HomeMy WebLinkAbout20082474.tiff BOARD OF COUNTY COMMISSIONERS' SIGN POSTING
CERTIFICATE
•
THE LAST DAY TO POST THE SIGN IS Sept 16. 2008 THE SIGN SHALL BE POSTED
ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY.
IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT
ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT
OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON
THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY
(ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY.
I, , HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT THE SIGN WAS POSTED
ON THE PROPERTY AT LEAST 10 DAYS BEFORE THE BOARD OF COMMISSIONERS
HEARING FOR USR-1660 IN THE AGRICULTURAL ZONE DISTRICT.
Michelle Martin
Name of Person Posting Sign17/ J
{
• Signature of Person Posting Sign
STATE OF COLORADO
)ss.
COUNTY OF WELD The foregoing instrument was subscribed and sworn to me this / day of S-L,�7 ,u,IbE✓, 2008.
WITNESS my hand and official seal.
NBAPub'c
BR0DHEAD
vs Oft,
��!(�,kOn1Yi%� n Expires: I
417 Commiydpn 6plar Y'70.1(109
EXHIBIT
• I E
use_ #110(00
o?ox8-,99 7y
}.. • �, i..
t, ♦i it•4
r Imo._ - ��l•■ • T ' 'IP•
' . - t • ` •
-
` L COt
1
0
' ,f • . 0
r•
•
•
la II el'
-
y� t F '� ,�-� •
l . .f
� , _ S° elik
A ■ • �/
fr
! � . ; NI , %3/4..„„.....
CD
a ,t3 z la, v ¢ Q W �-
c,..,, ....1
;® —� o roc
czi
. ,
0 alt: If!!
Pa
4
,ii. 3. 0
_a 1%.,
pn LAJ : w J
WI W \ Ict ma,
CC fcr .,0 'Lk
`
C COCV ` - • _
0 . ( , rs, a la to e4,
..A.:1-b.1 *.. illia rift t V
* t 4
0 CID iej 1/4.%3 el 1.. lit\ 711:41) .C itra CC 421, % .1
no
eN1 C 1 lia Ma CC - 1.,
-' C LaLuo
Wla �� \ T -4....3
Ira CC Ila ti-Th, se. .,
s � �- Z � CO
C� !
W a W C ' ` .- v {- a arm tY'�-- cc =i ef) , .
v .� -� .,, o £ 1ooi _
,51 :i
rim . .I
el ctc.. .------- -4..3 <taxi its ru ,.
flcn
. _.- (.1%)
Z 4 W Q
paO Z 0 Ims
:t: i:
re
` /1j% • \' " . �
�t.� -• • '
• • . ` �• 1
•
•
i�
_
.t` a t .
— +
� •' may, — ^
•
•a
\ 'C .' `:
: �
it
\\• I
% 1
LOLOFF CONSTRUCTION, INC.
EXCAVATING AND CONTRACTING
• PHONE 353-1621 Weld County Planning Department
KERSEY. COLORADO - 80644 GREELEY OFFICE
SEP 2 6 7nnft
RECEIVED
September 23, 2008
Weld County
Board of County Commissioners
PO Box 758
Greeley, Colorado 80632
Attention:Ester
Dear Sir/Madden
Loloff Construction Inc owns and holds property permit #M-1985-112 in the state of
Colorado.
• We are sending this letter to inform the State Of Colorado and Weld County that the
property directly to the East across Balsam Ave is in violation of Mining laws. Said
property is under application for a mining permit and Use by Special Review Permit
#1660. Said property for the last month has been digging exposing surface water and
hauling material off of said property.
Loloff Construction is requesting a cease and desist order to stop this until and actual
permit by the State of Colorado and USR permit is issued. Enclosed are pictures of
loading trucks and trucks leaving property.
Please keep us inform of the status of the situation.
Sinc e ,
7
Loloff Co struction, nc
Don Loloff President. .
EXHIBIT
• I F
use *Ratio
•
•
•
-
-
tz
•
1
•
• . iji' ii
I _
I L
itIli
a
ii____
i I'
L+SA.s lt 'V .qhr
- -:
-P
II +
li - - - t f.•
• Illiii
MEMORANDUM
• I LInge
TO: Board of County Commissioners
COLORADO DATE: October 1, 2008
FROM: Michelle Martin and Don Dunker
SUBJECT: USR-1660
The Department of Planning Services and the Department of Public Works recommends the
following conditions be added to the resolution and renumbered accordingly.
1.R The applicant shall attempt to address the requirements (concerns)of Greeley/Weld County
Airport Authority, as stated in the referral response dated 8/4/08. Evidence of such shall be
submitted in writing to the Weld County Department of Planning Services. (Greeley/Weld
County Airport Authority)
1.S The applicant shall submit a copy of a traffic study to the Weld County Department of Public
Works. The Traffic Study shall include triggers and require improvements to be constructed on
Balsam Avenue at the gravel pit access and at the Balsam Avenue and 8ch Street (SH-263)
intersection. It should also address the timing of these improvements. (Public Works)
• 1.A.10. The applicant shall show on the plat how the proposed access will function with the
proposed scale house and internal site circulations with parking and semi truck staging. There
will need to be at least one hundred feet of entrance roadway into the site perpendicular to
Balsam Avenue; this is to ensure no stacking or staging of vehicles on any County Roadway.
(Public Works)
,',
14111
J&T Consulting, Inc,
•
Memorandum
Date: September 28, 2008 JT Project No. 07-123
To: Michelle Martin—Weld County Planning and Zoning
Subject: USR 1660 Proposed Derr Pit Operations
From: J.C. York, P.E.
Michelle:
Per our meeting on September 25, 2008 I am providing more description and detail on the
proposed Derr Pit operations for USR 1660.
Portable Processing Plant
The portable processing plant that is proposed for the Derr Pit will enable the operator to move
the processing facility to different locations within the proposed pit during mining. Initially the
plant will be placed in the southeast corner of the pit to begin mining. The first phase of the
mining as described in the Division of Mining, Reclamation, and Safety application (Exhibit D) is
approximately 27 acres where the area will be mined to depth of six feet. No groundwater will be
exposed during this phase. The portable plant will move as mining of this phase progresses
from east to west and then back to the east. Once the plant is back on the east side of the pit it
• will move north and then back to the west to complete the first phase of the mining. During the
mining stockpiles of overburden and topsoil will be placed on the north side of the pit outside the
100-year floodplain. Product stockpiles will remain close to the processing facility. As mining
progresses to the next phases of mining the plant will be placed on the pit floor and move within
each phase to complete the mining of each phase. The plant will remain at least 500 feet from
the County Road 41.5 (Balsam Avenue)during all phases of the mining.
Water Source and Sewage Disposal
The water source proposed for the facility will be a well. The well will be used for the scale
house restroom facility only. It will not be used for drinking water. Drinking water will be supplied
by using bottled water at the scale house.
The scale house will also have a septic tank that will not have a leach field as no discharges will
be allowed from the tank. The septic tank will be equipped with a high level alarm at which time
the septic tank will be pumped by a licensed sewage disposal contractor. The scale house will
not be built during the initial phases of the mining as the operator will utilize loader scales to
determine the amount of material leaving the site. Trucks will be required to tare in at an off-site
certified scale such that loads remain within legal limits.
Sincerely,
c -74":"7:11i
J. C. York, P.E. e+sn� m
•
V 1400 W 122nd Avenue—Suite 120•Westminster CO 80234• Ph: 303-457-0735•Fax: 303-920-0343
Hello