Loading...
HomeMy WebLinkAbout20080580.tiff AMENDED AND RESTAT SITE SPECIF1PDEVELOPMENT PLAN AND US Y SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE DATE RECEIVED: • RECEIPT #/AMOUNT # 1$ CASE#ASSIGNED: APPLICATION RECEIVED BY PLANNER ASSIGNED: Parcel Numbers.s___0___-2._6-Z-6J1_-_0__11__a_(but only the WzNE4SE4 of Sec. 23 ). (12 digit number-found on Tax I.D.information,obtainable at the Weld County Assessor's Office,or www.co.weld.co.us). Legal Description W'NE%SE% ,Section 23, Township 6 North, Range 66 West Flood Plain: Zone District: R-1 , Total Acreage: 2n , Overlay District: Geological Hazard: ,Airport Overlay District: FEE OW NER(S) OF THE PROPERTY: Name: Ogilvy Irrigating & Land Co. Work Phone #9703715322 Home Phone # Email Address: Address: R99 71-h Street , S»itA 760 • Greeley,,00 80631 City/State/Zip Code . APPLICANT OR AUTHORIZED AGENT (See Below:Authorization must accompany applications signed by Authorized Agent) Name: Thomas E. Hellerich, Agent . for TARH E&P Holdings, L_p., . Work Phone #9703524805 Home Phone # Email thellerich@wh-h.com Address: Address: 5354 w 11th Greet , S»itn 101 Greeley, CO 80634 City/State/Zip Code • PROPOSED USE: Oil and gas well drilling, completion, operation, compression, and all other uses consistent with drilling and production of oil and gas. I (We)hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs,a letter of authorization from all fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal authority to sign for the corporation. See Limited Power of Attorney- submitted With this application. 2008-0580 • EXHIBIT Thomas E. Hellerich,Attorney-in-Fact Date: September 6, 2007 • • SPECIAL LIMITED POWER OF ATTORNEY • State of Colorado County of Weld TARN E&P Holdings,LP,a Texas Limited Partnership,and Texas American Resources Company,a Texas corporation (collectively referred to a "Principal"), whose principal place of business is 98 San Jacinto Boulevard, Suite 800, Austin, Texas 78701, do hereby appoint, with full power of substitution and revocation Thomas E. Hellerich, whose business address is 5754 West 111 Street, Suite 101, Greeley, CO 80634 ("Attorney-in-Fact"), as its true and lawful attorney-in-fact, under limited circumstances for the expressly limited purposes and upon the following terms and conditions: 1. Special and Limited Powers. Attorney-in-Fact may act in Principal's name,place and stead and may, on Principal's behalf, execute and file application forms and plats with, make appearances, and give testimony before the Weld County Planning Commission and the Board of Weld County Commissioners for Weld County, Colorado, acknowledge, affirm,modify, amend, deliver and execute, acknowledge, affirm, modify, amend, deliver and accept contracts and agreements,required or necessary in connection with obtaining one or more Use by Special Review permits from Weld County, Colorado,for the drilling,completion,and production of oil and gas wells in the W 1/2NE1/4SEI/4 of Section 23,Township 6 North,Range 66 West,6"'P.M,Weld County,Colorado. 2.Monetary Limits. Attorney-in-Fact may not bind Principal under any contract or agreement, or similar commitment,or any multiple contracts or agreements relating to or in connection with obtaining one or More Use by Special Review permits from Weld County, Colorado,for the drilling,completion,and production of oil and gas wells in the WI/2NE1/4SEI/4 of Section 23, Township 6 North, Range 66 West, 6t° P.M, Weld County, Colorado,where such commitments or liabilities assumed by Principal exceed$3,500.00 US. 3.Construction. This instrument is to be construed and interpreted as a special and limited power of • attorney. 4.Revocation. This Special Power of Attorney may be voluntarily revoked at any time by Principal's written revocation delivered to the person appointed hereunder or by Principal recording a revocation in the real property records of Weld County,Colorado or both. 5.Ratification. Principal ratifies and affirms all that its Attorney-in-Fact shall lawfully do or cause to be done on behalf of Principal by virtue of this Special Limited Power of Attorney. -rd This Special Limited Power of Attorney is signed by Principal this (a"day of September 2007. TARN E&P HOLDIN S LP,by TEXAS AMERI A RESOURCES COMPANY TARN &P HOLDI S GP, L.L.C, its Gen al Partner By: By: Name: ro i Name: se an Title: Secre ry Title: Chief rating Officer • 1 , • • • STATE OF TEXAS ) ) ss. COUNTY OF TRAVIS ) The foregoing instrument was acknowledged before me this 6«' day of September 2007, by Troy Gieselman as Secretary of TARN E&P HOLDINGS GP, L.L.C as General Partner of TARN E&P Holdings LP,a Texas limited partnership,on behalf of said partnership. Witness my hand and official seal. ''''.. LADELLE H.ROBERTS `�� My commission expires: ; MY COMMISSION EXPIRES �• Ir.•,- July 15,2009 Notary Public at. STATE OF TEXAS ) ' ) ss. COUNTY OF TRAVIS )The foregoing instrument was acknowledged before me this /�- day of September 2007, by Troy Gieselman as Chief Operating Officer for Texas American Resources Company, a Texas corporation, on behalf of said corporation. Witness my hand and official seal. i My commission expires: �ai.LG1Pl_ 7• /6L'' . � s LADELLEH.ROBEFi1S Notary Public • • MY COMMISSION EXPIRES , -, ',.• July 15,2009 RR • 2 • • SITE SPECIFIC DEVELOPMENT PLAN AND USE BY SPECIAL • REVIEW (USR) QUESTIONNAIRE The following questions are to be answered and submitted as part of the USR application. If a question does not pertain to your use, please respond with"not applicable", with an explanation as to why the question is not applicable. 1. Explain in detail, the proposed use of the property. Drill, complete and operate two (2) oil and gas wells directionally-drilled from one (1) drilling pad in the W1/2NE1/4SE1/4 of Section 23, Township 6 North, Range 66 West. The existing tank battery site in the SE1/4NE1/4 of said Section 23 will be used for these two wells. Initially it is anticipated that one additional tank, separator or meter house will be required. The ultimate number of tanks will depend on production. 2. Explain how this proposal is consistent with the intent of Weld County Code, Chapter 22 (Comprehensive Plan). ' "Oil and as development in the County is an integral part of the Court economy, and has a substantial direct and indirect impact on current and future land use, oil and gas development is cyclical but the economics of drilling has caused extensive drilling • activities in the Court. (Weld County Code Ordinance 2002-6." "Oil and gas exploration and production should be conducted in a manner which minimizes interference with existing surface use and mitigates the impact on future land uses. OG. Goal 2. The extraction of oil and gas resource should conserve the land and minimize the impact on surrounding land." Applicant is directionally drilling two wells from one pad near an existing well, thereby mitigating the impact on future land uses and minimizing the impact on the surrounding property. The existing battery for the two wells also mitigates and minimizes the impact. 3. Explain how this proposal is consistent with the intent of the Weld County Code, Chapter 23 (Zoning) and the zone district in which it is located. OIL AND GAS PRODUCITON FACILITIES are permitted in an R-1 zone as a use by special review. Applicant is hereby making application for a use by special review for two wells, which are located in an R-1 zone and such additional wells as may in the future be allowed by the Colorado Oil and Gas Conservation Commission and which would be drilled from the same pad. • 4. What type of uses surround the site? Explain how the proposed use is consistent and • compatible with surrounding land uses. The surrounding lands uses are agricultural and recreational (Seeley Lake). The grouping of wells on one pad is consistent with good land use,taking as little land out of production as possible while ensuring that the oil and gas resources are developed. One battery site, which already exists, will minimize land dedicated to oil and gas development. 5. Describe, in detail, the following: a. How many people will use this site? Six to ten workers, 24 hours per day, during drilling. Completion, for a short period of time (less than 12 hours), may involve up to 20 workers. Thereafter, only an occasional visit from the pumper is anticipated. b. How many employees are proposed to be employed at this site? None c. What are the hours of operation? • Production is anticipated at all times. d. What type and how many structures will be erected (built) on this site? Separation equipment(one to two separators), gas metering (minimum of one meter) and crude oil storage tanks (likely one additional 300-bbl tank) are anticipated, together with perhaps a larger water storage tank. In the future, depending on line pressures, a compressor may be necessary to ensure sufficient pressure to sell into existing lines. e. What type and how many animals, if any, will be on this site? None. f. What kind(type, size, weight) of vehicles will access this site and how often? After drilling and completion, an occasional crude oil tank truck will visit the tank battery to pick up crude oil, and the pumper is expected to visit the wells on a daily basis via pickup truck. During drilling,the rig will be brought in by trucks- approximately 20—and assembled on the site. g. Who will provide fire protection to the site? • • • Eaton Fire Protection District • h. What is the water source on the property? (Both domestic and irrigation). No water will be needed other than that brought in by water trucks. There is no ongoing need for any water. Bottled water is used for drinking water. i. What is the sewage disposal system on the property? (Existing and proposed). No system exists. Portable toilets are used during drilling and completion; thereafter no facilities. j. If storage or warehousing is proposed, what type of items will be stored?N/A 6. Explain the proposed landscaping for the site. The landscaping shall be separately submitted as a landscape plan map as part of the application submittal. No landscaping is proposed. 7. Explain any proposed reclamation procedures when termination of the Use by Special Review activity occurs. Separators,meter houses and tanks will be removed. The wells will be plugged and • abandoned in full compliance with Colorado Oil and Gas Conservation Commission rules. 8. Explain how the storm water drainage will be handled on the site. There is not anticipated to be any additional storm water drainage due to limited land disturbance. It is likely that a Field Stormwater Management Plan will be filed with the CDPHE. 9. Explain how long it will take to construct this site and when construction and landscaping is scheduled to begin. Once undertaken, drill site construction is a one to two day process. 10. Explain where storage and/or stockpile of wastes will occur on this site. Other than temporary pits during drilling and completion, no storage and/or stockpile of wastes will occur on this site. • M:\T0672\002\USR QUESTIONNAIRE.doc Hello