Loading...
HomeMy WebLinkAbout20070701.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Rockies Express Pipeline Case Number USR-1598 Submitted or Prepared Prior to At Hearing Hearing 1 Staff Comments X Department of Planning Services Field Check Form X Planning Commissioner Ehrlich Field Check Form Letter to Applicant X N Affadavit of sign posting X Legal Notifications X N 2 Application X Maps ' Surrounding Property/ Mineral Owners Utilities 3 Referral List X 4 Referrals without comment X Weld County Sheriff's Office, referral received February 25, 2007 Referrals with comments X 5 Weld County Code Compliance, referral received December 13,2006 Weld County Department of Building Inspection, referral received January 5, 2007 West Greeley Soil Conservation District, referral received January 8, 2007 Colorado Department of Transportation, referral received January 8, 2007 4407 Weld County Department of Public Health and Environment, referral received January 10, 2007 Weld County Department of Public Works, referral received January 15,2007 Farm Service Agency, referral received February 22, 2007 N, PC Exhibits N 6 Sign Posting- Photograph +Affidavit X I hereby certify that the 6 items identified herein were submitted to the,Department of Planning Services at or prior to the cheduled Planning Commissioners hearing. u EXHIBIT Kim OrPtah -r 1- us22007-0701 feet WRD�' LANDSUMMARY S APPLICATION SHEET COLORADO Case Hearing Date: March 6, 2007 Number: USR-1598 Applicant: Rockies Express Pipeline, LLC Address: Tim Atwater 370 Van Gordon Street PO Box 281304 Lakewood CO 80228-8304 Request: Request for a Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility including Oil and Gas Support and Service (Natural Gas Processing Facility) in the A(Agricultural)Zone District Legal Description: Part SE4 of Section 5, T11 N, R66W of the 6th P.M., Weld County, Colorado Location: North of and adjacent to County Road 132 Section Line and West of and adjacent to State Highway 85 Size of Parcel: 25 +/- acres POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services'staff has received responses from the following agencies: • Weld County Code Compliance, referral received December 13, 2006 • Weld County Department of Building Inspection, referral received January 5, 2007 • State of Colorado, Department of Transportation, referral received January 8, 2007 • West Greeley Soil Conservation District, referral received January 8, 2007 • Weld County Department of Public Health and Environment, referral received January 10, 2007 • Weld County Department of Public Works, referral received January 15, 2007 • Weld County Sheriffs Office, referral received February 25, 2007 The Department of Planning Services' staff has not received responses from the following agencies: • Nunn Fire Protection District • State of Colorado, Division of Water Resources • State of Colorado, Division of Wildlife y EXHIBIT USR-1598,Rockies Express Pipeline, LLC, page 1 1! Vi; avoin LAND USE APPLICATION SUMMARY SHEET WUDc. COLORADO Planner: Kim Ogle Case Hearing Date: March 6, 2007 Number: USR-1598 Applicant: Rockies Express Pipeline, LLC Address: Tim Atwater 370 Van Gordon Street PO Box 281304 Lakewood CO 80228-8304 Request: Request for a Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility including Oil and Gas Support and Service (Natural Gas Processing Facility) in the A(Agricultural)Zone District. Legal Description: Part SE4 of Section 5, T11 N, R66W of the 6th P.M., Weld County, Colorado Location: North of and adjacent to County Road 132 Section Line and West of and adjacent to State Highway 85 Size of Parcel: 25 +/- acres Parcel Number: 0203 05 300014 THE DEPARTMENT OF PLANNING SERVICES'STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services'staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-5-100.A(OG.Goal 1. )states "Oil and gas exploration and production should occur in a manner which minimizes the impact to agricultural uses and the environment and reduces the conflicts between mineral development and current and future surface uses." Further,Section 22-5-100.B(OG.Goal.2) states "The extraction of oil and gas resources should conserve the land and minimize the impact on surrounding land." The request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility including a Natural Gas Processing Facility in the A(Agricultural)Zone District is a new USR. B. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural) Zone District. Section 23-3-40.A.2 of the Weld County Code provides for Mineral Resource Development Facility including a Natural Gas Processing Facility in the A(Agricultural)Zone District. USR-1598,Rockies Express Pipeline,LLC, page 2 C. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing surrounding land uses. The property is sited adjacent to State Highway 85 and County Road 132 Section Line.To the north,west and south are dry pasture agricultural lands. To the east are lands owned by Public Service Company of Colorado. There are seven property owners within five hundred feet of this facility. No letters or telephone calls have been recieved in favor of or in opposition to this proposal. D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The proposed site is not within the three mile referral area of any municipality. The application materials state that the improvements consist of a compressor building for three electric compressors; one generator, a supervisory control system a motor control center (MCC) and an office/warehouse building. All improvements are enclosed within a chain link fence with three-strands of barb wire atop. There are currently three other Natural Gas Compressor Stations within 1/4 mile of this site, surrounded by non-irrigated grazing lands. E. Section 23-2-220.A.5--The application complies with Section 23-5 of the Weld County Code. The existing site is not within the Airport, Geologic Hazard or Flood Hazard Overlay Districts. The existing site is within the County Road Impact Fee Area and the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. Effective January 1, 2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11) Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) F. Section 23-2-220.A.6 --The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The lands are presently in the CRP Program and are designated non-prime on the Important Farmlands Map of Weld County dated 1979. G. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based,in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services'staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. The plat shall be amended to delineate the following: 1. The plat shall be prepared per Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 2. All sheets associated with this plat shall be labeled USR-1598. (Department of Planning Services) 3. The attached Development Standards. (Department of Planning Services) USR-1598,Rockies Express Pipeline, LLC, page 3 4. The approved Screening Plan, to address the outdoor storage of materials, associated with this facility shall be screened from adjacent properties, and the public rights-of-way. (Department of Planning Services) 5. The approved Sign Plan. (Department of Planning Services) 6. The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to State Highways.Please contact CDOT to verify the right-of-way of State Highway 85 at County Road 132 vicinity. (CDOT) 7. County Road 132 is designated on the Weld County Road Classification Plan as a Section Line road,with 60 feet of right-of-way both sides of centerline.The applicant shall verify the existing right-of-way and the documents creating the right-of-way. All setbacks shall be measured from the edge of future right-of-way. If the right-of-way cannot be verified, it shall be dedicated. This road is not maintained by Weld County. (Department of Public Works) 8. The applicant shall provide written and graphic evidence that the coordinate North 0+00 on the plat identifying the section where WCR 132 exists. Verification of the south end of the property in conjunction with relationship to the section line needs to be clarified on the plat drawing. Identify the location of this section line on your plat drawing. (Department of Public Works) 9. The applicant shall delineate on the plat the circulation and off-street parking spaces including the access drives. Further, each parking space shall be equipped with wheel guards or curb stops where needed to prevent vehicles from extending beyond the boundaries of the space and from coming into contact with other vehicles,walls, fences or plant materials. (Department of Public Works) 10. The screened trash enclosure for the facility. (Department of Planning Services) 11. A graphic key and or symbol serving to identify each component that is located within the USR Boundary. The key and corresponding component shall be summarized in tabular format and be clearly delineated on the plat. (Department of Planning Services) B. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.)and Emissions Permit application from the Air Pollution Control Division, Colorado Department of Health and Environment to the Department of Public Health and Environment . Written evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) C. The applicant shall submit a dust abatement plan for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. Written evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) D. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1. A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2. A list of the type and volume of chemicals expected to be stored on site. 3. The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). Evidence of such shall be submitted USR-1598, Rockies Express Pipeline,LLC, page 4 in writing to the Weld County Department of Planning Services. (Department of Public Health and Environment) E. Submit written evidence from the State Engineers Office demonstrating that a commercial well has been obtained for this facility. (Department of Planning Services) F. Submit written evidence from the Colorado Department of Transportation demonstrating two approved points of ingress and egress and an access permit onto State Highway 85 has been approved by the Colorado Department of Transportation. (Colorado Department of Transportation, Department of Planning Services) G. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 2. One month prior to construction activities: A. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non-contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wq/PermitsUnit for more information. Written evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) 3. Prior to the issuance of a Certificate of Occupancy: A. An individual sewage disposal system is required for the proposed office/warehouse building and shall be installed according to the Weld County Individual Sewage Disposal Regulations. Written evidence of such shall be submitted to the department of Planning Services. (Department of Public Health and Environment) B. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) 4. Upon completion of 1. above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval. The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty (30) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 5. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are ArcView shapefiles, Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to maps(caco.weld.co.us. (Department of Planning Services) 6. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 7. In accordance with Weld County Code Ordinance 2005-7 approved June 1, 2005, should the plat not be recorded within the required sixty(60) days from the date of the Board of County Commissioner Resolution was signed a $50.00 recording continuance charge shall be added for each additional 3 month period. (Department of Planning Services) USR-1598,Rockies Express Pipeline, LLC, page 5 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS Rockies Express Pipeline, LLC USR-1598 1. The Request for a Site Specific Development Plan and a Special Review Permit for a Mineral Resource Development Facility including a Natural Gas Processing Facility in the A (Agricultural) Zone District, as indicated in the application materials on file and subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act,30-20-100.5,C.R.S.,as amended. (Department of Public Health and Environment) 5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris,and other potential nuisance conditions. (Department of Public Health and Environment) 6. The applicant shall operate in accordance with the approved"waste handling plan". (Department of Public Health and Environment) 7. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. (Department of Public Health and Environment) 8. This facility shall adhere to the maximum permissible noise levels allowed in the Industrial Zone as delineated in 25-12-103 C.R.S., as amended. (Department of Public Health and Environment) 9. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the facility. (Department of Public Health and Environment) 10. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and Environment) 11. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. (Department of Public Health and Environment) 12. All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). (Department of Public Health and Environment) 13. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health and Environment, Water Quality Control Division. (Department of Public Health and Environment) USR-1598, Rockies Express Pipeline,LLC, page 6 • 14. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) 15. The applicant is required to comply with all Colorado Department of Health and Environmental (CDPHE) regulations regarding berming and spill prevention for materials and liquids stored on site. (Department of Public Works) 16. The applicant is required to comply with all Colorado Department of Health and Environment, Water Quality Control Division regulations regarding storm water quality permitting and protection and construction storm water discharges. (Department of Public Works) 17. The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. The applicant must take into consideration storm water capture/quantity and provide accordingly for best management practices. (Department of Public Works) 18. A building permit shall be obtained prior to the construction of buildings or structures including the office building. (Department of Building Inspection) 19. A plan review is required for each building for which a building permit is required. Plans shall bear the wet stamp of a Colorado registered architect or engineer. Two complete sets of plans are required when applying for each permit. (Department of Building Inspection) 20. Buildings shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2003 International Building Code; 2003 International Mechanical Code; 2003 International Plumbing Code; 2003 International Fuel Gas Code; and the 2005 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) 21. The office will require an engineered foundation based on a site-specific geotechnical report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. (Department of Building Inspection) 22. The structure will probably be classified as B (Office) occupancy. Fire resistance of walls and openings, construction requirements, maximum building height and allowable areas will be reviewed at the plan review. Setback and offset distances shall be determined by the Weld County Code. (Department of Building Inspection) 23. Building height shall be measured in accordance with the 2003 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. When measuring buildings to determine offset and setback requirements, buildings are measured to the farthest projection from the building. Property lines shall be clearly identified and all property pins shall be staked prior to the first site inspection. (Department of Building Inspection) 24. Provide letter of approval from Nunn Fire protection District prior to placing of office building. (Department of Building Inspection) 25. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the County Road Impact Fee Program. (Department of Planning Services) 26. Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) (Department of Planning Services) USR-1598, Rockies Express Pipeline, LLC, page 7 27. The facility operates twenty-four (24) hours a day, seven (7) days a week as stated in the application materials. (Department of Planning Services) 28. The Cheyenne Station number 905 Facility is limited to four(4)full-time employees as stated in the application materials. (Department of Planning Services) 29. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. (Department of Planning Services) 30. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. (Department of Planning Services) 31. Personnel from Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 32. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. (Department of Planning Services) 33. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) USR-1598, Rockies Express Pipeline,LLC, page 8 DEPARTMENT OF PLANNING SERVICES 6 NORTH OFFICE \\?:( 918 10TH Street GREELEY, CO 80631 PHONE: (970) 353-61O0, Ext. 3540 ' FAX: (970) 304-6498 WI`Dc. COLORADO December 12, 2006 Rockies Express Pipeline 370 Van Gordon St PO Box 281304 Lakewood CO 80228-8304 Subject: USR-1598- Request for a Site Specific Development Plan and Special Review Permit for a Mineral Resource Development Facility including Natural Gas Processing Facility in the A (Agricultural)Zone District on a parcel of land described as SE4 of Section 5,T11 N, R66W of the 6th P.M., Weld County, Colorado. Dear Applicant: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for March 6,2007, at 1:30 p.m. This meeting will take place in the Hearing Room, Weld County Planning Department, 918 10`" Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute, C.R.S.24-65.5-103 (adopted as part of H.B.01-1088) requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time,date,and location. In the event the property is not adjacent to a publicly maintained road right-of-way, one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services' staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concerning this matter, please call. Respectfully, Kim Ogl Planner MEMORANDUM TO: Planning Commission COLORADO DATE: March 6, 2007 FROM: Kim Ogle, Planning Manager SUBJECT: Addendum to Staff Comments Rockies Express Pipeline, LLC USR-1598 Add Item 1.J to read: The applicant shall submit a subdivision exemption application for review and approval for the substation facility located in the southwest corner of the property which is associated with the Mineral Resource Development Facility including Oil and Gas Support and Service (Natural Gas Processing Facility). Should the property have transferred through friendly condemnation, show evidence of such by Deed, as applicable. Reletter after inserting of this Addendum. End Memorandum. -- PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS FEBRUARY 23, 2007 THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT- OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, KIM OGLE, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE PLANNING COMMISSIONERS HEARING FORA SITE SPECIFIC DEVELOPMENT PLAN AND SPECIAL REVIEW PERMIT FOR A MINERAL RESOURCE DEVELOPMENT FACILITY INCLUDING OIL AND GAS SUPPORT AND SERVICE (NATURAL GAS PROCESSING FACILITY) IN THE A (AGRICULTURAL) ZONE DISTRICT - USR-1598 KIM OGLE Name of Person Posting Sign it Signat of Person Posting Sign STATE OF COLORADO ) )ss. COUNTY OF WELD ) The foregoing instrument was subscribed and sworn to me this /11'day of mach , 2007. WITNESS my hand and official seal. WENDI INLOES (Dai� / TATE OF C0f_0RA Notary Public My Commission Expires: L 69, q ow r EXHIBIT 1 _Lc_ { t. w WING NOTICE IRK A PUBLIC HEARING CONCERNING THIS PROPERTY WILL BE HELD AT: of, is ,c ON , " ., o . 20•0.0Sa_ „ AI NAME te_tot � MC AN r__; "_• „Ls. SAS fFoSING - - _ REQUEST FAUw-r( = -- ACRES '" - . CASE NO. - _ FOR MORE INFORMATION CALL .F WELD COUNTY DEPARTMENT OF - ' - PLANNING • - .._ SERVICES AT (970)353-6100 ext. 3540 M - "_ 2/ 19/2007 40., iliI I .._ L 'v 3 a M.�,a x Ea ` P..,., c>x ¢ x \. & � +e1 �xp u�Pr-"a�'� t x 'ii t r +>rw f 'i wfi . 1 1 t.i.,k`n 44 v � ak � �, �4 'emu, r -� h. 9tt' r ' 4 1„:;,-,;;7,!,,,,,I,--,::',I,.....,a ''• 1rt .' pp 't t f' �s 3 3' 1" LL � F 3 fi A S NI 6 ( "' S>,� 1mj RS y�pqM O in, l4Aft s,, )1,, +i9 Y4. gx }�4E fax " 0 gait" "Z eS t,amill'' #M01!1 . : fls " a.� x i a £ {1s' ` 4. 12 '1"+ Y Z ` if fl � tL� •. £ A S y R 21/..,,t;',".4„ h.1,},. L n�' 44� e 4 r.,_ 4 _I _ _ - - __- Irv_ . 4 _ ._ life glit ni ! Y Y 3 . , \ �- _ n�' ' i ' . \\-r ,1\ Y, ' �y - - 1.- 1 �in ill II- _"fin .,, • n �,a .. C a -- --- - - 02/ 19/ 2007 02/ 19 /2007 - it _ - _ . 7.:01i; 02/ 19/ 2007 A /I/ ___ __ _ - . - - 1 ) +... ia .f- .. 02/ 19 / 2007 02/ 19/ 2007 S 74• metret 4( • • 02/ 19 / 2007 I via_—r w— .-.... •r— , _ - r - - _ _�, , 02/ 19/ 2007 4.. _ - FIELD CHECK inspection date: February 19, 2007 APPLICANT: Kinder-Morgan (Rockies Express Pipeline( CASE#: USR-1598 REQUEST: LEGAL: LOCATION: PARCEL ID#: ACRES: Zonina Land Use N Agricultural N Kinder Morgan Compressor Facility E Agricultural E Xcel Energy (Public Service Compressor Station) S Agricultural S Rangeland W Agricultural Rangeland Farmground - Feedlot COMMENTS: Facility is enclosed with a three strand barb wire on posts for the perimeter. There is a single point of ingress and egress off of SH 85 a two lane paved road. Good visibility in both directions at point of access. There is no access onto Section Line Road 132. No improvements were visible to this road. Entire site is a construction zone, with earthwork, trenching and subsurface exploration occurring. r Signature H - House DV- Derelict Vehicles D - Ditch O -Outbuilding NCJ - Noncommercial Junkyard A-Access to property IS - Irrigation Sprinkler W - Wetlands MH - Mobile homes OG - Oil and Gas structures Note any commercial business/commercial vehicles that are operating from the site. Note if there is a site distance problem with the access Hello