Loading...
HomeMy WebLinkAbout20081780.tiff • rtoctifi Weld County Referral IJune 3, 2008 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Carma Bayshore, LLC Case Number USR-1653 do Kerr McGee Oil and Gas Onshore LP represented by Joseph Lorenzo Planner Jacqueline Hatch Project A Site Specific development Plan and a Special Review Permit for an Oil and Gas Production Facility in a PUD with E (Estate), C-1, C-2 (Commercial), R-1, R-2, R-3 and R-4 (Residential)Zone Districts. Legal Part of Tract E in the St. Vrain Lakes Filing#1 being part of NE4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. • Location Approximately 1/4 mile east of CR 9.5 and approximately 1/4 mile south of State Highway 66. Parcel Number 1207 35 105023 The application has been previously submitted to you for review and recommendation. If you have any further questions regarding the application,please contact the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information,please contact the Department of Planning Services. A meeting has been scheduled with the Weld County Planning Commission on June 17, 2008, at 1:30 p.m. This meeting will take place in the Hearing Room, Southwest Weld County Planning Department, 42O9 CR 24.5, Longmont, Colorado. Weld County Planning Commission Hearing June 17, 2008 • +Weld County Planning Dept. ❖4209 CR 24.5,Longmont,CO.80504 ❖(720)652-4210 ext.8730 +(720)652-4211 fax 2008-1780 • re tf Weld County Referral ' April 4, 2008 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Carma Bayshore LLC Case Number USR-1653 c/o Kerr McGee Oil and Gas Onshore LP represented by Joseph Lorenzo Please Reply By May 4, 2008 Planner Jacqueline Hatch Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Production Facility in a PUD with E (Estate), C-1, C-2 (Commercial), R-1, R-2, R-3 and R-4 (Residential)Zone Districts. Legal Part of Tract E in the St. Vrain lakes Filing#1 being part of NE4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. • Location Approximately 1/4 mile east of CR 9.5 and approximately 1/4 mile south of State Highway 66. Parcel Number 1207 35 105023 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because �e have reviewed the request and find no conflicts with our interests. v l ee attached letter. Comments: • Signature /�t. Date 4;1 . LGW Agency W G I,NUwwio EXHIBIT (•Weld County Planning Dept. ❖4209 CR 24.5,Longmont,CO.80504 <•(720)652-4210 ext.8730 :•(720)652 b B • ierti: MEMORANDUM Wi`Pe. TO: Jacqueline Hatch COLORADO DATE: April 7, 2008 FROM: Kim Ogle, Planning Manager SUBJECT: Landscape Referral, USR-1653 Saint Vrain Lakes PUD Staff review of the application materials indicates that the previous discussion with the applicant remains valid specific to the on-site access, security and landscape details. Construction access will be from the existing single track access across the agrarian fields. Later, when the PUD begins to develop, access for monitoring, pick up of product will be from roads off of CR 9.5. The access to the facility will be form the southwest into the facility located at a point west of the elementary school site, thus avoiding potential conflicts with school children and school buses. The facility will be fenced with small gauge vinyl coated chainlink fence or appropriate • equal thus removing the potential attractive nuisance of the facility by unauthorized intrusions. It was noted that there will be some level of onsite security, yet undefined. The access gate and tracking pad was also discussed, including reinforced concrete over the sidewalk and into the site. Planning strongly encourages an integral landscape treatment be implemented on location that will tie into the existing framework of the St. Vrain Lakes PUD masterplan. Staff noted the possibility of an On-Site Improvements Agreement for all internal improvements. This documented will be evaluated at a future date uncertain. End Memorandum • 04-08-08 1518 IN Weld County Planning Depart nt • Weld County' ra APR eettl April 4, 2008 C. COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Carma Bayshore LLC Case Number USR-1653 c/o Kerr McGee Oil and Gas Onshore LP represented by Joseph Lorenzo Please Reply By May 4, 2008 Planner Jacqueline Hatch Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Production Facility in a PUD with E (Estate), C-1, C-2 (Commercial), R-1, R-2, R-3 and R-4 (Residential)Zone Districts. Legal Part of Tract E in the St. Vrain lakes Filing#1 being part of NE4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. • Location Approximately 1/4 mile east of CR 9.5 and approximately 1/4 mile south of State Highway 66. Parcel Number 1207 35 105023 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. See attached letter. Comments: • Signature - 4 � cyCJ Date "A- \ O-O6 Agency rnt .V :« t 4e• .n:sc •:•Weld County Planning Dept. ❖4209 CR 24.5, Longmont,CO.80504 ❖(720)652-4210 ext.8730 ❖(720)652-4211 fax M°"NrA'" MOUNTAIN VIEW FIRE PROTECTION DISTRICT Administrative Office: .l � f s 9119 County Line Road• Longmont, CO 80501 • e1 u (303) 772-0710• FAX (303) 651-7702 . F VIEW April 10, 2008 Ms.Jacqueline Hatch Weld County Planning Services 4209 Weld County Road 24.5 Longmont, CO 80504 Dear Ms. Hatch I have reviewed the material pertaining to the Site Specific Development Plan and Special Review Permit for the drilling of oil and gas wells south of Weld County Road 28 and east of Weld County Road 9.5 in the Carma Bayshore subdivision in Weld County. (Case Name: Kerr- McGee Oil & Gas — Carma, Case Number: USR-1653). The location of the proposed wells is within the boundaries of the Mountain View Fire Protection District and receives service from the • District. The Fire District does not object to the drilling of the wells. The Response Plan meets the requirements of the Fire District. Nothing in this review is intended to authorize or approve any aspect of the proposed project that does not comply with all applicable codes and standards. We appreciate being involved in the planning process. Should you have any questions, please contact me at (303)772-0710. Sincerely, LuAnn Penfold Fire Marshal J` LMP/Ip cc: project file 1p04.10.08 • Station 1 Station 2 Station 3 Station 4 Station 5 Station 6 Station 7 9119 Cnty Line Rd. 14308 Mead St.,Unit B P.O.Box 575 P.O.Box 11 10911 Dobbin Run 50 Bonanza Dr. P.O.Box 40 Longmont CO Longmont.CO 299 Palmer Ave. 8500 Niwot Road Lafayette,CO Erie,CO 100 So.Forest St. 80501 80504 Mead,CO 80542 Niwot,CO 80544 80026 80516 Dacono,CO 80514 itte Weld County Referral April 4, 2008 ' C APR 7 2008 COLORADO The Weld County Department of Planning Services has received the following item for review: Applicant Carma Bayshore LLC Case Number USR-1653 c/o Kerr McGee Oil and Gas Onshore LP represented by Joseph Lorenzo Please Reply By May 4, 2008 Planner Jacqueline Hatch Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Production Facility in a PUD with E (Estate), C-1, C-2 (Commercial), R-1, R-2, R-3 and R-4 (Residential)Zone Districts. Legal Part of Tract E in the St. Vrain lakes Filing#1 being part of NE4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. • Location Approximately 1/4 mile east of CR 9.5 and approximately 1/4 mile south of State Highway 66. Parcel Number 1207 35 105023 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because We have reviewed the request and find no conflicts with our interests. W, See attached letter. Comments: • Signature L Date 4/-/5.. O5 Agency A al +Weld County Planning Dept. +4209 CR 24.5,Longmont,CO.80504 0(720)652-4210 ext.8730 4(720)652-4211 fax Weld County Planning Departm GREELEY OFFICE MEMORANDUM RECEIVED TO: Jacqueline Hatch, Planning Services DATE: April 23, 2008 IFROM: Donald Carroll, Engineering Administrator Fµ(' SUBJECT: USR-1653, Carma Bayshore LLC c/o Kerr McGee Oil • COLORADO and Gas Onshore LP represented by Joseph Lorenzo The Weld County Public Works Department has reviewed this proposal. This project falls primarily under the purview of the Use by Special Review Standards, Weld County Code, Chapter 23, Article II, Division 4, Section 23. Our comments and requirements are as follows: COMMENTS: Weld County 1-25 Parallel Arterial Study: (September 2003) WCR 9.5 is classified by the County is a major arterial road and requires a 140-foot right-of-way. There is presently a 60-foot right-of-way. This road is maintained by Weld County. Pursuant to the definition of SETBACK in the Weld County Zoning Ordinance (23-1-90), the required setback is measured from the future right-of-way line. (WCRs 5.5, 7, 7.5, 9.5, and 11) I-25 MUD Roadway Standards: (July 2004) WCR 28 is classified by the County (I-25 Mixed Use Development Area Structural Plan — Map 2.2 Structural Transportation Network.) as a minor arterial which requires a 100-foot right-of-way at full build out. •EQUIREMENTS: Access: The applicant is identifying two access points to the proposed site. The existing access is temporary from WCR 28 (Eagle River Road) and the optional access from WCR 9.5 (Lake Catamount Parkway). The applicant shall provide a tracking control pad in using both locations. The access width requirements for emergency equipment (fire department) are a minimum of 20 feet. The applicant indicated that it has been cleared with the fire department and emergency services that the width and weight capacity of the access lane shall be adequate for emergency purposes. The applicant shall provide documentation to that effect. The right-of-way or easement shall be a graded and drained road to provide an all-weather access. The easement shall be graded and drained to provide an all-weather access. Pursuant to Chapter 15, Articles I and II of the Weld County Code, if noxious weeds exist on the property or become established as a result of the proposed development, the applicant/landowner shall be responsible for controlling the noxious weeds. Storm Water Drainage: Final drainage construction and erosion controls plans (conforming to the final drainage report) stamped, signed, and dated by a professional engineer license in the State of Colorado shall be submitted with each plan (phase). These plans (storm water management plans) shall be based upon urban drainage methodology. Ike applicant is required to comply with all Colorado Department of Health and Environmental (CDPHE) regulations regarding berming and spill prevention for materials and liquids stored on site. The applicant is required to comply with all Colorado Department of Health and Environment, Water Quality ontrol Division regulations regarding storm water quality permitting and protection and construction storm ater discharges. County Permits: The County permits are required for any drilling rigs that are over width or overweight utilizing County roadways. Contact Amy Burry at 381-3779 at 1111 H. Street, Greeley, Colorado, prior to moving on or off site. pc: USR-1653 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1653.DOC • • MEMORANDUM TO: Jacqueline Hatch, Planning Services DATE: 6/3/2008 FROM: Donald Carroll, Engineering Administrator SUBJECT: USR-1653, Carma Bayshore LLC c/o Kerr-McGee Oil & Gas Onshore LP I am responding to the letter from Robert T. Spencer, Kerr-McGee Oil & Gas Onshore LP, dated May 19, 2008. 1. Prior to recording the plat: 1. E. i, a tracking pad would be installed at the entrance of the primary access road off of the future Lake Catamount Parkway. This has been placed on the plat drawing and is acceptable. The applicant is not identifying the existing access (temporary) tracking pad from WCR 28 and or future Piedera River Road. The plat drawing is identifying SUA vehicle access easement, 30 feet in width. If this 30-foot easement is being utilized to access the facility either as a temporary or a secondary use, there should be a tracking pattern in place adjacent to the roadway. • In my previous memo dated April 23, 2008, under the Access Requirements, the access width requirement for emergency equipment (fire department) is a minimum of 20 feet. On the plat drawing, the applicant has indicated a 30-foot width, which is acceptable. The other item associated with this paragraph is that the applicant shall provide documentation from the fire department emergency response team that the width and weight capacity of the access lane shall be adequate for emergency purposes. The applicant shall provide this documentation to that effect. Don Dunker, Senior Engineer, and I feel that the remaining other transportation items are acceptable. pc: USR- 1653 M:\PLANNING-DEVELOPMENT REVIEW\USR-Use by Special Review\USR-1653-A.DOC • Jacqueline Hatch 0rom: Don Dunker ent: Friday, June 06, 2008 11:49 AM o: Jacqueline Hatch Cc: Donald Carroll; David Bauer; Don Dunker Subject: USR-1653 Jacqueline, I need to have this added as a development standard. When the Carma development occurs around this area the turning radii will have to be upgraded to 40 ' minimum, to ensure the oil and gas traffic stay in their traffic lanes and do not jump the sidewalks as they turn into the wellhead and tank battery areas. All damages created by oil and gas traffic to the surrounding roadways, curb and gutter and sidewalks will be required to be repaired at the expense of the Kerr-McGee Oil & Gas Onshore LP. The reason for this is there will be children on the sidewalks, more traffic in the area and pedestrians walking around, this is a safety issue. Thanks, Don Dunker, P.E. Weld County Public Works 1111 H Street Greeley, CO 80631 "phone: 970.304 .6496 ext. 3749 ax: 970.304 .6497 ddunker@co.weld.co.us • • MEMORANDUM TO: Jacqueline Hatch, Planning Services FROM: Lauren Light, Environmental Health ,4 SUBJECT:USR-1653 Carma Bayshore LLC do Kerr McGee Oil o and Gas OnShore LP • DATE: 4/29/08 COLORADO Environmental Health Services has reviewed this proposal for an oil and gas production facility. We have no objections to the proposal, however, we do recommend that the following conditions be part of any approval: We recommend that the following requirement be met prior to allowing the plat to be recorded: 1. The applicant shall submit a dust abatement plan for review and approval, to the Environmental Health Services, Weld County Department of Public Health & Environment. We recommend that the following requirement be incorporated into the permit as a condition • that must be met 45 days after first production: 1. The applicant shall submit evidence of an Air Pollution Emission Notice (APEN) application from the Air Pollution Control Division, Colorado Department of Health and Environment. Alternately, the applicant can provide evidence from the APCD that they are not subject to these requirements. We recommend that the following requirements be incorporated into the permit as development standards: 1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for final disposal in a manner that protects against surface and groundwater contamination. 2. No permanent disposal of wastes shall be permitted at this site. This is not meant to include those wastes specifically excluded from the definition of a solid waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S., as amended. 3. Waste materials shall be handled, stored, and disposed in a manner that controls fugitive dust, fugitive particulate emissions, blowing debris, and other potential nuisance conditions. • 4. Fugitive dust and fugitive particulate emissions shall be controlled on this site. The • facility shall be operated in accordance with the approved dust abatement plan at all times. 5. The operation shall comply with all applicable State noise statutes and/or regulations. 6. Adequate toilet facilities (port-a-potty) shall be provided during drilling/construction. 7. Bottled water shall be utilized for drinking and hand washing during drilling/construction. 8. If applicable, the applicant shall obtain a stormwater discharge permit from the Colorado Department of Public Health & Environment, Water Quality Control Division. 9. The operation shall comply with all applicable rules and regulations of the State and Federal agencies and the Weld County Code. • 2 Jacqueline Hatch 0rom: Lauren Light ent: Monday, June 02, 2008 9:23 AM o: Jacqueline Hatch Subject: Usr-1653 Dust abatement plan is sufficient. Will still need to provide a copy of the APEN submittal. Lauren Light Environmental Planner, Environmental Health Services Weld County Department of Public Health & Environment 1555 N. 17th Ave. Greeley, CO 80631 970-304-6415 Ext. 2211 (office) 970-304-6411 (fax) • 1 FROM :GERDOM & ASSOC FRX NO. :3038285244 Rpr. 23 2008 04:26PM P1 • e ae Weld County Referral EUDV April 4, Zoos APR -9 2008 • COLORADO TOWN OF MEAD The Weld County Department of Planning Services has received the following item for review: Applicant Carma Beyshore'LLC •Case Number USR-1653 do Kerr McGee Oil and Gas Onshore LP represented by Joseph Lorenzo • Please Reply Ely May 4,2008 Planner Jacqueline Hatch Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Production Facility in a PUD with E(Estate),C-1, C-2(Commercial), R-1, R-2, R-3 and R-4(Residential)Zone Districts. Legal Part of Tract E in the St.Vrain lakes Filing#1 being part of NE4 of Section 35, T3N, R68W of the 6th P.M.,Weld County,Colorado. • Location Approximately 1/4 mile east of CR 9.5 and approximately 1/4 mile south of State Highway 86. Parcel Number 1207 35105023 • The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. ff you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because • O We have reviewed the request and find no conflicts with our interests, CSep attached letter. aLCt iS Comments: P( rtci-ew G•r�!oca U rtrigo� �dolir raicaeA' . iOt to% ra r pC A 9J c-c ;,n. in _ e,,, j t,)ety F1taro le;arcf' R Signature Date 2?. 08!ifil• Agency 7on'n ,s-6 fitcad *Weld County Planning Dept. 44209 CR 24.5,Longmont.CO.80504 0(720)8524210 ext.8730 4(720)852-4211 fax ,G a • rect,,...., li,„Weld County Referral Sppry�F/a°,7o 0 WIiDc � gp,�e�ra°,o,Ncnl�,g�fl 4, 2008 o;�r`�;? s,ir, Fc; �oe ,�-ea COLORADO ,�F The Weld County Department of Planning Services has receivedthe following item for review: Applicant Carma Bayshore LLC Case Number USR-1653 do Kerr McGee Oil and Gas Onshore LP represented by Joseph Lorenzo Please Reply By May 4, 2008 Planner Jacqueline Hatch Project A Site Specific Development Plan and a Special Review Permit for an Oil and Gas Production Facility in a PUD with E (Estate), C-1, C-2 (Commercial), R-1, R-2, R-3 and R-4 (Residential)Zone Districts. Legal Part of Tract E in the St. Vrain lakes Filing#1 being part of NE4 of Section 35, T3N, R68W of the 6th P.M., Weld County, Colorado. • Location Approximately 1/4 mile east of CR 9.5 and approximately 1/4 mile south of State Highway 66. Parcel Number 1207 35 105023 The application is submitted to you for review and recommendation. Any comments or recommendation you consider relevant to this request would be appreciated. Please reply by the above listed date so that we may give full consideration to your recommendation. Any response not received before or on this date may be deemed to be a positive response to the Department of Planning Services. If you have any further questions regarding the application, please call the Planner associated with the request. Please note that new information may be added to applications under review during the review process. If you desire to examine or obtain this additional information, please call the Department of Planning Services. You will be notified in writing of the Planning Commission date once the date is determined. ❑ We have reviewed the request and find that it does/does not comply with our Comprehensive Plan because ❑ We have reviewed the request and find no conflicts with our interests. S See attached letter. Comments: III Signature j � �, �-� -� � �, il t"-, Date Agency A zt rb'111J c�Yu_r71yun Czhiv ;-/,�4 . •:•Weld County Planning'(b/ept. •:•4209 CR 24.5, Longmont,CO.80504 ❖(720)652-4210 ext.8730 ❖(720)652-4211 fax NEW • Longmont Conservation District o_Y5 v c/ on Road. Boy D—Long/71 W, Cu/nrad,,.vvl3111—P17(»7,0 f31)3) —66_4034 Fur 131131 6 4-9,S'y3 Site Review Memo To: Longmont CD Board From: Nancy McIntyre Subject: (List site name, location, Permit#, Purpose, etc.) Carma Bayshore LLC & Kerr McGee Oil &Gas, Case#USR-1653, special review permit for an oil and gas production facility in a residential/commercial zoned area. Located %mile east of 9.5 and south of Highway 66. Prime Farmland: The land is prime if irrigated, but has been zoned for development. • Water Quality: Land slopes to the St. Vrain River. Buffers should be developed around the construction sites. Noxious Weed Control: The property is currently agricultural. A noxious weed plan should be developed with the Weld County Weed Department. Soils Limitations: N/A Other concerns: Summary comments: • (O ASERI_1 1 T/O\-DE I El OP i 1E\T-SELF Gu I-ER V 9/ENT Hello