Loading...
HomeMy WebLinkAbout20083440.tiff BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS Moved by Tom Holton, that the following resolution be introduced for approval by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE: Weld County Code Changes STAFF: Chris Gathman REQUEST: Chapter 23:Sections 23-1-90,23-3-30 N,23-3-40 DD,23-3-210 C5,23-3-210 D10,23-3-220 C5,23-2-220 D8,23-3-230 C5„23-3-230 C4,23-3-230 D9,23-3-240 C8,23-3-240 D4,23-3- 310 C8,23-3-310 D8,23-3-320 C7,23-3-320 D13,23-3-330 C7,23-3-330 D14,23-3-420 H, 23-3-430 M, 23-4-970, 23-4-980, and 23-4-990. be recommended favorably to the Board of County Commissioners for the following reasons: 1. Section 23-2-120.8.1 - That the existing text is in need of revision as proposed. The proposed changes are part of a semi-annual review of the County Code to respond to constituent input about the code's provisions, to update it in relationship to other regulatory documents, and to maintain its overall functionality. 2. Section 23-2-120.8.2 - That the proposed amendment will be consistent with the future goals and needs of the County as set out in Chapter 22 and any other applicable code provision or ordinance in effect. The proposed revisions are consistent with County policies that supports alternative energy: "AIR.Policy 1.4 The County encourages innovative and creative approaches to alternative energy sources." 3. Section 233-2-120.8.3- That the proposed amendment will be consistent with the overall intent of this Chapter. The intent of Chapter 23, as defined by Section 23-1-140, is to provide a unified regulatory system for land use within the County and to promote the health, safety, convenience, morals, order, and welfare of present and future inhabitants of the County. The proposed changes to the code are designed to clarify ambiguities or omissions in the Code,and to address demand for alternative energy through recent technological upgrades. Motion seconded by Robert Grand. VOTE: For Passage Against Passage Absent Robert Grand Erich Ehrlich Roy Spitzer Bill Hall Doug Ochsner Nick Berryman Tom Holton Paul Branham Mark Lawley The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I, Kristine Ranslem, Recording Secretary for the Weld County Planning Commission, do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on October 21, 2008. Dated the 21st of Qctober, 2008. 4/-1)6(11110 eandeth Kristine Ranslem Secretary a8- 3VI/ cieD CHAPTER 23 ZONING Amend Sec. 23-1-90. Definitions. WIND TURDINCGENERATOR: A machine or machines that convert the kinetic energy in the wind into a usable form (commonly known as a"wind turbine"or"windmill"). The wind energy conversion system includes all parts of the system except for the tower and transmission equipment, excluding turbines for private use. Permitted through a USR in all districts. 1041 permit application is required only if of state wide concern. A wind turbine or windmill generating 50V of energy or less, associated with a farm or ranch operation and less than seventy(70)feet in height is considered a private(noncommercial)machine and not oubjcctto the UCR application process.A generator specifically designed to convert the kinetic energy in wind into electric energy. A WIND GENERATOR may include a generator, tower, and associated control or conversion electronics. The height of a wind tower is measured at the hub of the generator. Add Sec.23-3-30.N,23-3-210.C.5,23-3-220.C.5,23-3-230.C.4,23-3-240.C.8,23-3-310.C.8,23-3-320.C.7, and 23-3-330.C.7 to state the following: WIND GENERATOR(S),which may require the issuance of a Zoning Permit for WIND GENERATOR, as per Chapter 23,Article IV, Division 12, of the Weld County Code. Add Sec. 23-3-40.0D, 23-3-210.0.10, 23-3-220.0.8, 23-3-230.0.9, 23-3-240.0.4, 23-3-310.0.8, 23-3- 320.D.13, and 23-3-330.0.14 to state the following: WIND GENERATOR(S) requiring the issuance of Use-by-Special Review Permit, as per Chapter 23, Article II, Division 4, and Chapter 23, Article IV, Division 12, of the Weld County Code. ARTICLE IV Supplementary District Regulations Add Div. 12 and 13, as follows: Division 12 Wind Generators and Permitting Requirements Sec. 23-4-970: Wind Generator Standards: WIND GENERATORS are allowed as accessory uses, subject to Zoning Permit for WIND GENERATOR requirements,or as a Use-by-Special Review Permit, per the height guidelines and maximum numbers for LEGAL LOTS, below. The height of a wind tower is measured at the hub of the generator: Lot Size (Gross Acres) Accessory Use Zoning Permit for Use-by-Special Review (Building Permit WIND GENERATOR Permit Required only) 1 Acre-2.49 Acres Up to 40 feet and rotor 41 —60 feet Above 60 feet, or more diameter 12-feet or less than 3 per LEGAL LOT 2.5 Acres—4.99 Acres Up to 60 feet and below 61-120 feet Above 120 feet, or and rotor diameter of more than 3 per 14-feet or less LEGAL LOT 5 Acres— 34.99 Acres Up to 120 feet and 121-180 feet Above 180 feet, or below and rotor more than 3 per diameter 25 feet or less LEGAL LOT All WIND GENERATORS are subject to the following standards: A. Up to three (3) WIND GENERATORS per LEGAL LOT are allowed. More than three (3) WIND GENERATORS on a LEGAL LOT shall require the issuance of a Use-by-Special Review Permit, pursuant to the requirements of Article II, Division 4 of this Chapter, or the issuance of a 1041 Permit, pursuant to the requirements of Article III, Chapter 21 of this Code. B. WIND GENERATORS requiring the issuance of a Zoning Permit for Wind Generator are subject the application requirements of Section 23-4-980 of this Code. WIND GENERATORS requiring the issuance of a Use-by-Special Review Permit are subject to the application requirements of Section 23-2-260 of this Code. WIND GENERATORS requiring the issuance of a 1041 Permit are subject to the application requirements of Article III, Chapter 21 of this Code. C. All WIND GENERATORS must be setback from property lines, public rights-of-way, and access easements of a distance at least one (1) times the hub height of the generator. D. All WIND GENERATORS must be setback from any existing or planned overhead lines a distance of at least one (1) times the hub height of the generator. E. No part of the system, including guy wire anchors, shall extend closer than 30 feet to the property boundary. F. WIND GENERATORS must be painted or coated a non-reflective white, grey, or other neutral color. G. WIND GENERATORS must not be artificially illuminated,unless required by Federal Aviation Administration (FAA). H. Electrical controls must be wireless or underground, and power lines must be underground, except for and interconnection to an existing above ground power grid. WIND GENERATORS are subject to the following noise limits (measured from the nearest property line from the WIND GENERATOR): 1) Residential: 50 Decibels. 2) Commercial: 55 Decibels. 3) Light Industrial (I-1 Industrial): 65 Decibels. 4) Industrial (1-2 and 1-3 Industrial): 75 Decibels. J. WIND GENERATORS are subject to applicable Federal Aviation Administration (FAA) requirements and/or permits. K. WIND GENERATORS generating power as a commercial enterprise may be subject to regulation by the Colorado Public Utilities Commission. L. If proposing to interconnect to a utility company,the applicant shall provide to the Department of Planning Services a copy of a "letter of intent to interconnect" or interconnection agreement signed by the utility company. M. WIND GENERATORS shall not create a detrimental effect on nearby properties through electromagnetic interference. Sec. 23-4-980. Zoning Permit for WIND GENERATOR permit application requirements. An application for a Zoning Permit for a WIND GENERATOR shall include the following: A. Name, address, and telephone number of the applicant. B. Name, address, and telephone number of the owner of the land, if different from subsection A, above. C. Parcel number and legal description of the property for which the application is made. D. Evidence of interest in the subject land held by the applicant. E. If proposing to interconnect to a utility company, copy of a"letter of intent to interconnect"or interconnection agreement signed by the utility company. F. Number of acres of the property. G. Elevation drawings of the proposed facility showing all towers, structures, and other improvements related to the facility, showing specific materials, placement, and colors. H. Weld County road access information sheet. A vicinity map showing adjacent properties, general land uses, zoning, and roadways: 1. Within five hundred (500) feet of the proposed wind generator site. J. A sketch plan of the site at the scale of one(1)inch represents fifty(50)feet,or other suitable scale to show: 1. The proposed location of the wind generator(s) and other support structures (guy wires), including distances from the property LOT lines, above ground power lines and other STRUCTURES on the property. 2. Location and measurements of any easements or rights-of-way. 3. Amount of road frontages. 4. Identification of any county, state, or federal roads or highways. 5. Existing STRUCTURES on the property. K. An application fee. L. A certified list of the names, addresses, and the corresponding Parcel Identification Number assigned by the County Assessor of the owners of property (the surface estate) within five hundred (500) feet of the property lines of the parcel on which the wind turbine(s) shall be placed. The source of such list shall be the records of the County Assessor,or an ownership update from a title or abstract company or attorney, derived from such records or from the records of the County Clerk and Recorder. If the list was assembled from the records of the County Assessor, the applicant shall certify that such list was assembled within thirty (30) days of the application submission date. M. Notification responses of at least thirty percent(30%)of surrounding property owners within five hundred (500) feet of the subject property in opposition to the location of the WIND GENERATOR(S). Sec. 23-4-990. Delegation of authority. The Board of County Commissioners delegates the authority to issue a zoning permit for a wind generator which otherwise requires the approval of the Board of County Commissioners through a public hearing process to the Department of Planning Services upon a determination by the Department that: A. The applicant is in compliance with the criteria identified in this Chapter for the specific category of zoning permit for which application is being made. B.The Department of Planning Services has sent notice and has not received signed notification from at least thirty percent(30%) of surrounding property owners within five hundred (500)feet of the subject property in opposition to the location of the wind generator. If opposed, the petition shall indicate that the surrounding property owners who have signed the notification have objections to the issuance of a zoning permit for the wind generator. 10 -21- wog in the A(Agricultural)Zone District. LOCATION: North of and adjacent to CR 6, 1/4 mile east of CR 13, 1/2 mile west of CR 15. The Chair asked Ms. Hatch if she wishes for this case to remain on consent as well. Ms. Hatch replied yes. The Chair asked if the applicant wishes for this case to remain on consent. The applicant indicated yes. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. The Chair asked the Planning Commission if they would like to have this case pulled from consent. No one wished to have it pulled. Robert Grand moved that the Consent Agenda including AmUSR-1614 and USR-1669, be forwarded to the Board of County Commissioners along with the Conditions of Approval and Development Standards with the Planning Commission's recommendation of approval. Tom Holton seconded the motion. Motion carried unanimously. The Chair read the next case into record. CASE: Weld County Code Changes PLANNER: Chris Gathman REQUEST: Chapter 23: Sections 23-1-90, 23-3-30 N, 23-3-40 DD, 23-3-210 C5, 23-3-210 D10, 23-3-220 C5, 23-3-220 D8, 23-3-230 C5, 23-3-230 C4, 23-3-230 D9, 23-3- 240 C8, 23-3-240 D4, 23-3-310 C8, 23-3-310 D8, 23-3-320 C7, 23-3-320 D13, 23-3-330 C7, 23-3-330 D14, 23-3-420 H, 23-3-430 M, 23-4-970, 23-4-980, and 23-4-990. Chris Gathman, Department of Planning Services, stated that these proposed code changes are to address one specific issue which is in regard to wind generators or wind turbines. Mr. Gathman commented that in the proposed definitions changes which were handed out, they made a revision to the definition. He indicated that originally it was called a wind turbine and staff has changed that to wind generator. Staff took out some of the language in regard to how it applies to a 1041 application in order to simplify it. In addition,staff is proposing to modify the Zoning Code to allow wind generators as an accessory use or as a use allowed with zoning permit approval. The Zoning Permit would be through an administrative process if we do not receive objections from 30% or more of the property owners adjacent to the property where the wind generator is proposed. If we do get objections from 30%or more of the property owners,then there would be a hearing that would be held by the Board of County Commissioners who would make the final decision. The other wind generators that are either taller or if there is more than three(3)wind generators proposed on an individual property then it would be reviewed under a standard Use by Special Review permit. The criteria as to which process the application would fall under is based on 1)the size of lot,2)the height of the wind generator, 3) rotor diameter, and 4) number of wind generators per lot. Staff is also proposing wind generator standards that would regulate setbacks, design (specifically color), noise, and compatibility. Commissioner Ochsner and asked how the surrounding property owners are notified. Mr.Gathman said that it would be similar to a Use by Special Review permit in which the applicant would submit a surrounding property owners list along with the application. The surrounding property owners would be notified by letter. Mr. Gathman indicated that there is a zoning permit process for mobile homes which is very similar. An applicant would make an application and provide the surrounding property owner list to the Department of Planning Services and then those property owners within 500 feet of the outer boundaries of the property are notified of that application. Mr.Gathman pointed out the definition for the wind generators. Specifically under this proposed code change, wind generators would be allowed as an Accessory Use,as a Zoning Permit or as a Use by Special Review in the Agricultural Zone District, Estate Zone District, all of the Commercial Zone Districts (C1-C4), and all Industrial Zone Districts (I-1 — 1-3). Mr. Gathman pointed out on the second page a table that illustrates the proposed heights and rotor diameter that would be allowed as an Accessory Use based on the lot size. For instance on 1 -2.49 acres a wind generator up to 40 feet with a rotor diameter of 12-feet or less would be allowed as a Use By Right. If you exceed 40 feet but below 60 feet you would go through the Zoning Permit process. Then wind generators above 60 feet would require a Use by Special Review permit. Commissioner Holton clarified that 40 feet or below is a Use by Right. Mr. Gathman stated that was correct and added that the applicant would need to submit the proper building permits to install it. Mr. Gathman stated that the Department of Planning Services was receiving a lot of inquiries and requests about wanting to put up wind turbines and therefore that is what prompted these code changes. He added that originally the only thing in our codes was under the wind generator definition. It essentially said all wind turbines would require a special use permit with the exception of wind turbines that generate 50 volts of energy or less and is associated with a farm or ranch operation and is less than 70 feet in height. Based on information that staff has seen and inquires received we are seeing more of the small scale wind turbines that are possibly 40 feet in height. Staff looked at 1 acre as the minimum lot size. On properties under 1 acre in size there are difficulties with: 1) being able to fit it on the property, and 2) some logistical details with the wind turbine. If there are existing buildings they have to be set back a certain distance or you don't get enough wind. In addition to the table as was pointed out, there are standards that would apply to all of these wind generators, such as how many would be allowed per lot as a Use by Right. This proposal allows up to three (3)wind generators per lot. Mr.Gathman indicated that the standard for the setback would be at least one(1)times the hub height(motor) of the generator. He added that there is a standard for the guy wire anchors and having minimum setback from property lines as well. Mr. Gathman stated that there are standards included for the color of the wind generators and added that unless required by FAA there would be no lighting. Mr. Gathman noted that Page 3 addresses noise standards. He pointed out that in the agricultural zone district there is not a noise level that is defined per the County Code and State Statutes. Included in the proposed changes is a provision if the applicant is going to be installing these wind generators to net meter that the Department of Planning Services would require some evidence from the utility company that they would accept that. Commissioner Grand asked about Item M on Page 3 which states "Wind Generators shall not create a detrimental effect on nearby properties through electromagnetic interference and/or physical appearance". Mr. Grand referred to the"and/or physical appearance"and asked if that means if someone doesn't like the way that it looks they can say no. Mr. Gathman commented that the reason that is included is because when someone applies for a zoning permit for a wind turbine there has to be a review process for that and that would address some possible concerns. Tom Honn, Planning Department, commented that staff doesn't address what any of these turbines look like, so it could be a fairly awkward device that gets installed. He added that all that sentence really does is establish a neighbor's ability to say that they are concerned about it and that it needs to go through a hearing process. Mr. Honn commented that staff tried to set this up so that it is more accessible to property owners and reasonably priced. Commissioner Holton commented that he would be in favor of ending the sentence after"interference". Commissioner Hall asked what kind of noise levels these wind generators create. Mr. Honn said that there is not much noise that comes from these. He added that the design is what makes the biggest difference. Commissioner Lawley referenced Item Mon Page 3 and asked if there was another mechanism for citizens to address their concerns other than the last portion of that sentence. Mr. Gathman replied yes and added that under Section 23-4-980 there will be a Zoning Permit process in which the surrounding property owners within 500 feet of the property will be notified. The public can then raise objections and it does not have to be anything specific to that criteria. Commissioner Holton expressed concern over the cases with the cell phone towers and added that the objections are from those who don't want to see it. Therefore, he can see objections for the wind generators being the same. He reiterated being in favor of ending the sentence after"interference" in Item M. Mr. Honn commented that it doesn't prevent surrounding property owners from saying that they are concerned about it and then it goes into the hearing process. He commented that until neighborhoods get familiar with them and we see more of them around we may see some objections to them. Commissioner Ochsner asked if there is any cost difference if it goes through an administrative process or the hearing process. Mr.Gathman commented that currently the zoning permit fee for mobile homes is$300 and it is not geared whether or not there is a hearing; it is only a flat processing fee. Commissioner Ocshner commented that he is trying to see what the cost detriment would be for someone who would be applying for this is. Mr. Gathman commented that staff will have to work the fees out but it would be considerably less than the Use by Special Review fee which is$1200 on the low end. He clarified that as far as the zoning permit process it would be a meeting that would be before the Board of County Commissioners; there would be no Planning Commission hearings involved with the zoning permit. There would be Planning Commission hearings only if it would have to go through the Use by Special Review permit. Commissioner Holton asked if the zoning permit would change the zoning for the entire lot. Mr. Gathman replied that it would not. Commissioner Holton stated that in the update to the Comp Plan the committee added for the County to consider incentives. He added that he would be in favor of the County Commissioners to consider incentives and waive the fees to put these wind generators in. Mr. Holton referred to the table on Page 2 and added that he would like to see another line added for the 1 — 2.49 acres with the wind generators 40 feet and below that it would only require a building permit. He believes that it would be more definitive for someone who is looking at the code book. Mr. Holton raised a question on how a wind generator would be used for Ag use for a house and three sprinklers. He commented that it would then be four (4) units and asked if they would be required to go through a Use by Special Review since the application would go over three. Mr. Honn commented that the applicant might come in with a couple of large units rather than smaller units. Mr. Holton gave the scenario that if there was a ditch or something that was not logistically possibly to run those lines in. Mr. Honn said that maybe what we would want is to have the capability for the agricultural district to have a small scale review to determine if more than three still meets the intent. Mr. Honn asked Commissioner Holton to state his intent so that staff can work with Mr. Barker on some language to bring to the Board of County Commissioners which addresses his concern. Bruce Barker, County Attorney, clarified if what Commissioner Holton is suggesting is the need for going more than three on larger properties. Mr. Holton said yes and added that Guttersons have 20,000 to 30,000 acres and if that would be one legal lot in the county then they are only limited to three and it doesn't produce enough when they are trying to pump water for their cattle. Mr. Barker asked what size they might be. He added that the County wouldn't want to be in a position where they are going to put in a large wind farm. Mr.Barker commented that because of the size this might be something that we can create a category for the in between areas. He added that you can get greater numbers because they are going to be smaller units on a larger piece of property. Mr. Honn added the assumption was that typically we would be dealing with parcels less than 80 acres in size and in many cases it will be the 2-5 acre lot. However, there are the large more agricultural scale things that we do need to define on how we might treat that situation should it ever occur. Mr. Barker commented that the categories were established for the individual who wants to have one of these for their house and then the next category up was going to be the wind farm. He indicated that he wasn't sure if they thought of using these for a variety of them. Commissioner Grand suggested that another line could be added to the table to address the larger scale wind generators but word it so that it would be under the administrative review. Mr. Honn stated that when the Planning Commission makes a motion for these changes to include your intent of what you are trying to achieve. Commissioner Holton said he is comfortable with staff to create language from this discussion. Commissioner Holton referred to Section 23-4-990 Delegation of Authority and asked about the reference to the commercial vehicle. Mr. Gathman replied that it was a typo and will make sure that it gets removed. Commissioner Grand referred to Section 23-4-980, Item L. specifically the photo-realistic renderings (photosyms). Mr. Gathman commented that when we have had telecommunication towers we have had those photo renderings before and it just gives a good illustration of height comparison of surrounding buildings,etc. Mr. Grand felt that it would be a burden on the applicant. Mr. Honn commented that if there was a strong enough neighborhood opposition it would be a good tool to use for the impact. Commissioner Holton wished to clarify with Mr. Grand if wanted to delete Item L and renumber accordingly. Mr. Grand stated yes. Commissioner Holton expressed that he would like the County Commissioners to consider the application fees and building permits. He added that if we are going to provide incentives and encourage people to do this he would be in favor of the applicant pulling a building permit but not get charged for it on a Use by Right. Mr. Gathman indicated that there are some incentives as well through the State through the Governor's Energy Office. Commissioner Grand agreed with Mr. Holton for the applicant to apply for the building permit but there is not charge included. Mr. Holton asked how much the building permit fee would be for one of these less than 40 feet in height. Mr. Honn commented that he hasn't valued one and couldn't give an exact fee but estimated that it would be around$300 with minimal electrical fees above that. Mr. Holton expressed that he would be in favor of waiving the fees but still require the inspections for proper installation. Mr. Honn said that there should be a minimal building fee identified for all of the inspections(foundation and electrical inspections)as well as ensure for the public health and safety concerns. Commissioner Lawley stated that there is a direct cost associated to the County for this. Mr.Honn added that there is a minimal cost recovery that the County would want to make sure to identify and still stay within the incentives. Commissioner Holton commented that he understands that it will cost the County to inspect these sites but for someone who is putting one in as a Use by Right they should then be given an incentive. Tom Holton moved to expand the chart under Section 23-4-970 so that it defines wind generators that are 40 feet or less require only a building permit, seconded by Erich Ehrlich. Motion carried unanimously. Tom Holton moved to end the sentence after"interference" on Item M, Page 3, seconded by Bill Hall. The Chair asked the secretary to poll the members of the Planning Commission for their decision. Nick Berryman, absent; Paul Branham, absent; Erich Ehrlich,yes; Robert Grand,yes; Bill Hall,yes; Mark Lawley, yes; Roy Spitzer, absent; Tom Holton, yes; Doug Ochsner, no. Motion carried. Robert Grand moved to delete Item L and renumber accordingly under Section 23-4-980, seconded by Tom Holton. The Chair asked the secretary to poll the members of the Planning Commission for their decision. Nick Berryman, absent; Paul Branham, absent; Erich Ehrlich,yes; Robert Grand,yes; Bill Hall,yes; Mark Lawley, yes; Roy Spitzer, absent; Tom Holton, yes; Doug Ochsner, yes. Motion carried unanimously. There was a lengthy discussion on waiving fees for the building permit which fall under the Use by Right as an incentive. Mr. Honn commented that he would be certain to identify the fees associated with this prior to the Board of County Commissioners hearing. He added that he understands the incentive and believes that the biggest incentive is that there is a process created where there are some that are strictly a Use by Right. The applicant just needs to pull a permit and can potentially have it up within a few weeks. If it is a little bigger it will only go through an administrative review and not a full Use by Special Review process. The incentive is already there through a Use by Right or a very minimal administrative process and any fee associated with that will be considerably less than what a Use by Special Review permit would have been. Tom Holton moved for the County Commissioners to consider the elimination of fees on the Use by Right and keep the fees for the remaining processes as low as possible to encourage the use and development of wind energy as a natural resource, seconded by Robert Grand. The Chair asked the secretary to poll the members of the Planning Commission for their decision. Nick Berryman, absent; Paul Branham, absent; Erich Ehrlich, yes; Robert Grand, yes; Bill Hall,yes; Mark Lawley, no with comment; Roy Spitzer, absent; Tom Holton, yes; Doug Ochsner, no with comment. Motion carried. Commissioner Lawley commented that he doesn't believe that the County should absorb those fees, especially considering that there is no direct impact to the public. Commissioner Ochsner commented that he believes that with the changes that have been made and with the ease of the application now it is enough of an incentive for the applicant. Tom Holton moved that the 2008 Code Changes as presented by staff and amended by the Planning Commission be forwarded to the Board of County Commissioners along with the Planning Commission's recommendation of approval, Robert Grand seconded the motion. The Chair asked the secretary to poll the members of the Planning Commission for their decision. Nick Berryman, absent; Paul Branham, absent; Erich Ehrlich, yes; Robert Grand, yes; Bill Hall, yes; Mark Lawley, yes; Roy Spitzer, yes; Tom Holton, yes; Doug Ochsner, yes. Motion carried unanimously. The Chair asked the Planning Commission members if there was any new business to discuss. No one had any further business to discuss. Meeting adjourned at 2:42 p.m. Respectfully submitted,rtiL p Kristine Ranslem Secretary ahC X720 Esther Gesick From: Chris Gathman Sent: Thursday, November 13, 2008 9:18 AM To: Esther Gesick Subject: Wind Generator Second reading Attachments: windgenerator2ndreading.wpd windgenerator2ndr eading.wpd(3... Esther, Here is the 2nd reading version of the wind generator ordinance. I made one minor change to the table (see in bold) and one item was removed on page 3 . Everything else is the same. Let me know if you have any questions. Sincerely, Chris Gathman, AICP, Planner II Weld County Department of Planning Services 918 10th Street, Greeley, Colorado 80631 ph (970)353-6100 ext. 3540 fax (970)304-6498 1 c- tip Esther Gesick From: Bruce Barker Sent: Monday, October 13, 2008 11:24 AM To: Thomas Honn; Chris Gathman; Kim Ogle Cc: Esther Gesick Subject: Revised Draft Wind Generator Code Change Attachments: Ord08-16.1 st.wpd Ord08-16.1st.wpd (30 KB) See the attached. I think this simpler verion would do the trick. Let me know your thoughts. c)tii.i i:A1;'�- Wi.tl.,'�Y4 JI.ta»'`Menclats,L, �Zlr�... 624015 C/tiU:vuy Cep, n,c ,,, 1 1. Revise the Weld County Wind Turbine Definition as follows: Sec. 23-1-90.Definitions. MAJOR FACILITIES OF A PUBLIC UTILITY OR PUBLIC AGENCIES: Public Utilities or Public Agencies operating or constructing a mine, ELECTRIC TRANSMISSION LINES, WIND ENERGY FACILITIES(MAJOR),commercial radio transmission towers, cellular and other wireless communication towers, domestic water storage facilities,POWER PLANTS, SUBSTATIONS of electrical utilities,wastewater treatment facilities, water treatment facilities, including extensions,expansions or enlargements thereof; STORAGE AREAS of utilities providing electricity,water, wastewater and natural gas or other petroleum derivatives, including extension, expansions or enlargements thereof; PIPELINES of utilities providing natural gas or other petroleum derivatives, including extensions, expansions or enlargements thereof; road,park or other public way, ground or space, public building or structure or public utility,whether publicly or privately owned. WIND Generator: A maehine or machines that convert the kinetic energy in the wind into a usable form(commonly known as a"wind turbine" or"windmill").The wind energy conversion system includes all parts of the system except for the tower and transmission equipment,excluding turbines for private use. Permitted through a USR in all districts. 1011 permit application is required only if of state wide concern. A wind turbine or windmill generating 50V of energy or less, associated with a farm or ranch operation and less than seventy(70) feet in height is considered a private(noncommercial)maehine and not subject to the USR application process. A generator specifically designed to convert the kinetic energy in wind into electric energy.A wind generator may include a generator,tower and associated control or conversion electronics. The height of a wind tower is measured at the hub of the generator.The wind generator shall be for private use and shall be located on the property that is utilizing the energy. Wind Energy Facility(minor): A facility which is used for the production of electrical energy from energy supplied by the wind including any transmission lines, and developed for the purposes of supplying or distributing electrical energy up to a total of 100 kilowatts to a customer or customers. Wind Energy Facility(major): A facility which is used for the production of electrical energy from energy supplied by the wind including any transmission lines; and developed for the purposes of supplying or distributing electrical energy in the amount greater than 100 kilowatts for a customer or customers. 2. Add: "Wind generators(subject to requirements of Division 12,Chapter 23 of the Weld County Code)"to the following code sections: A(Agricultural)- Sec. 23-3-30 N " Cl (Neighborhood Commercial)- Sec. 23-3-210 C5, C2 (General Commercial)—Sec.23-3-220 C5, N C3 (Business Commercial)—Sec.23-3-230 C5,4 — N' C4(Highway Commercial)—Sec.23-3-240 C8 " II (Industrial)—Sec.23-3-310 C8 NI I2 (Industrial)—Sec.23-3-320 C7 N 13 (Industrial)—Sec. 23-3-330 C7 3. Add: "Wind Energy Facility(minor) (subject to the supplemental criteria of Division 13,Chapter 23 of the Weld County Code) and Wind Energy Facility (major)"to the following code sections: Ni A(Agricultural)—Sec.23-3-40 DD Cl (Neighborhood Commercial)—Sec. 23-3-210 D10 C2 (General Commercial)—Sec.23-3-220 D8 C3 (Business Commercial)—Sec. 23-3-230 D9 "- C4 (Highway Commercial)—Sec. 23-3-240 D4 N 11 (Industrial)—Sec.23-3-310 D8 I2 (Industrial)—Sec.23-3-320 D13 "U I3 (Industrial)—Sec.23-3-330 D14 4. Add the following to Article IV- Supplementary District Regulations Division 12—Wind Generators&Permitting Requirements 23-4-970: Wind Generator Standards: Wind Generators are allowed as accessory uses, subject to Zoning Permit for Wind Generator requirements, and as a special review permit per the wind generator height guidelines below. The height of a wind tower is measured at the hub of the generator: Lot Size (Gross Use by Right Zoning Permit Special Review Acres) (accessory Use) for Wind Permit Approval Generator required approval required 1 Acre-2.49 Up to 40 feet and 41 -60 feet Above 60 feet Acres rotor diameter 12- feet or less 2.5 Acres-4.99 Up to 60 feet and 61-120 feet Above 120 feet Acres below and rotor diameter of 14- feet or less 5 Acres-34.99 Up to 120 feet 121-180 feet Above 180 feet Acres and below and rotor diameter 25 feet or less All Wind Generators are subject to the following standards: P'l. One wind generator per lot is allowed. Additional wind generators(up to a total of three wind generators)meeting the use by right height requirements will require Zoning Permit for Wind Generator approval.More than 3 wind turbines on a property will be subject to special review permit requirements per Division 4 (Special -13se-Review)of this Chapter. k-hek, Z ;D g I The wind generator must be setback from property lines,public rights of way, and access easements of a distance at least one(1)times the hub height of the generator. C'. The wind generator must be setback from any overhead lines a distance of at least one(1)times the hub height of the generator. b 4. No part of the system, including guy wire anchors, shall extend closer than 30 feet to the property boundary. E 5. The wind generator must be painted or coated a non-reflective white, grey, or other neutral color. F '6. The wind generator must not be artificially illuminated(unless required by FAA). G R. Electrical controls must be wireless or underground and power lines must be underground except for and interconnection to an existing above ground power grid. 4'8. Wind generators are subject to the following noise limits(measured from the nearest property line from the wind generator): I) Residential: 50 Decibels z) Commercial: 55 Decibels 3) Light Industrial(I-1 Industrial): 65 Decibels `/)Industrial (I-2 and I-3 Industrial): 75 Decibels I '9l Wind generators are subject to applicable Federal Aviation Administration(FAA) requirements and/or permits. S 10. Wind generators shall not generate power as a commercial enterprise as defined by the Public Utilities Commission. 11. Wind Generators subject to Zoning Permit for Wins Generator requirements are subject the application requirements of Section XX of the Weld County Code. Wind M Generators requiring Special Review approval are subject to the application requirements of Section XX of the Weld County Code(for non-1041 applications) and subject to the requirements of Section XX(for 1041 applications). L 1,2. If proposing to interconne t to a utility comp ny,the applicant shall provide a"letter of intent to interconnect"onterconnection a Bement signed by the utility company. 23-4-980: Zoning Permit for Wind Generator permit requirements. An application for a Zoning Permit for a Wind Generator shall include the following: A. Name, address and telephone number of the applicant. B. Name, address and telephone number of the owner of the land if different from Subsection A above. C.Parcel number and legal description of the property for which the application is made. D. Evidence of interest in the subject land held by the applicant. E If proposing to interconnect to a utility company, the applicant shall provide a "letter of intent to interconnect"or interconnection agreement signed by the utility company. F.Number of acres of the property. G. Elevation drawings of the proposed facility showing all towers, structures, and other improvements related to the facility, showing specific materials, placement and colors. II. Weld County road access information sheet. I. A vicinity map showing adjacent properties, general land uses,zoning and roadways: l)k. Within five hundred(500) feet of the proposed wind generator site. J. A sketch plan of the site at the scale of one (1) inch represents fifty (50) feet or other suitable scale to show: 1. The proposed location of the wind generator(s) and other support structures (guy wires), including distances from the property LOT lines, above ground power lines and other STRUCTURES on the property. 2. Location and measurements of any easements or rights-of-way. 3. Amount of road frontages. 4. Identification of any county, state or federal roads or highways. 5. Existing STRUCTURES on the property. K. An application fee. L. Photo-realistic renderings (photosyms)of the site after construction, demonstrating the true impact of the facility on the surrounding visual environment (if required by the Department of Planning Services). The Department of Planning Services may request photo-realistic renderings of the site from specific vantage points. M. The requirements of this Division require the applicant to provide a certified list of the names, addresses and the corresponding Parcel Identification Number assigned by the County Assessor of the owners of property (the surface estate) within five hundred (500) feet of the property lines of the parcel on which the wind turbine(s) shall be placed. The source of such list shall be the records of the County Assessor, or an ownership update from a title or abstract company or attorney, derived from such records or from the records of the County Clerk and Recorder. If the list was assembled from the records of the County Assessor, the applicant shall certify that such list was assembled within thirty (30) days of the application submission date. N. Notification responses of at least thirty percent(30%) of surrounding property owners within five hundred(500) feet of the subject property in opposition to the location of the wind turbine(s). Division 13—Wind Energy Facility(Minor)—Supplemental Criteria: 23-4-990: Wind Energy Facility(Mink wind energy facility(minor)must meet the following criteria in addition to Division Q1 criteria and requirements: Au-het, II) q V. Wind generators associated with the facility must be setback from property lines, public righteiay, access easements equal to one(1)times the hub height of the n generator. g S. Wind generators associated with the facility must be setback from any overhead lines a distance of at least onAmes the hub height of the generator. L'3. The wind generators associated with the facility must not be artificially illuminated (unless required by FAA). b`4. Electrical controls must be wireless or underground and power lines must be underground except for and interconnection to an existing above ground power grid. ( S. Wind generators associated with the facility are subject to the following noise limits (measured from the nearest property line from the wind generator): o Residential: 50 Decibels z) Commercial: 55 Decibels 3) Light Industrial (I-1 Industrial): 65 Decibels LO Industrial (1-2 and I-3 Industrial): 75 Decibels F`6. Wind generators are subject to applicable Federal Aviation Administration(FAA) requirements and/or permits. G 'V. Wind generators shall not generate power as a commercial enterprise as defined by the Public Utilities Commission. t1 & The proposed wind generator shall not create a detrimental effect on nearby properties through electromagnetic interference and/or physical appearance. Hello