Loading...
HomeMy WebLinkAbout20071271.tiff RESOLUTION RE: GRANT CHANGE OF ZONE, PZ#1116, FROM A(AGRICULTURAL)ZONE DISTRICT TO PUD (PLANNED UNIT DEVELOPMENT) ZONE DISTRICT FOR THREE (3) LOTS WITH E(ESTATE)ZONE USES,WITH THE EXCEPTION THAT TWO(2)CATTLE PER ACRE BE ALLOWED (LONE TREE ESTATES PUD) - A BETTER JOB, INC. WHEREAS,the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS,a public hearing was held on the 30th day of May, 2007, at 10:00 a.m. for the purpose of hearing the application of A Better Job, Inc., 38515 Weld County Road 41, Eaton, Colorado 80615,requesting Change of Zone,PZ#1116,from the A(Agricultural)Zone District to the PUD(Planned Unit Development)Zone District for three(3)lots with E(Estate)Zone uses,with the exception that two (2) cattle per acre be allowed (Lone Tree Estates PUD), for a parcel of land located on the following described real estate, to-wit: Lot C of Recorded Exemption#3846;being part of the NW1/4 of Section 27, Township 7 North, Range 65 West of the 6th P.M., Weld County, Colorado WHEREAS, the applicant was represented by Troy and Angela Hauer, and WHEREAS, Section 27-6-120 of the Weld County Code provides standards for review of said Change of Zone, and WHEREAS,the Board of County Commissioners heard all the testimony and statements of those present,studied the request of the applicant and the recommendation of the Weld County Planning Commission and,having been fully informed,finds that this request shall be approved for the following reasons: 1. The applicant has complied with all the application requirements listed in Section 27-5-30 of the Weld County Code. 2. The request is in conformance with Section 27-6-120.D as follows: a. Section 27-6-120.D.5.a - The proposal is consistent with any Intergovernmental Agreement in effect influencing the PUD and Chapter 19 (Coordinated Planning Agreements), Chapter 22 (Comprehensive Plan), Chapter 23(Zoning),Chapter 24(Subdivision)and Chapter 26(Mixed Use Development)of the Weld County Code. The proposed site is not influenced by an Intergovernmental Agreement. The proposal is consistent with the aforementioned documents as follows: 1) Section 22-2-60.C(A. Goal 3)states, "Provide mechanisms for the division of land which is agriculturally zoned. Options for division shall be provided to ensure the continuation of agricultural production 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL)TO PUD -A BETTER JOB, INC. PAGE 2 and accommodate low intensity development. Urban-scale residential, commercial, and industrial development will be discouraged in areas where adequate services and infrastructure are not currently available or reasonably obtainable." The applicant is proposing a low density residential development for three(3)lots on 24.7 acres. The minimum lot size is 6.719 acres, with an overall density of one septic system per 8.2 acres, which does meet the current Department of Public Health and Environment policy. 2) Section 22-2-60.D(A.Goal 4)states,"Conversion of agricultural land to nonurban residential, commercial, and industrial uses will be accommodated when the subject site is in an area that can support such development. Such development shall attempt to be compatible with the region. This goal is intended to address conversion of agricultural land to nonurban uses. Once converted, this land is less conducive to agricultural production." The proposed PUD will be serviced by the North Weld County Water District for potable water requirements. Fire protection will be provided by sprinkler systems. Individual Sewage Disposal Systems are proposed to handle the effluent flow. The Department of Public Health and Environment,in its referral dated January29,2007,states the Geotechnical Exploration Report by Two Rivers Testing, dated February 2006, does not include any preliminary percolation data. The lots are large and locating a septic system on the lots is not anticipated to be a problem from a geotechnical standpoint;however, portions of Lots 1 and 3, and all of Lot 2, are located within the boundary of the 100-yearfloodplain. The majority of the property is located within the 100-year floodplain. The surrounding property consists of primarily agricultural uses. 3) Section 22-2-210.D.2 (PUD.Policy 4.2.) states, "A Planned Unit Development which includes a residential use should provide common open space free of buildings,streets,driveways,or parking areas. The common open space should be designed and located to be easily accessible to all the residents of the project and usable for open space and recreation. Some Planned Unit Developments may not require common open space depending on their type,density,or other factors." Lone Tree Estates PUD is considered a non-urban scale development, and does not require any open space, per Section 27-2-140 of the Weld County Code. The proposal does not include any open space. 4) Section 22-2-210.D.3 (PUD.Policy 4.3.) states, "Conservation of natural site features such as topography, vegetation, and water courses should be considered in the project design." The site is primarily level, with the Lone Tree Creek running along the eastern 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL)TO PUD -A BETTER JOB, INC. PAGE 3 edge of the property. The site is located in the floodplain, as delineated on Federal Emergency Management Agency FIRM Community Panel Map 080266 0487 C,dated September 28, 1982. Building and septic envelopes shall be delineated on the plat. 5) Section 22-2-210.F.1 (PUD.Policy 6.1.) states, "The development should provide for perpetual maintenance of all commonly shared land and facilities. The County should not bear the expense or responsibility of maintenance for any commonly shared land or facilities within the Planned Unit Development." The proposal does not include any open space. The applicant is not proposing any school bus shelter, mail kiosk, or development sign. 6) Section 22-3-50.8(P.Goal 2)states,"Require adequate facilities and services to assure the health, safety, and general welfare of the present and future residents of the County." The proposed PUD will be serviced by the North Weld County Water District for potable water, and fire protection will be provided by sprinkler system. Individual Sewer Disposal Systems will handle the effluent flow. b. Section 27-6-120.D.5.b - The uses which will be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Chapter 27, Article II, of the Weld County Code. 1) Section 27-2-20, Access standards — The Department of Public Works,in its referral dated January 19,2007,has recommended that the internal roadway be paved. The applicant is proposing the cul-de-sac length be increased to approximately 60 feet. This will allow slightly more than three vehicle lengths for staging. If agricultural equipment is proposed to utilize the roadway for access, the applicant shall add approximately 25 feet to the cul-de-sac in length. 2) Section 27-2-40, Bulk requirements—The applicant has chosen to adhere to the bulk requirements of the E(Estate)Zone District. The applicant has met the remaining Performance Standards as delineated in Section 27-2-10. The Conditions of Approval and Development Standards ensure compliance with Sections 27-2-20 through 27-2-220 of the Weld County Code. c. Section 27-6-120.D.5.c-The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The proposed site is not influenced by an Intergovernmental Agreement. The site is located within the three-mile referral area for the Town of Eaton. The Town of Eaton, in its referral dated December 26, 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL) TO PUD -A BETTER JOB, INC. PAGE 4 2006, indicated it has reviewed the request and finds no conflicts with its interests. d. Section 27-6-120.D.5.d - The PUD Zone District shall be serviced by an adequate water supply and sewage disposal system in compliance with the Performance Standards in Chapter 27,Article II,of the Weld County Code. The proposed PUD will be serviced by the North Weld County Water District for potable water requirements. Fire protection will be provided by sprinkler systems. Individual Sewage Disposal Systems will handle the effluent flow. The County Attorney's Office has indicated that the agreements submitted by the applicant are adequate for the Change of Zone. The Department of Public Health and Environment has indicated, in a referral response dated January 29, 2007,that the application has satisfied Chapter 27 of the Weld County Code in regard to water and sewer service. e. Section 27-6-120.D.5.e-Street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. The Department of Public Works has indicated,in the referral response dated January 19, 2007, that Weld County Road 43 requires 40 feet for future right-of-way. f. Section 27-6-120.D.5.f-An Off-site Road Improvements Agreement and an On-site Improvements Agreement proposal is in compliance with Chapter 24 of the Weld County Code,and a Road Improvements Agreement is complete and has been submitted,if applicable. The Department of Planning Services shall require an Improvements Agreement in accordance with Section 27-6-120.6.f of the Weld County Code for improvements to Lone Tree Estates PUD, and all on-site improvements. The Weld County Department of Public Works has reviewed the proposal and has determined that the internal road right-of-way shall be sixty(60)feet in width, including cul-de-sacs with a sixty-five (65) foot radius, and dedicated to the public. Stop signs and street names will be required at all intersections. g. Section 27-6-120.D.5.g - There has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. The site is located with a floodplain. All construction or improvements occurring in the floodplain, as delineated on Federal Emergency Management Agency FIRM Community Panel Map 080266 0487 C, dated September 28, 1982, shall comply with the Flood Hazard Overlay District requirements of Chapter 23,Article V,Division III,of the Weld County Code, and all applicable FEMA regulations and requirements, as described in 44 CFR parts 59 and 60. No commercial mineral deposits have been noted. A Flood Hazard Development Permit will be required prior to the issuance of a building permit. 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A (AGRICULTURAL) TO PUD -A BETTER JOB, INC. PAGE 5 h. Section 27-6-120.D.5.h - Consistency exists between the proposed zone districts uses,and the Specific Development Guide. The submitted Specific Development Guide accurately reflects the Performance Standards and allowed uses described in the proposed Zone District, as described previously. The applicant is requesting that the Final Plan be administratively reviewed. The Department of Planning Services and the Board concurs with this request. NOW,THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County,Colorado,that the application of A Better Job, Inc.,for Change of Zone,PZ#1116,from the A(Agricultural)Zone District to the PUD(Planned Unit Development)Zone District for three(3)lots with E (Estate)Zone uses, with the exception that two (2) cattle per acre be allowed (Lone Tree Estates PUD), on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the Change of Zone plat: A. The applicant shall either submit a copy of an agreement with the property mineral owner/operator(s), stipulating that the oil and gas activities have been adequately incorporated into the design of the site,or show evidence that an adequate attempt has been made to mitigate the concerns of the mineral owner/operator(s). Drill envelopes may be delineated on the plat,in accordance with the State requirements,as an attempt to mitigate concerns. The plat shall be amended to include any possible future drilling sites. B. The applicant shall submit a detailed Signage Plan to the Department of Planning Services. The sign shall comply with the sign code in Sections 23-4-60 through 23-4-120, including appendices 23-C,23-D,and 23-E of the Weld County Code. C. The applicant shall address the requirements and concerns of the West Greeley Soil Conservation District, as stated in the referral response dated December 28, 2006. Evidence of such shall be submitted, in writing,to the Weld County Department of Planning Services. D. The applicant shall address the requirements and concerns of the Department of Public Works, as stated in the referral response dated January 19, 2007. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. E. The applicant shall address the requirements and concerns of the Weld County Sheriffs Office,as stated in the referral response dated February 25, 2007. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. F. The applicant shall address the requirements and concerns of the Weld County Department of Public Health and Environment, as stated in the 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL) TO PUD - A BETTER JOB, INC. PAGE 6 referral response dated January 29, 2007. Evidence of such shall be submitted,in writing,to the Weld County Department of Planning Services. G. The applicant shall attempt to address the requirements and concerns of the State of Colorado, Division of Wildlife, as stated in the referral response dated January 12,2007. Evidence of such shall be submitted, in writing,to the Weld County Department of Planning Services. H. The applicant shall address the requirements and concerns of Eaton School District RE-2, as stated in the referral response dated January 15, 2007. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. The applicant shall contact the Eaton Fire Protection District,to discuss any requirements and concerns it may have. Evidence of such shall be submitted, in writing,to the Weld County Department of Planning Services. J. The applicant shall be required to submit a Re-vegetation Plan of all disturbed areas during construction. The plan shall include information regarding plant type, installation methods, and maintenance. K. The applicant shall be required to provide written and graphic evidence from Eaton School District RE-2 and the post office that the proposed mailbox location and bus shelter plan meets the design standards and delivery requirements for the mailbox facility,and the proposed school drop off/pick up location shall be approved by the School District. Mailbox kiosks and the bus shelter shall be located on an open space area owned,and maintained by,the Homeowners'Association. Written evidence of compliance with the standards and requirements shall be submitted to the Department of Planning Services. Further,evidence shall be provided that the PUD meets the intent of the Americans with Disabilities Act (ADA) for access. L. If applicable,the applicant shall provide additional information pertaining to the entry sign and plant materials,including common,botanical,and species names,size at installation,and any additional information deemed necessary by the Landscape Architect, if any. M. The applicant shall address the issue of the turf/native and seed grasses in all open space areas, if applicable. N. The applicant shall address the requirements and concerns of the Department of Building Inspection,as stated in the referral response dated January 26, 2007. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. O. The applicant shall address the requirements and concerns of the Department of Planning Services, as stated in the referral response dated 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL) TO PUD -A BETTER JOB, INC. PAGE 7 January 5,2007. Evidence of such shall be submitted,in writing,to the Weld County Department of Planning Services. P. There seems to be a discrepancy between the North Weld County Water District, the Eaton Fire Protection District, and the applicant, regarding the water source for fireflow protection. Evidence of adequate fireflow protection shall be submitted, in writing, to the Weld County Department of Planning Services. Q. The applicant has identified a road name for the proposed development (Lone Tree Circle). The applicant shall provide written evidence from all applicable service agencies that the proposed name is in compliance with the identification/naming protocol. R. The applicant shall provide evidence of the submittal of an application of a CLORM/LOMR Permit and payment of applicable fees to FEMA. S. The plat shall be amended to include the following: 1) All sheets of the plat shall be labeled PZ-1116. 2) The applicant shall adhere to the plat requirements in preparation of the Change of Zone plat. The vicinity map shall be delineated at a scale of 1"=2000', and the Site Plan shall be delineated at a scale of 1" =100', or 1"=200'. 3) The applicant shall delineate a Landscape Legend and provide additional information regarding the proposed plant material species. At a minimum, the applicant shall identify existing on-site plant material delineated with a single dot in the center of the circle, and proposed additional plant material with a "+" in the middle of each circle. 4) The placement of the school bus pullout/shelter and mailbox kiosk(s) shall be shown on the Change of Zone plans in an open space area maintained and owned by the Homeowners' Association. Final configuration and details of these items shall be determined by Eaton School District RE-2 and the postmaster. 5) The applicant shall contact the Department of Public Works to verify the status of County Road 43, and it shall be delineated on the plat. All setbacks shall be measured from the edge of future right-of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way. If the right-of-way cannot be verified,it shall be dedicated. This road is maintained by Weld County. 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL) TO PUD - A BETTER JOB, INC. PAGE 8 6) Easements shall be shown on the Change of Zone plat, in accordance with County standards(Section 24-7-60)and/or Utilities Coordinating Advisory Committee recommendations. 2. The Change of Zone is conditional upon the following and that each shall be placed on the Change of Zone plat as notes prior to recording: A. Change of Zone, PZ#1116, is from the A(Agricultural)Zone District to the PUD (Planned Unit Development) Zone District for three (3) lots with (E) Estate Zone uses,with the exception that two(2)cattle per acre are allowed (Lone Tree Estates PUD),as indicated in the application materials on file and subject to, and governed by, the Conditions of Approval stated hereon and all applicable Weld County regulations. B. Animal Units shall comply with the animal units allowed in the E (Estate) Zone District,as outlined in Section 23-1-90 of the Weld County Code,with the exception for cattle, which shall be two (2) per acre. C. Water service shall be obtained from the North Weld County Water District. D. This PUD is in rural Weld County and is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment,Water Quality Control Division,and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. E. Language for the preservation and/or protection of the absorption field envelopes shall be placed in the development Covenants. The Covenants shall state that activities such as permanent landscaping, structures, dirt mounds,or other items are expressly prohibited in the absorption field site. F. A Stormwater Discharge Permit may be required for a development/ redevelopment/construction site where a contiguous or non-contiguous land disturbance is greater than,or equal to,one acre in area. The applicant shall contact the Water Quality Control Division of the Colorado Department of Public Health and Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. G. During development of the site,all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Health and Environment, a Fugitive Dust Control Plan must be submitted. H. In accordance with the Regulations of the Colorado Air Quality Control Commission,any development that disturbs more than five(5)acres of land 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL) TO PUD - A BETTER JOB, INC. PAGE 9 must incorporate all available and practical methods that are technologically feasible and economically reasonable,in order to minimize dust emissions. If land development creates more than a 25-acre contiguous disturbance, or exceeds six (6) months in duration, the responsible party shall prepare a Fugitive Dust Control Plan, submit an Air Pollution Emissions Notice, and apply for a permit from the Colorado Department of Public Health and Environment. J. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance,taxes and maintenance of open space, streets, private utilities, and other facilities, along with the enforcement of Covenants. Open space restrictions are permanent. K. The Homeowners'Association shall be responsible for replacing all dead, or dying, plant material in the open space areas. L. Weld County's Right to Farm Statement,as delineated on this plat,shall be recognized at all times. M. Stop signs and street name signs will be required at all intersections. N. All signs,including entrance signs,shall require building permits. Signs shall adhere to Chapter 23,Article V,Division II,and Appendix 23-C through 23-E, of the Weld County Code. These requirements shall apply to all temporary and permanent signs. O. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. P. Building permits shall be obtained prior to the construction of any building or structure. Building permits are also required for signs and structures,such as bus shelters, if provided. Q. Activities such as permanent landscaping,structures,dirt mounds,or other items are expressly prohibited in the septic absorption field site. R. A plan review is required for each building. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. S. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Currently, Weld County has adopted the following:2003 International Building Code,2003 International Residential Code,2003 International Mechanical Code, 2003 International 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL)TO PUD -A BETTER JOB, INC. PAGE 10 Plumbing Code,2002 National Electrical Code,and Chapter29 of the Weld County Code. T. Each building will require an engineered foundation based on a site-specific Geotechnical Report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. U. All discharge of stormwater drainage from the proposed sites to offset properties must be located in a dedicated drainage easement granted by affected neighbors. Written documentation of this agreement shall be included in the Drainage Report. V. Prior to all new construction, a letter of approval from the Eaton Fire Protection District shall be submitted to the Department of Building Inspection. W. Building height shall be measured in accordance with the applicable Building Code for the purpose of determining the maximum building size and height for various uses and types of construction,and to determine compliance with the Bulk Requirements of Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code, in order to determine compliance with offset and setback requirements. Off-set and setback requirements are measured to the farthest projection from the building. X. Any structure located inside the 100-yearfloodplain boundarywill be required to obtain a Flood Hazard Development Permit,as well as a building permit. Y. WARNING: LOTS MAY NOT BE BUILDABLE DUE TO FLOODPLAIN OR FLOODWAY DESIGNATION. Please be advised that owners of Lot(s)1,2, and 3 may not be able to obtain building permits to construct non-agricultural structures. All construction or improvements occurring in the flood plain,as delineated on the Federal Emergency Management Agency FIRM Community Panel Map 080266 0487 C, dated September 28, 1982, shall comply with the Flood Hazard Overlay District requirements of Chapter 23, Article V, Division III, of the Weld County Code, and all applicable FEMA regulations and requirements, as described in 44 CFR parts 59 and 60. Z. The installation of any septic system within the 100-year floodplain shall comply with the Weld County I.S.D.S.Flood plain Policy. In accordance with the State of Colorado I.S.D.S. Regulations, no septic system shall be installed within the floodway. AA. Potential purchasers are hereby notified that a Confined Animal Feeding Operation is located directly south of the proposed development. Off-site impacts that may be encountered include: noise from trucks, tractors, and 2007-1271 PL1895 CHANGE OF ZONE#1116 FROM A(AGRICULTURAL) TO PUD - A BETTER JOB, INC. PAGE 11 equipment; dust from animal pens; and odors from animal confinement, silage, and manure. BB. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Articles II and VIII, of the Weld County Code. CC. Weld County Government personnel shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. DD. The site shall maintain compliance at all times with the requirements of the Weld County Departments of Public Works, Public Health and Environment, and Planning Services, state and federal agencies, and the Weld County Code. EE. The property shall be maintained in such a manner that grasses and weeds are not permitted to grow taller than twelve(12)inches. In no event shall the property owners allow the growth of noxious weeds. FF. No development activity shall commence on the property, nor shall any building permits be issued, until the Final Plan has been approved and recorded. GG. The applicant shall comply with Section 27-8-50 Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan-If a PUD Final Plan application is not submitted within two(2)years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed, or that the landowner cannot implement the PUD Final Plan,the Board of County Commissioners may, at a public hearing, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. HH. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. 3. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty (30) days of approval by the Board of County Commissioners. Along with the Change of Zone plat map,the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A(AGRICULTURAL) TO PUD -A BETTER JOB, INC. PAGE 12 formats are .shp(Shape Files),Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). 4. At the time of Final Plan application submission: A. Roadway and grading plans,along with construction details,will be required for the Final Plat. B. Proposed building envelopes and grading to accommodate drainage shall be provided with the final grading and drainage plans. C. Easements shall be shown in accordance with County standards and/or recommendations of the Utilities Coordinating Advisory Committee, and dimensioned on the final plat. D. The applicant shall submit an On-site (Private) Improvements Agreement with the Final Plan application that addresses all improvements associated with this development, per compliance with Section 24-9-10 of the Weld County Code. E. Afinal Drainage Reportstamped,signed,and dated bya Colorado licensed professional engineer, along with construction plans, conforming to the Drainage Report, shall be submitted with the Final Plan application, for approval,prior to recording the final plat. The report shall address all issues indicated in the Weld County Department of Public Works referral response, dated January 19, 2007. F. The applicant shall provide written documentation to the Department of Planning Services that any bus pullout area satisfies both the Department of Public Works and Eaton School District RE-2. The right-of-way will be dedicated on the final plat. G. Evidence shall be provided to the Weld County Department of Planning Services, from the applicable Post Office, stating the proposed mailbox location meets its design standards and delivery requirements. Should a single pedestal mail box not be the preferred standard,written evidence from the applicable Post Office shall be provided stating the contrary. H. Additional information may be submitted regarding the bus shelter. The information may include setbacks,road right-of-way encroachment,type of construction, and foundation. The applicant shall submit a time frame for construction, in accordance to Section 27-2-200 of the Weld County Code. J. The PUD street name and lot addresses shall be submitted to the Eaton Fire Protection District, the Weld County Sheriff's Office, Ambulance provider, 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A (AGRICULTURAL)TO PUD -A BETTER JOB, INC. PAGE 13 and the Post Office for review. Written evidence of approval shall be submitted to the Weld County Department of Planning Services. K. The applicant shall address the requirements of Eaton School District RE-2, as stated in the referral response dated January 15,2007. Evidence of such shall be submitted, in writing, to the Weld County Department of Planning Services. L. The applicant shall submit Covenants for Lone Tree Estates PUD. The Covenants shall be approved by the Weld County Attorney's Office prior to recording the final plat. M. All rights-of-way for proposed roadways must be dedicated on the final plat. N. Improvements Agreements (on-site and off-site)shall be approved by the Board of County Commissioners, prior to recording the final plat. O. The applicant shall show a typical cross section for all traffic circles on the roadway plans. P. Intersection sight distance triangles at the development entrance(s)will be required, and shall be shown (labeled and dimensioned) to comply with AASHTO's"A Policy on the Geometric Design of Highways and Streets"on Final Plan materials. All landscaping within the sight distance triangles must be less than 3.5 feet in height at maturity, and noted on the final roadway plans. Q. The applicant shall submit to the Department of Public Works, stamped, signed,and dated final plat drawings,and roadway/construction and grading plan drawings, for review and approval, with the Final Plan application. Construction details must be included. R. Stop signs and street name signs will be required at all intersections and shown as a Signing Plan on final roadway plans. The current edition of the Manual on Uniform Traffic Control Devices (MUTCD) shall govern the Signing Plan. S. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo Coverages and Arclnfo Export files format type is.e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). 5. Prior to construction: A. Stop signs and street name signs will be required at all intersections. 2007-1271 PL1895 CHANGE OF ZONE #1116 FROM A (AGRICULTURAL) TO PUD -A BETTER JOB, INC. PAGE 14 B. A letter of approval from the Eaton Fire Protection District shall be submitted to the Department of Building Inspection. C. The applicant shall submit construction plans for the utilities showing a water supply analysis indicating the available fireflow at the most demanding point in the water system. The above and foregoing Resolution was,on motion duly made and seconded,adopted by the following vote on the 30th day of May, A.D., 2007. BOARD OF COUNTY COMMISSIONERS 1 ,� 0! •••.� WELD COUNTY, COLORADO ATTEST: L /,� • �� // ,gyp ��� EXCUSED 1 �� I %.avid E. Long, Chair Weld County Clerktoth •. ,( 5' � — �� 'y?, ` `V, William H. a Pr. Te' BY: .4 „' \ I De ty CI to the Boa . how � C/ 2�` William F. Garcia APP FjOV D AS M: EXCUSED bed D. Masden u y ttorney \ a� Douglas Rademache Date of signature: 1Ia-'01 • • 2007-1271 PL1895 Hello