CHANGE ORDER NO.1
Bridge 27/66A Replacement
Project Description: Replacement of existing steel bridge on WCR 27 over the Greeley Canal #2. The
new bridge will be a reinforced concrete structure approximately 40' wide by 60' long. Short Elliott
Hendrickson Inc. (S.E.H.) has completed the design of the new bridge. Construction bidding is scheduled
for September, 2008.
Owner: Weld County Public Works Department, PO Box 758, Greeley, Colorado 80632
Consultant: Short Elliott Hendrickson Inc., 2000 South Colorado Boulevard, Suite 6000, Colorado Center
Tower One, Denver, CO 80222-7938
The following change is hereby made to the Contract Documents:
Contract Time Extension: The original Agreement for Professional Services is extended one full year for
upcoming construction. The anticipated construction services completion date is June 1, 2009.
Change to Contract Scope: Engineering Construction Services shall be added to the Contract. A detailed
description and cost breakdown of these services is attached.
CHANGE TO CONTRACT PRICE:
Original Contract Amount $170,106.38
Change Order No.1 Costs $88,934.31
Revised Contract Amount $259,040.69
CHANGE TO CONTRACT TIME:
The Contract time will be increased by 365 calendar days.
RECOMMENDED:
JUN 3 0 2008
Owner Representative:
Date:
William H. Jerke, Chair
Engineer: cvt 1-E Date: Co 1(0
APPROVALS:
Consultant: Short Elliott Hendrickson
Inc.
AZ
By:/�� 7)4, l/-v/ Date: 6A5/Co
Title: 7/0 if'c I1Coyua Pj (Peviii.e �2vIe��rzc�L—
a eys 8
-3n-vsv £'O ; 0.0 6 o 06/30 42- gJas d' -41,73
1414
SEH
June 13,2008 RE: Weld County
WCR 27/66A Bridge Replacement
SEH No. AWELDC0801.00
Mike Bedell
Weld County
1111 H Street
Greeley, CO 80632
Dear Mike:
This letter supplements and amends the Agreement for Professional Services between Weld County,
Owner, and Short Elliott Hendrickson Inc. (SEH°) dated 9/12/07 and addresses providing services in
connection with the design and construction administration of a replacement bridge for Weld County
Bridge 27/66A, BRO C030-030, Project Code/SA# 14655, and related improvements (hereinafter called
the "Project").
The County has requested that SEH provide services through the re-construction of the bridge. The scope
of services to be provided is shown in the attached material, but generally consists of: full time
construction inspection provided by Mike Shrout, material testing as outlined in the attached CDOT Form
250, and shop drawing review and other technical assistance(included in the existing contract).
You will pay us a fee for these services,currently estimated to be$88,934.31, in accordance with the
Agreement. This brings the total authorized fee to$259,040.69 when the design engineering fee of
$170,106.38 is included.
This letter, the Supplemental Letter Agreement dated April 9, 2008, and the Agreement for Professional
Services dated 9/12/07 along with Exhibits A and B represent the entire understanding between you and
us in respect of the Project and may only be modified in writing signed by both of us. If it satisfactorily
sets forth your understanding of our agreement, please sign the enclosed copy of this letter in the space
provided below and return it to us.
Sincerely,
SHORT ELLIOnHE�
TTT HENDRICKSON INC.
77
Mark Hildahl
Project Manager
Accepted by: Weld County
By: 1 Y -:—LLZ ?,c_J2, CX Date: (-O' I (.0 ( 0?)
Authorized Client Signature
Encl: Construction Services Estimate,Terracon's Fee Breakdown,CDOT 250 Form,M. Shrout's Resume
Short Elliott Hendrickson Inc.,2000 South Colorado Boulevard,Suite 6000,Colorado Center Tower One Denver,CO 80222-7938
SEH is an equal opportunity employer I www.sehinc.com I 720.540.6800 I 800.490.4966 720.540.6801 fax
Weld County 6/6/2008
WCB 27/66A
Weld County Road 27 over Greeley Canal #2
Construction Services Estimate
Construction Inspection
Assume 120 days construction duration => 17 weeks
Include 1 week before and after for Project Start-Up and Closeout
19 weeks total @ 40 hr/wk = 760 hours
Michael Shrout's Billing Rate= 87.00 $/hour
Total: $66,120.00
This includes pre-bid meeting, pre-construction meeting, and
substantial completion inspection.
PM, Review, &Admin
PM Review Admin
Hildahl Davis Osmanovic
Hours 12 12 4
Rate $153.82 $166.95 $85.58
$1,845.84 $2,003.40 $342.32 Total: $4,191.56
Michael lives nearby, so no per diem is needed.
Vehicle: $4.50 /hour + Mileage: 950 miles (5 miles each
760 hours $0.505 /mile way per day)
$3,420.00 $479.75 Total: $3,899.75
Material Testing
Terracon Estimate Testing: $14,723.00
Shop Drawing Review&Technical Assistance
30 hours for shop drawing review and technical assistance are included in existing
contract, dated 9/21/07. No additional hours are included.
Total Construction Management Estimate: $88,934.31
o¢ ., ., ., .. ., - N I
'° a c o! a N N o a a cv O
E c v a N
m` m a w a ! I
O
Ts a o L
3 Ln
Q m 0 a
N O l- N N N in N 0 0 0 l 0 ' 0 NI N N N N a a o o N
al
O O O1
w N.
ma m 'E o O o
CO
a ❑ _ Q r •.- •-• r r r N Q N r N N Q en m 0 0
N y j a s
2 5 L
W ti .- N M O h cp
Q H a
O 0-2 I III n N. N N •Q N N 1.
N
m y
l CO
2 Lou ^ N O a in
a n
m 0 " Q .6 N
N
0
co U r r
r r '., r O h N T) O
co¢ Q a , C O.
N g
i d N
O 2
o Q - a ' I III N a a
a W 73
- 'a J
m N tI v
Nin
W
UC ° -1N a a r N m I a
UVN a N m
0 O03
M U III N 4i.
Ma- 0o. o en
g w E' 'c
2
r n
m
c u a
= o I O w w a E .i m
m Tu , a` T. m o
th m o - 3 t 0.
F O w j
P_ 9 O m o x o 12
a
0. a a a 0-
E � O E C Es
0 a
m 22 c m E ..1 m d
2 0 2 c
a x C 311 a e r
S in o fr
m
m N N U ° k m
T. a \ li O N N N b (0 m k d E 6
A m 2 > a 69 �' o' c `�-
O O t a
CI - o o m
0)4.. _. `c I I ty''1 a E "o E
C m L N m N O 0 6 VO N V
CO 2 N o 2 p C• 2 9 m O
W a, ¢ U N 0520c
2 o c
'o m I I = = 5. a .E
q n N N U ! CO N N yH g 02 q „
Nre
H NI a p 1 9 CO ! y C
3 I > b4
p' O i 2 a m
6.I. m 0 I a in o x 5
o
'2 m I- 69
0 w W 1 p W O m m
O N CO H 2 2
o C a o,2• I I U
E3 N m
a I a e
a a LL = o
w o ¢ I I o.
m I E
0 e I
J N LL I a ! N to� N N
w
It , c
E
E E
g " I r 0 o
U
a w a
¢ I
a
to th 3
0 CO w
a N I
f m a)
C A O O
a I I I N 5, N
N I I
iii a y
a o, E
O o o
t n a o N N ' Q a a
m N 2 I Z
E.O. E
°
LL w
E I
a s Q NJ N oo r
O o a N
I
C. I
¢ ` ...-1 w
O
O fil
2 ro o a e)
in
a N
r--
,.
Do 0 — .— m N CO N
a 2 � N N
N
a `
h
Ts 2
m U U U y Zr y y V YO y y O y y O O V y U
U
T
0
v N CD 01
(� d m N N r ' r r N ' r 3- Q N 0) ,_ 0 ,- N 0)
m O
O
C N g ❑ 0 Agri;
m
a w m g m 7, a m d » Y 44 m E a a r a a U c0
m c a .. W " u n Y°c u x °m m 5 c O. $ m r243 - 2 = L y 9 E o Y y
o a x n E v m 2' a m t. a o m @ a Z o UT a H N N p ° - = m 2
m o m m o g o n o m o 2 E m` 01 Eaz
n m o 0 m '" a E m @ @ m a m m m a m E '^ U a U v 'E W E
p N. m 9 2 a o a a s 2 a a 2 a E -O O. E m v a
0 K r LTJ w 2 -, ._ 2 m _ o a '_ x a '_ o_. E c b y LI,E 2 W
m N tii 55 -a m N a
E
o
N E
O Ea N N n Q (O w
° R E U ~ E a a a N N C Q Q in a t°
Michael Shrout
Senior Designer/Construction Inspector
Experience
Education Stantec Consulting,Fort Collins Co-Senior Designer.
University of Colorado Boulder, Primary duties—creation of plans for roadway projects,and water
Co utility/storm drainage pipelines for Environmental Infrastructure and
Urban Land projects
Certifications/Training
ACI Concrete Field Testing Colorado Dept of Transportation,Durango& Greeley,Colorado-
Technician— Grade 1
ACI Concrete Transportation Engineering/Physical Sciences Technician III.Primary duties—
Construction Inspector creation of complete plans/specs packages for advertised highway
RMAEC Asphalt Technician A- construction projects, including: resurfacing,minor and major widening,
Laydown &Asphalt Inspector minor and major reconstruction,bridge replacement with detours,
Level ICDOT Erosion Control complete virgin alignments, realignments, intersection design,
Supervisor Training g
interchange layout,grade and superelevation improvements,safety
improvements,drainage, irrigation,cost estimates.
8 Mile Major New Alignment,US 34 at Dearfield. Design and
Construction.Design and Construction.This was a complete major
new alignment with a bridge over a canal. Michael performed
construction inspection on the bridge,canal realignment,many irrigation
structures, asphalt pavement, and wrote a large percentage of the CDOT
Form 266s that measured work, allowing payment to the Contractor.
8 Mile Overlay, I-25, SH 52 to SH 66. Design and
Construction/Assistant Project Engineer. This was a night paving
project. Michael performed reviews of the traffic control, performed
asphalt inspection,and wrote most of the CDOT Form 266s that
documented work, allowing payment to the Contractor.
Bridge Replacement with Detour,SH 392 E of Windsor. Design and
Construction/Assistant Project Engineer. This was a bridge
replacement over a canal. Michael was de facto Project Engineer and
performed reviews of traffic control, performed inspection of the detour
and new bridge, performed asphalt inspection,and wrote nearly all of the
CDOT Form 266s that documented work,allowing payment to the
Contractor.
8 Mile Overlay,I-76,Lochbuie To Hudson.Design and
Construction/Assistant Project Engineer. This was a resurfacing
project. Michael performed reviews of the traffic control, performed
asphalt inspection, and wrote most of the CDOT Form 266s that
documented work, allowing payment to the Contractor.
Bridge Replacement with Detour, US 36 W/O Last Chance.Design
and Construction/Assistant Project Engineer.This was a bridge
replacement over a draw. Michael performed reviews of traffic control,
performed inspection of the detour and new structure, performed asphalt
1 inspection,and wrote nearly all of the CDOT Form 266s that documented
SEHMichael Shrout I Senior Designer/Construction Inspector I page 1
work,allowing payment to the Contractor.
Additional Experience
• Construction Inspector and Assistant Project Engineer
• Proficient in AutoCAD,Eagle Point,COGO, etc.
• Gaining experience with Bentley MicroStation and InRoads
• Proficient with most Microsoft Office applications
• Familiar with CDOT specifications and practices,AASHTO
standards, MUTCD
SEE' Michael Shrout I Senior Designer/Construction Inspector I page 2
BOARD OF COUNTY COMMISSIONERS
REVIEW/WORK SESSION REQUEST
RE: Construction Services Change Order for Bridge 27/66A Replacement
DEPARTMENT: PUBLIC WORKS DATE: 6/18/08
PERSON REQUESTING: Wayne Howard, Engineering Division
Brief description of the problem/issue:
Weld County received federal funds for the replacement of Bridge 27/66A. The design is now complete, and
R.O.W./Easements acquisition is ongoing. The project is scheduled to be bid out in September 2008.
Construction is scheduled to be completed in May, 2009. Public Works is recommending that Short Elliott
Hendrickson Inc., the consultant who completed the design, be utilized for construction services. The
construction services will entail daily inspection, materials quality control, and documentation. This work
requires an inspector who is familiar with CDOT regulations and paperwork requirements.
What options exist for the Board:
The cost for the work was negotiated and the proposed Change Order No.1 amount is $88,934.31. Weld
County's portion of this amount is 20% ($17,786.86), and the federal funds cover the remaining 80%. The
Board could either accept or not accept the Change Order No.1. Not accepting this change order could result in
the bridge replacement project not meeting completion deadlines, and Public Works would be required to seek
an alternate means of accomplishing the construction services work.
Recommendation to the Board:
I recommend approval for the Change Order No.1. Approval will allow the project to proceed in a timely
manner, and ensure inspection by a well-qualified individual. The proposed cost is reasonable when compared
to similar completed projects and industry standards.
Approve Schedule
Recommendation Work Session Comments
William H. Jerke, Chair c/
Robert D. Madsen, Pro-Tem V
William F. Garcia Vl.4
David E. Long J
Douglas Rademacher
Attachments: Change Order
(11.- ,
MEMORANDUM
TO: Clerk to the Board DATE: June 23, 2008
FROM: Wayne Howard, Chief Senior Engineer, Public Works
COLORADO
SUBJECT: Agenda Item
Change Order No. 1 for Bridge 27/66A Replacement Project with Short Elliott Hendrickson
Attached are TWO original Change Order No. 1. PLEASE RETURN ONE ORIGNAL TO PUBLIC
WORKS as soon as it is signed.
pc: Mike Bedell, Engineering
M:\Francie\Agenda Wayne Howard.doc
2008-1823
Hello