Loading...
HomeMy WebLinkAbout20073008.tiff ftwei :, MEMORANDUM ' TO: Clerk to the Board DATE: September 17, 2007 • FROM: Wayne Howard, Chief Senior Engineer, Public Works COLORADO SUBJECT: Agenda Item Please put this item on the Agenda: Change Order No 3 with FHU on the Weld County Road 13, 8 to 5th Street Project not to exceed $60,152.00 M:Trancie\Agenda item.doc r.+ X o O rn N r*1 C-> -n r0 (C rn a - ?N-< cc ,E& 0054 9/9'VA o7 2007-3008 /0 -01_ O7 BOARD OF COUNTY COMMISSIONERS • REVIEW/WORK SESSION REQUEST RE: WCR 13, WCR 8 to 5th St. in Frederick Change Order No. 3 —FHU DEPARTMENT: Public Works Engineering Division DATE: September 11, 2007 PERSON REQUESTING: Wayne Howard, P.E., Chief Senior Engineer Brief description of the problem/issue: Weld County entered into a Professional Engineering Services Agreement with Felsburg Holt&Ullevig(FHU)in 2004 for the WCR 13 Road Improvements Project. The contract only included design services but allowed an option to include construction services if requested by the department. The project originally included the work from WCR 8 to 5t"St. in Frederick. Upon receiving an $800,000 Congestion Relief Grant,the project was split into to projects to avoid Federalizing the entire 3.25 miles. The federal share project includes the intersection of SH 52 and WCR 13 and that section of WCR 13 north of the intersection. The non-federal project includes WCR 13 south of 511 52 to WCR 8. Only the federal portion from S11 52 north requires CDOT oversight. As PW prepares for construction of both projects,we are developing the construction inspection requirements. In order to minimize inspection costs,PW is proposing that FHU furnish 1 full time, CDOT certified inspector for the federal share project only and PW will also perform inspection duties to supplement the work. For the non-federal project,PW personnel will inspect 100%of the project. This will save approximately$65,000 by using PW staff vs consulting staff. All project management will be 100%PW staff. The cost for 1 full time inspector by FHU is$60,152.00. (See supporting details) Additional Contract Time—Existing FHU agreement will expire on July 31, 2007 and needs to be extended 365 days to cover the construction contract time plus finalizing CDOT paperwork time all estimated to be completed by July 2008. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The Board can either accept or not accept Change Order No.3 for the additional construction management services. Recommendation to the Board: I recommend approval of Change Order No. 3 as these services will assure adequate construction management and inspection in compliance with CDOT procedures.. Approve Schedule Recommendation Work Session Other David E. Long William H. Jerke William F. Garcia t•C Robert D. Masden Douglas Rademacher Attachments C.O. No. 3 and Supporting Documentation pc: M:\—Active Projects\Strategic Corridor\WCR 13, from WCR8 to SH 52+\Design\Contracts\CONSULTANT-FHU\C.O. #3 CM Services\9-05-07 bocc worksession request.doc CHANGE ORDER NO.3 Weld County Road 13, 8 to 5th Street Date: August 13, 2007 Project: Weld County Road 13, 8 to 5h St. The project is located between WCR 8 and 5th Street in Frederick and is funded with Energy Impact Funds, Congestion Relief, and Strategic Road Funds. The engineering consulting firm Felsburg Holt and Ullevig(FHU)was selected as the consultant for the project to provide engineering design services. The original contract includes a paragraph authorizing the addition of Construction Management Services at a later date.This Change Order is written to add this service. Owner: Weld County,Colorado Consultant: Felsburg Holt and Ullevig,6300 South Syracuse Way, Suite 600,Centennial,CO 80111 The following change is hereby made to the Contract Documents: o Additional services to the original Scope of Work were required. Additional services included: Provide Construction Management Services on Project STA $60,152.00 052A-027 SH 52 and WCR 13 Intersection Improvements Total Increase Cost $60,152.00 CHANGE TO CONTRACT PRICE: Original Contract Price: $ 459,928.05 Current Contract Price adjusted by previous Change Order: $ 569,650.88 The Contract Price due to this Change Order will be increased by: $ 60,152.00 The new Contract Price, including this Change Order,will be $ 629,802.88 CHANGE TO CONTRACT TIME: o Additional time to the original Scope of Services were required. O Added Days Construction Management Services thru July 2008 365 Total number of Days Added 365 The Contract time will be increased by 303 calendar days. RECOMMENDED: �.pp V Owner Representative: � o() Date: SEP 2 4 2007� David E Long, Engineer: Date: //07 APPROVALS: Consultant: Felsburg Holt and Ullevig(FHU) �� , F By: { Date: 8-22^U7 Title: py, nc.? MA—Active Projects\Strategic Corridor AWCR 13.front WCRS to SH 52+V Design A Contracts VCONSULTANT-FIIUVC.O.#3 CM Services\8-13-07 C.O.#3 CM serviccsdoe 076r2- .30C'Y • CO LO j " 0 a CO \ ( ° / 69 cn cp in co up D Gs \tt- _ CO ` 03 CO§ I z Z la & " } 6 » _ ES ES w 0 ( - Z ® Co (Nz < - - 2 g Cl: _ 69 Ea qZ w ( ° CO CO I 0 ° # �_ w ~ HO ( / _ OH I- y t $ CO 2 e I \ z j 02 0ow > 0 IX 4 EL w 5 H Z ` NLL W / k f w ` I cm LO « < 1- 3 2 � D CO � ` N � " o < $ O w + LL 0 z o \ k Hello