Loading...
HomeMy WebLinkAbout20071618.tiff MEMORANDUM 4 i'lr"* 1 TO: Planning Commission wokDATE: February 20, 2007 COLORADO FROM: Jacqueline Hatch, Planner SUBJECT: Correction 3rd AMUSR-1002 The Department of Planning Services requests that the following items be added to the Development Standards new number 18 and renumber accordingly New #18 and renumber accordingly page 9 18.All potentially hazardous chemicals must be stored and handled in a safe manner in accordance with product labeling and in a manner that minimizes the release of hazardous air pollutants (HAP's) and volatile organic compounds (VOC's). (Department of Public Health and Environment) 19.If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health and Environment) 20.The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) UMW I .- 2007-1618 Weld County Planning Department / a GREELEY OFFICE M E M O RAN D U I IFEB 16 2007 ECEIVED voligTO: Jacqueline Hatch, Planning Services DATE: 2/15/2007 CFROM: Donald Carroll, Engineering Administrator COLORADO• SUBJECT: 3rd AmUSR-1002, Cannon Land Company/ Encana Oil & Gas Inc. In our design review meeting, we asked the applicant to provide a plat drawing to scale. A new plat drawing dated January 11, 2007, was provided. WCR 22 is designated as a strategic roadway requiring a 140-foot right-of-way at full build out. There is presently a 60-foot right-of- way. The applicant needs to identify the future right-of-way on the plat drawing showing the 70- foot right-of-way from the centerline/section line of WCR 22. These items need to be placed on the plat drawing as to determine setbacks and future rights-of-way. Once these items have clearly been identified on the plat drawing, please resubmit for verification. The future right-of-way should be identified and labeled as "reserved for future widening". The idea of placing right-of-way and future right-of-way is that the applicant will not build any permanent structures within this right-of-way. pc: Td AmUSR-1002 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\3rd AmUSR-1002-B.DOC EXHIBIT Sr- �3 Hello