Loading...
HomeMy WebLinkAbout20072521.tiff RESOLUTION RE: GRANT CHANGE OF ZONE,PZ#1130,FROM A(AGRICULTU L)ZON STRICT TO PUD(PLANNED UNIT DEVELOPMENT)ZONE DISTRICT FOR (6)RESI NTIAL LOTS WITH E(ESTATE)ZONE USES-MACKEY CIRCLE PUD-GAR VICKY,B , AND JAMIE MACKEY,AND MICHAEL COHRS WHEREAS,the Board of County Commissioners of ou , orado, ursuant to Colorado statute and the Weld County Home Rul harter, sted wit ority of administering the affairs of Weld County,Colorad nd WHEREAS,a public hearing was hel he 5th day of Septemb 2007,at 10:00 a.m. for the purpose of hearing the application o ary, 'ky,Bryon,and Jamie ackey,6804 Aaron Drive,Fort Collins,Colorado 80524,and hael Coh 29 Poste Viejo Lane,Greeley,Colorado 80634,requesting Change of Zone,P 130,from the Agricultur Zone District to the PUD (Planned Unit Development)Zone District for six(6)resid 'al lot ith E(Estate)Zone uses- Mackey Circle PUD,for a parc of land located on the follows scribed real estate,to-wit: Lot B Recorded Exemption#4589 d Lot A of Record Exemption #2792; bo part of the NW1/4 f Section 6,Township 7 orth,Range 65 West o he 6th P.M.,Weld Cou ,Colorado WHEREA ,at said hea g,Gary Mackey,a licant,was present,and WHERE ,Section 27-6- of the We ounty Code provides standards for review of said Change of ne,and W EREA oard of Count ommissioners heard all the testimony and statements of those esent,studied the request oft applicant and the recommendation of the Weld County Plannin Commission and,having been Ily informed,finds that this request shall be approved for the foil ing reasons: 1. The applicant complied with all the application requirements listed in S tion 27-5-30 of the Weld County Code. e request is i conformance with Section 27-6-120.D as follows: Sectio 27-6-120.D.5.a - The proposal is consistent with any lnterg vernmental Agreement in effect influencing the PUD and Chapter 19 (Coo inated Planning Agreements),Chapter 22(Comprehensive Plan), a r 23(Zoning),Chapter 24(Subdivision)and Chapter 26(Mixed Use De opment)of the Weld County Code.The proposed PUD is not located in an area affected by an Intergovernmental Agreement.Section 22-2-60.C (A.Goal 3)states,"Provide mechanisms for the division of land which is agriculturally zoned. Options for division shall be provided to ensure the continuation of agricultural production and accommodate low intensity development."The proposed six-lot PUD is located on the dry corner of a productive farm. The applicant is proposing to change the zoning to PUD 2007-2521 910, PL1922 C(' k, w, /r', CI-,38'=07 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD- GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 2 (Planned Unit Development)with E (Estate)Zone uses and conform to the regulations in Chapter 23 pertaining to the E (Estate) Zone District. b. Section 27-6-120.D.5.b - The uses which will be allowed in the proposed PUD will conform with the Performance Standards of the PUD Zone District contained in Chapter 27, Article II, of the Weld County Code. The applicant has met all of the Performance Standards, as delineated in Section 27-2-10 of the Weld County Code. The Conditions of Approval will ensure compliance with Sections 27-2-20 through 27-2-210 of the Weld County Code. c. Section 27-6-120.D.5.c-The uses which will be permitted will be compatible with the existing or future development of the surrounding area as permitted by the existing zoning, and with the future development as projected by Chapter 22 of the Weld County Code or master plans of affected municipalities. The proposed site is within the three-mile referral area for the Towns of Ault and Pierce, and neither town has responded with comments regarding the proposed Change of Zone application. In the referrals received in response to the sketch plan, dated October 19, 2006, and October 24, 2006, respectively, both municipalities indicated no conflict with the proposal. d. Section 27-6-120.D.5.d - The PUD Zone District shall be serviced by an adequate water supply and the sewage disposal system in compliance with the Performance Standards in Chapter 27, Article II, of the Weld County Code. The proposed PUD will be serviced by the North Weld County Water District and Individual Sewage Disposal Systems will handle the effluent flow. In the referral dated May 29, 2007, the Department of Public Health and Environment recommended approval of the application. The County Attorney has reviewed, and approved, the draft Water Service Agreement from the North Weld County Water District. e. Section 27-6-120.D.5.e-Street or highway facilities providing access to the property are adequate in functional classification, width, and structural capacity to meet the traffic requirements of the uses of the proposed PUD Zone District. County Road 37 is classified as a local paved road, as stated in the Weld County Department of Public Works referral, dated May 16, 2007, and improvements to County Road 37 are not required. f. Section 27-6-120.D.5.f-An Off-Site Road Improvements Agreement and an On-site Improvements Agreement proposal is in compliance with Chapter 24 of the Weld County Code, and a Road Improvements Agreement is complete and has been submitted, if applicable. Conditions of Approval will ensure the applicant will complete an On-site (Private) Improvements Agreement which addresses all improvements associated with this development, per compliance with Section 24-9-10 of the Weld County 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD - GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 3 Code, prior to recording the final plat. The Improvements Agreement will require the construction of an internal road which will be dedicated to the County but maintained by the Homeowners' Association. g. Section 27-6-120.D.5.g - There has been compliance with the applicable requirements contained in Chapter 23 of the Weld County Code regarding overlay districts, commercial mineral deposits, and soil conditions on the subject site. Parts of the proposed subdivision are encumbered by floodplain, as shown on the FIRM Community Panel Map 080266 0480C. The location of the floodway within the designated floodplain has not been determined, and instead of locating the precise location of the floodway,the applicant has chosen to designate the entire floodplain as a"No-build Zone." In the referral dated June 15, 2006, the Colorado Geological Survey did not indicate the presence of mineral deposits and noted there are no geological conditions that would preclude subdivision; however, the referral noted that the existence of"expansive, collapsible and/or low-strength soils are likely present on-site." h. Section 27-6-120.D.5.h - Consistency exists between the proposed zone district uses, and the Specific Development Guide. The submitted Specific Development Guide accurately reflects the Performance Standards and allowed uses described in the proposed Zone District, as described previously. NOW, THEREFORE, BE IT RESOLVED by the Board of County Commissioners of Weld County, Colorado, that the application of Gary, Vicky, Bryon, and Jamie Mackey, and Michael Cohrs, for Change of Zone, PZ#1130, from the A(Agricultural)Zone District to the PUD(Planned Unit Development) Zone District for six (6) residential lots with E (Estate) Zone uses - Mackey Circle PUD, on the above referenced parcel of land be, and hereby is, granted subject to the following conditions: 1. Prior to recording the Change of Zone plat: A. The plat shall be amended as follows: 1) All sheets of the plat shall be labeled PZ-1130. 2) The plat shall adhere to Section 27-9-20 of the Weld County Code. 3) County Road 37,adjacent to the proposed development,is classified by the County as a local paved road requiring 60 feet of right-of-way. The applicant shall verify the existing right-of-way, and the documents creating the right-of-way shall be noted, labeled, and dimensioned on the Change of Zone plat. If the right-of-way cannot be verified, it shall be dedicated on the final plat. 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD-GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 4 4) Primary and secondary septic envelopes shall be placed on Lot 5. All septic system envelopes must meet all setbacks. 5) Portions of the proposed subdivision lay within a Zone-A Flood Hazard Area, as shown on the Flood Insurance Rate Map, dated September 28, 1982 (FIRM 080266 0480C). All portions of all lots located in the 100-year floodplain shall be designated as "No-build Zones." B. The applicant shall submit to the Department of Planning Services a finalized, executed, and recorded copy of the Water Service Agreement between the applicant and North Weld County Water District for service to the PUD. 2. The Change of Zone is conditional upon the following,and that each shall be placed on the Change of Zone plat as notes prior to recording: A. Change of Zone, PZ#1130, is from the A(Agricultural)Zone District to the PUD (Planned Unit Development) Zone District for six (6) residential lots. The lots will adhere to the uses allowed in the E (Estate) Zone District, except for the allowance of Auxiliary Quarters, as defined by Section 23-1-90 of the Weld County Code. The PUD will be subject to, and governed by, the Conditions of Approval stated hereon and all applicable Weld County regulations. B. All landscaping within the site distance triangles must be less than 3.5 feet in height at maturity. C. A Homeowners'Association shall be established prior to the sale of any lot. Membership in the Association is mandatory for each parcel owner. The Association is responsible for liability insurance, taxes and maintenance of open space, streets, private utilities, and other facilities. Open space restrictions are permanent. D. Water service shall be obtained from the North Weld County Water District. E. This PUD is not served by a municipal sanitary sewer system. Sewage disposal shall be by septic systems designed in accordance with the regulations of the Colorado Department of Public Health and Environment, Water Quality Control Division, and the Weld County Code in effect at the time of construction, repair, replacement, or modification of the system. Septic systems shall be designed for site-specific conditions including, but not limited to, shallow groundwater, bedrock, gravel, and/or clay. F. A Stormwater Discharge Permit may be required for a development/ redevelopment/construction site where a contiguous or non contiguous land 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD-GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 5 disturbance is greater than, or equal to, one acre in area. The applicant shall contact the Water Quality Control Division of the Colorado Department of Public Health and Environment atwww.cdphe.state.co.us/wq/PermitsUnit for more information. G. During development of the site, all land disturbances shall be conducted so that nuisance conditions are not created. If dust emissions create nuisance conditions, at the request of the Weld County Department of Public Health and Environment, a Fugitive Dust Control Plan must be submitted. H. In accordance with the Regulations of the Colorado Air Quality Control Commission,any development that disturbs more than five(5)acres of land must incorporate all available and practical methods that are technologically feasible and economically reasonable, in order to minimize dust emissions. If land development creates more than a 25-acre contiguous disturbance, or exceeds six(6) months in duration, the responsible party shall prepare a Fugitive Dust Control Plan, submit an Air Pollution Emissions Notice, and apply for a permit from the Colorado Department of Public Health and Environment. J. A separate building permit shall be obtained prior to the construction of any building or structure, including any future entryway and/or gates. K. A plan review is required for each building for which a building permit is required. Residential building plans may be required to bear the wet stamp of a Colorado registered architect or engineer. L. Buildings shall conform to the requirements of the codes adopted by Weld County at the time of permit application. Currently, Weld County has adopted the following: 2006 International Residential Code, 2006 International Building Code, 2006 International Mechanical Code, 2006 International Plumbing Code, 2006 International Fuel Gas Code, 2005 National Electrical Code, and Chapter 29 of the Weld County Code. M. Each building will require an engineered foundation based on a site-specific Geotechnical Report or an open hole inspection performed by a Colorado registered engineer. Engineered foundations shall be designed by a Colorado registered engineer. N. Fire resistance of walls and openings,construction requirements, maximum building height, and allowable areas, will be reviewed at the plan review. Setback and offset distances shall be determined by Chapter 23 of the Weld County Code. 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD- GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 6 O. Building height shall be measured in accordance with the applicable Building Code for the purpose of determining the maximum building size and height for various uses and types of construction, and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code, in order to determine compliance with offset and setback requirements. Offset and setback requirements are measured to the farthest projection from the building. Property lines shall be clearly identified, and all property pins shall be staked, prior to the first site inspection. P. Prior to the release of building permits, the applicant shall submit evidence of approval from the Ault Fire Protection District to the Weld County Department of Building Inspection. Q. All signs, including entrance signs, shall require building permits. Signs shall adhere to Chapter 23, Division II, of the Weld County Code. These requirements shall apply to all temporary and permanent signs. R. Effective January 1, 2003, building permits issued on the proposed lots will be required to adhere to the fee structure of the County-Wide Road Impact Fee Program. S. Effective August 1, 2005, building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee Programs. T. Installation of utilities shall comply with Section 24-9-10 of the Weld County Code. U. The property owner shall be responsible for complying with the Performance Standards of Chapter 27, Articles II and VIII, of the Weld County Code. V. Weld County Government personnel shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Conditions of Approval stated herein and all applicable Weld County regulations. W. The site shall comply with all applicable rules and regulations of state and federal agencies, and the Weld County Code. X. No development activity shall commence on the property, nor shall any building permits be issued, until the Final Plan has been approved and recorded. 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD-GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 7 Y. The applicant shall comply with Section 27-8-50 of the Weld County Code, as follows: Failure to submit a Planned Unit Development Final Plan - If a PUD Final Plan application is not submitted within three(3)years of the date of the approval of the PUD Zone District, the Board of County Commissioners shall require the landowner to appear before it and present evidence substantiating that the PUD project has not been abandoned and that the applicant possesses the willingness and ability to continue with the submission of the PUD Final Plan. The Board may extend the date for the submission of the PUD Final Plan application and shall annually require the applicant to demonstrate that the PUD has not been abandoned. If the Board determines that conditions or statements made supporting the original approval of the PUD Zone District have changed, or that the landowner cannot implement the PUD Final Plan, the Board of County Commissioners may, at a public hearing, revoke the PUD Zone District and order the recorded PUD Zone District reverted to the original Zone District. Z. The PUD Final Plan shall comply with all regulations and requirements of Chapter 27 of the Weld County Code. AA. Weld County's Right To Farm Statement, as it appears in the Weld County Code, Appendix 22-E, shall be placed on the plat. 3. The applicant shall submit two(2)paper copies of the plat,for preliminary approval, to the Weld County Department of Planning Services. 4. The Change of Zone plat map shall be submitted to the Department of Planning Services for recording within thirty (30) days of approval by the Board of County Commissioners. Along with the Change of Zone plat map, the applicant shall submit a digital file of all drawings associated with the Change of Zone application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp(Shape Files), Arclnfo Coverages, and Arclnfo Export files format type is .e00. The preferred format for Images is .tif (Group 4). (Group 6 is not acceptable). 5. In accordance with Weld County Code Ordinance#2005-7,approved June 1, 2005, should the plat not be recorded within the required thirty(30)days from the date of the Board of County Commissioners Resolution, a $50.00 recording continuance charge shall be added for each additional three (3) month period. 6. At the time of Final Plan submission: A. The applicant shall submit an On-site Improvements Agreement According to Policy Regarding Collateral with the Final Plan application. This agreement must be reviewed, and approved, by County staff. 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD- GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 8 B. The plat shall indicate the location of the development sign and mailbox. An outlot shall be created so that the sign and mailboxes are located on property owned, and maintained, by the Homeowners' Association. C. The applicant shall submit evidence that the appropriate postal district has reviewed and approved the design of the mailbox pull off. D. The applicant shall name the interior road in accordance with Section 2-13-70 of the Weld County Code, as stated in the Weld County Department of Building Inspection referral, dated May 22, 2007. E. All copies of the Final Plan application shall include a copy of the proposed street name, as indicated in the Weld County Department of Building Inspection referral, dated May 22, 2007. F. The applicant shall submit evidence, to the Department of Planning Services, that the chosen interior street name and addresses have been reviewed by the Weld County Sheriffs Office, the Weld County Paramedic Service, and the appropriate postal district. G. The Department of Public Works received a Preliminary Subsurface Exploration and Geologic Hazards Report, dated August 24, 2006. This report was prepared by Earth Engineering Company, Inc., and is stamped, signed, and dated by Michael Joseph Coley, P.E. #35724. At the time of Final Plan submittal,the Final Subsurface Exploration and Geologic Hazards Report must be delivered to Department of Public Works for review. This report shall be signed, stamped, and dated by a Colorado registered professional engineer. H. The applicant shall submit,with the Final Plan materials, a pavement design for the internal roadway, prepared by a Colorado registered professional engineer. The applicant shall submit, to the Departments of Planning Services and Public Works, three copies of stamped, signed, and dated final plat drawings, and roadway/construction and grading plan drawings, for review and approval, with the Final Plan application. Construction details must be included. J. Stop signs and street name signs will be required at all intersections and shown as a Signing Plan on final roadway plans. The current edition of the Manual on Uniform Traffic Control Devices (MUTCD) shall govern the Signing Plan. 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD- GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 9 K. Easements shall be shown on the final plat, in accordance with County standards and/or recommendations of the Utilities Coordinating Advisory Committee. L. As per the application materials submitted at the Change of Zone, the applicant has agreed to install two fire hydrants at the request of the Ault Fire Protection District. The location and design of these hydrants shall be located on the utility map. Three additional copies (in excess of the 25 required) of the utility map shall be submitted at the Final Plan. M. A Final Drainage Report, stamped, signed, and dated by a Colorado registered professional engineer, shall be submitted with the Final Plan application. The five-year storm and 100-year storm drainage studies shall take into consideration off-site flows both entering and leaving the development. Increased runoff due to development will require detention of the 100-year storm developed condition while releasing the five-year storm existing condition. The engineer will be required to show stormwater (detention) detailed calculations in the sealed Final Drainage Report. The Final Drainage Report shall include a flood hazard review documenting any FEMA defined floodways. The engineer shall reference the specific map panel number, including date. The development site shall be located on the copy of the FIRM Community Panel Map #080266 0408C. N. The applicant must show the proposed detention facility and corresponding easement on the Final Plan materials. The maintenance of the detention pond shall be addressed. O. The applicant shall address all redline comments in the Drainage Report and on the construction plan drawings, as stated in the referral from the Department of Public Works, dated May 16, 2007. P. Portions of the proposed PUD lay in a Zone-A Flood Hazard Area, as shown on the FEMA Flood Insurance Rate Map, dated September 28, 1982(FIRM Community Panel Map #080266 0480C). All portions of all lots located in the 100-year floodplain shall be designated as"No-build Zones"on the final plat. Q. The applicant shall prepare a construction detail for typical lot grading with respect to drainage for the Final Plan application. Front, rear, and side slopes around building envelopes must be addressed. In addition, drainage for rear and side lot line swales shall be considered. Building envelopes must be planned to avoid stormwater flows, while taking into account adjacent drainage mitigation. R. Final drainage construction and erosion control plans (conforming to the Drainage Report) stamped, signed, and dated by a Colorado registered 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD- GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 10 professional engineer, shall be submitted with the Final Plan application. These plans (Stormwater Management Plans) may be based on Urban Drainage methodology. S. The applicant shall address all other issues in the referral from the Department of Public Works, dated May 16, 2007. Evidence that the Department of Public Works' concerns have been addressed shall be provided to the Department of Planning Services. T. The applicant shall submit three (3) copies of the Covenants for Mackey Circle. The Covenants shall be approved by the Weld County Attorney's Office prior to recording the final plat. U. Language for the preservation and/or protection of the absorption field envelopes shall be placed in the development Covenants. The Covenants shall state that activities such as permanent landscaping, structures, dirt mounds, or other items are expressly prohibited in the absorption field site. 7. Prior to recording the final plat: A. The applicant shall submit evidence to the Department of Planning Services that the required School District cash-in-lieu of land dedication fee has been paid, as stated in the referral dated April 16, 2007. B. As stated in the referral from the Department of Public Works, dated May 16, 2007, the applicant shall enter into an Improvements Agreement According to Policy Regarding Collateral for Improvements. The agreement shall be approved by the Board of County Commissioners. C. The applicant shall submit Certificates from the Secretary of State showing the Homeowners' Association has been formed and registered with the State. D. The applicant shall submit the appropriate recording fee ($6.00 for the first page and $5.00 for all others)and a deed which transfers ownership of the outlot(s) to the Homeowners' Association. E. The applicant shall submit finalized copies and the appropriate fee ($6.00 for the first page and $5.00 for each additional page)to the Department of Planning Services for recording the Restrictive Covenants for Mackey Circle in the Office of the Clerk and Recorder. F. The applicant shall submit a digital file of all drawings associated with the Final Plan application. Acceptable CAD formats are .dwg, .dxf, and .dgn (Microstation); acceptable GIS formats are .shp (Shape Files), Arclnfo 2007-2521 PL1922 CHANGE OF ZONE#1130 FROM A(AGRICULTURAL)TO PUD - GARY, VICKY, BRYON, AND JAMIE MACKEY, AND MICHAEL COHRS PAGE 11 Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is .tif(Group 4). Group 6 is not acceptable. G. The applicant shall submit, to the Department of Planning Services, evidence of the granting and recording of any easement deemed necessary by either the County Attorney or the Department of Public Works The above and foregoing Resolution was, on motion duly made and seconded, adopted by the following vote on the 5th day of September, A.D., 2007. BOARD OF COUNTY COMMISSIONERS W�OUNTY��RADO ATTEST: add avid E. Long, Chair Weld County Clerk to th / Pow BY: n,, / William . Jer e Pro-Tern De ty ClerkkJJJto the Board Wi ' F. Garcia,` (� APP E S TO Robert D. Masden my Attorney ouglas ademach r Date of signature: g/3Lf/(07 2007-2521 PL1922 Hello