Loading...
HomeMy WebLinkAbout20082779.tiff BEFORE THE WELD COUNTY, COLORADO, PLANNING COMMISSION RESOLUTION OF RECOMMENDATION TO THE BOARD OF COUNTY COMMISSIONERS • Moved by Robert Grand,that the following resolution be introduced for passage by the Weld County Planning Commission. Be it resolved by the Weld County Planning Commission that the application for: CASE NUMBER: USR-1668 APPLICANT: Peter&Heather Valconesi PLANNER: Kim Ogle REQUEST: A Site Specific Development Plan and a Use by Special Review Permit for a Use by Right or an Accessory Use in the Commercial or Industrial Zone Districts, provided the property is not a lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions and one(1)single-family dwelling unit per lot(assemble wall components for laundromats and a secondary residence)in the A(Agricultural) Zone District. LEGAL DESCRIPTION: Lot B of RE-4254, Pt NE4 of Section 14,T4N, R68W of the 6th P.M.,Weld County, Colorado. LOCATION: South of and adjacent to CR 46 and approximately 3/4 mile east of I-25. be recommended favorably to the Board of County Commissioners for the following reasons: 1. The submitted materials are in compliance with the application requirements of Section 23-2-260 of the Weld County Code. 2. It is the opinion of the Planning Commission that the applicant has shown compliance with Section 23-2-220 of the Weld County Code as follows: A. Section 23-2-220.A.1 -- The proposed use is consistent with Chapter 22 and any other applicable code provisions or ordinance in effect. Section 22-2-150D.A Goal 4 states: "Conversion of agricultural land to nonurban residential, commercial and industrial uses will • be accommodated when the subject site is in an area that can support such development. Such development shall attempt to be compatible with the region." The proposed assembly structure is planned to resemble a horse barn with stucco siding, rock wainscoting and large wood pillars. The surrounding property is primarily agricultural in nature with a few homes in close proximity. There are six parcels within 500 feet of the property.Section 23-2-240.A.10 of the Weld County Codes states "...that buffering or screening of the proposed use from adjacent properties may be required in order to make the determination that the proposed use is compatible with the surrounding uses." As a Condition of Approval the applicant will be required to screen the use from adjacent properties and rights-of-way. Development Standards and Conditions of Approval will ensure that the proposed use will be compatible with the vicinity B. Section 23-2-220.A.2--The proposed use is consistent with the intent of the A(Agricultural) Zone District. Section 23-3-40.R of the Weld County Code provides for a Site Specific Development Plan and a Special Review Permit for a Use by Right, an Accessory Use, or a Use by Special Review in the Commercial or Industrial Zone District (assemble wall components for laundromats) and Section 23-3-40.L (secondary residence) in the A (Agricultural)Zone District C. Section 23-2-220.A.3--The uses which will be permitted will be compatible with the existing surrounding land uses. The surrounding properties are agricultural in nature with rural residences. The Town of Berthoud has annexed the property to the southwest of the site these lands are approved for a residential subdivision, however, no development has occurred and land continues to be farmed, The location of the assembly structure will have little if any affect on adjacent neighbors given the topography. Conditions of Approval and Development Standards will ensure compatibility with the surrounding area. • D. Section 23-2-220.A.4 -- The uses which will be permitted will be compatible with future development of the surrounding area as permitted by the existing zoning and with the future development as projected by Chapter 22 of th d any other applicable EXHIBIT 2008-2779 Resolution USR-1668 Peter&Heather Valconesi Page 2 • code provisions or ordinances in effect, or the adopted Master Plans of affected municipalities. The site is located within three miles of the Town of Berthoud, the Town of Johnstown and Larimer County. The Town of Berthoud in their referral dated September 9, 2008 stated that the "Berthoud Comp[rehensive] Plan shows area as Low Density Residential, but Town has no objection to proposal." Larimer County returned a referral dated September 10,2008 indicating no conflict,and the Town of Johnstown did not return a referral. E. Section 23-2-220.A.5--The site does not lie within any Overlay Districts. Effective January 1, 2003, Building Permits issued on the proposed lots will be required to adhere to the fee structure of the County Road Impact Program. (Ordinance 2002-11) Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40) F. Section 23-2-220.A.7 -- The Design Standards (Section 23-2-240, Weld County Code), Operation Standards (Section 23-2-250, Weld County Code), Conditions of Approval and Development Standards ensure that there are adequate provisions for the protection of health, safety, and welfare of the inhabitants of the neighborhood and County. This recommendation is based, in part, upon a review of the application materials submitted by the applicant, other relevant information regarding the request, and responses from referral entities. The Department of Planning Services met with the applicant on September 11, 2008 to discuss the referrals received. The applicant submitted an electronic mail letter dated September 16, 2008 that attempted to • address the comments outlined in the received referrals. The Conditions of Approval outlined below are the remaining items that still need to be addressed. The Planning Commission recommendation for approval is conditional upon the following: 1. Prior to recording the plat: A. The applicant shall submit a detailed sign plan in compliance with Chapter 23 Appendix 23-C of the Weld County Code to the Weld County Department of Planning Services for review and approval. (Department of Planning Services) B. The applicant shall address the requirements (concerns) of the Little Thompson Water District,as stated in the referral response dated August 14, 2008. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) C. The applicant shall address the requirements (concerns)of the Johnstown Fire Protection District,as stated in the referral response dated August 29, 2008. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) D. The applicant shall address the requirements(concerns)of the Weld County Department of Public Works, as stated in the referral response dated September 5,2008. Including but not limited to a final drainage construction and erosion control plans. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) • E. The applicant shall address the requirements(concerns)of the Weld County Department of Public Health and Environment,as stated in the referral response dated September 4,2008. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) Resolution USR-1668 Peter& Heather Valconesi Page 3 • F. The applicant shall address the requirements(concerns)of the Weld County Department of Building Inspection, referral dated September 4,2008. Evidence of such shall be submitted in writing to the Weld County Department of Planning Services. (Department of Planning Services) G. The applicant shall submit a dust abatement plan(vehicle traffic)for review and approval,to the Environmental Health Services, Weld County Department of Public Health & Environment. Evidence of acceptance shall be submitted in writing to the Weld County Department of Planning Services. (Department of Environmental Health) H. The applicant shall submit evidence of an Air Pollution Emission Notice (A.P.E.N.) and Emissions Permit application from the Air Pollution Control Division,Colorado Department of Health and Environment, if applicable.Alternately, the applicant can provide evidence from the APCD that they are not subject to these requirements. Evidence of acceptance shall be submitted in writing to the Weld County Department of Planning Services. (Department of Environmental Health) The applicant shall submit a waste handling plan, for approval, to the Environmental Health Services Division of the Weld County Department of Public Health & Environment. Evidence of acceptance shall be submitted in writing to the Weld County Department of Planning Services. The plan shall include at a minimum, the following: 1) A list of wastes which are expected to be generated on site(this should include expected volumes and types of waste generated). 2) A list of the type and volume of chemicals expected to be stored on site. • 3) The waste handler and facility where the waste will be disposed (including the facility name, address, and phone number). (Department of Environmental Health) J. The applicant shall submit evidence to the Department of Planning Services and the Environmental Health Department, from Little Thompson Water District, demonstrating that water is available for the business and for a second residence. Evidence of acceptance shall be submitted in writing to the Weld County Department of Planning Services. (Department of Environmental Health) K. Provide all drainage/stormwater calculations for the proposed pond and channel. Mentioned drainage report was not included in this submittal. (Department of Public Works) L. The applicant shall submit a Landscape and Screening Plan for the site. The plan at a minimum shall include the existing and future plant material including the proposed fencing, lighting,screening and landscape treatment from adjacent properties. The plan shall include the method of screening the outdoor storage of vehicles, equipment or materials from adjacent properties and future rights-of-way. The applicant shall maintain compliance with Section 23-2-250.6.7 of the Weld County Code at all times. (Department of Planning Services) M. The applicant shall complete all proposed improvements including those regarding landscaping,screening,access improvements and parking lot requirements or enter into an Improvements Agreement according to policy regarding collateral for improvements and post adequate collateral for all required materials. The agreement and form of collateral shall be reviewed by County Staff and accepted by the Board of County Commissioners prior to recording the USR plat. (Department of Planning Services) • Resolution USR-1668 Peter& Heather Valconesi Page 4 • N. The applicant shall submit a letter to the Department of Planning Services requesting a vacation of the Site Specific Development Plan and a Use by Special Review Permit, USR- 739,for a 200 dog Kennel that presently encumbers this property. (Department of Planning Services) O. The plat shall be amended to delineate the following: 1. All sheets shall be labeled USR-1668 (Department of Planning Services) 2. The attached Development Standards. (Department of Planning Services) 3. The plat shall delineate any signs in compliance with Chapter 23,Appendix 23-C of the Weld County Code. (Department of Planning Services) 4. County Road 46 is designated on the County Road Classification Plan as collector road,which requires 80 feet of right-of-way at full build out.There is presently 60 feet of right-of-way. A total of 40 feet from the centerline of County Road 46 shall be delineated on the plat. The future and existing right of way including the documentation creating them shall be delineated on the plat. This road is maintained by Weld County. (Department of Public Works) 5. A Forty(40)foot radius is required on all accesses to public roads for accesses designed to accommodate truck traffic. {A minimum effective turning radius of forty(40)feet shall be used for accesses intended to accommodate truck traffic. (Weld County Codification Ordinance 2000-1)} (Department of Public Works) 6. The applicant shall provide a Lighting Plan. Should exterior lighting be a part of this • facility, all light standards shall be delineated on the plat and be in accordance with Section 23-3-250.B.6 of the Weld County Code. (Department of Planning Services) 7. The Department of Planning Services has determined from the application materials that eleven(11)parking spaces and one(1)ADA parking space will be required on site. Each parking space should be equipped with wheel guards where needed to prevent vehicles from extending beyond the boundaries of the space and from coming into contact with other vehicles, walls, fences, sidewalks, or plantings (Department of Planning Services) 8. The approved Landscape and Screening Plan. (Department of Planning Services) P. The applicant shall submit two (2) paper copies of the plat for preliminary approval to the Weld County Department of Planning Services. (Department of Planning Services) 2. Upon completion of 1.above the applicant shall submit a Mylar plat along with all other documentation required as Conditions of Approval.The Mylar plat shall be recorded in the office of the Weld County Clerk and Recorder by Department of Planning Services' Staff. The plat shall be prepared in accordance with the requirements of Section 23-2-260.D of the Weld County Code. The Mylar plat and additional requirements shall be submitted within thirty(30)days from the date of the Board of County Commissioners resolution. The applicant shall be responsible for paying the recording fee. (Department of Planning Services) 3. The Department of Planning Services respectively requests the surveyor provide a digital copy of this Use by Special Review. Acceptable CAD formats are.dwg, .dxf,and .dgn(Microstation); acceptable GIS formats are ArcView shapefiles,Arclnfo Coverages and Arclnfo Export files format type is .e00. • The preferred format for Images is.tif(Group 4). (Group 6 is not acceptable). This digital file may be sent to maps(@co.weld.co.us. (Department of Planning Services) Resolution USR-1668 Peter&Heather Valconesi Page 5 • 4. Prior to operation: A. The applicant shall provide a written sign-off from the Johnstown Fire Protection District to the Department of Building Inspection. (Department of Building Inspection) B. The applicant shall submit evidence of a Colorado Discharge Permit System or CDPS permit from the Colorado Department of Public Health and Environment(CDPH&E), Water Quality Control Division, to cover stormwater discharges from construction sites (5 CCR-1002-61) Alternately, the applicant can provide evidence from CDPH&E that they are not subject to the CDPS requirements. Written evidence of approval shall be submitted to the Department of Planning Services. (Department of Public Health and Environment) 5. Prior to the issuance of the Certificate of Occupancy: A. An individual sewage disposal system is required for the proposed facility and is required to be designed by a Colorado Registered Professional Engineer. The system shall be designed and installed according to the Weld County Individual Sewage Disposal Regulations. (Department of Public Health and Environment) 6. The Special Review activity shall not occur nor shall any building or electrical permits be issued on the property until the Special Review plat is ready to be recorded in the office of the Weld County Clerk and Recorder. (Department of Planning Services) Motion seconded by Nick Berryman. VOTE: • For Passage Against Passage Absent Robert Grand Bill Hall Tom Holton Doug Ochsner Erich Ehrlich Roy Spitzer Paul Branham Mark Lawley Nick Berryman The Chair declared the resolution passed and ordered that a certified copy be forwarded with the file of this case to the Board of County Commissioner's for further proceedings. CERTIFICATION OF COPY I, Kristine Ranslem, Recording Secretary for the Weld County Planning Commission,do hereby certify that the above and foregoing resolution is a true copy of the resolution of the Planning Commission of Weld County, Colorado, adopted on October 7, 2008. Dated the 7th of October, 2008. • ' t`/1 ' Kristine Ranslem Secretary SITE SPECIFIC DEVELOPMENT PLAN SPECIAL REVIEW PERMIT DEVELOPMENT STANDARDS • Valconesi—High Mark Manufacturing, Inc. USR-1668 1. A Site Specific Development Plan and a Use by Special Review Permit for a Use by Right or an Accessory Use in the Commercial or Industrial Zone Districts (assemble wall components for laundromats[High Mark Manufacturing, Inc.])and a secondary residence)one single family dwelling unit per lot other than those permitted as a use by right in the A(Agricultural)Zone District,subject to the Development Standards stated hereon. (Department of Planning Services) 2. Approval of this plan may create a vested property right pursuant to Section 23-8-10 of the Weld County Code. (Department of Planning Services) 3. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. (Department of Public Health and Environment) 4. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. (Department of Public Health and Environment) 5. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. (Department of Public Health and Environment) • 6. The applicant shall operate in accordance with the approved"waste handling plan". (Department of Public Health and Environment) 7. The facility shall be operated in accordance with the approved "dust abatement plan"at all times. (Department of Public Health and Environment) 8. If applicable,the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. (Department of Public Health and Environment) 9. This facility shall adhere to the maximum permissible noise level allowed in the Commercial Zone as delineated in Section 14-9-10 of the Weld County Code. (Department of Public Health and Environment) 10. Adequate handwashing and toilet facilities shall be provided for employees and patrons of the facility. (Department of Public Health and Environment) 11. Sewage disposal for the facility shall be by septic system. Any septic system located on the property must comply with all provisions of the Weld County Code, pertaining to Individual Sewage Disposal Systems. (Department of Public Health and Environment) 12. A permanent, adequate water supply shall be provided for drinking and sanitary purpose. (Department of Public Health and Environment) 13. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. (Department of Public Health and Environment) • 14. A building permit shall be obtained prior to the construction of any new building,addition or remodel of existing buildings. A building permit is required for change of use of any existing buildings. (Department of Building Inspection) Resolution USR-1668 Peter&Heather Valconesi Page 7 15. A plan review is required for each building for which a building permit is required. Plans shall bear the west stamp of a Colorado registered architect or engineer. Two complete sets of plans are required with applying for each permit. (Department of Building Inspection) 16. Structures shall conform to the requirements of the various codes adopted at the time of permit application. Currently the following has been adopted by Weld County: 2006 International Building Code; 2006 International Mechanical Code; 2006 International Plumbing Code; 2006 International Fuel Gas Code; and the 2005 National Electrical Code and Chapter 29 of the Weld County Code. (Department of Building Inspection) 17. A building permit application must be completed and two complete sets of plans including engineered foundation plans bearing the wet stamp of a Colorado registered architect or engineer must be submitted for review. A geotechnical engineering report performed by a registered State of Colorado engineer shall be required. (Department of Building Inspection) 18. Building height shall be measured in accordance with the 2006 International Building Code for the purpose of determining the maximum building size and height for various uses and types of construction and to determine compliance with the Bulk Requirements from Chapter 23 of the Weld County Code. Building height shall be measured in accordance with Chapter 23 of the Weld County Code in order to determine compliance with offset and setback requirements. When measuring buildings to determine offset and setback requirements, buildings are measured to the farthest projection from the building. Property lines shall be clearly identified and all property pins shall be staked prior to the first site inspection. (Department of Building Inspection) 19. A letter of approval shall be provided to the Department of Building Inspection from the Johnstown Fire Protection District prior to construction of any structure. (Department of Building Inspection) • 20. If exterior lighting is proposed to be a part of this facility, all light standards shall be delineated in accordance with Section 23-3-250.B.6 of the Weld County Code. (Department of Planning Services) 21. Should noxious weeds exist on the property or become established as a result of the proposed development the applicant/landowner shall be responsible for controlling the noxious weeds,pursuant to Chapter 15, Articles I and II of the Weld County Code. (Department of Public Works) 22. The normal hours of operation are 8:00am to 4:30pm. Monday through Saturday with occasional periods of 24 hour operation. (Department of Planning Services) 23. The site shall not have more than six (6) employees on site at any given time. (Department of Planning Services) 24. The living quarters located in the building associated with the assembling of wall components shall be utilized by employees of the company or by Valconesi family only. (Department of Planning Services) 25. The second single family residence shall be for the Valconesi family only. (Department of Planning Services) 26. The application does not propose any portion of the site to be leased to another party. In the event that a portion of the building is proposed to be leased to another party in the future,the applicant shall submit a copy of the lease agreement and information regarding the proposed use of the leased portion to the Weld County Building Inspection Department,Johnstown Fire Protection District and the Department of Planning Services for review. Based upon the proposed use and/or impacts of the leased portion,the Department of Planning Services may require an Amended Use by Special Review application. (Department of Planning Services) • 27. Effective January 1, 2003, Building Permits issued on the lot will be required to adhere to the fee structure of the Weld County Road Impact Program. (Ordinance 2002-11)(Department of Planning Services) Resolution USR-1668 Peter&Heather Valconesi Page 8 • 28. Effective August 1, 2005, Building permits issued on the subject site will be required to adhere to the fee structure of the Capital Expansion Impact Fee and the Stormwater/Drainage Impact Fee. (Ordinance 2005-8 Section 5-8-40)(Department of Planning Services) 29. The landscape and screening on site shall be maintained in accordance with the approved Landscaping and Screening Plan. (Department of Planning Services) 30. The property owner shall allow any mineral owner the right of ingress or egress for the purposes of exploration development,completion,recompletion,re-entry,production and maintenance operations associated with existing or future operations located on these lands. (Department of Planning Services) 31. The property owner or operator shall be responsible for complying with the Design Standards of Section 23-2-240, Weld County Code. (Department of Planning Services) 32. The property owner or operator shall be responsible for complying with the Operation Standards of Section 23-2-250, Weld County Code. (Department of Planning Services) 33. Personnel from the Weld County Government shall be granted access onto the property at any reasonable time in order to ensure the activities carried out on the property comply with the Development Standards stated herein and all applicable Weld County regulations. (Department of Planning Services) 34. The Special Review area shall be limited to the plans shown hereon and governed by the foregoing standards and all applicable Weld County regulations. Substantial changes from the plans or Development Standards as shown or stated shall require the approval of an amendment of the Permit • by the Weld County Board of County Commissioners before such changes from the plans or Development Standards are permitted. Any other changes shall be filed in the office of the Department of Planning Services. 35. The property owner or operator shall be responsible for complying with all of the foregoing Development Standards. Noncompliance with any of the foregoing Development Standards may be reason for revocation of the Permit by the Board of County Commissioners. (Department of Planning Services) i 1O, - 7-O-nO? The Chair called a recess at 1:33 p.m. and added that they will accept further public comments after the • hearing of two cases, USR-1668 and USR-1665. Commissioner Ehrlich left the meeting at 1:33 p.m. The Chair reconvened the meeting at 1:42 p.m. and started with the first Consent Agenda item. CASE NUMBER: USR-1668 APPLICANT: Peter&Heather Valconesi PLANNER: Kim Ogle REQUEST: A Site Specific Development Plan and a Use by Special Review Permit for a Use by Right or an Accessory Use in the Commercial or Industrial Zone Districts, provided the property is not a lot in an approved or recorded subdivision plat or lots parts of a map or plan filed prior to adoption of any regulations controlling subdivisions and one(1)single-family dwelling unit per lot(assemble wall components for laundromats and a secondary residence)in the A(Agricultural) Zone District. LEGAL DESCRIPTION: Lot B of RE-4254, Pt NE4 of Section 14,T4N, R68W of the 6th P.M.,Weld County, Colorado. LOCATION: South of and adjacent to CR 46 and approximately 3/4 mile east of 1-25. The Chair asked if the Planning Commissioners would like this case to remain on the Consent Agenda. Mr. Grand said that he would like to hear this case due to the response of two letters that were received regarding a water issue and a road issue. Mr. Ochsner also stated that he would like to hear this case. Chris Gathman, Department of Planning Services,stated the applicant is represented by Sheri Lockman,with Lockman Land Consulting, LLC. The site is located south of and adjacent to County Road 46 and approximately 3/4 mile east of 1-25. The • property is within the three mile referral area of the Town of Berthoud, the Town of Johnstown and Larimer County. The Town of Berthoud in their referral dated September 9, 2008 stated that the "Berthoud Comprehensive Plan shows area as Low Density Residential, but the Town has no objection to proposal." Larimer County returned a referral dated September 10, 2008 indicating no conflict, and the Town of Johnstown did not return a referral. This proposed facility is to be the manufacturing headquarters of High Mark Manufacturing, Inc, a company that aassembles wall components and related furniture for Laundromats. The application materials indicate a second single family residence is also requested. At this time it is an unimproved parcel so there is no residence currently on the property. Mr. Gathman stated that he understands under this application, the applicant would have the business and a residence and then at some later time there would be another residence on the property. The hours of operation are 8:00 a.m. to 4:30 p.m. Monday through Saturday with occasional periods of 24 hour operation depending on material order. The site will have no more than six (6)employees on site at any given time. The proposed assembly structure is planned to resemble a horse barn with stucco siding, rock wainscoting and large wood pillars. Living quarters will be on the second floor of this structure. Water is to be provided by Little Thompson Water District and an ISDS system will handle the effluent flows. Site lighting will be from wall mounted lights that are shielded. The surrounding properties are agricultural in nature with rural residences. There are six parcels within 500 feet of the property.The Town of Berthoud has annexed the property to the southwest of the site and these lands are approved for a residential subdivision, however, no development has occurred and land continues to be farmed. The location of the assembly structure will have little if any affect on adjacent r • neighbors given the topography. m Mr. Gathman indicated that the site slopes considerably to the south. The residences north of the location x= ..) will not be able to see the site, given the topography. K 4 ..+won • Fourteen referral agencies have reviewed this case and eleven offered comments, some with specific conditions that have been incorporated into this recommendation. Staff received one letter from a surrounding property owner dated September 30, 2008 objecting to the proposed application citing compatibility and quality of life, specific to traffic, noise, dirt and dust, additional light, and potential for additional crime. Staff also received an email October 1, 2008 which states their concern of the amount of water that they would be able to get from the Little Thompson Water District. This neighbor indicates that they have a lack of water pressure and are concerned that this use would further aggravate the already low water pressure problems. In addition their concerns are additional traffic on County Road 46 as well as air quality, dust, noise and damage to County Road 46. A handwritten letter was received October 1, 2008 from a neighboring property owner immediately to the east of the site. The neighbor has an existing access and they are concerned if this access would be shared with this proposed use. They request that their access remain as their own private access drive and not be shared with this business. Mr. Gathman stated that under the proposal there would be a separate access from County Road 46 and added that the applicant would not be sharing the access with their neighbor. The Chair asked if the applicant had any comments. Sheri Lockman, 36509 CR 41, Eaton CO. Ms. Lockman stated that High Mark Manufacturing is currently located in Johnstown and they assemble wall components for laundromats. She added that the panels are built off-site then assembled with water lines, power boxes, conduit and wire on-site. • Ms. Lockman stated that the business will have a maximum of six employees. She added that the applicant is planning to make the business look like a very attractive horse barn. They plan to have stucco siding, rock wainscoting and large wood pillars. Ms. Lockman stated that the surrounding properties are agricultural in nature with single family residences. She commented that the Town of Berthoud has annexed the property southwest of the site but stated it is being farmed at this time. She added that Johnstown and Berthoud indicated that they had no concerns with this proposal nor had any interest in annexing this site. Ms. Lockman expressed that careful consideration was given to the location of the buildings. She stated that the site was chosen because it will have the least impact to the surrounding property owners. She indicated that this site is screened from adjacent property owners. Ms. Lockman commented that one of the letters of concern was from Albert and Lorane Michall and indicated that they asked for reassurance that the proposal will not affect their private road, holding pond or ditch. Ms. Lockman stated that Mr. and Mrs. Michall can be assured that the USR will not have any affect whatsoever on their road, holding pond or ditch. Ms. Lockman said that the other concerns that were raised included noise. The business does not produce any noise which can be heard off-site, nor does it have any associated smell. Ms. Lockman added that the lighting on the buildings will consist of one light near each door and they will be shielded so that it is not a nuisance to the surrounding property owners. The business will have a maximum of six employees along with two UPS type delivery trucks which only come once a week. Ms. Lockman commented that this is not an excessive amount of traffic. • Mr. Valconesi will be submitting a dust abatement plan which will protect the adjacent neighbors from dust. The plan includes applying an approved dust control chemical such as Magnesium Chloride to the section of roadway that is generating the dust if the County deems necessary. 5 Ms. Lockman stated that the Little Thompson Water District has agreed to service the proposed uses and • commented that they are the experts and should know if they have the ability to furnish the water. She added that Mr. Valconesi will have to comply with any upgrades that the water district deems necessary. She stressed that the business and residence will not be very big water users. She asked the Planning Commissioners to keep in mind that biggest water user by far will be single-family residence and that is a Use by Right; he does not have to ask for permission to build that residence. Ms. Lockman stated that the applicants wish to maintain the value and the residential quality of this property. She indicated that they do not wish to turn this property into a Commercial/Industrial looking site. Ms. Lockman showed some photos of the site. She indicated that staff had asked for additional screening; therefore the applicants are proposing additional bushes and trees along the south side of the property. They feel the screening on the other three sides of the building is adequate given the drop in elevation and distance to the other homes. Ms. Lockman said that the second part of the request is for an apartment within that building. The apartment would be used by the applicant and his family for their single-family dwelling until they are able to build the home at the top of the hill. She commented that it could be a few years. The final plan for the apartment is to house the applicant's mother who intends to live on the site when her health reaches a point where she requires additional care. Ms. Lockman commented that the applicant would have preferred to do a Recorded Exemption for the additional home. However it is not eligible for an additional split. Ms. Lockman stressed that this unit will not be used as a rental apartment at any time. The Chair asked Public Works and the Health Department for their comments. Dave Snyder, Public Works, commented that he looked at the traffic counts and found that it is well below • the dust abatement threshold for that section of road. It appears to be a very minimal impact. Lauren Light, Health Department, stated that she received a well serve letter from Little Thompson Water District and they stated that if there are any upgrades required it is the responsibility of the applicant to put in the upgrades to that water line. The Health Department is requiring a Dust Abatement Plan which will be for on-site dust. They are also requiring a Waste Handling Plan and will have the applicant inquire with the State whether they will need an Air Emissions Permit because there will be some wood cutting on the site. Ms. Light indicated that - there is a Development Standard which restricts the noise to the Commercial Zone. The Weld County Code states that the Commercial and Residential Zone are the same; therefore the noise cannot exceed what you find in the normal residential area. Ms. Light stated that they do not have any concerns based on the Development Standards. Commissioner Grand asked Ms. Light is she is comfortable that there will be an adequate water supply. Ms. Light replied that according to the letter from the Little Thompson Water District she is comfortable. Commissioner Ochsner asked if the Water District is aware of these concerns and further asked if it could be forwarded to them. Mr. Gathman said that he could certainly send them their concerns. Commissioner Grand asked for a copy of the Little Thompson Water District letter be sent to Mr. and Mrs. Michall as well. The Chair asked if there was anyone in the audience who wished to speak for or against this application. No one wished to speak. • The Chair asked the applicant if they read through the Development Standards and Conditions of Approval and if they are agreement with those. The applicant replied that they are in agreement. Robert Grand moved that Case USR-1668, be forwarded to the Board of County Commissioners along with 6 the Conditions of Approval and Development Standards with the Planning Commission's recommendation of • approval, Nick Berryman seconded the motion. The Chair asked the secretary to poll the members of the Planning Commission for their decision. Nick Berryman, yes; Paul Branham, yes; Erich Ehrlich, absent; Robert Grand, yes; Bill Hall, yes; Mark Lawley, absent; Roy Spitzer, absent; Tom Holton, absent; Doug Ochsner, yes. Motion carried unanimously. The Chair read the next case into record. CASE NUMBER: USR-1665 APPLICANT: High Plains Disposal, Inc PLANNER: Chris Gathman LEGAL DESCRIPTION: Part N2 of Section 25,T5N, R65W of the 6th P.M.,Weld County, Colorado. REQUEST: A Site Specific Development Plan and a Special Review Permit for Oil and Gas Support Facility(Class II - Oilfield Waste Disposal Facility)in the A(Agricultural) Zone District. LOCATION: South of and adjacent to CR 54 and approximately 1/2 mile west of CR 49. Chris Gathman, Department of Planning Services, stated that the site is located south of and adjacent to County Road 54 and approximately'% mile west of County Road 49. The proposed site is bordered by an agricultural parcel to the east, a parcel with oil and gas production facility(tank battery and wellhead)to the west, and agricultural land to the north (across County Road 54).The Union Pacific Railroad and agricultural land along with oil and gas production facility is located immediately to the south. The three nearest single-family residences are located approximately 1/4 to the west of the site. Development Standards and Conditions of Approval will ensure compatibility with existing surrounding land uses. Fifteen referrals were sent out; nine referrals were received and either indicated no concerns or are addressed through development standards and conditions of approval. No referral responses were • received from the State of Colorado, Oil &Gas Conservation Commission, Division of Wildlife, LaSalle Fire Protection District, Union Pacific Railroad, and State of Colorado Department of Health. Mr. Gathman stated that he received a phone call from the EPA indicating that they do not review injection well permits. The site is located within the three-mile referral area of the Town of Kersey. No letters from surrounding property owners have been received.The Department of Planning Services did receive a phone call from a nearby property owner who expressed concern in regard to traffic accessing to and leaving the site.A primary concern expressed by this neighbor was how vehicles would access onto County Road 54 without impeding oncoming traffic through the merging of large vehicles onto County Road 54 without an accel/decel lane and also the potential for trucks swinging into the oncoming lanes when leaving the site. This application was submitted prior to the adoption of the new application review process. The applicant requested that the application be reviewed under the old process; therefore no community meeting was requested by the Department of Planning Services. The following are Conditions of Approval and Development Standards addressing/mitigating concerns: • The Department of Public Works is requiring a 60-foot radius access onto County Road 54. • The Department of Public Works has designated a haul route based on where traffic is going to and coming from. • A lighting plan (because the applicant is proposing to haul until 10 PM) • A landscape plan (clarifying the berming of the site) Mr. Gathman referred to a memo that he handed out. He indicated that there were several recommended changes to staff comments. He stated that under Condition of Approval 2.1, per Public Works' • recommendation they are suggesting to change it to read "The applicant shall submit an improvements agreement that addresses the timing and scope of the applicant's participation in paying the costs of improvements to the intersection of WCR 49 and State Highway 34, WCR 47 and State Highway 34, WCR 47 and WCR 54 and WCR 49 and WCR 54 based upon the applicant's proportion of overall use of 7 Hello