HomeMy WebLinkAbout20081163.tiff Ki "r;;:t t MEMORANDUM TO: Clerk to the Board DATE: April 16, 2008 C. FROM: Wayne Howard, Public Works COLORADO SUBJECT: Agenda Item Change Order No. 1 for the WCR 24 Corridor Study in the amount of$17,569.00. This item is a Change Order under a QBS Contract with Short, Elliott & Hendrickson, Inc. M:\Francie\AgendaChairSignature.doc EG' oD58 etc-At -01,e C2(' 7 u/ ? /- � ; P 2008-1163 '1'(; . - ',L) CHANGE ORDER NO. 1 Weld County Road 24 Corridor Study Date: Project: The Weld County Public Works Department plans to initiate a Corridor Study for Weld County Road 24 (WCR24). Project limits arc from the WCR23/WCR24 intersection(western terminus)to WCR 22/U.S. 85 intersection (eastern terminus). Change Order No. I is required to perform additional analysis of the corridor and additional public meetings. Owner: Weld County PW, 1111 H St..P.O. Box 758,Greeley.Colorado 80632 Consultant: Short Elliott & Hendrickson Inc. (SEH). Colorado Center Tower One, Suite 6000, 2000 South Colorado Blvd.. Denver.CO 80222.7923 The following change is hereby made to the Work Order No.5: o Additional services to the original Scope of Work are required. Additional services included: (Sec attached Exhibit A) • Identify a minimum of three alternative alignments taking into consideration any feedback received from the public • Additional one-on-one mcctings with local landowners • Two additional open house meetings • Revise original final report to include additional information o Costs for additional services are shown in the attached Exhibit B CHANGE TO CONTRACT PRICE: Original Contract Price: $ 45,752.00 Current Contract Price adjusted by previous Change Order: $ 45,752.00 The Contract Price due to this Change Order will be increased by: $ 17.56900 The new Contract Price,including this Change Order, will he$ 63.321,00 CHANGE TO CONTRACT TIME: The Contract time will he extended until August IS,2008. RECOMMENDED: APR 2 12008 Owner Representative: -' Date: Robert D. Masden,Chhir Pro-Tem Engineer: r era 4114441/1 Date: 4/, APPROVALS(/ Consultant: �SEN. .IIn By: "C \-t Date: 04/67/08 a-&'a G. WALD:.4 Title: rearrCz- MA..t4[sE2- 500E- //y = Exhibit A Weld County Public Works Department a 4*1C. COLORADO Weld County Road 24 Corridor Study Weld County Road 23 to U.S. 85 Work Order No. 5 Change Order #1 doe SEH March 2008 Weld County Road 24 Corridor Study General. The purpose of this task order is to continue work in pursuit of a Weld County Board of Commissioners (Commissioners) approved corridor study and roadway/bridge alignment that connects the Weld County Road (WCR)24/WCR23 intersection and the WCR22/U.S.85 intersection. The potential improvements would provide a new crossing of the South Platte River. Adjacent South Platte crossings are located approximately 2 miles north and 3 miles south of the study area on WCR 28 and 18 respectively. State Highway crossings are located 3 miles north and 5.5 miles south of the study area on SH66 and SH62 respectively. The previous task order for this corridor study resulted in submittal of a draft corridor study that identified a recommended alignment. The corridor study was presented to the Commissioners and a public hearing was held. Based on review of the corridor study and comments received at the public hearing, the Commissioners requested that the study team develop additional permutations of the alternatives developed thus far, perform additional evaluations, hold subsequent public and one-on-one property owner meetings and issue an updated corridor study. Study Area and Termini. The corridor termini primarily define the study area. The northwestern corner of the study area is established by WCR24/WCR23 intersection. The southeastern corner of the intersection is established by the WCR22/U.S. 85 intersection. Scope. The scope of work can be broken into six definable tasks: (1)project management, (2) development of additional alignment alternatives, (3) supporting Weld County Staff present findings to the Commissioners, (4) evaluating the additional alignments against original criteria, (5) revising and reproducing the corridor study and (6) attending and supporting public meetings and one-on-one property owner meetings. Project Management This task involves meeting with Weld County staff to develop the project, hold progress meetings, provide general support to Weld County during project prosecution, and administer the project. Alignment/Alternative Development Three additional permutations of alignments will be developed. Alternative 4 will be modified to skirt the eastern historic wall of the South Platte River, Alternative 3 will be modified to make better use of the existing WCR22 alignment. Alternative 2 will be adjusted to make better use of the existing WCR22.5 alignment and abandon bridge site. In addition, current roadway design criteria used to develop the original alternatives will be revisited and adjusted as appropriate considering engineering judgment, safety and project constraints. Commissioner Support Weld County Staff will periodically brief the Commissioners during the course of the task order. This will require development of graphics, text documents and potentially power point presentations. The consultant will be responsible for providing Weld County staff with this information. Evaluation. Existing evaluation criteria will be used to rank the new alignments and revisit the existing alignments. The criteria itself will not be revised. However, weighting may be adjusted slightly based on the results of the comments heard at the public hearing and recommendations from the Commissioners. An evaluation panel will be established and the standardized Weld County evaluation process will be followed. It is anticipated that a preliminary and final evaluation meeting will be held. Page 1 of 2 Weld County Road 24 Corridor Study Study. The bulk of the current report is usable as is. Revisions will be made to the report to incorporate changes made since the original publishing. It is anticipated that a draft and final version of the report will be developed. Open House and Meetings. Two public meetings are anticipated. The first will be held early in the project to discuss the current disposition of the project. The second will be held after alternatives have been developed. One-on-one property owner meetings will also be conducted early in the project. It is anticipated that approximately three meetings will be held. In addition, a site visit with Weld County staff will be conducted early in the project. Budget. The level of effort for the current change order to WO No. 5 is $17,569.00. A detailed cost estimate is attached. Schedule. The anticipated completion date of the task order is August 15, 2008. Page 2 of 2 Exhibit B Project Fee Schedule SEH WCR24 Cooridor Study Weld County Public Works, 3/19/2008 Fully Burdened Labor $16,266.00 Other Direct Costs $1,303.00 Subconsultants $0.00 Total $17,569.00 P:\UZ\W\WELDC\050200\050205\admin\budget\WCR24_Cost_Est_2.xls 3/20/2008 op o o cv m 0i x on cl)212 on 0 0 o 2. LC- C' _ o r -2EO et 000c0 } §\ }/ `J ® ®§ • Se 0 • 216, 0 - 8 ) O i Ozaolr wmcco > \ }\ \ 28 ; l<0<co0I- LIJ co .� , . 0 0 o o n. 12 C9 N o co co co o co 0 o CD o 0!00-0 \\\` co �\ 0= ri ) �,_» n'-s r mw ( fc 0 It _ \}\} ) f ; !<0<Q)0 8 8 0 § BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: WCR 24 Corridor Study—Change Order No. 1 DEPARTMENT: PUBLIC WORKS DATE: 4/9/08 PERSON REQUESTING: Wayne Howard, P.E., County Engineer-CIP Brief description of the problem/issue: PW hired SEH (one of the On-Call Consultants) to perform the WCR 24 Corridor Study. The goal of the study was to identify a preferred alignment which would connect WCR 24 to WCR 22 across the South Platte River. Several public meetings were held in 2007 during this study and Scot Lewis from PW presented the final report to the BOCC on October 1, 2007. Many local landowners attended the public hearing with opposition to the preferred alignment identified in the final report. The BOCC has requested PW relook at other possible alignments that may be more favorable. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) PW has requested SEH submit a scope of work and fee to continue working on the corridor study and consider three possible revised alignments as well as hold additional public meetings for review of other options. Attached is Change Order No. 1 with a total fee of$17,569.00 to perform these additional services. Recommendation to the Board: I recommend that the BOCC approve Change Order No. 1 and proceed with the study. If accepted, SEH would begin working immediately identifying new or revised alignments. The study should be completed by mid- August 2008. Approve Schedule Recommendation Work Session Comments William H. Jerke, Chair Roberta Masden, Pro-Tem William F. Garcia David E. Long V Douglas Rademacher rit Attachments pc: M:\—Active Projects\Strategic Corridor\WCR 24 Corridor Study\Design\Contracts\Work Session Request CO I.doe Hello