(EquipmentSudden Rental)Any E ter rises. In Ne i hse our ch an Ias irdown rimer be Lg.16, be adved ld hevet Enterprises.One hair near lunch and any down rime will r nNrrwt'OEtc ary Cnar9.Is t0D0 SALES TAX be adjusted when verified All Irnoima are due the 50th of me following month.By end of month.unpaid actotats are placed on COO TOTAL ORDER t'. 7^ end a 1 h%finance merge which is an annual rare of 18%will be 80340. Idle accounts,51.00 rebilIfnn 'b harge4and all reasonable attorney fees and court cost for collection if necessary. Page 1 ott , //c;___.:1_2....7:-./.4„.,— • ,74✓ '. Customers Signature , Others Signature - • .,el it PfDV o DURAN EXCAVATING PAGE 09 01/31/2007 10:10 97037.,9532 .�,�, yy li 7 7' 1 $ k 1' A`/£ '11.�` A1:Y'' tr... , r r. Z+y4. P.:''�uc en r .. ) •• , Y L } Enter rlaes 25 ORDER* 335711 P.O.x {r��,Cr-- � •� - 0M NORTH 75M1 AVENUE �1 GREELEY,,COWR*DO wail � ' �l i• ORDERED: 12/7/2005 .. ";v Pone(970)352-Ono ACCOUNT N: DURAN E . Denver{303)St-0259 TAKEN by.Robin ORDERED by DURAN EXCAVATING, INC. LOCATION: County Jail , 418 NORTH 9TH AVENUE Hauled by Eagle Trucking • CREELEY, CO 30631 - '51� •. • y_... EQUIPMENT GRAVEL'a OTHER UNIT EXTENDED ITEM NO. REM DESCRIPTION 7 ggDATE I COST 4 AMOUNT ART WN NET GROS,S TARE NET TWE TIME 1 i E HOURS POUNDS POUNDS TONS EACH : GCCB Croenet)Con Dage PU 1207A6 7:12 55X0 24400 1545 $303 35.EC i74-S>,r_ COCO „ Cnwned con,sue PU 1207196 7:56 539D0 240( 14.75 10.00 35-50 381.1.2„l =CD ';';. Cmsned Coll San PU 12M7A6 627 53980 14400 :14.n FOOD 3550 301 c;' :, •r:ru:' 541W 24.0E 14.85 SO.C,7 355: Sat 57 GCC® , erushe� on Baia PU 120745X:60 OCCe,:\r, Cili ted Con. Sass PU 12%37A6 925 53'300 2440( 14'15 TOW 15.5C $79.47 -'1•'-•1';..:6•"'" •,_ ' 23400 14.70 •30.00 35. i60 ES h•' GCC9 'Y Craned Con.Base Pt7 12/07406 10:01 5. 0 2..,;'^• - 54100 24400 14.55 30.00 35'.60 387.67 fiCCB ;' Crooned Con.Vase PU 1207/06 1¢40 ' ...I•r"ry ., 54500 240 15.06 30.0' 3550 382'Y7 r GDCB cnwnea can ease • au t24RA6 .11:33 _ GCCB Cmstled Con.Base PU 1207/06 11:58 5490° 24403 15.25 30.00 35.5 $63.er •.a.=' 56600 24400 _ 15-6t 10.00 15.5 355•`-C t'CCB Cm. Snarl Con.gab! PU 12/07/06 1229 -l GCCB Crooned Con. as-a PU 12f37ti6 12:55 53900 21Ae?C 14.75 $0.00 35.60 5e1 GCCB i Crushed con.Bate PU 12WItZ 1321 5:100 24400 l4.35 39,0_ 35.55 170 Q GCCB Cnrsnea Con.Hasa PU 12137/06 13:43 53300 24400 14.45 30.00 15.50 3.7947 CCCB_ Crusned Con.eaae PU 12 706 14:11 53700 2440( 14.65 30.03 S5.SC 180.57 GCCB cnjsnea Con.Base PU 1207105 14:32 5'1100 24400 14.4 W.CC 35.& 375.37 GCCB Crushed Con. Ease PU 12WL6 16:CE 53790 244CC 14.65 $000 $5.5 SEG.E7 TERMS: 10rae1-Ooevery) Sudden Enterprises and employees assumes no(lability ter 216.35 4130235 any damage to personal property when customer requests and direct truck beyond are line.Signed recelpf of gravel acknowledges wnendUp and owner . stays hauling o1 same is a enceinte negotiated tran6erAon between seller and 236piTons Delivered 43 SO 00 /Ton vino (Equapproved v d by Sudden my a rPPSes. In the bows totaled oen tan oice miser be bpprmed dBudder Emerpnses.One hell hour lunch end any down time will SALES TAX id g3 be adjusted when verified. Mlnlrtum Del,YEr'f Charge Is SOLO a bwotCee are due fie 1081 of me following rnonet.By end of month,unpaid amounts are pieced on COD to-rat., ORDER 41 yJ 235 and a 1 14 finance charge,.mkt is an am rate of 1a°.6 will be appled. idle arson,91-00 retrsM9 char and/1 asonaNe °may fees and mutt cost tot collection II necessary. Page 1 Of l r �4.,_ Customer's Signature -Drivers Signature fl I TVERV COPY 01131;2007 10:10 9703/89532 DURAN EXCAVATING PAGE 10 'r•-� t- - • ♦i' '• .z eucklen x .1,-W.1.;;;:.', Enterprises - ORDERS A y • I1�IWrLJ Boa NORTH 25th AVENUE �� ss ^' -�' 7/ 2 GREELEY.COLORADO 80631 • �. !S ORDEREED'. 12/8/2006 Phone(970)357-0720 ACCOUNT 4: DURAN E Denver(303)823.8259 - TAKEN by.Robin ORDERED by • DURAN EXCAVATING. INC LOCATION: County Jail 418 NORTH 9Th .AV'EUUE Hauled by Eagle Trucking . GREELEY, CO E063L -, • }1. EQUIPMENT GRAVEL. OTHER : ITEM NO. ITEM DESCRIPTION Cpl DATE NCIED J C COT $AMOUNT START STOP DOWN NET GROSS TARE NET LnAC1ii TIME TIME L TIME HOURS POUNDS POUNDS TONS/ 7 GC CB Cru6led Con, Base PU 12^FAli 7:01 53200 2440[ 14'450 7/1.00 s'0' 372.20 GCCB Crushed Con. Base PU 12CEt06 727 52100 24430 13.85 SOW $55x1 $76.17 GCCB cruohod Con Vase PU 12=435 7153 52000 2440[ 13`80 SOIL 35 SC 37590 GCCB Crr5nea Con.B3a0 PU 1208AZ 8:17 54100 24400 14.3` 3n..W I--+C 431 07 GCCB Crushed Con.Base PU 12.0846 8:41 53933 2441X 14.70 W. Se5.5C 331.12 GC_B Cnimned CM.Sze, PU 120B436 9:01 54030 24400 15.13 $0.CC SS Sr- 5'33.21 GCCB Crusneo Con. Bale PU 12[346 9.28 54X29, 2440( 1431 50.00 S5.5C 551.95 GCCB Cnlaneo Con Bard PU lawns 9:45 _ f" 524`0 '2440[ '14.82 SC.Xi $s,`0 577.11 GC CB r...ii^S^. Cor. `__: PU 12138/06 1027 54330 2440E 14.57 30.CC II:.'3 $22.22 GI3CE C:Nched Coo. Baal y 124646 -10:52 53403 24400 14.50 20.00. $.60 57975 GC CB .;ru::iel Con. -8'% DU 1293:.X` 11: 51500 9140E 1455 �..00 I'f: v.'_ '2 GCC5 Cna"ane0 Con Daso PU 12Ua.C1E 11:53 58040 2440: 14.37, TOW SS.50 sass GCCB Crooned Con. eaa? PU 1205.06 1717 $3100 2440: 14-39 10-00 S`.•.:.7 ST 92 GC C8 Cluene7 Con 8366 PU 22.105/C6 1241 53000 2440( 14.30 FCC 55.60 $73.65 GCCB Cru€ne4Con Sass PU 1241x,06 1:3iCf7 6X300 24403 14.1d 3000 ISEC *77.55 GCCB Citaned Con E334 PU 12435/C6 13'.12 530'00 2440 14.5E 30.Cre 19.50 $51.02 GCC5 Cnrap0 Con. B_se PU 12XCIOo 13:58 53400 24400 14.50 lace &-6C 179.75 4_, — - TERMS: (Gravel-Delivery) Bucklen Enterprises and employees assumes no liability for 245 ZC t13S1 tae any damage to personal property when customer requests and threats truck e beyond cure line.Signed receipt of grovel acknowledges ownership and owner meals hauling of same Is a separate negotiated transaclion between safer and Tons Delivered® /Ton 2000 owner. 245.98tam (Equlpment Rental)Any altarationa in the hours totaled on this invoke must be approved by Bucklen Enlorpnses.One half hour lunch and any down time will SALES TAX 1'.s,') be adjusted when vented. M�nln>um D Jrter• Gnat,_, is SC.00 All Invoices are due the 10th al the following mono,.By and of month.unpaid accounts are placed an COD and a 11a%finance charge.which is an annual rota of 18%will be applied. TOTAL ORDER t` 'Sl.i,:l Idle accounts,$1.00 rebating charge and an reasonable attorney lees and coon mat for collection if necessary. U' Page 1 of 1 ./.7 %-• Drlwi's Signature Customer's Signature nr. tvrnv envy PAGE 11 01%31/2007 10:10 9703789532 DURAN EXCAVATING _ e r y Bucklen ii r f i 449 Enterprises • - ORDERS 3338_ P.0.1 ' 13Od.NORTH 25th AVENUE '- - inrillsrligeliElli4.. GREELEY,COLORADO 90631 swan. ORDERED: 12/8/2006 Phone(970)3530720 ACCOUNT f1: DURAN E Denver(303)623.8259 TAKEN by:Robin ORDERED by DURAN EXCAVATING, INC LOCATION: County Jail 418 NORTH 9111 AVENUE CREME-IT, C:; 80631 EQUIPMENT GRAVEL OTHER ITEM NO. ITEM DESCRIPTION TRUCK DATE UNIT ENDED COST SSA AMOUNT STARE STOP L TN1 DOWN NET GROSS TARE NET EACH TIME TIME E HOURS POUNDS POUNDS TONS GCCB Cnlsne1C on. '35o PU 12,06h70 B:1,, S4.3 2"..5'64 15..S 50.00 15.50 1.54 AC GCC5 Cruened.Con dace PU '2.L OE 8'59 -11CC 215Cg; 16,'15 17.W S5.50 $23.87 GCCB Calf bed Cro Base PU 120605 9:22 5'26:0 23WC 14,66 56.00 ZS 180.30 GC CIS Craned p:en sz;1 PU 120614E 2-43 33X/ 23517. 15 1C 1a.cc S5.SC Eats GCCB CN5ne.1 Cen. 324e PU 12, .V3 1Q:Ce. 527CO 23606 11.55 10.0D 15.SC SW 02 GCCB Crughed Con.Hag? PU 1vV$W IO1.LB 3466 23i CO 14 93 aJ•/: 15.X 182.11 GCCB Crushed Con, S3ae PU 1208.05 11:24 53oX PGA( 14.90 10 Cc S5.Sd $8t b5 GCCE Cruened Con,Sane PU tatexc 11.42 SMOG 2' 0X 14.6: al cc $S$C 530.57 GCCB Clanei C:r.. sz=o iu c c6 ,2:1A r•rnC 230; 11.& S/.0.' 15,62 181 40 PU C€ 1 2 .,iCn 2?crx .:75 tJ '- :'5C S=' .. GccB cresreoc..,•; as-� • 1 ,as z3_ — ` •_ GCCB .:Nailed can Ewt PLr 1_OVX 133.04 3:.:r 2JEJC 166_ 3C.CC 19.60 S:O.50 GC CB Cruaned Con.Baia PU 1212,53 15''.. 72500 236tX 14.50 S•J.CC S5-SC 179.75 1CCB Cli shed Con. E7f9 PU ':AV3 13:54 Stir 2:350. 15,1: TO CC 7a.SC S23.<`2 GC CB CRAMS()Con. 4112 Pu :2.41:164 6.13 S_al 271 10.5f 17 O. S5.5C 160.02 =CB CNened Csn E3;e PU 12o.cf5 ta'2' '.310D 2tAC 15.1E 17 L1. 5.5C Ki3_32 ;_u � `TEAMS- (Gravel-Delivery) 6udden Emerpneea and employees assumes no Witty for 2_.1_ 5:14791 arty damage to personal property when customer requests and directs truck beyond turn line.Signed receipt of gravel acknowledges ownarahlp and armor enacts hauling of same is a separate negotiated transaction between seller and Tons Delivered® to t}_ sib SO0,00owner. 2n.�i2 (Equipment Rental)Any afternoons In the hours totaled on this Invoice must to approved by Sudden Enterprises.One:alt hour lunch and any down lime will V a SALES TA)( S0,ft bo adjusted when yenned_ I.unlrum Deh Sty;Philp is t OC All itwolcee are due the 10th al ma following month.By end of month unpaid accounts are placed on COD 1i-2213/ and a 1 YEN finance cnargs,which lanjannual rate of 10%will be applied. TOTAL ORDER — Idle aomunts.$1.00 rebllling and ail reaeon�atie attorney lees and court coat for mllacfWn II necessary. Pagel of 1 ..i./:,.fc�. —_--_1'.2..1... i / . - (r—�ti Customers Signature others'Signature . OE?IVEPY C'DPY EXCAVATING PAGE 12 01/31/2007 10:10 9703789532 DURAN *.,',F;is ._ � ^ ,:�1• _> Enterprises B �-:�x: 7 ORDER r 3362`( P.O.S ' 804 NORTH 281b AVENUE ri Ida GREELEY,,COLORADO WW1 nap Opie. ORDERED: 12./13/2006 Phone(970)353-0720 ACCOUNT a: DURAN E Denver(303)8238259 TAKEN by: Robin ORDERED by Driver DURAN EXCAVATING, INC. LOCATION: County SoiI • 4.0 NORTH 911 AVENUE 0 Street . GREELEY, CO •30631 EQUIPMENT GRAVEL OTHER K UNR' EXTENDED ITEM NO. ITEM DESCRIPTION TRUCE OOg DATE COST S AMOUNT START 510P DOWN NET GROSS TARE NET EACH TIME TIME L TIME HOURS POUNDS POUNDS TONS GCCB Crashed Con. 6asa_ PU 12 5 8 y13A :0? ` 5246 2dOIX '". F 1AJC.DC S5 C 'Fiat GCCB Crushed Con. 93sE PU 12'13 8'29 51&-0 2dlYX 1391 rI3(X 35W 7EW GCCB Drbfnea Con Babe PU 12!1396 8:99 522120 2400[ 14,EE IU.CC Sf1 Frr.it • • TERMS:(Gravel•Oefvery) Sudden Emerpdsas and employees asaumes no liability for a-C 521338 any damage to personal property when customer requests and directs truck - beyond cub Ore.Signed receipt of gravel ecfdicwleog05 ownertmp and owner 10)00attains!muting of same Is a separate negotiated aansacdon between seller and a_^4, Tons De7ivafed © S"Sit /Ton owner, a p eed b u Any aerations m the ft ho tousled oand [Hs Invoice dwn must be S0102 be argust d Sudden Verified. Enterprises.One haft hour lunch erM any down dma will Mlmmam oe:lrart =ya is 202] SALES TAX be adjust when verinea. _ _ All Invoices ate due the t Ott cl the following month.By end o1 mortal.unpaid account are paced on COD TOTAL ORDER ^_J :�0 end a 1 1%finance charge,which Is an annual rate of 18%vet be appled. idle accounts,31.00 rob89 •dr" end elf onabie attorney fees and court cost lot collection ft necessary. Page 1 an 1 �Yrl�r/ Customers Signature Drivers 9lgnatUre • her nrmov cloy PAGE 13 01/31/2007 10:10 9703729532 DURAN EXCAVATING _ ( ����-y///Imo. �.1 r, T -Or?f r • i�r Buckles • ` . : r, Enterprises ORDER" 3361 P.0.1)Wit NORTH STA AVENUE r ,fie' I�w GREELEY. ICOLORADO 80631 sat E' ORDERED: 12/13/200E Phone(970)359-0720 ACCOUNT 4: DURAN E Denver(303)623-B259 TAKEN by.Robin • ORDERED by Driver • DURAN c(C>VA TING, INC, LOCATION: County Jail - 41d NORTH Sm AVENUE 0 Snot . GREELEt CO 60631 EQUIPMENT GRAVEL OTHER _ ITEM NO. ITEM DESCRIPTION ODE DATE UNIT ENOEO COST $AMOUNT START STOP L DOWN NET GROSS TARE NET �L.H TIME TIME TIME HOUPtS POUNDS POUNDS TONS — GCCEI CN3ne0 COn, ease PU 1V1SAJ5 13:49 53500 2400( )4,W 10IJJ 55.SCl 5$1.40 GCCB C r=heJ Con. ?3se P'J 12f13AE 14:'222 59500 2400 14.75 IO.00 S5.5C $91..12 OGG& CN3crea Can..Ha*? Pu 12,13AX 14:41 53420 2(000 1471 13.03 55.SC 523.417 GC 08 cNsheC Con,9n`r? PU :2:13.96 1S 33 33420 24000 1A 71 53.DD 55.50 'EO.% GC CB CNCSed Ch: 832e PU 12.'13.c5 13.49-" 53300 24CO: 14.6; 100E 7S.SC '°0,57 • • TERMS: (Gravel-oeiNery) Burden Enterprises and employees assumes no Pability for 73 SS SM,?3) any damage lo personal propertywhen customer requests and threats truck beyond curb One.Signed receipt of gravel admowledges ownership and owner attests hauling of same is a mamma negotiated aensaceon oaaveen eager and 73,61 Tons DelNated 0 Sg.00 /Ton SOi00 owner. (Equipment Rental)Any animations In the hours totaled on this Irrmlce must to approved by Sudden Enrefpr'sec.One half hour lunch and any dawn time war ;.1lnlnum Datrrary Charge rc 409-0 SALES TAX •1`E'O be adjusted when verified. AO imams aro due the 10th of the following month.By end at month,unpaid accounts an placed on COO T.,71 __ and a I Y4 finance charge.which IS an&Mat rale of 18%will be applied. TOTAL ORDER if / Idle amounts.51.00 rebB ®eSnei a�a�nobte anomey roes and court Cott for°Aeolian If neceeeery. rte' } Page: O(I 77 ,// /.. /i; p7-./✓i • Drivers SlgnaNre � Customer's Signature DGL:VFFY CC?" 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 14 \Ism. ra PROJECT LOGS xcavatfn. Imo. • JOH NUMBER DATE IN CHARGE TEMPERATURE GENERAL WEATHER CONDITIONS D } AL' El AM I N I 4 A EM L•YEES AN•CLASSIFIC•TI•N FULL NAME HRS. PHASE&CATA CLASS HRS. EQUIP it PHASE#CATA CLASS HRS. EOL/IP S STARTIFINISH cam c • N-4. flfl -.- ra ' t • •C - ♦ �------ • ':uz/` zio -- - I , PT -t.. c'.cC1-O '< T--).„-& ,1:)5 c.\a.3 BACK CHARGES LIST MATERIAL LABOR&EQUIPMENT AME OF COMPANY BEING BACK CHARGED US w . DESCRIPTION: O,.,:-(7, ,K , C. _ c,pD-c i L),Kt. 1)OtT'S r Nh /TF 1:: . C.u(, Qti:_. / - 7 / - L`//a/L 2.L /- -, %!l c g r7,,'4 7 iJ9 .Jtc' 27147 "c4: ii / /. .;.2,-- V 6 . EQUIPMENT UNIT A HOURS LABOR OTHER / A-r -' X-C/ 3 . ,C:A4c-l.' , / -g3 3 -!7/ ' _,7 „...2::.' 2 X//TU V a,Pf_-i-A.,wJT CHECK HERE IF REGULAR RESIDENT INSPECTOR WAS ON THE JOB THIS DATE 1I NAMES OF OT R I PE S.REPRESENTATIVES OF OWNER,ARCHIENGR OR DE VISITING PROJECT TYPE OF INSP TOME SU. .NTRACT.RS •N .. 3RE ASPHALT 1 SIGNAGE.STRIPING , CONCRETE STRUCTURES SURVEYORS CONCRETE FLATWORM TRAFFIC CONTROL ELECTRICAL OTHER LANDSCAPING OTHER w,:10 01/31/2907 10:10 9703789532 DURAN EXCAVATING PAGE 15 ),P>55 Roche Greeley,Colorado Las Vegas, Nevada Westminster,Colorado -`k\ .oanotruetere,Inc. ADDITIONAL WORK AUTHORIZATION (Dally) Bll Dale: Job Job to- Weld County/Roche Constructors,Inc. 12-4-06 Name:WELD JAIL PHASE III No: 0615 Specifically describe Remove pumping subgrode and replace with Recycled concrete line L.3 looting from 21 to 18.1-(see related letter horn Northern Colorado Geo-Tech) AWA 004 Duran Excavating. Shaded area for office use only Cost Code Employee's name Reg. Rate O.T.. 01 Total PT&l Total Hrs. Hrs. Rote Raw clin C^ i41k yJp1)M JN, F l • T i �j Labor subtotal #v Cost Code Material Req. Ouon. Unit Sub Tax Total Total Material Subtotal Cost Code Tools or Equip. NO. Rate Rental Period Total Too13&Equip.Subtotal '^F. f. Invoice No. Subcontractor Amount ALL PRICING SUBJECT TO REVIEW SEE ATTACHED LOAD TICKETS AND DURAN LOGS Subcontractor Subtotal • SUBTOTAL _ OVERHEAD (^_S) RCI Rep Calendar day extension ❑ No SUBTOTAL ❑ Yes of days) PROFIT( Ta) Owner/Sub Rep ' • . - . .•. • •co;N(2701354-34I LT'(:1/U) Uiil92 ". ;/PG 20131'eveiuO I50G3n) Ito.Nr.,r!)'/('U:G721 Cr.:dey,c'mrxerin ravvcmccrc0':m0" / . 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 16 Iuran �..- U _ PROJECT LOGS - '�xcavating me. JOB NUMBER DATE IN CHARGE I TEMPERATURE GENERAL WEATHER CONDITIONS Tins %L 9 A NOON I AAM '1-2\ IZ x.\0 . l� .Ru ►I - L-IZ. ` I l'R4 EM'LAYEES AN•CLASSIFI • •N FULL NAME HRS. PHASE S CATA CLASS HRS. ECUIP# PHASES CATA CLASS HRS. EQUIPS START/FINISH \*,AoVfn nlC-#f vn1Ftv1 -al a nn( -nt , l., — • inn 14'x,0 aPF1R Tc-k r--O A '-41n0- n , Q I-1 'a1 zo-?0 o 1;,4--A 7,44.- W Z FF\R+P\\I C0.st7 IS "» 'o-*n O FC3/46 -3r"cs- u; F ...1 '. !‘, V• L`_c / -,1• • - • _ 1 - Li R0DsIC,'l N ?O ✓E1 2-lnp-\C, L lon-iu-A2 P^SC1APc-. GP,`t`AW. '2...1 no-LO L . -7nn-''': -, P.',. Q^r.PN �OI oI0OI-Cll 7.r) TK•-)F'. Inc)-'V?'• rimo..),I I)r=, .� '1.--,S,-)- O O 4. rx10 Coot-OI n -4 CXDIr ion - ' O BACK CHARGES LIST MATERIAL,LABOR A EQUIPMENT • NAME OF COMPANY BEING BACK CHARGED R; l9 , DESCRIPTION: (R. „` L� ` L. j'/ � // / / CC .w 3 / i y(i_7,--,-) /0/(0,4G5 Clt:(s:T c :'-r,nc-R5 . 1,,,7/41- hf.0 .GYi'7C 1✓7;zcb.rivi-J -r.tr-7 !sue I ,,,-.,7, >`a a! yvT-em 7 Pelt—EQUIPMENT UNITE HOURS LABO OTHER cK//) !0,4?2_tR 1,z_-Si ,3 /oaa-,F 2-93 2. ?1c na,u r2'. x,-26 , 9 . CHECK HERE IF REGULAR RESIDENT INSPECTOR WAS ON THE JOB THIS DATE El NAMES OF OTHER INSPECTORS.REPRESENTATIVES OF OWNER.ARCH/ENGR OR D$VISITING PROJECT TYPE OF INSP. TIME I PRi- sNFRINI SOBCONTPACTORS ON JOB SUE ASPHALT SIGNAGE,STRIPING CONCRETE STRUCTURES SURVEYORS CONCRETE FLATWORK TRAFFIC CONTROL ELECTRICAL OTHER LANDSCAPING OTHER La,Jo- _ 01/31!2007 10: 10 9703789532 DURAN EXCAVATING PAGE 17 Rochell Greeley, Colorado Las Vegas,Nevada Westminster,Colorado -anniruclors Inc ADDITIONAL WORK AUTHORIZATION (Dolly) Bill I{ Date: Job Jots to: Weld County/Roche Constructors,Inc. 112.5-06 Name:WELD JAIL PHASE III - No.: 0615 Specifically describe Remove pumping subgrade and replace with Recycled concrete line L5 fooling from 21 10 18+/-(see related letter from Northern Colorado Geo-Tech) AWA 005 Duran Excavating. Shaded area for office use only Cost Code Employee's name Reg. Rate O.T.. 0.T. Total PTA' Total Hrs. Hrs. Rale Raw Labor subtotal +.-4 Cost Code Material Req. Quan Unit Sub Too Total Total 4rY Material Subtolal ;q;& • Cost Code Tools or Equip.. NO. Rote Rental Period • Total Tools&Equip.Subtotal r , Invoice No. subcontractor Amount ALL PRICING SUBJECT TO REVIEW SEE ATTACHED LOAD TICKETS AND DURAN LOGS Subcontractor Subtotal ^ SUBTOTAL RCI Rop ✓ OVERHEAD(�71 Calendar day extension CI No SUBTOTAL (] Yes of Cloy(s) Owner/Sub Rep PROFIT(__%) TOTAL Y :)"m�•r!',:411(101 371E 3E171 Av(111• •` 19 NOM) r•a.oar 1727 OOP) G,utley,ca 0mds, 1' x.x.rchcnublrunnrt. 1 •e . ....;L '.v'. n!:•rr•(970)ISE 3rt1 . :'.1a77}35G•3G1` ) 34 01r'31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 18 LII \ PROJECT LOGS vii g Ira JOB NUMBER I . DATE I IN CHARGE I TEMPERATURE GENERAL WEATHER CONDR70NS W I:b• el/ 5AM NOON I LAM —4.,, \ Acn\• 14CF• nAA4u \kb Ltrj — pi,� FULL NAME HRS. PHASE a CATA CLASS MRS. EQUIP* PHASE/CATA CLASS HRS. EQUIP* START/FINISH \-,V4IO MCP'WFI I -1 et ()a)l - O l L Ton- y1G TE\RROI) 7nus\ISoc�l 8 gm-o\ 0 SLSI '1 .)--, 330 FACSIIanI CP`it, -",IBC 2 CY0-\n n Fk-40. 10:)-: (It 6w-r itr, (r,nnl r_c. l'ii . 710O-17 \- - •T — 0-1('X>7-,D l L -1('t')-. (7 - n o 1 f-r7-1 rr r ST rr. A '.-r> 1 — Cl _. PrA.Sr(A9\t. r,e‘rati z10n-I,O 4-- — OO2-01 L- --3 noO-3 raL CC -1 7 C 71r)D-\fl Tt ;<--'c gnc) \-(>\ I n, TIC:zic7o1)-, ,1 Tern 9owr:acm 9 01oo1-OI O Ek-3t noc)- 4" Tr?',NI 1 r:rM.S INS CUM() r-'-7i p 1 `_u,3- --r_700-I O O 1,-u:': 71)- `' "` N1cd-I'.`_. (>TtR:aCLy1`A '•DO1-COI ` ::, I . c7 1 ' - .9% y-,„ PR •, .1 --�-T -,p L' , -- a . -OI `IO -enr BACK CHARGES LIST MATERIAL LABORS EQUIPMENT NAME OF COMPANY BEING BACK CHARGED PN:CF\F DESCRIPTION: EA/ / /,! � .. 7., '. 7.<:A:' d.:,, i�✓ !c., .4.../2.:5747�//i!( ,,✓✓Y7/'�� ,D,44�C!'': 'r (_ / ,ee, _ yr„ere_______‘„is,---: _,--7L-1.,:- ::74/.-2/„ .,r/. 5�:" C. 41 35/0.nP' 6d 'arc . / , .^--,(/.: ;' �. ;f:G. i rv . .F/.:-' .;- �' '/C',cc� 1 % / - it ./ < - .2 .'/. A. - ( A -„"y' r - SZvto- e-2/1/fr.t rar&Te t /A'/.2 7Z:_77-3/ � ,-'-- .ter:,, EQUIPMENT UNIT+ HOURS :. LABOR OTHER . 5 k 1 >si� s2 rk ;ice 9 9 Na G.\,V;A cr'`r=') :.-_1> cl .,,n Ir. �cs .F St,-5 I g -7K--2...(0 -7.5 7)• •'rr P rrl CA:- TtK't7 ' CHECK HERE IF REGULAR RESIDENT INSPECTOR WAS ON THE JOB THIS DATE Ti NAMES OF OTHER INSPECTORS. PRES IVES OF OWNER.ARCH/ENGR OR DE VISITING PROJECT TYPE OF INSP, TIME PA S•4,4W TM t .( > _ -Flo PJ . ASPHALT SIGNAGE,STRIPING CONCRETE STRUCTURES ' SURVEYORS CONCRETE PIATWORK TRAFFIC CONTROL ELECTRICAL OTHER LANDSCAPING OTHER ,C+: 01/31/2007 10:10 9703769532 DURAN EXCAVATING PAGE 19 r: ppyy >,,'$ Roche Greeley,Colorado Las Vegas,Nevada Westminster,Colorado `'yo Cnnelruclore.Inc ADDITIONAL WORK AUTHORIZATION (Daily) Bill Dale: Job Job to: Weld County/Roche Constructors.Inc. 12-6-06 Name:WELD JAIL PHASE III No.: 0415 Spedlicolly describe Remove pumping subgrade and replace with re-cycled concrete. Note limits extended under observation of Northern Colorado Geo Tech due to encountering more organic material during over ex AWA 007 Duran Excavating Shaded area for office use only Cost Code Employee's name Reg. Rate O.T O.T. Total PTd1 Total Hrs. Mrs. Rate _ Row _ Labor subtotal k,SV3.. ' Cost Code Material Req. Quern.. Unit Sub Tax Total Total Material Subtotal 1.=r:?;�-�> 21P<'<i. Cost Code Tools or Equip:. NO. Rate Rental Period Total 1 Tools A Equip.Subtotal yAlp.,yr, rnvoice No. Subcontractor Amount ALL PRICING SUBJECT TO REVIEW SEE ATTACHED LOAD TICKETS AND DURAN LOGS Subcontractor Subtotal SUBTOTAL RCI Rep OVeRHEAD Calendar day extension ▪ Na SUBTOTAL ❑ Yes of(iays) PROFIT Owner/Sub Rep IOTA err• .:11>'�'• %i` ivr q q ?linen(l04 514-1716 36171''r Avenue WWI P.O.Bnr Ylt/ 00132 GicdcY,Ctlm:gn meee-rwutteeewa' /. �1,.- omit(?rm:Ll,-lldl f^Y(J1113a6d E1 ncrvrr r? ) 1 ) , . ', 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 20 • . • '�_"'a° PROJECT LOGS lin xcavating In . JOB NUMBER I DATE I IN CHARGE TEMPERATURE GENERAL WEATHER OONOrnONS 7TW S- /jr 0 A . NOON 4 PM 72 I H ;uP.i .• 4,S\ 1 q0 C _>(�D`AS. • F EM•L•YEE- ^CLASSIPICATI•i� FULL NAME HRS. PHASE&CATA CLASS HRS. EQUIP n PHASEN CATA CLASS HRB. EQUIP 0 STARTIFINISH s 1 \Ctgc) m�eu, A/ -9 'floe-10 ti- 4 TK-pa , 02-51-6t I -, 100- uV -1'\Tn Pry,-)cR - _°)nO1- 01 dO --1 ' &-!;; noo-6o n 'J Pkyr -lob-L-2.) u ` Fs�?,)�o c�zt�z c -�,o 0 9 C'x-�k -7:30-7P r nUtn MOQ rA ✓ .c-I.fl I-- f q -Hy) J3 j.. .Li n ? w-ti.. bPu;Q•A ✓=1 z. -x-k-In L -:;...y> ::- :,__ A_ ��f?0. �1 aIOOI 04 T.D. \- Ty�� -� -yA\ . hizi °. D:-'1 Si ` vi "A^./^G'/ 0 ..1. J^-c/ -)'•- 'Il3: P kg= ..';r r,c^--c )r.I.-9 ?'100- `0 y ''t, -, ,--.�.0' /"L BACK CHARGES UST MATERIAL LABOR&EQUIPMENT NAME OF COMPANY BEING BACK CHARGED R/r LL • DESCRIPTION: PC-......ell • ' .-/+ . ..' r�r 4/%i•:,i'1 .iii:J 1. . , _ / - /". - ! x-:_ /gi /(2/7: - .7 /7•'/- -. G/ / '—GC ..-< i /U�,;,'c _I!/ :,�_ it' ATT. /4//C\_ 71:v- Z `/,- x - '' y.c-' t. p//1 • • EQUIPMENT UNIT_ HOURS ' LABOR OTHER , f XC/4///;T-1/ &k-3 7 7h' //id...-//ix-r-• y'- `,43^ c 0c Cuirk'Get/2' 5-kJ'? Ayer- C.S.-C/ 447(L,,:;r <17,7.7 7 E-:46//l.,6l .Oa/A, / 5'.S 7344. .4.O ilyi»� 7- - ,c• y CHECK HERE IF REGULAR RESIDENT INSPECTOR WAS ON THE JOB THIS DATE .la NAMES OF OTHER INSPECTORC,RE R SENTAT V 5 OP OWNER.ARCHIENGR CR DE vIS TING PRO ECT TYPE OF INEP TIME P•4rs�c� SUBCONTRACTORS ON JOB SITE SIGNAGB.STRIPING ASPHALT CONCRETE STRUCTURES SURVEYORS CONCRETE FLATWORK TRAFFIC CONTROL i OTHER ELECTRICAL OTHER LANDSCAPING .o • 01;31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 21 ))c' Roche Greeley,Colorado Las Vegas,Nevada Westminster,Colorado \�: Constructer',Inc. ADDITIONAL WORK AUTHORIZATION (Daily) Bill Dote; Job IJob lo: Weld County/Roche Constructors, Inc. 12-7-06 Name:WELD JAIL PHASE Ft No.: 0615 Specifically describe Remove pumping subgrade and replace with re-cycled concrete. Note limits extended under observation of Northern Colorado Geo Tech due to encountering more organic material during over ex AWA 008 Duran Excavating. Shaded area for office use only Cost Code Employee's name Reg Rote O.T. O.T. Total PT81 Total Hrs, Firs. Rote Raw j.r.,7ri' .I ' Labor subtotal , ��, Cost Code Materiel Req. Quer. Unit Sub Tax Total Total tv Material Subtotal ^\:;;�',:; Cost Code Tools or Equip. NO. Rate Rental Period Total Tools 8 Equip Subtotal _E Invoice No. Subcontractor Amount ALL PRICING SUBJECT TO REVIEW SEE ATTACHED LOAD TICKETS AND DURAN LOGS _ Subcontractor Subtotal Rivi,A4%° SUBTOTAL RCI Rep OVERHEAD I_%) Calendar day extension ❑ No SUBTOTAL In Yes _of dayls) Owner/Sub Rep PROFIT(_%) T•TAL ^-1 d sc.. " t,S !` r•I`c^(010)3b' Intl far l°79)]pp 140 ]cnvct amrm(301)517-:716 361 714 Aveeuc(806343 PG am 1/27 IHpn77) Unteky,Cldrtrarin waw.radtacnn>tnu'lots • 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 22 ��=aavari\ jSuran\\ PROJECT LOGS JOB NUMBER l DATE ' IN CHARGE TEMPERATURE GENERAL WEATHER CONDITIONS f R1. .. 9AM Naomi *AM Z ' 1'1.\ 4.,fFo . P c. IRQq ` ' 5)° V FULL NAME HRS. PHASE&CATA CLASS HRS. EQUIP X PHASE#CATA CLASS HRS. EQUIP k START/FINISH 1,` I0vY M`-lc'\jEN el0(.1\—O\ -'g ICY - :`3,30 cT4RF •`c'; Tnt.\1:-1h1 "CJ a,•'11 -0{ } 1, -.)-?,-/-D-2o /r/ \ -7r.:!!) ;�i2'l� CtiC�.F.>.\ c_P•A≥ L/-g -7, ,n--. n n 4-L7) o �7 c-r'1V -zoo-331 — Pr_ ,.,,..- P: --te R `7nn1-r)1 in 1 f`-,a --70o- 36) • P--,C G- O.: �., '.:' '' nn-'.o L — /r -O / 'i' 1oD- ciI•_,^r_ : ' ,n /'.. �1 �.. )r)--' iJ �- rj ZZCYj-9,f) t -,rX1-13W) T..Tim G -V". 71:. - v-•-:•1 n 1\'4c-, n' r-an o J D-1 7(11J- JY c' f'. :• -. cl no, -01 r. -41S 7--- .. -/:'.) Th '4 Win- ,1 -'r1_ 9:"±..-.•• - 7 ., . . 21JO -10 t- —. BACK CHARGES LIST MATERIAL LABOR&EQUIPMENT • NAME OF COMPANY BEING BACK CHARGED rj.•`. DESCRIPTION: ft •/7 ' i , ,e. / L / ' i .5<Qi(.4-rJ .1 _; /' .. , "• 5/ /7/ e> r :./rp . ,� h P�Cp�:T� .. 1 -: '„ - IS Caii5xh rnnc,P5-4 • EQUIPMENT . UNIT A HOURS LABOR OTMEN c‘r .r, =F SL-57 R Mc/ 4,z,-/enc.-=. rt._Sl,- (.cat, i�.7', ',-%; rir, T" JC1 7X11 -g - • >,;- c R 7-5 95 5 /4 _-///�16 -.,.7u�L cor ,_8ba 6-,;, !)-(4:.-.;,'-''<..< ./_ / /---c"-.2/0 7.5 CHECK HERE IF REGULAR RESIDENT INSPECTOR WAS ON THE JOB THIS DATE I NAMES OF OTHER INSPECTORS, RESE cA�rv. E,�OFa,OwNER.ARCH/ENGR OR DE VISITING PROJECT TYPE OF INSP. TIME tP� PA—Sy v‘pi SUBCONTRACTORS ON JOB SITE ASPHALT SIGNAGE.STRIPING CONCRETE STRUCTURES SURVEYORS CONCRETE F ATWONK TRAFFIC CONTROL • ELECTRICAL OTHER • LANDSCAPING OTHER ' LG]a ILA, 01/31/2007 10:10 9703789532 DURAN EXCAVATING PAGE 23 ^' `4))5. Roche Greeley,Colorado Las Vegas, Nevada Westminster,Colorado Conalraclan.Inc ADDITIONAL WORK AUTHORIZATION (Daffy) Sill Date: Job Job to: Weld County/Roche Constructors.Inc. 12-8-06 Name:WELD JAIL PHASE III No.: 0615 Specifically describe Over excavate and replace subgrode with re-cycled concrete per direction of Northern Colorado Geo-Tech AWA 010 Duran Excavatinnj. Shaded area for office use only Cost Code Employee's name Reg. Rote O.T, O.T. Total PTRI Total Hrs. Hrs. Rote Raw .'1;4.2;4^; Labor subtotal Cost Code Material Rea. Guam Unit Sub Tax Total Total is Material Subtotal Cost Code Tools or Equip. NO. Role Rental Period Total Tools 8 Equip..Subtotal 4.14-24:.., Invoice No. Subcontractor Amount ALL PRICING SUBJECT TO REVIEW cee ArrAruenlnen nrieFrS AND DLIRAN LOGS onst .tor•^ dt`� I"0Cfl0y..•>x�Awy3����o�`Jwa'a �e' ��B�rs Exceeding Your Expectations Since 1971 Change Order Request Weld County Jail North Complex Phase 3 Greeley,CO Project No.:0615CO • Date: January 31,2007 COR No.: 004 Description of Change: Approximately 277 LF of shoring was required along the north and northwest foundations and retaining wall. Due to the actual location of the fiber optics line running paralell to the north wall of the building,we could not obtain a safe excavation and slope for working on the footings and foundation wall. Also included is shoring at the northeast corner along the antenea,this was required due to the location of the antanea's grounding ring extending into the excavation. Contractor and Supplier Breakdown: Company Amount Duran Excavating 42,960.00 Duran Excavating 37,384.00 RCI budgeted an allowance of$25,000 for Shoring (25,000.00) Sub-Total $ 55,344.00 Roche Constructors Breakdown: Material Sub/Equip Labor Sub-Totals $ 0.00 $ 0.00 $ 0.00 Taxes ) %mat); %labor) 0.00 0.00 0.00 Sub-Total $ 0.00 $ 0.00 $ 0.00 RCI Total $ 0.00 Summary: Subcontractor Totals $ 55,344.00 RCI Work $ 0.00 Mark-up on Sub/RCI Work (4%) $ 2,2i.4O0 Sub-Total 57,558.0C General Liability Insurance 0.00 Payment and Performance Bond (if applicable) $ 0.00 Total: $ 57,558.00 This price is good for seven (7) days. Time extension required for this work:0 days. Corporate Office 361 71st Avenue(80634)•Post Office Box 1727(80632)•Greeley,Colorado Roche (970)356-3611.Fax(970)356-3619 [?�Denver Metro(303)534-3716 r4 m? �'� Constructors.Inc. www.rocheconstructors.com illyran\xca November 3, 2006 Roche Constructors 361 71n Ave Greeley Colorado 80634 Re: Weld County Jail Phase III Shoring Ann: Ryan Strub Dear Mr. Strub The following is a cost to install and remove shoring on the north side of the building on the above project. Material to be SZ-20 cold rolled pile. Furnish & Install 160 lf. of wall 6 to 7 feet deep approximately 2,200 sf. $42,960.00 If Engineered plans are required add $ 3,000.00 Sincerely l;m Lrst E. Duran 418 N. 9th Avenue• Greeley, Colorado 80631 (970) 351-0192 Z0 39tid 9NIlCACCX3 Nvdfa ZE968LE0L6 00:0T 900E/L0/TT RC uran JAN Q Q "ri I7 IS excavating Inc. December 28, 2006 Roche Constructors 361 7151 Ave Greeley Colorado 80634 e Re: Weld County Jail Phase III JAN n (/ Additional Shoring 5A�L r��] Attn: Ryan Strub GRa y Dear Mr. Strub The following is a cost for additional shoring requested by Roche Constructors. (Material to be SZ-20 cold rolled pile.) This work requested required two additional move ins. 12/07/06 Furnish and Install 800 sf of shoring x 19.50 per sf. = $ 15,600.00 12/19/06 Furnish and Install 912 sf. of shoring x 19.50 per sf. = $ 17,784.00 Mobilization 2 each x 2,000.00 = $ 4 111 11 Grand Total 37,384.00 Sincere Ernest . Duran President 418 N. 9th Avenue• Greeley, Colorado 80631 (970) 351-0192
Hello