Loading...
HomeMy WebLinkAbout20071841.tiff WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CTL THOMPSON DATED: June 13, 2007 Work Order Number: CTL-3 Project Title: Public Works WCR 18 west of Highway 85: Subgrade Investigation Commencement Date: June 25, 2007 Completion Date: July 31,2007 Limitations on compensation: Not to exceed$3,091.20 Project Description: Soils subgrade investigation needed for the design of roadway improvements. Scope of Services: See attached Scope of Work dated June 11,2007 Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein, by this reference, and accordance with the terms and conditions Notice to Proceed is hereby given. contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement and this work order (including the attached By: ‘6\"..-ell LOk T.-E. forms) the Professional Services Agreement Project Manager shall control. Date: to I co 0—► /�/ Professional By: G�' Department nt Headd� CTL Thompson, Inc. Date: i°""""'^7 /� 351 Linden Street,Unit 140 Fort Collins,CO 80524 By: hector of Finance and Administration By: i /07/02/20'07 Title: Q ECHNII Ca- D601: 4 frt. By: `� ' �" /�✓ Pro-Tem Chairman,Weld County Commissioners Date: To✓WE 5/�°� Date: 07/02/2007 ATTESTING TO BOARD MM SSIONERSIGNATURES ONLY MMI%am ICI I � $ � OUNTY CL RK TO THE BOARD /art Cepl ��� DEPUI�CLEW tQ THE BO/A"D c;-P05-6 o� da �7 ml /91-3 61/4)7-A99/ CTLITHOMPSON trionnomanni June 11,2007 Weld County Public Works 1111 H Street Greeley, CO 80632 Attention: Mr.Wayne Howard Subject: Fee Estimate for Subgrade Investigation WCR 18 West of Highway 85 Weld County, Colorado Proposal No. FC 07-0187(Revised) Mr. Howard: At your request, CTL I Thompson, Inc. Is pleased to provide this fee estimate for geotechnical engineering services for a subgrade investigation for the above referenced project. For preparation of this proposal, you provided us a site map delineating the project limits. We understand the County desires to obtain information regarding the existing pavement system and underlying subgrade soils for use in planning and design of the proposed improvements. Our services will be limited to subgrade exploration and testing. No pavement design is requested for this project. Based on the provided site location map,the project covers approximately 1700 lineal feet. We estimate drilling 4 exploratory borings along the roadway at a spacing of approximately 500 feet. All borings will be drilled to a depth of 10 feet. We will collect and test samples of the subgrade soils, as we deem necessary, In accordance with Weld County street standards. You have requested Hveem (R-value) tests be performed for this project. We understand that we will need to provide the necessary utility locates and traffic control for this investigation. We anticipate that the County will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms of our professional services agreement with Weld County for the year 2007. 351 Linden Street I Unit 140 I Fort Collins,Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 Our estimated fee for geotechnical services associated with the subgrade investigation is $3,091.20. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. .B. "Chip" Leadbetter, III, P.E. Geotechnical Department Manager WELD COUNTY PUBLIC WORKS WCR 18 WEST OF NWT 85 2 CTL I T PROPOSAL NO.FC 07-0187(rev.5.11-07) CTLITHOMPSON FEE ESTIMATE FC-07-0187 (rev. 6-11-07) WCR 18, West of Hwy 85 Item - Unit Quantity Unit Cost Amount Traffic Control Traffic Control 1/2 day 1 $219.00 $219.00 Sub-total $219.00 Drilling Mobilization LS 1 $135.00 $135.00 Locates LS 2 $77.00 $154.00 Permit Applications Hr 2 $60.00 $120.00 Rig Hr 3 $135.00 $405.00 Drilling Supervision Hr 3 $60.00 $180.00 Sub-total $994.00 Laboratory Natural moisture/density Ea 4 $5.50 $22.00 Sieve analysis w/Atterberg Limits Ea 2 $120.00 $240.00 Swelvconsolidation Ea $37.00 $74.00 Hveem URN value Ea 2 $310.00 $620.00 std Proctor Ea 2 $75.00 $150.00 Sub-total $1,106.00 Engineering Engineering Technician Hr 3 $45.00 $135.00 Sr. Engineering Technician Hr 3 $55.00 $165.00 Project engineer Hr 3 $75.00 $225.00 Associate Hr 1 $100.00 $100.00 Sub-total $625.00 Sub-Total $2,944.00 contingency $147.20 Total $3,091.20 N uTE ; LP-i> 'v-- -k-- av c-'-i r Cr AS(-)sva. "T' zc≥ • c::)\L... V`-24c-e-`- w\\_-\_ 'FL.. ---CE` \CO • • BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: WCR 18,just west of SR 85 (0.25 miles) DEPARTMENT: PUBLIC WORKS DATE: 6/19/07 PERSON REQUESTING: Wayne Howard,Engineering Division Brief description of the problem/issue: Public Works Department is currently working on designing road improvements to WCR 18 including a new bridge over the Platte Valley Canal. Improvements include correcting sharp horizontal curves and new canal bridge. In order to accurately calculate the pavement design we are in need of existing soil boring information. PW has an existing On-Call contract with CTL Thompson to provide the required geotechnical services necessary for the design. The scope of work and costs for the services is shown in the attached Work Order No. 3. The proposed costs are not to exceed$3,091.20. What options exist for the Board? (Include consequences,impacts,costs, etc. of options) The Board could either accept or not accept the cost associated with Work Order No. 3. Without this information, a cost effective pavement design could not be calculated. Recommendation to the Board: I recommend approval for Work Order No. 3 to CTL Thompson. These costs are consistent with other costs for projects similar in scope of work. Approve Schedule Recommendation Work Session Other David E. Long William H. Jerke William F. Garcia Robert D. Masden Douglas Rademacher Attachments pc: M:\-Active Projects\WCR 18,West of SH 85\Design\Contracts\Work Session Request CTL,doc cte-6 ,,, MEMORANDUM wineTO: Clerk to the Board DATE: June 26, 2007 COLORADO FROM: Wayne Howard, Public Works SUBJECT: Consent Agenda Item Work Order No. 3 with CTL Thompson for the WCR 18 west of SH 85 project not to exceed $3,091.20. Enclosed is one original Work Order. M:\Francie\AgendaChairSignature.doc YJ CJ I AEl n ni;r—{ C.) -' :la-G cn CM:Sent !fi ent AC Alt 2007-1841 CA(r:ilia7 Hello