HomeMy WebLinkAbout20070701.tiff INVENTORY OF ITEMS FOR CONSIDERATION
Applicant Rockies Express Pipeline Case Number USR-1598
Submitted or Prepared
Prior to At
Hearing Hearing
1 Staff Comments X
Department of Planning Services Field Check Form X
Planning Commissioner Ehrlich Field Check Form
Letter to Applicant X
N Affadavit of sign posting X
Legal Notifications X
N 2 Application X
Maps
' Surrounding Property/ Mineral Owners
Utilities
3 Referral List X
4 Referrals without comment X
Weld County Sheriff's Office, referral received February 25, 2007
Referrals with comments X
5 Weld County Code Compliance, referral received December 13,2006
Weld County Department of Building Inspection, referral received January 5, 2007
West Greeley Soil Conservation District, referral received January 8, 2007
Colorado Department of Transportation, referral received January 8, 2007 4407
Weld County Department of Public Health and Environment, referral received
January 10, 2007
Weld County Department of Public Works, referral received January 15,2007
Farm Service Agency, referral received February 22, 2007
N, PC Exhibits
N 6 Sign Posting- Photograph +Affidavit X
I hereby certify that the 6 items identified herein were submitted to the,Department of Planning Services at or prior to the
cheduled Planning Commissioners hearing.
u EXHIBIT
Kim OrPtah -r 1- us22007-0701
feet
WRD�' LANDSUMMARY S APPLICATION
SHEET
COLORADO
Case Hearing Date: March 6, 2007
Number: USR-1598
Applicant: Rockies Express Pipeline, LLC
Address: Tim Atwater
370 Van Gordon Street
PO Box 281304
Lakewood CO 80228-8304
Request: Request for a Site Specific Development Plan and Special Review Permit for a Mineral
Resource Development Facility including Oil and Gas Support and Service (Natural Gas
Processing Facility) in the A(Agricultural)Zone District
Legal
Description: Part SE4 of Section 5, T11 N, R66W of the 6th P.M., Weld County, Colorado
Location: North of and adjacent to County Road 132 Section Line and West of and adjacent to State
Highway 85
Size of Parcel: 25 +/- acres
POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS
The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code.
The Department of Planning Services'staff has received responses from the following agencies:
• Weld County Code Compliance, referral received December 13, 2006
•
Weld County Department of Building Inspection, referral received January 5, 2007
• State of Colorado, Department of Transportation, referral received January 8, 2007
• West Greeley Soil Conservation District, referral received January 8, 2007
•
Weld County Department of Public Health and Environment, referral received January 10, 2007
• Weld County Department of Public Works, referral received January 15, 2007
• Weld County Sheriffs Office, referral received February 25, 2007
The Department of Planning Services' staff has not received responses from the following agencies:
• Nunn Fire Protection District
• State of Colorado, Division of Water Resources
• State of Colorado, Division of Wildlife
y EXHIBIT
USR-1598,Rockies Express Pipeline, LLC, page 1
1!
Vi; avoin LAND USE APPLICATION
SUMMARY SHEET
WUDc.
COLORADO
Planner: Kim Ogle
Case Hearing Date: March 6, 2007
Number: USR-1598
Applicant: Rockies Express Pipeline, LLC
Address: Tim Atwater
370 Van Gordon Street
PO Box 281304
Lakewood CO 80228-8304
Request: Request for a Site Specific Development Plan and Special Review Permit for a Mineral
Resource Development Facility including Oil and Gas Support and Service (Natural Gas
Processing Facility) in the A(Agricultural)Zone District.
Legal
Description: Part SE4 of Section 5, T11 N, R66W of the 6th P.M., Weld County, Colorado
Location: North of and adjacent to County Road 132 Section Line and West of and adjacent to State
Highway 85
Size of Parcel: 25 +/- acres Parcel Number: 0203 05 300014
THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE
APPROVED FOR THE FOLLOWING REASONS:
1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of
the Weld County Code.
2. It is the opinion of the Department of Planning Services'staff that the applicant has shown compliance
with Section 23-2-220 of the Weld County Code as follows:
A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other
applicable code provisions or ordinance in effect. Section 22-5-100.A(OG.Goal 1. )states
"Oil and gas exploration and production should occur in a manner which minimizes the
impact to agricultural uses and the environment and reduces the conflicts between mineral
development and current and future surface uses." Further,Section 22-5-100.B(OG.Goal.2)
states "The extraction of oil and gas resources should conserve the land and minimize the
impact on surrounding land." The request for a Site Specific Development Plan and a
Special Review Permit for a Mineral Resource Development Facility including a Natural Gas
Processing Facility in the A(Agricultural)Zone District is a new USR.
B. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural)
Zone District. Section 23-3-40.A.2 of the Weld County Code provides for Mineral Resource
Development Facility including a Natural Gas Processing Facility in the A(Agricultural)Zone
District.
USR-1598,Rockies Express Pipeline,LLC, page 2
C. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing
surrounding land uses. The property is sited adjacent to State Highway 85 and County Road
132 Section Line.To the north,west and south are dry pasture agricultural lands. To the east
are lands owned by Public Service Company of Colorado. There are seven property owners
within five hundred feet of this facility. No letters or telephone calls have been recieved in
favor of or in opposition to this proposal.
D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future
development of the surrounding area as permitted by the existing zoning and with the future
development as projected by Chapter 22 of the Weld County Code and any other applicable
code provisions or ordinances in effect, or the adopted Master Plans of affected
municipalities. The proposed site is not within the three mile referral area of any municipality.
The application materials state that the improvements consist of a compressor building for
three electric compressors; one generator, a supervisory control system a motor control
center (MCC) and an office/warehouse building. All improvements are enclosed within a
chain link fence with three-strands of barb wire atop. There are currently three other Natural
Gas Compressor Stations within 1/4 mile of this site, surrounded by non-irrigated grazing
lands.
E. Section 23-2-220.A.5--The application complies with Section 23-5 of the Weld County Code.
The existing site is not within the Airport, Geologic Hazard or Flood Hazard Overlay Districts.
The existing site is within the County Road Impact Fee Area and the Capital Expansion
Impact Fee and the Stormwater/Drainage Impact Fee.
Effective January 1, 2003, Building Permits issued on the proposed lots will be required to
adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11)
Effective August 1, 2005, Building permits issued on the subject site will be required to
adhere to the fee structure of the Capital Expansion Impact Fee and the
Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40)
F. Section 23-2-220.A.6 --The applicant has demonstrated a diligent effort to conserve prime
agricultural land in the locational decision for the proposed use. The lands are presently in
the CRP Program and are designated non-prime on the Important Farmlands Map of Weld
County dated 1979.
G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code),
Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and
Development Standards ensure that there are adequate provisions for the protection of
health, safety, and welfare of the inhabitants of the neighborhood and County.
This recommendation is based,in part, upon a review of the application materials submitted by the applicant,
other relevant information regarding the request, and responses from referral entities.
The Department of Planning Services'staff recommendation for approval is conditional upon the following:
1. Prior to recording the plat:
A. The plat shall be amended to delineate the following:
1. The plat shall be prepared per Section 23-2-260.D of the Weld County Code.
(Department of Planning Services)
2. All sheets associated with this plat shall be labeled USR-1598. (Department of
Planning Services)
3. The attached Development Standards. (Department of Planning Services)
USR-1598,Rockies Express Pipeline, LLC, page 3
4. The approved Screening Plan, to address the outdoor storage of materials,
associated with this facility shall be screened from adjacent properties, and the
public rights-of-way. (Department of Planning Services)
5. The approved Sign Plan. (Department of Planning Services)
6. The Colorado Department of Transportation (CDOT) has jurisdiction over all
accesses to State Highways.Please contact CDOT to verify the right-of-way of State
Highway 85 at County Road 132 vicinity. (CDOT)
7. County Road 132 is designated on the Weld County Road Classification Plan as a
Section Line road,with 60 feet of right-of-way both sides of centerline.The applicant
shall verify the existing right-of-way and the documents creating the right-of-way. All
setbacks shall be measured from the edge of future right-of-way. If the right-of-way
cannot be verified, it shall be dedicated. This road is not maintained by Weld
County. (Department of Public Works)
8. The applicant shall provide written and graphic evidence that the coordinate North
0+00 on the plat identifying the section where WCR 132 exists. Verification of the
south end of the property in conjunction with relationship to the section line needs
to be clarified on the plat drawing. Identify the location of this section line on your
plat drawing. (Department of Public Works)
9. The applicant shall delineate on the plat the circulation and off-street parking spaces
including the access drives. Further, each parking space shall be equipped with
wheel guards or curb stops where needed to prevent vehicles from extending
beyond the boundaries of the space and from coming into contact with other
vehicles,walls, fences or plant materials. (Department of Public Works)
10. The screened trash enclosure for the facility. (Department of Planning Services)
11. A graphic key and or symbol serving to identify each component that is located
within the USR Boundary. The key and corresponding component shall be
summarized in tabular format and be clearly delineated on the plat. (Department
of Planning Services)
B. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.)and
Emissions Permit application from the Air Pollution Control Division, Colorado Department
of Health and Environment to the Department of Public Health and Environment . Written
evidence of approval shall be submitted to the Department of Planning Services.
(Department of Public Health and Environment)
C. The applicant shall submit a dust abatement plan for review and approval, to the
Environmental Health Services, Weld County Department of Public Health &
Environment. Written evidence of approval shall be submitted to the Department of
Planning Services. (Department of Public Health and Environment)
D. The applicant shall submit a waste handling plan, for approval, to the Environmental
Health Services Division of the Weld County Department of Public Health & Environment.
The plan shall include at a minimum, the following:
1. A list of wastes which are expected to be generated on site (this should include
expected volumes and types of waste generated).
2. A list of the type and volume of chemicals expected to be stored on site.
3. The waste handler and facility where the waste will be disposed (including the
facility name, address, and phone number). Evidence of such shall be submitted
USR-1598, Rockies Express Pipeline,LLC, page 4
in writing to the Weld County Department of Planning Services. (Department of
Public Health and Environment)
E. Submit written evidence from the State Engineers Office demonstrating that a commercial
well has been obtained for this facility. (Department of Planning Services)
F. Submit written evidence from the Colorado Department of Transportation demonstrating
two approved points of ingress and egress and an access permit onto State Highway 85
has been approved by the Colorado Department of Transportation. (Colorado
Department of Transportation, Department of Planning Services)
G. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the
Weld County Department of Planning Services. (Department of Planning Services)
2. One month prior to construction activities:
A. A stormwater discharge permit may be required for a development/redevelopment
/construction site where a contiguous or non-contiguous land disturbance is greater than
or equal to one acre in area. Contact the Water Quality Control Division of the Colorado
Department of Public Health and the Environment at
www.cdphe.state.co.us/wq/PermitsUnit for more information. Written evidence of
approval shall be submitted to the Department of Planning Services. (Department of
Public Health and Environment)
3. Prior to the issuance of a Certificate of Occupancy:
A. An individual sewage disposal system is required for the proposed office/warehouse
building and shall be installed according to the Weld County Individual Sewage Disposal
Regulations. Written evidence of such shall be submitted to the department of Planning
Services. (Department of Public Health and Environment)
B. The septic system is required to be designed by a Colorado Registered Professional
Engineer according to the Weld County Individual Sewage Disposal Regulations.
(Department of Public Health and Environment)
4. Upon completion of 1. above the applicant shall submit a Mylar plat along with all other
documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office
of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall
be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County
Code. The Mylar plat and additional requirements shall be submitted within thirty (30) days from
the date of the Board of County Commissioners resolution. The applicant shall be responsible for
paying the recording fee. (Department of Planning Services)
5. The Department of Planning Services respectively requests the surveyor provide a digital copy of
this Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation);
acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files
format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable).
This digital file may be sent to maps(caco.weld.co.us. (Department of Planning Services)
6. The Special Review activity shall not occur nor shall any building or electrical permits be issued on
the property until the Special Review plat is ready to be recorded in the office of the Weld County
Clerk and Recorder. (Department of Planning Services)
7. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat
not be recorded within the required sixty(60) days from the date of the Board of County
Commissioner Resolution was signed a $50.00 recording continuance charge shall be added for
each additional 3 month period. (Department of Planning Services)
USR-1598,Rockies Express Pipeline, LLC, page 5
SITE SPECIFIC DEVELOPMENT PLAN
SPECIAL REVIEW PERMIT
DEVELOPMENT STANDARDS
Rockies Express Pipeline, LLC
USR-1598
1. The Request for a Site Specific Development Plan and a Special Review Permit for a Mineral
Resource Development Facility including a Natural Gas Processing Facility in the A (Agricultural)
Zone District, as indicated in the application materials on file and subject to the Development
Standards stated hereon. (Department of Planning Services)
2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld
County Code. (Department of Planning Services)
3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act,
30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that
protects against surface and groundwater contamination. (Department of Public Health and
Environment)
4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those
wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites
and Facilities Act,30-20-100.5,C.R.S.,as amended. (Department of Public Health and Environment)
5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust,
fugitive particulate emissions, blowing debris,and other potential nuisance conditions. (Department
of Public Health and Environment)
6. The applicant shall operate in accordance with the approved"waste handling plan". (Department of
Public Health and Environment)
7. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be
operated in accordance with the approved dust abatement plan at all times. (Department of Public
Health and Environment)
8. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as
delineated in 25-12-103 C.R.S., as amended. (Department of Public Health and Environment)
9. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the facility.
(Department of Public Health and Environment)
10. Sewage disposal for the facility shall be by septic system. Any septic system located on the property
must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal
Systems. (Department of Public Health and Environment)
11. A permanent, adequate water supply shall be provided for drinking and sanitary purposes.
(Department of Public Health and Environment)
12. All potentially hazardous chemicals must be stored and handled in a safe manner in accordance
with product labeling and in a manner that minimizes the release of hazardous air pollutants
(HAP's) and volatile organic compounds (VOC's). (Department of Public Health and
Environment)
13. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado
Department of Public Health and Environment, Water Quality Control Division. (Department of
Public Health and Environment)
USR-1598, Rockies Express Pipeline,LLC, page 6
•
14. The operation shall comply with all applicable rules and regulations of the State and Federal
agencies and the Weld County Code. (Department of Public Health and Environment)
15. The applicant is required to comply with all Colorado Department of Health and Environmental
(CDPHE) regulations regarding berming and spill prevention for materials and liquids stored on
site. (Department of Public Works)
16. The applicant is required to comply with all Colorado Department of Health and Environment,
Water Quality Control Division regulations regarding storm water quality permitting and protection
and construction storm water discharges. (Department of Public Works)
17. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it
will reasonably preserve the natural character of the area and prevent property damage of the
type generally attributed to run-off rate and velocity increases, diversions, concentration and/or
unplanned ponding of storm run-off. The applicant must take into consideration storm water
capture/quantity and provide accordingly for best management practices. (Department of Public
Works)
18. A building permit shall be obtained prior to the construction of buildings or structures including the
office building. (Department of Building Inspection)
19. A plan review is required for each building for which a building permit is required. Plans shall bear
the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are
required when applying for each permit. (Department of Building Inspection)
20. Buildings shall conform to the requirements of the various codes adopted at the time of permit
application. Currently the following has been adopted by Weld County: 2003 International Building
Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International
Fuel Gas Code; and the 2005 National Electrical Code and Chapter 29 of the Weld County Code.
(Department of Building Inspection)
21. The office will require an engineered foundation based on a site-specific geotechnical report or an
open hole inspection performed by a Colorado registered engineer. Engineered foundations shall
be designed by a Colorado registered engineer. (Department of Building Inspection)
22. The structure will probably be classified as B (Office) occupancy. Fire resistance of walls and
openings, construction requirements, maximum building height and allowable areas will be
reviewed at the plan review. Setback and offset distances shall be determined by the Weld
County Code. (Department of Building Inspection)
23. Building height shall be measured in accordance with the 2003 International Building Code for the
purpose of determining the maximum building size and height for various uses and types of
construction and to determine compliance with the Bulk Requirements from Chapter 23 of the
Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld
County Code in order to determine compliance with offset and setback requirements. When
measuring buildings to determine offset and setback requirements, buildings are measured to the
farthest projection from the building. Property lines shall be clearly identified and all property pins
shall be staked prior to the first site inspection. (Department of Building Inspection)
24. Provide letter of approval from Nunn Fire protection District prior to placing of office building.
(Department of Building Inspection)
25. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee
structure of the County Road Impact Fee Program. (Department of Planning Services)
26. Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to
the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee.
(Ordinance 2005-8 Section 5-8-40) (Department of Planning Services)
USR-1598, Rockies Express Pipeline, LLC, page 7
27. The facility operates twenty-four (24) hours a day, seven (7) days a week as stated in the
application materials. (Department of Planning Services)
28. The Cheyenne Station number 905 Facility is limited to four(4)full-time employees as stated in
the application materials. (Department of Planning Services)
29. The property owner or operator shall be responsible for complying with the Design Standards of
Section 23-2-240, Weld County Code. (Department of Planning Services)
30. The property owner or operator shall be responsible for complying with the Operation Standards
of Section 23-2-250, Weld County Code. (Department of Planning Services)
31. Personnel from Weld County Government shall be granted access onto the property at any
reasonable time in order to ensure the activities carried out on the property comply with the
Development Standards stated herein and all applicable Weld County regulations. (Department
of Planning Services)
32. The Special Review area shall be limited to the plans shown hereon and governed by the
foregoing standards and all applicable Weld County regulations. Substantial changes from the
plans or Development Standards as shown or stated shall require the approval of an amendment
of the Permit by the Weld County Board of County Commissioners before such changes from the
plans or Development Standards are permitted. Any other changes shall be filed in the office of
the Department of Planning Services. (Department of Planning Services)
33. The property owner or operator shall be responsible for complying with all of the foregoing
Development Standards. Noncompliance with any of the foregoing Development Standards may
be reason for revocation of the Permit by the Board of County Commissioners. (Department of
Planning Services)
USR-1598, Rockies Express Pipeline,LLC, page 8
DEPARTMENT OF PLANNING SERVICES
6 NORTH OFFICE
\\?:(
918 10TH Street
GREELEY, CO 80631
PHONE: (970) 353-61O0, Ext. 3540
' FAX: (970) 304-6498
WI`Dc.
COLORADO December 12, 2006
Rockies Express Pipeline
370 Van Gordon St
PO Box 281304
Lakewood CO 80228-8304
Subject: USR-1598- Request for a Site Specific Development Plan and Special Review Permit for a
Mineral Resource Development Facility including Natural Gas Processing Facility in the A
(Agricultural)Zone District on a parcel of land described as SE4 of Section 5,T11 N, R66W of the
6th P.M., Weld County, Colorado.
Dear Applicant:
Your application and related materials for the request described above are being processed. I have scheduled
a meeting with the Weld County Planning Commission for March 6,2007, at 1:30 p.m. This meeting will take
place in the Hearing Room, Weld County Planning Department, 918 10`" Street, Greeley, Colorado. It is
recommended that you and/or a representative be in attendance to answer any questions the Planning
Commission members may have.
It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners.
Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all
mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County
Planning Department with written certification indicating the above requirements have been met.
A representative from the Department of Planning Services will be out to the property a minimum of ten days
prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which
identifies the hearing time,date,and location. In the event the property is not adjacent to a publicly maintained
road right-of-way, one sign will be posted in the most prominent place on the property and a second sign
posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way.
The Department of Planning Services' staff will make a recommendation concerning this application to the
Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the
scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office
before the Planning Commission hearing to make arrangements to obtain the recommendation.
If you have any questions concerning this matter, please call.
Respectfully,
Kim Ogl
Planner
MEMORANDUM
TO: Planning Commission
COLORADO DATE: March 6, 2007
FROM: Kim Ogle, Planning Manager
SUBJECT: Addendum to Staff Comments
Rockies Express Pipeline, LLC
USR-1598
Add Item 1.J to read:
The applicant shall submit a subdivision exemption application for review and approval for the
substation facility located in the southwest corner of the property which is associated with the
Mineral Resource Development Facility including Oil and Gas Support and Service (Natural Gas
Processing Facility).
Should the property have transferred through friendly condemnation, show evidence of such by
Deed, as applicable.
Reletter after inserting of this Addendum.
End Memorandum.
-- PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE
THE LAST DAY TO POST THE SIGN IS FEBRUARY 23, 2007 THE SIGN SHALL BE
POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-
OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW
IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE
DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST
PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT
WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED
ROAD RIGHT-OF-WAY.
I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS
POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING
COMMISSIONERS HEARING FORA SITE SPECIFIC DEVELOPMENT PLAN AND SPECIAL
REVIEW PERMIT FOR A MINERAL RESOURCE DEVELOPMENT FACILITY INCLUDING OIL
AND GAS SUPPORT AND SERVICE (NATURAL GAS PROCESSING FACILITY) IN THE A
(AGRICULTURAL) ZONE DISTRICT - USR-1598
KIM OGLE
Name of Person Posting Sign
it
Signat of Person Posting Sign
STATE OF COLORADO )
)ss.
COUNTY OF WELD )
The foregoing instrument was subscribed and sworn to me this /11'day of mach , 2007.
WITNESS my hand and official seal.
WENDI INLOES
(Dai� / TATE OF C0f_0RA
Notary Public
My Commission Expires: L 69, q ow
r
EXHIBIT
1 _Lc_
{ t. w
WING NOTICE IRK
A PUBLIC HEARING CONCERNING
THIS PROPERTY WILL BE HELD AT:
of, is
,c
ON , " ., o . 20•0.0Sa_ „
AI
NAME te_tot � MC AN r__; "_•
„Ls. SAS fFoSING - - _
REQUEST FAUw-r( = --
ACRES '"
- . CASE NO. - _
FOR MORE INFORMATION CALL .F
WELD COUNTY DEPARTMENT OF - '
- PLANNING • - .._
SERVICES AT
(970)353-6100 ext. 3540 M
- "_ 2/ 19/2007
40.,
iliI I .._
L 'v
3 a M.�,a x Ea `
P..,., c>x ¢ x \.
& � +e1 �xp u�Pr-"a�'� t x
'ii t r +>rw f 'i wfi . 1 1 t.i.,k`n 44 v
� ak � �, �4 'emu,
r -� h. 9tt' r ' 4
1„:;,-,;;7,!,,,,,I,--,::',I,.....,a ''• 1rt
.' pp 't t f'
�s 3 3' 1" LL �
F 3 fi A S
NI
6
( "' S>,� 1mj RS y�pqM
O
in,
l4Aft
s,, )1,,
+i9 Y4.
gx }�4E fax
"
0 gait"
"Z eS t,amill'' #M01!1 . : fls " a.�
x i a £
{1s' ` 4. 12 '1"+
Y Z `
if fl � tL� •.
£ A S
y R 21/..,,t;',".4„ h.1,},. L
n�'
44�
e
4 r.,_
4
_I
_ _ - - __- Irv_ . 4 _ ._ life
glit
ni !
Y
Y
3
. ,
\ �-
_ n�' ' i ' .
\\-r ,1\ Y, ' �y - -
1.-
1
�in ill II- _"fin .,, •
n �,a .. C a
-- --- - - 02/ 19/ 2007
02/ 19 /2007
-
it
_
-
_
. 7.:01i;
02/ 19/ 2007
A
/I/ ___ __
_ - .
- - 1 ) +... ia .f- ..
02/ 19 / 2007
02/ 19/ 2007
S
74•
metret 4(
•
•
02/ 19 / 2007
I
via_—r w— .-.... •r— , _
-
r - -
_ _�, ,
02/ 19/ 2007
4.. _ -
FIELD CHECK inspection date: February 19, 2007
APPLICANT: Kinder-Morgan (Rockies Express Pipeline( CASE#: USR-1598
REQUEST:
LEGAL:
LOCATION:
PARCEL ID#: ACRES:
Zonina Land Use
N Agricultural N Kinder Morgan Compressor Facility
E Agricultural E Xcel Energy (Public Service Compressor Station)
S Agricultural S Rangeland
W Agricultural Rangeland Farmground - Feedlot
COMMENTS:
Facility is enclosed with a three strand barb wire on posts for the perimeter. There is a single point of
ingress and egress off of SH 85 a two lane paved road. Good visibility in both directions at point of
access. There is no access onto Section Line Road 132. No improvements were visible to this road.
Entire site is a construction zone, with earthwork, trenching and subsurface exploration occurring.
r
Signature
H - House DV- Derelict Vehicles D - Ditch
O -Outbuilding NCJ - Noncommercial Junkyard
A-Access to property IS - Irrigation Sprinkler
W - Wetlands
MH - Mobile homes OG - Oil and Gas structures
Note any commercial business/commercial vehicles that are operating from the site.
Note if there is a site distance problem with the access
Hello