Loading...
HomeMy WebLinkAbout20083121.tiff rt)ti"‘E's MEMORANDUM TO: Clerk to the Board DATE: December 22, 2008 C. COLORADO FROM: Mike Bedell, Senior Engineer SUBJECT: Consent Agenda Item Agreement with Naranjo Civil Construction to replace Bridge 27/66A in the amount of$586,559.00. This was an approved bid on the 12/22/2008 agenda, Doc#2008- 3121 Enclosed are two original Agreements. Please return one signed original Agreement to Public Works. pc: Mona Weidenkeller Bridge 27/66A file M:AFrancieVAgendaChairSignature.doc (—) C7 W J f.. L./3 S�' /, AY .1ccg-3ral AGREEMENT BRIDGE 27/66A REPLACEMENT {7 THIS AGREEMENT,made this day of �(fdt�. ,2008,by and between Weld County,Colorado,hereinafter called "Owner" and Naranjo Civil Construction Inc. doing business as(an individual, ) or (a partnership,) or (a corporation)hereinafter called "Contractor". WITNESSETH: That for and in consideration of the payments and agreements hereinafter mentioned: 1. The Contractor will commence and complete the following:BRIDGE 27/66A REPLACEMENT described in the Invitation for Bids,Bid No. B0800107. 2. The Contractor will furnish all of the material,supplies,tools,equipment,labor and other services necessary for the construction and completion of the Project described herein. 3. The Contractor will commence the work required by the Contract Documents within ten(10)calendar days after the Notice to Proceed and will complete the BRIDGE 27/66A REPLACEMENT within 120 calendar days unless the period for completion is extended otherwise by the Contract Documents. 4. The Contractor agrees to perform all of the Work described in the Contract Documents and comply with the terms therein for the sum of$ 586,559.00 , or as shown in the Bid Schedule. 5. The term"Contract Documents"means and includes the following: (A) Invitation for Bids (B) Instructions to Bidders (C) Bid Proposal (D) Bid Bond (E) Statement of Qualifications and Subcontractors (F) Required Project Forms (G) Agreement (H) Labor and Materials Payment Bond (I) Performance Bond (J) Notice of Award (K) Notice to Proceed (L) Change Order (M) Certificate of Substantial Completion (N) Lien Waiver (O) Notice of Acceptance (P) Contract,Specifications,and Drawings issued by the Weld County Public Works Department. (Q) Colorado Department of Transportation "Standard Specifications for Road and Bridge Construction" (R) Colorado Department of Transportation Standard Plans"M&S Standards" (S) Addenda: No. 1 , dated 11/12/08 ,2008. 6. The Owner will pay to the Contractor in the manner and at such times as set forth by the Contract Documents,or otherwise agreed upon in writing. ()ivy-31.2/ 7. This Agreement shall be binding upon all parties hereto and their respective heirs,executors,administrators, successors,and assigns. 8. Contract Appropriations: The Owner hereby states and affirms that the amount of money appropriated for this Contract is equal to or in excess of the Contract amount. No change order to this Contract requiring additional compensable work to be performed,which work causes the aggregate amount payable under the Contract to exceed the amount appropriated for the original Contract shall be issued by the Owner unless the Owner assures the Contractor,in writing,that lawful appropriations to cover the costs of the additional work has been made or unless such work is covered under a remedy-granting provision contained in the Contract. IN WITNESS WHEREOF,the parties hereto have executed, or caused to be executed by their duly authorized officials, this Agreement in two(2)copies each of which shall be deemed an original on the date first above written. ORDERED BY: ACCEPTED BY: THE BOARD OF WELD COUNTY COMMISSIONERS CONTRACTOR BY �< I4.C--id BY //*4r NAME William H. Jerke NAME HEWN NPc 5.9 (Please Type) TITLE Chair TITLE fe.P.SIDEKT Date 12/29/2008 ADDRESS 19b3 ata Aye-. Cba_E y lb R0b31 (SEAL) (SEAL) ATTEST: gefleal E KGs"V/ ATTEST: IS crfir9v)iacyr, Weld Count Clerk to u e BY Ce./ � �AV �r it 4 BY I_FS Deputy Clerk to the Boar;&N I (Please Type) TITLE SETCR TA2N a MEMORANDUM 80Date: December 3, 2008 ipTo: Monica Mika, Director of Administrative Services C� From: Michael Bedell, P.E., Senior Engineer COLORADO RE: Bid Request No. B0800107 BOCC Approval Date 12/22/08 Bids were received and opened on November 25, 2008 for contract services for the construction of Weld County Bridge 27/66A Replacement Project. Eleven bids were received for the project and amounts ranged from $586,559.00 to $770,844.65 with the lowest bid submitted by Naranjo Civil Construction Inc. from Greeley, Colorado. My Engineer's Estimate for the construction bid was $700,000.00. The overall project budget in the amount of $1,034,000.00 is associated with an approved contract between Weld County and Colorado Department of Transportation dated 5/15/07 (amended 7/31/08). Weld County is responsible for 20% of the project costs, and CDOT is responsible for 80%. Attached is an updated budget status report for your information. CDOT has given their concurrence to award the construction contract. It is my recommendation to award the project to Naranjo Civil Construction Inc. Construction of the project is anticipated to begin in January, 2009 with completion of the project in May, 2009. M:\—Active Projects\Bridge 27-66A\Construction\Correspondence\Letters\Award Recommendation Memo.doc WELD COUNTY PUBLIC WORKS DEPARTMENT BUDGET STATUS UPDATE • MB Project Name BRIDGE 27/66A 4 Project Limits CANAL CROSSIN00Thitig DATE 10-Dec-08 TOTAL BUDGET AMOUNT $1,034,000 I CONSTRUCTION SUBTOTAL $587,109 � C ENGINEERING SUBTOTAL $421,247 COLORADO ESTIMATED BALANCE REMAINING $25,644 DESIGN Complete PUBWORKS SPENT TO DATE $292,273 R.O.W. Complete CONST. 2009 CONSTRUCTION COSTS UNIT UNIT COST QUANTITY TOTAL NARANJO CIVIL CONSTRUCTION LS $586,559 1 $586,559 POWER SERVICE - PVREA LS $550 1 $550 Subtotal $587,109 ENGINEERING COSTS UNIT UNIT COST QUANTITY TOTAL DESIGN SERVICES - S.E.H. LS $170,106 1 $170,106 CONSTRUCTION SERVICES - S.E.H. LS $88,934 1 $88,934 R.O.W. ACQUISITION LS $58,807 1 $58,807 WELD LABOR (10% OF BUDGET) LS $103,400 1 $103,400 Subtotal $421,247 TOTAL $1,008,356 :. . �.. ...r...... L a_paI F .. 1 •� r ' -:..• N • ♦ 1 n ♦ I 1 -;- 1-F ,.t.• [O ' Is • 676 ;\': ... • '..• .1. ♦1••• i•1• 'F'S • ♦ •••• 14.y;. ..T....1-.; }.• 1•: ••4••:•4••.......-• .. .'°, ' t ��l¢ • . • . • • :... ..'.. 1 ••y •. ._.2. \1:..r i .: • ...y-- j : • q:.l.r • • ••• 1 1 •- ;' ••i • •.. 1 1• •' : •�1 . • ; . . I-.• c Ori of g•a• co :. tO ard.21\D-ANN' .r. c0.0 ••-., `VI�: � i •1I -: r u , v + •v 1 •. : • '�' • 1:1 ' _=i a :..• '. 1 0 1 ••• . V V M M N N N N 1 ,• CO V N N F- Z WW a• G J W 0 c0 U °' CD H w in Ce .-• g stycD CC U �o 3 p N 0 O 01 CV l— U flu 2 co m co W U 0mcov � '� � co UI W z � ui .≥ ? ` >. ° p W wato O ° 11i o a ._CC CC H 0 CO Q. CO roFUZ mJin WELD COUNTY PURCHASING -kti T T fj k915 10TH Street Greeley CO 80631 E-Mail: mwalters(th.co.weld.co.us E-mail: reverettaco.weld.co.us ' Phone: (970) 356-4000, Ext. 4222 or 4223 Fax: (970) 336-7226 QUO DATE OF BID: November 25th, 2008 REQUEST FOR: Bridge 27/66A Replacement w/CDOT DEPARTMENT: Public Works Department BID NO: #60800107 PRESENT DATE: December 1st, 2008 APPROVAL DATE: December 22nd, 2008 VENDORS TOTAL BID AMOUNT Naranjo Civil Construction Inc $586,559.00 1863 2nd Avenue Greeley CO 80631 Mountain Constructors Inc $623,688.85 622 Main Street, P O Box 405 Platteville CO 80651 Jalisco International Inc $632,418.05 6663 Colorado Blvd Commerce City CO 80022 Flatiron Constructors Inc $632,581.50 10090 125 Frontage Road Longmont CO 80504 Zak Dirt Inc $644,128.25 14290 Hilltop Road Longmont CO 80504 TLM Constructors $664,779.50 1015 37th Avenue Ct Suite #102 Greeley CO 80634 Connell Resources $666,033.00 7785 Highland Meadows Pkwy, Ste. 100 Ft Collins CO 80528 Concrete Express Inc $668,737.90 2027 W Colfax Avenue Denver CO 80204 cG C'OS? 2008-3121 /g//ice Page 2 VENDORS TOTAL BID AMOUNT Paramount Construction $674,645.55 4701 Jackson Street Denver CO 80216 Structures Inc $706,526.50 4 Inverness Ct East, Suite 250 Englewood CO 80112 Tarco Inc $770,844.65 4781 W 58th Avenue Arvada CO 80002 Engineering Estimate: $700,000.00 *Bids are being reviewed at this time. Hello