Loading...
HomeMy WebLinkAbout20080215.tiff t WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND CTL THOMPSON DATED: December 18, 2007 Work Order Number: CTL-4 Project Title: Public Works WCR 74 from WCR 59 to WCR 61: Soils Subgrade Investigation Commencement Date: January 7, 2008 Completion Date: February 4, 2008 Limitations on compensation: Not to exceed $5,456.33 Project Description: Soils subgrade investigation needed for the design of roadway improvements. Scope of Services: See attached Scope of Work dated December 18, 2007 Professional agrees to perform the services The attached forms are hereby accepted and identified above and on the attached forms in incorporated herein, by this reference, and accordance with the terms and conditions Notice to Proceed is hereby given. contained herein and in the Professional Services Agreement between the parties. In the event of a conflict between or ambiguity in the Weld County terms of the Professional Services Agreement and this work order (including the attached By: ,C..) y�•E • forms) the Professional Services Agreement Project Manager shall control. Date: \Z I \cI n'1 Professional By: /" y — Department ad CTL Thompson, Inc. Date: / — a' — 351 Linden Street, Unit 140 Fort Collins, CO 80524 By: Direct r n ministration By: v Date: IN 77 [0 Title: Se .oc &c. Co?7 By: / lam! t✓ Chairman, g,d Coyr_ty Commissioners --Date: i2�.r °"7 Date: JAN 99 Z008 n. iI. 00 rw nl-712_�� .EG 0658n CTLITHOMPSON December 18,2007 Weld County Public Works 1111 H Street P.O.Box 758 Greeley,Colorado 80632 Attention: Mr.Mike Bedell Subject: Fee Estimate for Subgrade Investigation WCR 74 from WCR 59 to WCR 61 Weld County, Colorado Proposal No. FC 07-0478 Mr. Bedell: At your request, CTL I Thompson, Inc. is pleased to provide this fee estimate for geotechnical engineering services for a subgrade investigation for the above referenced project. For preparation of this proposal, you provided us a site map delineating the project limits. We understand the County desires to obtain information regarding the existing pavement system and underlying subgrade soils for use in planning and design of the proposed improvements. We have also been requested to have the underground utilities located for the entire roadway. Our services will be limited to subgrade exploration, testing, and utility locations. No pavement design is requested for this project. Based on the provided site location map,the project covers approximately 5260 lineal feet. Your office has requested drilling 7 exploratory borings along the roadway at a spacing of approximately 700 to 800 feet. All borings will be drilled to a depth of 10 feet. We will collect and test samples of the subgrade soils,as we deem necessary,in accordance with Weld County street standards. You have requested Hveem(R-value) and Proctor tests be performed for this project. We understand that we will need to provide the necessary utility locates and traffic control for this investigation. You have also requested underground utility locates for the entire roadway length. Utility locate companies often charge additional fees for locating underground utilities outside of our dig area. Our estimate includes a fee for the additional locates if we are billed for these services by the locate company. We anticipate that the County will use our estimate for the basis of establishing a budget for the project and to issue a purchase order for our services. Our estimated scope of services and associated fees were prepared according to the terms of our professional services agreement with Weld County for the year 2007. 351 Linden Street I Unit 140 I Fort Collins,Colorado 80524 Telephone:970-206-9455 Fax:970-206-9441 Our estimated fee for geotechnical services associated with the subgrade investigation with utility locates is $5,456.33. If we can be of further assistance, please contact us at your convenience. Very truly yours, CTL I THOMPSON, INC. Thomas W. Fl ,CPG Senior Geologist WELD COUNTY PUBLIC WORKS WCR 74 PRON WCR 59 TO WCR II 2 CTL I T PROPOSAL NO.PC 07-0479 CTLITHOMPSON FEE ESTIMATE FC-07-0478 WCR 74 from WCR59 to WCR 61 Item Unit Quantity Unit Cost Amount Traffic Control Traffic Control Day 1 $431.00 $431.00 Sub-total $431.00 Drilling Mobilization LS 1.5 $135.00 $202.50 Locates (setup) LS 2 $77.00 $154.00 Permit Application Hr 2 $60.00 $120.00 Rig Hr 5 $135.00 $675.00 Drilling Supervision Hr 6 $60.00 $360.00 Contract Locates Hr 6 $86.25 $517.50 Sub-total $2,029.00 Laboratory Natural moisture/density Ea 7 $5.50 $38.50 Sieve Analysis w/Atterberg Limits Ea 4 $120.00 $480.00 Swell/consolidation Ea 4 $37.00 $148.00 Hveem 'R' value Ea 2 $310.00 $620.00 std Proctor Ea 2 $75.00 $150.00 Sub-total $1,436.50 Engineering Engineering Technician Hr 4 $45.00 $180.00 Sr. Engineering Technician Hr 4 $55.00 $220.00 Project Engineer Hr 8 $75.00 $600.00 Associate Hr 3 $100.00 $300.00 Sub-total $1,300.00 Sub-Total $5,196.50 contingency $259.83 Total $5,456.33 ‘64;" .„ MEMORANDUM TO: Clerk to the Board DATE: 1/8/2008 C. COLORADO FROM: Mike Bedell, Public Works SUBJECT: Consent Agenda Item Please put this item on the next Consent Agenda: Work Order Form Pursuant to an Agreement between Weld County and CTL Thompson, Work Order CTL-4 Enclosed are two duplicate original Work Order Forms. Please return one signed original to Public Works. M:\Francic\Agcnda Item.doc f rl . I "O i... I ice N.3v) N 2008-0215 CFCC-Ai&i Ara_ Hello