Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Browse
Search
Address Info: 1150 O Street, P.O. Box 758, Greeley, CO 80632 | Phone:
(970) 400-4225
| Fax: (970) 336-7233 | Email:
egesick@weld.gov
| Official: Esther Gesick -
Clerk to the Board
Privacy Statement and Disclaimer
|
Accessibility and ADA Information
|
Social Media Commenting Policy
Home
My WebLink
About
20070243.tiff
Document A101T" - 1997 Standard Form of Agreement Between Owner and Contractor where the basis of payment is a STIPULATED SUM AGREEMENT made as of the Tenth day of January in the year of Two Thousand Seven (In words, indicate day, month and year) ADDITIONS AND DELETIONS: The author of this document has BETWEEN the Owner: added information needed for its (Name, address and other information) completion.The author may also have revised the text of the original Weld County Government AIA standard form.An Additions and 915 10h Street Deletions Report that notes added PO Box 758 information as well as revisions to Greeley,CO 80632 the standard form text is available from the author and should be reviewed.A vertical line in the left margin of this document indicates and the Contractor: where the author has added (Name, address and other information) necessary information and where the author has added to or deleted from the original AIA text. Sun Construction&Design Services,Inc. 1232 Boston Avenue This document has important legal Longmont,CO 80501 consequences. Consultation with an attorney is encouraged with respect to its completion or modification. The Project is: AIA Document A201-1997,General (Name and location) Conditions of the Contract for Weld County Courts Phase III Construction,is adopted in this document by reference. Do not use with other general conditions unless this document is modified. The Architect is: (Name, address and other information) This document has been approved and endorsed by The Associated General Contractors of America. Bley Associates,Architects 5312 W.9th St Drive Suite 150 Greeley,CO 80634 The Owner and Contractor agree as follows. AIA Document A101^r—1997.Copyright©1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977. 1987,1991 and 1997 by The American Init. Institute of Architects. All rights reserved. WARNING:This AIA°` Document is protected by U.9.Copyright Law and International Treaties. Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:46:05 on 01/08/2007 under Order (:-.412(' . � No.1000222309_1 which expires on 2/14/2007,and is not for resale. rt L'.4 User Notes: (, 2007-0243 R (e l I3`I I�?bC•7 2007-0243 ARTICLE 1 THE CONTRACT DOCUMENTS The Contract Documents consist of this Agreement,Conditions of the Contract(General,Supplementary and other Conditions),Drawings,Specifications,Addenda issued prior to execution of this Agreement,other documents listed in this Agreement and Modifications issued after execution of this Agreement;these form the Contract,and are as fully a part of the Contract as if attached to this Agreement or repeated herein. The Contract represents the entire and integrated agreement between the parties hereto and supersedes prior negotiations,representations or agreements,either written or oral.An enumeration of the Contract Documents,other than Modifications,appears in Article 8. ARTICLE 2 THE WORK OF THIS CONTRACT The Contractor shall fully execute the Work described in the Contract Documents,except to the extent specifically indicated in the Contract Documents to be the responsibility of others. ARTICLE 3 DATE OF COMMENCEMENT AND SUBSTANTIAL COMPLETION §3.1 The date of commencement of the Work shall be the date of this Agreement unless a different date is stated below or provision is made for the date to be fixed in a notice to proceed issued by the Owner. (Insert the date of commencement if it differs from the date of this Agreement or, if applicable, state that the date will be fixed in a notice to proceed.) January 29,2007 If,prior to the commencement of the Work,the Owner requires time to file mortgages,mechanic's liens and other security interests,the Owner's time requirement shall be as follows: §3.2 The Contract Time shall be measured from the date of commencement. §3.3 The Contractor shall achieve Substantial Completion of the entire Work not later than 138 days from the date of commencement,or as follows: (Insert number of calendar days.Alternatively, a calendar date may be used when coordinated with the date of commencement. Unless stated elsewhere in the Contract Documents, insert any requirements for earlier Substantial Completion of certain portions of the Work) Portion of Work Substantial Completion Date ,subject to adjustments of this Contract Time as provided in the Contract Documents. (Insert provisions, if any,for liquidated damages relating to failure to complete on time or for bonus payments for early completion of the Work) ARTICLE 4 CONTRACT SUM §4.1 The Owner shall pay the Contractor the Contract Sum in current funds for the Contractor's performance of the Contract.The Contract Sum shall be Four Hundred Fifty-four Thousand Five Hundred Dollars and Zero Cents ($ 454,500.00),subject to additions and deductions as provided in the Contract Documents. §4.2 The Contract Sum is based upon the following alternates,if any,which are described in the Contract Documents and are hereby accepted by the Owner: (State the numbers or other identification of accepted alternates. If decisions on other alternates are to be made by the Owner subsequent to the execution of this Agreement, attach a schedule of such other alternates showing the amount for each and the date when that amount expires) Init. ALA Document A101^r-1997.Copyright O 1915,1918,1925,1937,1951,1958,1961,1983,1967,1974,1977,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING:This AlA® Document is protected by U.S.Copyright Law and International Treaties. 2 Unauthorized reproduction or distribution of this AIA®Document,or any portion of It,may result in severe civil and criminal penalties,and will be / prosecuted to the maximum extent possible under the taw. This document was produced by AIA software at 13:46:05 on 01/08/2007 under Order No.1000222309_1 which expires on 2/14/2007,and is not for resale. User Notes: (3208960458) §4.3 Unit prices,if any,are as follows: Description Units Price($0.00) N/A ARTICLE 5 PAYMENTS §5.1 PROGRESS PAYMENTS §5.1.1 Based upon Applications for Payment submitted to the Architect by the Contractor and Certificates for Payment issued by the Architect,the Owner shall make progress payments on account of the Contract Sum to the Contractor as provided below and elsewhere in the Contract Documents. §5.1.2 The period covered by each Application for Payment shall be one calendar month ending on the last day of the month,or as follows: §5.1.3 Provided that an Application for Payment is received by the Architect not later than the first day of a month,the Owner shall make payment to the Contractor not later than the Fifteen dayof the same month.If an Application for Payment is received by the Architect after the application date fixed above,payment shall be made by the Owner not later than Fifteen ( 15 )days after the Architect receives the Application for Payment. §5.1.4 Each Application for Payment shall be based on the most recent schedule of values submitted by the Contractor in accordance with the Contract Documents.The schedule of values shall allocate the entire Contract Sum among the various portions of the Work.The schedule of values shall be prepared in such form and supported by such data to substantiate its accuracy as the Architect may require. This schedule,unless objected to by the Architect,shall be used as a basis for reviewing the Contractor's Applications for Payment. §5.1.5 Applications for Payment shall indicate the percentage of completion of each portion of the Work as of the end of the period covered by the Application for Payment. §5.1.6 Subject to other provisions of the Contract Documents,the amount of each progress payment shall be computed as follows: .1 Take that portion of the Contract Sum properly allocable to completed Work as determined by multiplying the percentage completion of each portion of the Work by the share of the Contract Sum allocated to that portion of the Work in the schedule of values,less retainage of Ten percent 10.00%).Pending final determination of cost to the Owner of changes in the Work,amounts not in dispute shall be included as provided in Section 7.3.8 of AIA Document A201-1997; .2 Add that portion of the Contract Sum properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the completed construction(or,if approved in advance by the Owner,suitably stored off the site at a location agreed upon in writing),less retainage of Ten percent ( 10.00%); .3 Subtract the aggregate of previous payments made by the Owner;and .4 Subtract amounts,if any,for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of AIA Document A201-1997. §5.1.7 The progress payment amount determined in accordance with Section 5.1.6 shall be further modified under the following circumstances: .1 Add,upon Substantial Completion of the Work,a sum sufficient to increase the total payments to the full amount of the Contract Sum,less such amounts as the Architect shall determine for incomplete Work,retainage applicable to such work and unsettled claims;and Intl AIA Document A101Te—1997.Copyright m 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991 and 1997 by The American Institute of Architects. All rights reserved. WARNING:This AIA®Document is protected by U.S.Copyright Law and International Treaties. 3 Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:46:05 on 01/08/2007 under Order No.1000222309_I which expires on 2/14/2007,and is not for resale. User Notes: (3208960458) (Section 9.8.5 of AlA Document A201-1997 requires release of applicable retainage upon Substantial Completion of Work with consent of surety, if any.) .2 Add,if final completion of the Work is thereafter materially delayed through no fault of the Contractor,any additional amounts payable in accordance with Section 9.10.3 of AIA Document A201-1997. §5.1.8 Reduction or limitation of retainage,if any,shall be as follows: (1f it is intended,prior to Substantial Completion of the entire Work, to reduce or limit the retainage resulting from the percentages inserted in Sections 5.1.6.1 and 5.1.6.2 above, and this is not explained elsewhere in the Contract Documents, insert here provisions for such reduction or limitation.) Reduction to Five Percent(5%)upon completion of 50%of project. §5.1.9 Except with the Owner's prior approval,the Contractor shall not make advance payments to suppliers for materials or equipment which have not been delivered and stored at the site. §5.2 FINAL PAYMENT §5.2.1 Final payment,constituting the entire unpaid balance of the Contract Sum,shall be made by the Owner to the Contractor when: .1 the Contractor has fully performed the Contract except for the Contractor's responsibility to correct Work as provided in Section 12.2.2 of AIA Document A201-1997,and to satisfy other requirements, if any,which extend beyond final payment;and .2 a final Certificate for Payment has been issued by the Architect. §5.2.2 The Owner's final payment to the Contractor shall be made no later than 30 days after the issuance of the Architect's final Certificate for Payment,or as follows: ARTICLE 6 TERMINATION OR SUSPENSION §6.1 The Contract may be terminated by the Owner or the Contractor as provided in Article 14 of AIA Document A201-1997. §6.2 The Work may be suspended by the Owner as provided in Article 14 of MA Document A201-1997. ARTICLE 7 MISCELLANEOUS PROVISIONS §7.1 Where reference is made in this Agreement to a provision of AIA Document A201-1997 or another Contract Document,the reference refers to that provision as amended or supplemented by other provisions of the Contract Documents. §7.2 Payments due and unpaid under the Contract shall bear interest from the date payment is due at the rate stated below,or in the absence thereof,at the legal rate prevailing from time to time at the place where the Project is located. (Insert rate of interest agreed upon, if any.) ( )per annum (Usury laws and requirements under the Federal Truth in Lending Act, similar state and local consumer credit laws and other regulations at the Owner's and Contractor's principal places of business, the location of the Project and elsewhere may affect the validity of this provision. Legal advice should be obtained with respect to deletions or modifications,and also regarding requirements such as written disclosures or waivers.) §7.3 The Owner's representative is: (Name, address and other information) AIA Document A101^r-1997.Copyright O 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991 and 1997 by The American hit. Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by US.Copyright Law and International Treaties. 4 Unauthorized reproduction or distribution of this AlA" Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:46:05 on 01/08/2007 under Order No.1000222309_1 which expires on 2/14/2007,and is not for resale. User Notes: (3208960458) Pat Persichino 915 10th Street PO Box 758 Greeley,CO 80632 970-3564000 ext 4234 §7.4 The Contractor's representative is: (Name, address and other information) David Bode 1232 Boston Avenue Longmont,CO 80501 970-667-0452 §7.5 Neither the Owner's nor the Contractor's representative shall be changed without ten days written notice to the other party. §7.6 Other provisions: None ARTICLE 8 ENUMERATION OF CONTRACT DOCUMENTS §8.1 The Contract Documents,except for Modifications issued after execution of this Agreement,are enumerated as follows: §8.1.1 The Agreement is this executed 1997 edition of the Standard Form of Agreement Between Owner and Contractor,AIA Document A101-1997. §8.1.2 The General Conditions are the 1997 edition of the General Conditions of the Contract for Construction,AIA Document A201-1997. §8.1.3 The Supplementary and other Conditions of the Contract are those contained in the Project Manual dated ,and are as follows Document Title Pages AIA A201 1987 Edition Section General Conditions of the 1-24,01010: Page I 01010 Contract for Constrcution Summary of Work §8.1.4 The Specifications are those contained in the Project Manual dated as in Section 8.1.3,and are as follows: (Either list the Specifications here or refer to an exhibit attached to this Agreement.) Title of Specifications exhibit: (Rows deleted) §8.1.5 The Drawings are as follows,and are dated November 14,2006 unless a different date is shown below: (Either list the Drawings here or refer to an exhibit attached to this Agreement.) Title of Drawings exhibit:T1.0,SI.0,A0.1,A1.0,A1.l,A1.2,A3.0,A4.0,A6.0,M0.1,M1.0,M2.0,M2.1,M3.0, ED-1,E-I,E-2,E-3,EM-1,FA-1,EC-1 (Rows deleted) §8.1.6 The Addenda, if any,are as follows: AIA Document A101 Ts-1997.Copyright m 1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991 and 1997 by The American Init. Institute of Architects. All rights reserved. WARNING:This AIA® Document is protected by U.S.Copyright Law and International Treaties. 5 Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AA software at 13:46:05 on 01/08/2007 under Order No.1000222309_1 which expires on 2/14/2007,and is not for resale. User Notes: (3208960458) Number Date Pages No.One 11/21/2006 Two pages,Including specification sections 08700 and 07412 No.Two 11/29/2006 Three pages,including modifications of Construction Documents AD2.0,AD2.1, AD2.2 No.Three 12/6/2006 Two pages,including modifications of sketch numbers AD3.0 and AD3.1 No.Four 12/8/2006 Two pages of modifications to Construction Documents No.Five 12/12/2006 Two pages of modifications to Construction Documents Portions of Addenda relating to bidding requirements are not part of the Contract Documents unless the bidding requirements are also enumerated in this Article 8. §8.1.7 Other documents,if any,forming part of the Contract Documents are as follows: (List here any additional documents that are intended to form part of the Contract Documents.AIA Document A201- 1997 provides that bidding requirements such as advertisement or invitation to bid, Instructions to Bidders, sample forms and the Contractor's bid are not part of the Contract Documents unless enumerated in this Agreement. They should be listed here only if intended to be part of the Contract Documents.) Specifications Book Dated 2007 This Agreement is entered into as of the day and year first written above and is executed in at least three original copies,of which one is to be delivered to the Contractor,one to the Architect for use in the administration of the C6nt�ct,and the remai der to the Owner. OWNER(Signature) JAN 2 4 jIA/ CONTRA azure) Weld County Government I David Bode,Project Manager David E.Long Sun Construction&Design Services,Inc. Chair Board of County Commissioners Weld County,Colorado (Printed name and title) (Printed name and title) ATTEST: �0k4/4 Eft WELD COUNTY CLERK TO TN -O■■``r" r !66 *f� O 419 DEPUTY C.. :c, iU l—i!L ri ATTESTING TO BOARD OF COUNTY COMMISSIONER S,G;i;1"iORES ONLY AIA Document A101^r—1997.Copyright ®1915,1918,1925,1937,1951,1958,1961,1963,1967,1974,1977,1987,1991 and 1997 by The American init. Institute of Architects. MI rights reserved. WARNING:This AIA® Document is protected by US.Copyright Law and International Treaties. 6 Unauthorized reproduction or distribution of this AIA®Document,or any portion of it,may result in severe civil and criminal penalties,and will be prosecuted to the maximum extent possible under the law. This document was produced by AIA software at 13:46:05 on 01/08/2007 under Order No.1000222309_1 which expires on 2/14/2007,and is not for resale. User Notes: (3208960458) �j
Hello