HomeMy WebLinkAbout20080331.tiff WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY
AND
TERRACON
DATED: January 15, 2008
Work Order Number: TERRACON - 5
Project Title: Public Works WCR 29: Soils Subgrade Investigation
Commencement Date: February 4,2008
Completion Date: March 10,2008
Limitations on compensation: Not to exceed $6,044.00
Project Description: Soils subgrade investigation needed for the design of roadway improvements.
Scope of Services: See attached Proposal dated January 15, 2008
Professional agrees to perform the services The attached forms are hereby accepted and
identified above and on the attached forms in incorporated herein, by this reference, and
accordance with the terms and conditions Notice to Proceed is hereby given.
contained herein and in the Professional
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the Weld County
terms of the Professional Services Agreement
and this work order (including the attached By: n YE
forms) the Professional Services Agreement Project Manager
shall control. Date: � I \c,\c>S
Professional By:
Department Head
Terracon Consulting Engineers Date: / -4,V -
1289 First Avenue
Greel , CO 631 By:
Director o A tapd,Administration
By; Date: LLUUU��
Title: U,?e Pre ccr/1-y+ By:
Chairman, Weld County Commissioners
Date: /t2-2-4)O Date: JAN 3 0 2008
ea 005e
6 , 00 ftdCi 0„ �� cod'- 033/
January15, 2008 lierracon
Consulting Engineers &Scientists
128o First Avenue
Greeley, Coloraadodo 8063 Weld County Department of Public Works 1
1
1111 H Street Phone 970.351.0460
P.O. Box 758 Fax 970.353.8639
www.terracon.com
Greeley, Colorado 80632-0758
Attn: Mr. Mike Bedell
Re: Proposal/Agreement for Geotechnical Engineering Services
71st Avenue from Poudre River Ranch to 'O'Street
Weld County, Colorado
Terracon Proposal No. P2108002g
Terracon is pleased to submit this proposal for providing geotechnical exploration and engineering
services for the subject project. This proposal includes an outline of the project information provided to
us, our scope of services, fee, and schedule.
A-PROJECT INFORMATION
•
Terracon understands the project will consist of paving approximately 4,000 lineal feet of 71st Avenue
from the Poudre River Ranch subdivision to 'O' Street in Weld County, Colorado. Additional work at
the site will consist of the replacement of an existing canal bridge with a pre-cast box culvert and the
pavement of a gravel parking lot near the Poudre River Trailhead. We understand that Weld County
will be performing the pavement design for the project, and that this design will be based on the soils
information generated from our exploration and testing at the site. The scope of services and
estimated fees for the project have been developed through coordination with the client. Proposed
grade changes to the road were not developed at the time of this proposal. Terracon assumes some
minor grade changes to accommodate line of site issues for the project will be necessary. For the
purposes of this proposal, Terracon assumes site grading cuts and fills will be less than 3 feet.
B-PROPOSED SCOPE OF SERVICES
The purpose of the geotechnical engineering services will be to evaluate the subsurface soil and
groundwater conditions at the site and to provide soils testing for a pavement design to be performed
by Weld County. We propose to explore the subsurface conditions on the site with a total of seven
test borings. Of this total, six test borings will be located in the proposed pavement of 71st Avenue and
one test boring will be located in the existing gravel parking lot. The borings will be advanced to
approximate minimum depths of 5 to 15 feet. The minimum depth of 5 feet assumes cuts will be less
than 2 feet. If cuts greater than 2 feet are included with the project, the 10 feet borings will be
required. The test boring located adjacent to the canal bridge replacement will be advanced to a
minimum depth of 15 feet. The borings will be advanced to the minimum depths outlined unless
refusal to drilling is encountered prior to full boring advancement. The depth and location of test
borings may be further adjusted depending upon actual subsurface conditions encountered.
Delivering Success for Clients and Employees Since 1965
More Than 95 Offices Nationwide
Proposal/Agreement for Geotechnical Engineering Services
Terracon
71st Avenue From Poudre River Ranch to 'O' Street
Terracon Proposal No.P2108002g
During the drilling operations, a Terracon representative will log the borings, record the results of
penetration tests, and obtain representative samples for further laboratory evaluation. Groundwater
measurements will be made in each boring during exploration and a minimum of 24-hours after drilling.
Drilling and sampling will be conducted in general accordance with applicable local standards.
At the completion of drilling operations, all samples will be returned to our laboratory where they will be
examined by the project geotechnical engineer. At that time, the field descriptions will be confirmed or
modified and an applicable laboratory testing program will be formulated and final boring logs
prepared.
Relatively undisturbed samples may be tested for moisture content, dry density, and consolidation and
expansion characteristics. Disturbed samples may be tested for liquid limit, plastic limit, moisture
content, grain size distribution, and Hveem Stabilometer (R-Value). Laboratory testing will be
conducted in accordance with applicable locally recognized standards.
The information obtained from the field exploration and laboratory testing program will be used to
evaluate the soil and subsurface conditions at the project site. Based on these results and on our
recommendations, Weld County will be able to perform a pavement section design.
Based upon our analyses, a geotechnical engineering report will be prepared. The following
information will be provided in the report:
• A brief review of our field and laboratory procedures, and the results of all
testing conducted;
• A discussion of the general subsurface conditions including soil and
groundwater conditions;
• Location and characteristics of groundwater;
• Design criteria related to the canal bridge replacement, including maximum net
allowable bearing pressures, lateral earth pressures, and predicted
performance;
• Unsatisfactory soil conditions and a discussion of remedial measures; and,
• Recommended construction procedures and quality control measures related to
earthwork.
2
Proposal/Agreement for Geotechnical Engineering Services Terracon
71"Avenue From Poudre River Ranch to'O'Street
Terracon Proposal No.P2108002g
Terracon will notify the Utility Notification Center of Colorado (UNCC) for location of public utilities a
minimum of 3 business days prior to our anticipated drill date. Terracon is not responsible for potential
damages or impacts to our schedule if adequate utility locates are not performed, or utility locates are
not completed by UNCC prior to our expected drill date.
Terracon assumes that site access will be open, and that the site is accessible with a 2 wheel drive
Ford F-750 truck with a CME-55 or CME-75 drill rig mounted on the back. If, once we arrive on site, it
is apparent the site will not support the above referenced drill rig, additional charges, including
equipment costs for towing the drill rig or remobilization to the site, will be applicable. Further, if the
area to be drilled will require traveling over landscape areas, Terracon is not responsible for damage to
landscaping if suitable alternate routes to access the site are not available.
It is anticipated that the field work for this project could commence within five to ten business days of
receipt of written notice to proceed, weather permitting, and that about one to two days would be
required for completion of the drilling. An additional ten to 15 working days would be required for the
completion of laboratory testing, engineering analyses and development of the final report and
recommendations. Verbal communications, including preliminary findings and recommendations, can
generally be issued approximately 3 to 5 working days after completion of the field work and prior to
issuing the final report.
C -COMPENSATION
The cost for our services, including all field work, laboratory testing, engineering analyses and report
preparation (five copies will be provided), will be on a unit rate basis. The following is a line item
estimate based on our discussions with Weld County:
Field Exploration Services
Drill Rig—Mobilization/Demobilization— 1 day @ $400/day $400
Drill Rig—Drill—4 hrs @ $136/hr $544
Field Engineer—Site Layout/Utility Locates/County&City Permits—8 hrs @ $70/hr $560
Field Engineer—Drill—4 hrs @ $70/hr $280
Traffic Control— 1 day @ $950/day $950
Flow Fill— 1 yard @$85/yd $85
Estimated Subtotal-Field Exploration Services $Z 819
3
Proposal/Agreement for Geotechnical Engineering Services Terracon
715t Avenue From Poudre River Ranch to'O'Street
Terracon Proposal No. P2108002g
Laboratory Testing Services
Soils Classification Testing (Includes Atterberg Limits, -#200 wash, Sieve Analysis)—
Estimate 6 @$115/each $690
Swell Consolidation Test—Estimate 3 @$85/each $255
Moisture Test—Estimate 3/boring*7 borings @$5/each $105
Density Test— Estimate 2/boring*7 borings @ $5/each $70
Hveem Stabilometer"R-Value" —Estimate 3 @$300/each $900
Standard Proctor—Estimate 3 @ $115/each $345
Estimated Subtotal—Laboratory Services $2,365
Report Preparation and Engineering Recommendations
Staff Engineer- Boring Logs/Laboratory Data Entry/AutoCAD—6 hrs @$70/hr $420
Geotechnical Engineer—Final Recommendations/Report Preparation —4 hrs @$85/hr $340
Principal Engineer—Report Review— 1 hr @ $100/hr $100
Estimated Subtotal—Report Preparation and Engineering Recommendations $860
Estimated Total $6,044
AUTHORIZATION
We appreciate the opportunity of submitting this proposal, and are available to discuss the details with
you. This project will be performed under the conditions set forth in the Weld County On-Call
Geotechnical Engineering Services Contract.
We appreciate your consideration of Terracon for this work, and look forward to working as your
geotechnical consultant on this and future projects.
Sincerely,
TERRACON
Jason . Mapes, E.I. ougl J. J , P.E.
Project Engineer Regional Manager
Copies to:Addressee (1-via E-mail)
4
0
MEMORANDUM
TO: Clerk to the Board DATE: January 25, 2008
COLORADO FROM: Mike Bedell, Public Works
SUBJECT: Item for Chair's Signature
Please submit this item for the Consent Agenda:
Work Order Form #5 Pursuant to an Agreement with Terracon for WCR 29, Soils
Subgrade Investigation, not to exceed $6,044.
Attached are two original Work Order Forms, please send one signed original Work Order Form
back to Public Works as soon as it is signed. .
Enclosures
M:AFrancieAAgendaMikeBedell.doc
M: \Francie\AgendaMikeBedell . doc
C encefti � 2008-0331