Loading...
HomeMy WebLinkAbout20071528.tiff 06-DEC-2006 09:28 FROM-COOT GREELEY TRAF +9703502258 T-445 P.001/001 F-954 rt,), Weld County Referral VI I November 20, 2006 e�t�t C. � tl COLORADO • NOV 27 zoos cDoussignmaraggsa The Weld County Department of Planning Services has received the following item for review: Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as . a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A(Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7,T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan f 1 We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: -\tsv `& 'kit r3 e yc I C\evs ncik whccPlnt \rtNs,.f \Vhtaue++v0I . (C 'S-C- 'Q6w ‘00,V* .\t \ t1 - 'CS`te ^ \\+ l ceilVANy, Signature rue. ' \at- (aucvM ' Date \NeI(o16r, Agency C l EXHIBIT +Weld County Planning Dept. 24209 CR 24.5,Longmont,CO.80504 4172016524210 ekL87.6.(720165 2007-1528 latd 5cap._ 6 *se; 4444-Nn, Weld County Referral illip November 20, 2006 e COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A (Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7, T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 AWe have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature Date .oj-.W b Agency L l- A N w l N EJ •:•Weld County Planning Dept. ❖4209 CR 24.5, Longmont, CO. 80504 +(720)652-4210 ext.8730 +(720)652-4211 fax MEMORANDUM TO: Michelle Martin Planner II COLORADO DATE: December 4, 2006 FROM: Kim Ogle, Planning Manager SUBJECT: Gib Smith USR-1591, Gib Smith Trucking Inc. Gib Smith, Applicant Landscape Referral Property Research indicates that this parcel is presently completing a Recorded Exemption to divide the property, Case number RE-4015. All future correspondence should reflect this revised Legal Description, including and not limited to the USR Plat. The Department of Planning Services reviewed the above referenced Use by Special Review documentation and drawings and offers the following comments: The Use by Special Review Plat shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. In addition to these requirements, the plat scale shall be 1" = 40 feet. The Vicinity Map scale of 1" = 2000 feet scale accurately be delineated on the plat. This application shall be in compliance with Section 23-3-250 A. and B and is address in the following comments. Section 23-3-250.A.1 Stormwater Management. All users of land shall provide and maintain stormwater retention facilities designed to retain the stormwater runoff in excess of historic flow from the developed site. The stormwater retention facility on a developed site shall be designed for a one-hundred- year storm. The stormwater retention facility shall be designed and operated to release the retained water at a quantity and rate not to exceed the quantity and rate of a five-year storm falling on the undeveloped site. The application materials do not specifically address this issue, stating "due to a slight incline of the parcel, the stormwater will drain naturally to the bar ditch along the County Road as it has been." The applicant shall contact the Storm Water Engineering Staff of the Weld County Department of Public Works, to further discuss this issue. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.2 Parking. Sufficient screened, off-street, paved parking areas shall be provided to meet the requirements of employees, company vehicles, visitors and customers of the Uses Allowed by Right and Accessory Uses. Appendix 23-A describes the design requirements for parking spaces and Appendix 23-B delineates the number of parking spaces required by use for this property. USR-1591,Gib Smith Trucking page 1 The proposed facility is comprised of one structure and a storage [cargo] container with no future structures planned as stated in the application materials. Per the application materials, Building I is a single story metal skinned 60x100 square foot structure serving as the shop with unknown associated activities. Additional information should be requested addressing the use of this structure. The application materials state there are five employees and up to 30 persons who may access the site for the Outdoor Vehicular Storage Facility. The parking requirement for this facility is as follows: Building I is classified as a warehouse having 6000 SF. The warehouse component is calculated as one space for every 1000 SF of floor area. Total having parking required for Building I is 6 parking spaces as outlined in Appendix 23-B. The Outdoor Vehicular Storage Facility component should have a minimum of thirty spaces for parked vehicles and a minimum of 10 parking spaces for Leasee's and an additional five spaces dedicated to the five tractor trailers associated with the Trucking business. Total parking as delineated in the Weld County Code for this facility is 51 parking spaces. Should the employee or the Outdoor Vehicular Storage Facility Leasee numbers increase, the parking requirement shall be structured according to Appendix 23-B of the County Code. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.3 Street Access. Lots shall have safe access to an approved public or private street. The design designation of any street or highway as to type shall be in conformance with that shown on the county thoroughfare plan and/or the master plan of the affected municipality. Visual inspection of the USR Plat identifies one point of ingress and egress, onto CR 22.5. The internal circulation is unclear, additional information shall be submitted delineating the internal circulation pattern and the proposed parking areas associated with this facility. Further, the applicant shall delineate on the plat the proposed parking layout, including adequate aisles, and wheel stops. Written evidence of compliance from the Department of Public Works, the Fire Protection District and associated emergency responder personnel shall be submitted to the Department of Planning Services. The Fire District of record may require a second point of ingress and egress for this facility, including, potentially the upgrade and maintenance of County Road 22.5 right-of-way. All approved access roads shall be graded and drained to provide all weather access. Accesses shall be placed in such a location as to have adequate sight distance in both directions, shall not be placed below the crest of a hill or where physical obstructions are present. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.4 Required Yards - Setback No use or accessory use may be located closer than twenty (20) feet to the existing or proposed (whichever represents the greater right-of-way width) highway or street right-of-way. Off-street parking areas may be permitted in the required setback area when the area is screened from direct view of persons on the public rights-of-way. Fences over six (6) feet in height are not required to comply with the minimum setback and may be located on the property line. Fences located on corner lots abutting public right-of-way shall not obstruct the view of vehicular traffic USR-1591,Gib Smith Trucking page 2 at an intersection. There was not a scaled elevational drawing of the proposed facility, therefore, prior to the release of building permits, the set back shall be verified given the existing proposed site conditions, specifically addressing the landscape and screening component that is delineated within the County Road 22.5 right-of-way. Further, evidence that the storage [cargo] container meets the required setbacks is required from CR 25.5. Written evidence of compliance shall be submitted to the Department of Planning Services. Further, the applicant shall submit evidence that the proposed facility is in complete compliance with all known rights-of-way, fencing requirements and other associated improvements that may be required for this facility. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.4 Required Yards - Offset No use or accessory use may be located closer than ten (10) feet to its lot line. Off-street parking areas may be permitted in the required offset area when the area is screened from adjacent lots zoned R-1, R-2, R-3, R-4 or R-5. Fences over six (6) feet in height are not required to comply with the minimum Offset and may be located on the property line. The plans submitted with the application materials have not delineated the offset, and the dimensions are unknown and do not clearly appear to be in compliance with the County Code. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.5.A Required Landscaped Areas No more than eighty-five percent (85%) of the total area of a lot shall be covered. Land shall not be deemed covered if it is used for growing grass, shrubs, trees, plants or flowers or if covered by decorative gravel or wood chips, or if it is otherwise suitably Landscaped. There was not a schematic Landscape and Screening Plan submitted with the application materials. It is also unclear from the submitted drawings if the fifteen (15) percent landscaped requirement has been met. The applicant shall address this issue and provide additional documentation including all proposed fencing, lighting, adjacent property screening and landscape treatment to meet this section of the Weld County Code. Further, Staff will require an approved weed management plan and a reseeding /post construction plan to facilitate soil stabilization and plant material growth. Moreover, staff will require an update Landscape and Screening Plan that addresses the issue of the screening component for the buffer between adjacent properties and public rights-of-way. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.5.B That portion of a lot which abuts a public or private street right-of-way shall be landscaped for a distance of ten (10) feet, measured at a right angle from the lot line towards the interior of the lot. Driveways may pass through the required landscaped areas. There was not a schematic Landscape and Screening Plan submitted with the application materials. Additional information is required prior to accepting the plat for recording. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.6 Areas used for trash collection shall be screened from public rights-of-way and all adjacent USR-1591,Gib Smith Trucking page 3 properties. These areas shall be designed and used in a manner that will prevent wind- or animal-scattered trash. The application materials did not identify the location of the dumpster on the plat. Future submittals shall address this issue as outlined in this Section of the Code. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.7 Water Supply. Uses shall have an adequate source of potable water. The application materials state that water is provided via a Domestic well, Permit number unknown. Given this is a commercial operation and Commercial Well is required unless waived by Planning Services or the Department of Public Health and Environment. The applicant shall meet the requirements of the Weld County Department of Public Health and Environment at all times. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.8 Sewage Disposal. Uses shall have adequate sewage disposal facilities. The application materials state that individual sewage disposal systems (ISDS) will handle the effluent flow. Further, the applicant shall meet the requirements of the Weld County Department of Public Health and Environment. Written evidence of compliance shall be submitted to the Department of Planning Services. Section 23-3-250.A.9 Outside Storage. Uses involving outdoor storage of vehicles, (including the parking of employee vehicles) equipment or materials when permitted shall be screened from public rights-of-way and all adjacent properties. The applicant shall submit documentation as to how the outside storage will be screened during the construction period, and for periods thereafter. Section 23-3-350.B. Operation Standards. Uses shall demonstrate conformance with the following operation standards to the extent that they are affected by location, layout and design prior to construction and operation. Further, the applicant shall submit to the Department of Planning Services written evidence of compliance with all Department of Building Inspection regulations. Section 23-3-350.B.1 Noise. Uses and structures shall be located, designed and operated in accordance with the noise standards as established in Section 25-12-101 C.R.S. The applicant shall meet the established standards set by the Weld County Department of Public Health and Environment. Section 23-3-250.6-2 Air Quality. Uses shall be located, designed and operated in accordance with the air quality standards established by the Colorado Air Pollution Control Commission. The applicant shall meet the established standards set by the Weld County Department of Public Health and Environment. Section 23-2-250.6.3 Water Quality. Uses shall be located, designed and operated in accordance with the water quality control standards established by the Colorado Water Quality Control Commission. Section 23-2-250.6.4 USR-1591,Gib Smith Trucking page 4 Radiation and Radioactive Materials. The handling, use, storage and processing of radioactive materials shall be in accordance with the applicable regulations of the State and the United States government The application materials do not indicate this is applicable, should this not be the case, the applicant shall provide additional information to the Weld County Department of Public Health and Environment. Section 23-2-250.6.5 Heat. Uses shall not emit heat in such an amount sufficient to raise the temperature of the air or of materials at or beyond the Lot line more than five (5) degrees Fahrenheit. The application materials do not indicate this is applicable, should this not be the case, the applicant shall provide additional information to the Weld County Department of Public Health and Environment and the Department of Building Inspection. Further, the applicant shall obtain a written approval from the jurisdictional Fire Protection District stating that the facility is in compliance with the Fire Code. Section 23-2-250.6.6 Light. Any lighting, including light from high temperature processes such as welding or combustion, shall be designed, located and operated in such as manner as to meet the following standards: sources of light shall be shielded so that beams or rays of light will not shine directly onto adjacent properties; neither the direct nor reflected light from any light source may create a traffic hazard to operators of motor vehicles on public or private streets; and no colored lights may be used which may be confused with or construed as traffic control devices. The application materials did not include a Lighting Plan. Should exterior lighting be a part of this facility, all light standards shall be delineated on the USR Plat. Section 23-2-250.B.7 Property Maintenance. Property shall be maintained in such a manner that grasses and weeds are not permitted to grow taller than twelve (12) inches. In no event shall the property owners allow the growth of noxious weeds. The application materials do not address property maintenance. Future correspondence shall identify how the property will be in compliance with this Section of the County Code. Section 23-4-50. Off Street Loading. The applicant shall delineate on the plat the location of the loading zone that is in compliance with this Section of the Code. There shall be parking or staging of trucks within the public rights-of way. Further, the applicant shall meet all requirements of the Department of Public Works concerning access and internal circulation of vehicles for this proposed facility. Section 23-4-90 Signs. The application materials did not address the issue of on-site signs. The applicant shall provide written evidence that all proposed signs are in compliance with this section of the Code. The applicant shall enter into an Improvements Agreement according to policy regarding collateral for improvements and post adequate collateral for all transportation (access drive, parking areas, etcetera) and non-transportation (plant materials, fencing, screening, et cetera). The agreement and form of collateral shall be reviewed by County Staff and accepted by the Board of County Commissioners prior to recording the USR plat. End Memorandum. USR-1591,Gib Smith Trucking page 5 Apyttio{ 10i 75---.....1PRD ,._______ Weld County Referral November 20, 2006 ' T1, e ll ii Li NOV 2 2 273 ,U COLORADO I WELD COUNTY PUBLIC WORKS DEPT The Weld County Department of Planning Services has received the following item for review: Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A(Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7, T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. --- Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: Signature d1,.//// Date /4J, /—6/_ Agency C�2 .(44 .....a l lI ❖Weld County Planning Dept. +4209 CR 24.5, Longmont,CO. 80504 •'x(720)652-4210 ext.8730 ❖(720)652-4211 fax Weld County Planning Department \tHMEMORANDUM Min E OFFICE 6 2006 TO: Michelle Martin, Planning Services DA "1[� ,78C�,Y06FF D FROM: Donald Carroll, Engineering Administrator 0 SUBJECT: USR-1591, Gib Smith V COLORADO The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of the Use by Special Review Standards, Weld County Code, Chapter 23, Article II, Division 4; Section 23. Our comments and requirements are as follows: COMMENTS: Weld County Road Classification Plan (FHU): (June 2002) WCR 22.5 and 25.5 are local gravel roads and requires a 60-foot right-of-way at full build out. There is presently a 60-foot right-of-way. These roads are maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Zoning Ordinance (23-1-90), the required setback is measured from the future right-of-way line. ,,..The Colorado Department of Transportation (CDOT) has jurisdiction over all accesses to the state highways. lease contact Gloria Hice-Idler at the Greeley office to verify the access permit or for any additional requirements that may be needed to obtain or upgrade the permit. (U S Highway 85) REQUIREMENTS: U. S. Highway 85 Access Control Plan: The applicant shall contact Gloria Idler to verify the access permit for any additional requirements that may be necessary for obtaining or upgrading the permit to provide additional traffic utilizing U.S. Highway 85 to the proposed USR facility. Verification to Planning Services and Public Works is required. The applicant indicating access to the proposed USR is from WCR 22.5. Utilize this access point for the residential/USR facility. Off-Street Parking: The off-street parking spaces including the access drive shall be surfaced with gravel, recycled asphalt or the equivalent and shall be graded to prevent drainage problems. The employee and customer parking is adjacent to the shop area. The applicant needs to conform to all Standards of the Americans with Disability Act (ADA) requirement. Parking and Circulation: The applicant needs to indicate on the plat drawing parking spaces adequate circulation to accommodate trucks, trailers, equipment, RV storage. Utilize the existing agricultural, oil and gas, and ditch roads that are necessary for your agricultural operation. 'ursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. lichelle Martin, Planning Services USR-1591, Gib Smith December 4, 2006 Page 2 Storm Water Drainage: The historical flow patterns and run-off amounts will be maintained on site in such a manner that it will reasonably preserve the natural character of the area and prevent property damage of the type generally attributed to run-off rate and velocity increases, diversions, concentration and/or unplanned ponding of storm run-off. The applicant must take into consideration storm water capture/quantity and provide accordingly for best management practices. This area is not in the FEMA Flood Zones. Setbacks/Right-f-Way: If it is required that the applicant shall fence or screen the USR site, it shall be within their property and not in County right-of-way. Setbacks are measured from the present or future right-of-way line. pc: USR-1591 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1591.DOC ia t:t Weld County Referral Weld County Plannin m' n„ _ B Department wilgC November 20, 2006 'i ST BUILDING L)jr� 1 � 2006 COLORADOrIi/ED The Weld County Department of Planning Services has received the following item for review: • Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A(Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7, T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review-process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ yVe have reviewed the request and find no conflicts with our interests. See attached letter. Comments: 7Signature Date / 1,—(3, Zco,(c, Agency Pt-4- L.4i,r,>� ti Weld County Planning Dept. +4209 CR 24.5, Longmont,CO.80504 ❖(720)652-4210 ext.8730 +(720)652-4211 fax Wnld rnnnty PlaRntag DG),Gitnicnt cr^i "vArco BUILDING All\ili'1 UEL 1 5 2006 TOWN OF PLATTEVILLE Town Manager's Office c .,: ciVED 400 Grand Avenue Platteville, Colorado 80651 970.785.2245-303.776.1117-970.785.2476 (f) nmeier@plattevillegov.org December 13, 2006 Ms. Michelle Martin, Planner WELD COUNTY DEPARTMENT OF PLANNING SERVICES 4209 Weld County Road 24.5 Longmont, Colorado 80504 RE: Weld County Referral USR-1591 Dear Ms. Martin: The Platteville Planning and Zoning Commission ("Commission") conducted its meeting on Tuesday, December 12, 2006 and considered the aforementioned Referral. The applicant was notified of the meeting, but did not attend. The Commission decided to attach a letter to the Referral in order to more clearly articulate the views of the Town. The Town does have some issue with the Use by Special Review. More specifically, the Commission was concerned with the response to Question 5d of the Site Specific Development P/an and Use by Special Review Questionnaire as follows: 5d. What type and how many structures will be erected (built) on this site? Response: There will not be any new structures built on this site at this time. There is currently one pre-existing metal building (60x100) being used as a shop building. May build a house. It is the opinion of the Commission that if the commercial/industrial oriented use is to be granted, the applicant should not be allowed to build a house on the subject property. Essentially, the Commission would recommend the applicant choose between a residential or commercial/industrial use and not a hybrid which is being contemplated via the above-referenced response; and be more specific with regard for future use. If you have any questions or concerns, please do not hesitate to contact me. ry truly y urs r ,— Nichols J. Meier, Town anager xc: Mr. Paul Renck, Planning Commission Chairman ibeth rctp, ,..... Weld County Referral I County Planning DepartmedNovember 20, 2006 �• GREELEY OFFICE COLORADO NOV 21 Z0006((� The Weld County Department of I�Cli lsEDeceived the following item for review: Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A(Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7, T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. ttit See attached letter. Comments: c)\.9(UL. U'A aktisttUo ^ Signature � Date is-g_ur Agency 1�`(�1 Ct`e $i IYYJ_ +Weld County Planning Dept. +4209 CR 24.5, Longmont,CO.80504 •(720)652-4210 ext.8730 4•(720)6524211 fax MEMORANDUM WUDc. COLORADO To: Michelle Martin, Planner II December 4, 2006 From: Bethany Salzman, Zoning Compliance Officer II Subject: USR-1591 Referral Upon review of my case files and computer, an active Zoning Violation (VI-0600412)was noted. This violation was initiated due to the presence of multiple pieces of Commercial equipment and vehicles without the necessary Weld County Zoning Permits. This case has not been presented to the Board of County Commissioners through the Violation Hearing process. This application if approved by the Board of County Commissioners will correct the violation. If this application is denied, please ask the Board of County Commissioners to refer this case to the County Attorney's Office, but to delay legal action for 30 (thirty) days in order to give them adequate time to ensure that all commercial equipment and vehicles have been removed from the property. SERVICE,TEAMWORK,INTEGRITY,QUALITY STATE OF COLORADO OFFICE OF THE STATE ENGINEER welrl c lan^:ing Department " •e Division of Water Resources BUILDING Department of Natural Resources 1313 Sherman Street,Room 818 DEL 0 6 2006 ': • • Denver,Colorado 80203 'r016 Phone(303)866-3581 r FAX(303)866-3589 a ".,;, ,. Y ® Bill Owens www.water.state.c ,us November 27, 2006 Governor Michelle Martin Russell George Weld County Planning Dept. Executive Director Hal D.Simpson,P.E. 4209 CR 24.5 State Engineer Longmont, CO 80504 Re: USR-1591 - Site specific development plan and special review permit for a use permitted as a use by right, an accessory use or a use by special review in the commercial or industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the agricultural zone district Dear Ms. Martin: This referral does not appear to qualify as a "subdivision" as defined in Section 30- 28-101(10)(a), C.R.S. Therefore, pursuant to the State Engineer's March 4, 2005 memorandum to county planning directors, this office will only perform a cursory review of the referral information and provide comments. The comments do not address the adequacy of the water supply plan for this project or the ability of the water supply plan to satisfy any County regulations or requirements. In addition, the comments provided herein cannot be used to guarantee a viable water supply plan or infrastructure, the issuance of a well permit, or the physical availability of water. According to the submitted information, an existing well will be used to meet the water requirements at the site. The records available in the State Engineer's Office show that the applicant has constructed a well under permit no. 255953. That well is permitted for ordinary household purposes inside one single family dwelling, the watering of domestic animals, and the irrigation of not more than 1 acre of home gardens and lawns. Prior to using the existing well for the uses proposed in the referral, the well must be repermitted. The applicant filed a well permit application on November 17, 2006 to repermit the existing well for industrial, commercial, domestic, irrigation and livestock watering purposes. That well permit application has not yet been evaluated by the State Engineer's Office. Should you have any questions in this matter, please contact Joanna Williams of this office. Sincerely, •' Of Key' G. Rein, P.E. lef of Water Supply KGR/JMW Weld County Planning Department SOUTHbVFST BUILDING 0 NOV 2 S 2006 Weld County RerareAVED • November 20, 2006 wily C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A(Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7, T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan a We have reviewed the request and find no conflicts with our interests. ❑ See attached letter. Comments: r /k4 Signature tt. Date f l 21 wo Agency ' " S ��JJJ +Weld County Planning Dept. •'x4209 CR 24.5, Longmont, CO.80504 t(720)652-4210 ext.8730 +(720)652-4211 fax Robox Weld County Referral III D November 20, 2006 C. • COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Gib Smith Case Number USR-1591 Please Reply By December 19, 2006 Planner Michelle Martin Project Site Specific Development Plan and Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage for trucks, trailers, recreational vehicles, boats and equipment) in the A(Agricultural)Zone District. Legal Part E2 of the NE4 of Section 7, T2N, R66W of the 6th P.M., Weld County, Colorado. Location North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. Weld County Planning Commission Hearing (if applicable) February 20, 2007 ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan ❑ We have reviewed the request and find no conflicts with our interests. >&See attached letter. Comments: Signature ea Date Agency +Weld County Planning Dept. ❖4209 CR 24.5, Longmont,CO.80504 ❖(720)652-4210 ext.8730 :•(720)652-4211 fax a DEPARTMENT OF PLANNING SERVICES Weld County Administrative Offices 4209 CR CO Longmont CO 80504 Phone(720) 652-4210 Ext 8736 WEBSITE: www.co.weld.co.us 1111 C. COLORADO December13, 2006 Applicant: Gib Smith Case Number USR-1591 Project: Site Specific Development Plan and a Special Review Permit for a Use Permitted as a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial zone districts (outdoor storage, vehicles and equipment) in the A (Agricultural) Zone District. Legal: Part E2 of the NE4 of Section 7, T2N, R66W of the 6Ih PM, Weld County, Colorado. Location: North of and adjacent to CR 22.5 and east of and adjacent to CR 25.5. Parcel Number 1309 07 100032 There is a Violation; VI-0600412 (Issued), and one permit for this parcel. Permit; BCS-040111 is for a structural steel building, (final). Prior to the start of any construction, alterations, or change of occupancy; 1 A building permit application must be completed and hno complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report preformed by a registered State of Colorado engineer shall be required. 2 A plan review must be approved and a permit must be issued prior to the start of construction. 3 Setback and offset distances shall be determined by the 2003 International Building Codes and Chapter 23 of the Weld County Code (Offset and setback distances we measured from the farthest projection from the structure). 4 Buildings located within a 100 year flood plane require a Flood Hazard Development Plan. 5 A letter from the Fire District to ascertain if a permit is required. Please contact me for any further information regarding this project. Sincerely, Robert Powell Building Plans Examiner Service,Teamwork,Integrity,Quality Weld County Planning Department GREELEY OFFICE DEC 1 8 2006 MEMORANDUM riyVED TO: MICHELLE MARTIN,PLANNING SERVICES FROM: CHARLOTTE DAVIS, ENVIRONMENTAL HEALTH Cp C. DATE: 11/2 06 SUBJECT:USR-1591 GIB SMITH COLORADO CC: Environmental Health Services has reviewed this proposal for outdoor storage for trucks, trailers, RV's, boats & equipment. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirements be met prior to allowing the plat to be recorded: 1. The applicant shall submit a dust abatement plan for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. 2. The applicant shall submit evidence to the Department of Planning Services, from the Colorado Division of Water Resources, demonstrating that the well is appropriately permitted for the commercial use. 3. The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site (this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). We recommend that the following requirements be incorporated into the permit as conditions that must be met one month prior to construction activities: 1. A stormwater discharge permit may be required for a development/redevelopment /construction site where a contiguous or non- contiguous land disturbance is greater than or equal to one acre in area. Contact the Water Quality Control Division of the Colorado Department of Public Health and the Environment at www.cdphe.state.co.us/wp/PermitsUnit for more information. We recommend that the following requirements be incorporated into the permit as conditions that must be met prior to the issuance of the Certificate of Occupancy: 1. An individual sewage disposal system is required for the metal shop building and shall be installed according to the Weld County Individual Sewage Disposal Regulations. 2. The septic system is required to be designed by a Colorado Registered Professional Engineer according to the Weld County Individual Sewage Disposal Regulations. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. 4. The applicant shall operate in accordance with the approved "waste handling plan". 5. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. 2 6. This facility shall adhere to the maximum permissible noise levels allowed in the Commercial Zone as delineated in 25-12-103 C.R.S., as amended. 7. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the site. 8. Sewage disposal for the metal building shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. 9. A permanent, adequate water supply shall be provided for drinking and sanitary purposes. 10.If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 11.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. 3 Hello