Loading...
HomeMy WebLinkAbout20071872.tiff INVENTORY OF ITEMS FOR CONSIDERATION Applicant Paul and Michael Hungenberg do Case Number AmUSR-646 Petroleum Development Corporation (PDC) Submitted or Prepared Prior to At Hearing Hearing \/. 1 Staff Comments X Department of Planning Services Field Check Form X Planning Commissioner Field Check Form X Letter to Applicant X Affidavit of sign posting X Legal Notifications X ' 2 Application X Maps X Deed/Easement Certificate X Surrounding Property/ Mineral Owners X Utilities n/a 3 Referral List X Referrals without comment X Weld County Planning Department Landscape, referral received 4/2/2007 West Greeley Soil Conservation District, referral received 4/9/2007 N 4 Referrals with comments X Weld County Department of Public Health and Environment, referral received 5/8/2007 Greeley-Weld County Airport, referral received 4/27/2007 Weld County Sheriff's Department, referral received 4/30/2007 Weld County Zoning Compliance, referral received 4/5/2007 Weld County Department of Building Inspection, referral received 4/28/2007 Weld County Department of Public Works, referral received 5/9/2007 5 Surrounding Property Owners- Letters X 6 PC Exhibits X a. Memorandum Regarding Violation Information X I hereby certify that the items identified herein were submitted to the Department of Planning Services at or prior to the scheduled Planning Commissioners hearing. Hannah L Hippely fi P n er EXHIBIT EX 2007-1872 ' V r err gOt4; Wi`DC. LAND USE APPLICATION SUMMARY SHEET COLORADO Case Number: AmUSR-646 Hearing Date: June 5, 2007 Applicant: Paul and Michael Hungenburg c/o Petroleum Development Corporation Address: 3801 Carson Avenue, Evans, CO 80620 Request: A Site Specific Development Plan and Special Review Permit for an Oil and Gas Production Facility (continuing permitted oil and gas production facilities and an additional 2 oil and gas wells & 1 additional tank battery facility) in the R-1 (Low- Density Residential)Zone District. Legal Description: Part of Section 32 and Section 33, Township 6 North, Range 65 West of the 6th P.M., Weld County, Colorado Location: East of and adjacent to 1st Avenue (CR 41) and 0.75 miles south of"O" Street(CR 64) Size of Parcel: +/- 160 acres (area covered by AmUSR) POSSIBLE ISSUES SUMMARIZED FROM APPLICATION MATERIALS The criteria for review of this Special Review Permit is listed in Section 23-2-220 of the Weld County Code. The Department of Planning Services' staff has received responses from the following agencies: • Weld County Department of Public Health and Environment, referral received 5/8/2007 • Weld County Department of Public Works, referral received 5/9/2007 • Weld County Department of Building Inspection, referral received 4/28/2007 • Weld County Planning Department Landscape, referral received 4/2/2007 • Weld County Zoning Compliance, referral received 4/5/2007 • Weld County Sheriff's Department, referral received 4/30/2007 • West Greeley Soil Conservation District, referral received 4/9/2007 • Greeley-Weld County Airport, referral received 4/27/2007 Referrals have not been received from the following Agencies: • Colorado Oil & Gas Commission • Colorado Division of Wildlife • Eaton Fire Protection District • City of Greeley $y EXHIBIT AmUSR-646, Hungenburg c/o PDC, Page 1 of 6 71 �- \\ SPECIAL REVIEW PERMIT KADMINISTRATIVE REVIEW WIUc. COLORADO Planner: H. Hippely Case Number: AmUSR-646 Hearing Date: June 5, 2007 Applicant: Paul and Michael Hungenburg c/o Petroleum Development Corporation Address: 3801 Carson Avenue, Evans, CO 80620 Request: A Site Specific Development Plan and Special Review Permit for an Oil and Gas Production Facility (continuing permitted oil and gas production facilities and an additional 2 oil and gas wells & 1 additional tank battery facility) in the R-1 (Low- Density Residential)Zone District. Legal Description: Part of Section 32 and Section 33, Township 6 North, Range 65 West of the 6th P.M., Weld County, Colorado Location: East of and adjacent to 1st Avenue(CR 41)and 0.75 miles south of"O"Street(CR 64) Parcel Size: +/- 160 acres (area covered by AmUSR)Parcel Number: 0803 33 000010 THE DEPARTMENT OF PLANNING SERVICES' STAFF RECOMMENDS THAT THIS REQUEST BE APPROVED FOR THE FOLLOWING REASONS: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Department of Planning Services'staff that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: a. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-5-80.B (CM.Goal 2) states, "Promote the reasonable and orderly development of mineral resources". The proposal will have little impact on the surrounding area or subject properties. The property where the new facilities are located is currently under agricultural production and is without any structures. The permit for the USR-646 was obtained in 1984 by RA Resources. This amendment is necessary to permit the additional wells and tank battery facility that have recently been added to the property. The property owner has reached an agreement with the facility operator regarding the surface use of the property. b. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural) Zone District. Section 23-3-110.D of the Weld County Code provides for oil or gas production facilities as a Use by Special Review in the R-1 (Low Density Residential)Zone District. c. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing surrounding land uses. The use is located on vacant agricultural land. Existing single-family residences are located to the west of the site. AmUSR-646, Hungenburg c/o PDC, Page 2 of 6 d. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of the Weld County Code and any other applicable code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is located within the 3-mile referral area for the City of Greeley. The City of Greeley did not respond to the referral request. e. Section 23-2-220.A.5--The application complies with Section 23-5 of the Weld County Code. The site is affected by both the Weld County-Greeley Airport and FEMA FIRM panel map 080266 0628C, the applicant is compliant in regards to both overlay districts. Effective January 1, 2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11) Effective August 1, 2005, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) f. Section 23-2-220.A.6 --The applicant has demonstrated a diligent effort to conserve prime agricultural land in the locational decision for the proposed use. The site is located on land designated as"prime",however the wellheads and surface tank battery facility occupy a small portion of the site and will not prevent agricultural production on the site. g. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. •— This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services'staff recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. The plat shall be amended to delineate the following: 1) All sheets of the plat shall be labeled AmUSR-646. (Department of Planning Services) 2) County Road 41 (15`Avenue) is a local paved road that requires 60-feet of right-of- way at full build out. There is presently 60-feet of right-of-way. The applicant shall verify the existing right-of-way and the documents creating the right-of-way shall be noted on the plat. All setbacks shall be measured from the edge of future county road right-of-way. (Department of Public Works) 3) The plat shall show the entire area covered by this permit and shall be prepared in accordance with Section 23-2-260.D of the Weld County Code. (Department of Planning Services) 4) All existing wellheads and tank battery facilities shall be clearly shown on the plat. (Department of Planning Services) AmUSR-646, Hungenburg do PDC, Page 3 of 6 B. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application from the Air Pollution Control Division,Colorado Department of Health and Environment. A deferment of 45 days for this requirement will be allowed to give the applicant time to file their first production report. Alternately, the applicant can provide evidence from the APCD that they are not subject to these requirements. Evidence that this information has been received and approved by the Health Department shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) C. The applicant shall submit a dust abatement plan to the Weld County Department of Public Health and Environment. Written evidence of Health Department approval shall be provided to the Department of Planning Services. (Department of Public Health & Environment) D. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 2. Upon completion of 1.above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval.The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty(30) days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review. Acceptable CAD formats are.dwg, .dxf,and .dgn(Microstation); acceptable GIS formats are ArcView shapefiles,Arclnfo Coverages and Arclnfo Export files format type is .e00. The preferred format for Images is.tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to maps(a.co.weld.co.us. (Department of Planning Services) 4. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) 5. In accordance with Weld County Code Ordinance 2005-7 approved June 1,2005, should the plat not be recorded within the required sixty(60)days from the date the Administrative Review was signed a $50.00 recording continuance charge may be added for each additional 3 month period.(Department of Planning Services) AmUSR-646, Hungenburg do PDC, Page 4 of 6 SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT Paul and Michael Hungenburg do Petroleum Development Corporation DEVELOPMENT STANDARDS AM USR-646 1. A Site Specific Development Plan and a Special Review Permit for an Oil and Gas production facility (continuing permitted oil and gas production facilities and an additional 2 oil and gas wells & 1 additional tank battery facility) in the R-1 (Low Density Residential) Zone District subject to the Development Standards stated hereon. 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. The existing access directly across from 'F' Street shall be used. (Department of Public Works) 4. The applicant and/or operator shall operate in accordance with Emergency Response and Fire Protection Plan as approved by the Eaton Fire Protection District.(Department of Planning Services) 5. The easement shall be a graded or drained to provide all-weather access. (Department of Public Works) 6. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5,C.R.S.)shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 7. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S. (Department of Public Health and Environment) 8. Waste materials shall be handled,stored and disposed in a manner that controls fugitive dust,fugitive particulate emissions, blowing debris, and other nuisance conditions. (Department of Public Health and Environment) 9. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The facility shall be operated in accordance with the approved dust abatement plan at all times. (Department of Public Health and Environment) 10. Adequate toilet facilities (port-a-potty)shall be provided during drilling/construction. (Department of Public Health and Environment) 11. The operation shall comply with all applicable State noise statutes and/or regulations. (Department of Public Health and Environment) 12. If applicable,the applicant shall obtain a stormwater discharge permit from the Colorado Department of Health and Environment, Water Quality Control Division. (Department of Public Health and Environment) 13. All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants(HAP's)and volatile organic compounds (VOC's). (Department of Public Health and Environment) 14. Bottled water shall be provided for employees for drinking and hand washing during drilling/construction. (Department of Public Health and Environment) 15. Effective January 1, 2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11) AmUSR-646, Hungenburg do PDC, Page 5 of 6 16. A building permit shall be obtained prior to the construction or placement of oil and gas equipment on the site. (Department of Building Inspection) 17. Effective August 1, 2005, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) (Department of Planning Services) 18. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. 19. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. 20. Weld County personnel shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. 21. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 22. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. 23. The property owner or operator shall comply with all applicable rules and regulations of State and Federal agencies, including but not limited to the Colorado Oil and Gas Conservation Commission rules and regulations, and the Weld County Code. AmUSR-646, Hungenburg c/o PDC, Page 6 of 6 DEPARTMENT OF PLANNING SERVICES 1� a NORTH OFFICE 918 10TH Street GREELEY, CO 80631 PHONE: (970) 353-6100, Ext. 3540 FAX: (970)304-6498 WADe. COLORADO April 4, 2007 Paul& Michael Hungenberg c/o Petroleum Development Corporation 3801 Carson Av Evans CO 80620 Subject: AmUSR-646- Request for a Site Specific Development Plan and Special Review Permit for an Oil and Gas Production Facility (continuing permitted oil and gas production facilities and an additional 2 oil and gas wells& 1 additional tank battery facility)in the R-1 (Low-Density Residential)Zone District on a parcel of land described as Portions of Section 32 and 33,T6N, R65W of the 6th P.M.,Weld County, Colorado. Dear Applicants: Your application and related materials for the request described above are being processed. I have scheduled a meeting with the Weld County Planning Commission for June 5,2007, at 1:30 p.m. This meeting will take place in the Hearing Room, Weld County Planning Department, 918 10th Street, Greeley, Colorado. It is recommended that you and/or a representative be in attendance to answer any questions the Planning Commission members may have. It is the applicant's responsibility to comply with state statutes regarding notice to mineral estate owners. Colorado Revised Statute,C.R.S.24-65.5-103(adopted as part of H.B.01-1088)requires notification of all mineral estate owners 30 days prior to any public hearing. The applicant shall provide the Weld County Planning Department with written certification indicating the above requirements have been met. It is the policy of Weld County to refer an application to any town or municipality lying within three miles of the property or if the property is located within the comprehensive planning area of a town or municipality. Therefore,our office has forwarded a copy of the submitted materials to the Greeley Planning Commission for their review and comments. Please call Greeley at 970-350-9770 for further details regarding the date,time, and place of this meeting. It is recommended that you and/ora representative be in attendance at the Greeley Planning Commission meeting to answer any questions the Commission members may have with respect to your application. A representative from the Department of Planning Services will be out to the property a minimum of ten days prior to the hearing to post a sign adjacent to and visible from a publicly maintained road right-of-way which identifies the hearing time, date, and location. In the event the property is not adjacent to a publicly maintained road right-of-way,one sign will be posted in the most prominent place on the property and a second sign posted at the point at which the driveway (access drive) intersects a publicly maintained road right-of-way. The Department of Planning Services'staff will make a recommendation concerning this application to the Weld County Planning Commission. This recommendation will be available twenty-four(24)hours before the scheduled hearing. It is the responsibility of the applicant to call the Department of Planning Services'office before the Planning Commission hearing to make arrangements to obtain the recommendation. If you have any questions concernin this matter, please call. Resp cff ly, Ha nah Hipp y Planner PLANNING COMMISSIONERS' SIGN POSTING CERTIFICATE THE LAST DAY TO POST THE SIGN IS 05/26/07 THE SIGN SHALL BE POSTED ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT- OF-WAY. IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY (ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY. I, Hannah L Hippely , HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE BOARD OF COMMISSIONERS HEARING FOR a Site Specific Development Plan and Special Review Permit for an Oil and Gas Production Facility(continuing permitted oil and gas production facilities and an additional 2 oil and gas wells & 1 additional tank battery facility) in the R-1 (Low- Density Residential)Zone District. —AMUSR-646. Hannah L Hippely Name of Person Posting Sign Signature o Person Posting .ign STATE OF COLORADO ) ss. COUNTY OF WELD ) The foregoing instrument was subscribed and sworn to me th(� day of /V/O�l , 2007. WITNESS my hand and official seal. 4 .. «o.-rs•6s.r-4.s.+I WENDI INLOES NOTARY 9:iBLIC STATE OF COLORADO otary Public My Commission Expires: L CJ Y, _ . +....... . _ .� _. _. . ' . �I____ t - ___ Alt r4 - _ S,.< r* __ _ . Y • r.R. ten . l�tE ttd�• \ Y �.�V. .i 1 �`7. Yr ,- -trci - a t. - ems •- l�G lit . �•� _""'] 4 _ Y �14)�{� s •1c64141 T _ 6t ' t -` • .fi - ',r ' � , _ ` ]�. am • f )M W N fi '. 6L. ' SIIIIIIIIIIIII- ---_ - ,,, -- - lilac NOTICE wise. - . _ - C060NA CO..f�NAOl. _ se. - A PUBLIC HEARING CONCERNING =-- _- - - - THIS PROPERTY WILL BE HELD AT : - - M . 7- - _ 9/8 /Q 41'4 5rZe-k, Cawley CO S _�.� :. ON JV �� Cj'� , 2O �"� AT l moo -=. - -:------_--:.-j--- - NAME �IV U �� c/o Poe- - A 59F 1 a-'.c soi> -cc.-- oil and ' `�-- .' ': RE Q U E S �arw /i lsas !n -the. 2 r tlo. t Ate'. .--_--- IQiablTtf�: l� 2vi� _.:, cr--+� ''-: CASE NO . /tam1l� - tet-t [i 5F7 ' ! ACRES - -ti.-.' FOR MORE INFORMATION CALL • - - - s`ir- WELD COUNTY DEPARTMENT OF , iz,.�-.- 't ,�,a PLANNING SERVICES AT ititl ter-:= ( 970 ) 353 - 6100 ext . 3540 �`„t.-- '"' r t \..:g .. - ""-s-"' r 05 / 23 / 2007 ;.'...4.:. 0 �. f - rCa " .e uz t- - - 4 ..C c.C: ---irtinsigt -]r t b; + _ ' '-tit .e • " .• `$'J I Dw " N' A _ _ r "11"1111111111111.1.4 - _ • _ � __ _ - x'23/2007 ., ,. v r. 4. , i ' - i. '. • i •. �• .� %. .1 ?e0 ar , - .i �r ~raft,. s ,_ r1 I --v\ - : alas - rf - - r } ..:.c.�s9 sr r • ' _ ,p . 232007 �,- _ . _ - �.^.'- y g ll.ili i. • _ '• I '. •• •\ _ .• • • • r; : . < 05/23/2007 c • 7 • 05/23 / 2007 _-_ - nip C IIMB•• 05/23% ,a _ z r --- :. V sti. d 05/23/ 2007 .; .r . .1.�Y ri , J •�f -r s.....-. am .F�`�+ t' .y aW i ! 05/23/ 2007 FIELD CHECK CASE NUMBER: AmUSR-646 DATE OF INSPECTION: 02-3A)7 APPLICANT'S NAME: Paul & Michael Hungenberg do Petroleum Development Corporation (PDC) PLANNER: Hannah Hippely REQUEST: A Site Specific Development Plan and Special Review Permit for an Oil and Gas Production Facility(continuing permitted oil and gas production facilities and an additional 2 oil and gas wells & 1 additional tank battery facility) in the R-1 (Low-Density Residential)Zone District. LEGAL DESCRIPTION: Portions of Section 32 and 33, T6N, R65W of the 6th P.M., Weld County, Colorado. LOCATION: East of and adjacent to 1st Avenue (CR 41)and .75 miles South of 0 Street (CR 64). LAND USE: N ^. E 45I s S. i� FaAmAli ?\,C1J4 w ZONING: N A (Agricultural) E A(Agricultural) S A(Agricultural) W A(Agricultural) COMMENTS: J ett 5 LU.Jff�,,t' LL SiM �al -T7f -k -bagel � n 'a' e cv..d r)T -L_ �'jrnpk 1-2 P.C. Member FIELD CHECK Inspection Date: APPLICANT: Paul and Michael Hungenberg do Petroleum Development Corporation (PDC) CASE#: AmUSR-646 REQUEST: A Site Specific Development Plan and Special Review Permit for an Oil and Gas Production Facility (continuing permitted oil and gas production facilities and an additional 2 oil and gas wells & 1 additional tank battery facility)in the R-1 (Low-Density Residential)Zone District. LEGAL: Portions of Sections 32 and 33, Township 6 North, Range 65 West of the 6th P.M., Weld County, CO. LOCATION: East of and adjacent to 1st Avenue(CR 41)and .75 miles South of O Street(CR 64). PARCEL ID#:0803 33 000010 ACRES: 58 +/- Zoning Land Use N R-1 N E R-1 E 11 S R-1 S �o�ec- .¢.n-il al W R-1/I-3 W 1 ( teyt r -1-t4--Q, Comments: \A (SVI. 5l cxl l o ovtlit 91411 ci" (vIo\r frtA 14\-- Hannah Hip ely, PI ner o House(s) o Derelict Vehicles o Outbuilding(s) ❑ Non-commercial junkyard (list components) o Access to Property o Irrigation Sprinkler o Crop Productions o Crops o Site Distance ❑ Wetlands o Mobile Home(s) ❑ Oil & Gas Structures o Other Animals On-Site o Wildlife o Water Bodies o Utilities On-Site (transmission lines) o Ditch o Topography Note any commercial business/commercial vehicles that are operating from the site. Hello