Loading...
HomeMy WebLinkAbout20070364.tiff RESOLUTION RE: GRANT REQUEST TO PREADVERTISE SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL REVIEW PERMIT#1598 - ROCKIES EXPRESS PIPELINE, LLC WHEREAS, the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, the Board has received a request from Rockies Express Pipeline, LLC, 370 Van Gordon Street, P.O. Box 281304, Lakewood, Colorado 80228-8304, for preadvertisement of an application for a Site Specific Development Plan and Use by Special Review Permit#1598 for a Mineral Resource Development Facility, including Natural Gas Processing Facility, in the A (Agricultural) Zone District, and WHEREAS, said property is described as part of the SE1/4 of Section 5, Township 11 North, Range 66 West of the 6th P.M., Weld County, Colorado, and WHEREAS,after study and review the Board deems it advisable to grant said request,with the hearing date to be set as March 21, 2007, at 10:00 a.m. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the request from Rockies Express Pipeline, LLC, for preadvertisement of an application for a Site Specific Development Plan and Use by Special Review Permit#1598 for a Mineral Resource Development Facility, including Natural Gas Processing Facility, in the A (Agricultural) Zone District be, and hereby is, granted. BE IT FURTHER RESOLVED by the Board that the hearing date to consider said request be, and hereby is, set as March 21, 2007, at 10:00 a.m. 2007-0364 PL1874 ee P� , Ft, /4 cal fi/c)IA 7 GRANT PREADVERTISEMENT - ROCKIES EXPRESS PIPELINE, LLC (USR #1598) PAGE 2 The above and foregoing Resolution was,on motion duly made and seconded, adopted by the following vote on the 12th day of February, A.D., 2007. BOA F COUNTY COMMISSIONERS �� WEL COUNT COLD DO ATTEST: ��/I;,,� t�t.,:��•/.�� -� a , David E. Long, Chair Weld County Clerk tot fit9. t�.�"IP _ kit-1.-,-: 44 is. BY: 72/-24.,e i r i ` William H.ierke,Prp-Tem Deputy Clerk to the B t ' .r H ( L', ' - liam F. Garcia n • 0— obert D. Masden atornecy c j ougla Rademac er Date of signature: 3 --6-07 2007-0364 PL1874 MEMORANDUM tett; TO: Board of County Commissioners February 5, 2007 VIIVt FROM: Esther E. Gesick, Deputy Clerk to the Board COLORADO SUBJECT: Request for Pre-advertisement Rockies Express Pipeline, LLC, has submitted a request that the application for Use by Special Review Permit #1598, which will be heard by the Planning Commission on March 6, 2007, be pre-advertised. If you wish to approve this request, a hearing before the Board on March 21, 2007, will allow adequate time for advertising. 2007-0364 PL1874 4111 MEMORANDUM TO: Board of County Commissionets - . - , -5 A 1 fl p 2 DATE: January 29, 2007 R F 1 -: FROM: Kim Ogle, Planning Manager SUBJECT: Rockies Express Pipeline, LLC Land Use Case Number USR-1598 Request for Pre-Advertisement Tim Atwater, applicant The Department of Planning Services is in receipt of a letter from Rockies Express Pipeline, LLC requesting consideration for a pre-Advertisement hearing date before this Board. The applicant has outlined their request in the letter dated January 25, 2007. Two dates that are important to note is the operational date and the in-service date of December 31, 2007. Mr. Atwater, representing Kinder-Morgan submitted application documentation for processing in a timely manner, however, due to the holidays the referral agencies were not able to provide retum comment in the same manner. Planning Services notes the urgency in completing the land use application, thus enabling the applicant to meet their land use permitting obligations and given the tight construction and operational time frames would be in support of this request. End Memorandum. 2007-0364 AM \ SinnaLL C 25 January 2007 Weld County Commissioners 915 10`h Street P. O. Box 758 Greeley, CO 80632 Re: Early Release Pre Ad Hearing—Case Number USR-1598 —Natural Gas Compression Facility—Tract in the SE/4 Section 5, Township 11 North, Range 66 West, Weld County, CO Gentlemen: This letter represents Rockies Express Pipeline LLC's (REX) request for an expedited public hearing date for Case No. USR-1598 by the Weld County Board of County Commissioners. REX submitted its Land Use Application for the subject project with the Weld County Planning Department on December 4, 2006. The urgency to have this case heard by both the Planning Commission and Board of County Commissioners expeditiously is due to the following: 1. Kinder Morgan is either completing or will soon begin constructing a 42 inch natural gas pipeline in Colorado, Wyoming, Nebraska Kansas and Missouri that will transport natural gas from the Rocky Mountain region to energy companies and users throughout the United States (Entrega/REX pipeline). 2. The "in-service date" for the Entrega/REX pipeline has been established by contract to be December 31, 2007 (In-Service Date). 3. The proposed compressor station is an integral and necessary part of transporting natural gas through the Entrega/REX pipeline and must be operational before the December 31, 2007 In-Service Date. 4. Construction of the proposed Compressor Station is expected to take eight (8) months after construction begins. In order to meet the In-Service Date and finalize all materials contracts for the Compressor Station all local permits must first be obtained and construction must commence by April 15, 2007. 370 Van Gordon Street P.O. Box 281304 Lakewood, CO 80228-8304 800-525-3752 5. Currently, Case No. USR-1598 is scheduled to be heard by the Weld County Planning Commission on March 6, 2007. If the application is approved by the Planning Commission on that date this would mean that under the normal course the Board of County Commissioners would not hear the request until the week of May 7, 2007 which would not allow sufficient time for the Compressor Station to be constructed and operational by the In-Service Date. Rockies Express Pipeline LLC hereby request that its application for Case No. USR-1598 be heard by the Board of County Commissioners as soon as is feasibly possible after the Planning Commission approves said application and that both hearings be simultaneously noticed to further minimize any delays. Sincerely, IE XPRE INE LC Timot . A ater Senior-Kra—of Way Agent Enclosure cc: Weld County Department of Planning Services 918 10th Street Greeley, CO 80631 Hello