Loading...
HomeMy WebLinkAbout20073958.tiff Weld County Planning Department GREELEY OFFICE . MAR 0 8 2007 • PUBLIC WORKS DEPARTMENT RECEIVED 1111H P.O. BOX 758 GREELEY, COLORADO 80632 WEBSITE: WWW.CO.WELD.CO.US PHONE: (970) 356-4000,EXT. 3750 C. FAX: (970) 304-6497 COLORADO • March 7, 2007 ®p lie Mary Barstow Manager,White Wolf LLC 1719 East Mulberry Fort Collins, CO 80524 • Re: Erosion control measures for Waterford Hill PUD (PF-1095) Dear Mr. Barstow: Weld County:Public Works Department has received a copy of your-facsimile to Pamela Bailey' dated March 2, 2007, regarding erosion control at Waterford Hills Planned Unit..Development (Weld Co. Case No. PF-1095). In this facsimile, a request was made to abandon:the erosion,' control material previously planned for drainage swales at this site. The Board of County Commissioners (BOCC) of Weld County, Colorado, approved the Final Plan for Waterford Hill PUD on August 9, 2006. Weld County Public Works received three (3) copies of the final construction drawings•stamped, signed, and dated by a registered P.E. licensed to practice in the State of Colorado. These plans were approved on September 7, 2006. The final approved plan set includes permanent erosion protection for all internal drainage swales at Waterford Hill PUD. These swales have longitudinal slopes ranging from .0.75% to nearly 6.0%, with anticipated.100-year flow velocities and shear stresses that exceed permissible limits for bare soil and dryland seeded areas. In these September 2006 construction drawings, KBN Engineers proposed permanent erosion protection for all internal swales that included a turf reinforcement mat (TRM) from North American Green, specifically identified as product SC250. When installed per manufacturer recommendations, this product will provide sufficient 100-year erosion protection for all swales internal to Waterford Hills PUD. , Weld County Public Works does not agree with the March 2, 2007 facsimile statements that the combination of ripping, seeding, straw mulch crimping, erosion bales, and erosion logs in the proposed drainage swales will provide adequate long-term erosion protection for a 100-year design storm event. These methods are appropriate for short-term, construction-phase erosion control only. Per the conditions of the BOCC approval of Final Plans, install the SC250 TRM as shown on the approved KBN construction plans. Page 1 of 2 5 M:IPLANNING-DEVELOPMENT REVIEWlIRnal Plat(PF,MF,MJF)1PF-1095 Waterford Hill PUDIPF-1095 Design Change Denied.doc 2 0O-7 -3 q I 1 'PL1Q2l _rt., i "^er ` '� ��-A1"�,'`4 9y'C��r fi Public Works is available to answer any questions pertaining to Waterford Hill PUD during regular business hours. Sincerely, Brian K. Varrella, P.E., CFM Weld County Public Works 1111 H Street P.O. Box 758 Greeley, CO 80632-0758 Cc: Michael C. Ketterling, P.E., KBN Engineers, LLC Chris Gathman, Planning Services Kim Ogle, Planning Services U Richard Hastings, Public Works :• _Tracy Dyer, Public Works • • Page 2 of 2 M:IPLANNING-DEVELOPMENT REVIEW l3-Final Plat(PE.MF,MJF)PF•1095 Waterford Hill PUDIPF-1095 Design Change Denied.doc `v 42 Hello