HomeMy WebLinkAbout20083046.tiff '37 O; v( Q(t(h(
1171 ;cg
WELD COUNTY
CODE ORDINANCE 2008-16
IN THE MATTER OF REPEALING AND REENACTING, WITH AMENDMENTS, CHAPTER 23
ZONING, OF THE WELD COUNTY CODE
BE IT ORDAINED BY THE BOARD OF COUNTY COMMISSIONERS OF THE COUNTY OF
WELD, STATE OF COLORADO:
WHEREAS, the Board of County Commissioners of the County of Weld , State of Colorado,
pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority
of administering the affairs of Weld County, Colorado, and
WHEREAS, the Board of County Commissioners, on December 28, 2000, adopted Weld
County Code Ordinance 2000-1 , enacting a comprehensive Code for the County of Weld, including
the codification of all previously adopted ordinances of a general and permanent nature enacted
on or before said date of adoption , and
WHEREAS, the Weld County Code is in need of revision and clarification with regard to
procedures, terms, and requirements therein .
NOW, THEREFORE, BE IT ORDAINED by the Board of County Commissioners of the
County of Weld, State of Colorado, that certain existing Chapters of the Weld County Code be, and
hereby are, repealed and re-enacted , with amendments, and the various Chapters are revised to
read as follows.
CHAPTER 23
ZONING
Amend Sec. 23-1 -90. Definitions.
WIND GENERATOR: A generator specifically designed to convert the kinetic energy in
wind into electric energy. A WIND GENERATOR may include a generator, tower, and associated
control or conversion electronics . The height of a wind tower is measured at the hub of the
generator.
Add Sec. 23-3-30.N, 23-3-210.C.5, 23-3-220.C.5, 23-3-230.C.4, 23-3-240.C.8, 23-3-310.C.8,
23-3-320.C.7, and 23-3-330.C.7 to state the following: WIND GENERATOR(S), which may
require the issuance of a Zoning Permit for WIND GENERATOR, as per Chapter 23,
Article IV, Division 12, of the Weld County Code.
Add Sec. 23-3-40.DD, 23-3-210.D. 10, 23-3-220.D.8, 23-3-230.D.9, 23-3-240.D.4, 23-3-310.D.8,
23-3-320.D. 13, and 23-3-330.D.14 to state the following: WIND GENERATOR(S) requiring the
issuance of Use-by-Special Review Permit, as per Chapter 23, Article II, Division 4, and
Chapter 23, Article IV, Division 12, of the Weld County Code.
2008-3046
PAGE 1 ORD2008-16
ARTICLE IV
Supplementary District Regulations
Add Div. 6, as follows:
Division 6
Wind Generators and Permitting Requirements
Sec. 23-4-450 : Wind Generator Standards:
WIND GENERATORS are allowed as accessory uses, subject to Zoning Permit for WIND
GENERATOR requirements, or as a Use-by-Special Review Permit, per the height guidelines and
maximum numbers for LEGAL LOTS, below. The height of a wind tower is measured at the hub
of the generator:
Lot Size (Gross Acres) Accessory Use Zoning Permit for Use-by-Special Review
(Building Permit WIND GENERATOR Permit
Required only)
1 Acre - 2.49 Acres Up to 40 feet and rotor 41 — 60 feet Above 60 feet, or more
diameter 12-feet or less than 3 per LEGAL LOT
2.5 Acres — 4.99 Acres Up to 60 feet and below 61 -120 feet Above 120 feet, or
and rotor diameter of more than 3 per
14-feet or less LEGAL LOT
5 Acres — 34.99 Up to 120 feet and 121 -180 feet Above 180 feet, or
Acresand Above below and rotor more than 3 per
diameter 25 feet or less LEGAL LOT
All WIND GENERATORS are subject to the following standards:
A. Up to three (3) WIND GENERATORS per LEGAL LOT are allowed . More than
three (3) WIND GENERATORS on a LEGAL LOT shall require the issuance of a
Use-by-Special Review Permit, pursuant to the requirements of Article II , Division
4 of this Chapter, or the issuance of a 1041 Permit, pursuant to the requirements
of Article III , Chapter 21 of this Code.
B. WIND GENERATORS requiring the issuance of a Zoning Permit for Wind
Generator are subject to the application requirements of Section 23-4-980 of this
Code. WIND GENERATORS requiring the issuance of a Use-by-Special Review
Permit are subject to the application requirements of Section 23-2-260 of this Code.
WIND GENERATORS requiring the issuance of a 1041 Permit are subject to the
application requirements of Article III , Chapter 21 of this Code.
C. All WIND GENERATORS must be setback from property lines, public rights-of-way,
and access easements of a distance at least one ( 1 ) times the hub height of the
generator.
D. All WIND GENERATORS must be setback from any existing or planned overhead
lines a distance of at least one ( 1 ) times the hub height of the generator.
2008-3046
PAGE 2 ORD2008- 16
E. No part of the system , including guy wire anchors, shall extend closer than 30 feet
to the property boundary.
F. WIND GENERATORS must be painted or coated a non-reflective white, grey, or
other neutral color.
G. WIND GENERATORS must not be artificially illuminated , unless required by
Federal Aviation Administration ( FAA).
H . Electrical controls must be wireless or underground , and power lines must be
underground , except for and interconnection to an existing above ground power
grid .
I . WIND GENERATORS are subject to the following noise limits (measured from the
nearest property line from the WIND GENERATOR):
1 ) Residential: 50 Decibels.
2) Commercial: 55 Decibels.
3) Light Industrial ( I-1 Industrial): 65 Decibels.
4) Industrial ( 1-2 and 1-3 Industrial): 75 Decibels.
J . WIND GENERATORS are subject to applicable Federal Aviation Administration
( FAA) requirements and/or permits.
K. WIND GENERATORS generating power as a commercial enterprise may be
subject to regulation by the Colorado Public Utilities Commission .
L. If proposing to interconnect to a utility company, the applicant shall provide to the
Department of Planning Services a copy of a "letter of intent to interconnect" or
interconnection agreement signed by the utility company.
M. WIND GENERATORS shall not create a detrimental effect on nearby properties
through electromagnetic interference:
Sec. 23-4-460. Zoning Permit for WIND GENERATOR permit application requirements.
An application for a Zoning Permit for a WIND GENERATOR shall include the following :
A. Name, address, and telephone number of the applicant.
B. Name, address, and telephone number of the owner of the land, if different from
subsection A, above.
C. Parcel number and legal description of the property for which the application is
made.
D. Evidence of interest in the subject land held by the applicant.
2008-3046
PAGE 3 ORD2008-16
E. If proposing to interconnect to a utility company, copy of a "letter of intent to
interconnect" or interconnection agreement signed by the utility company.
F. Number of acres of the property.
G. Elevation drawings of the proposed facility showing all towers, structures, and other
improvements related to the facility, showing specific materials, placement, and
colors.
H . Weld County road access information sheet.
I . A vicinity map showing adjacent properties, general land uses, zoning , and
roadways:
1 . Within five hundred (500) feet of the proposed wind generator site.
J . A sketch plan of the site at the scale of one ( 1 ) inch represents fifty (50) feet, or
other suitable scale to show:
1 . The proposed location of the wind generator(s) and other support structures
(guy wires), including distances from the property LOT lines, above ground
power lines and other STRUCTURES on the property.
2 . Location and measurements of any easements or rights-of-way.
3. Amount of road frontages.
4. Identification of any county, state, or federal roads or highways.
5. Existing STRUCTURES on the property.
K. An application fee.
L. A certified list of the names, addresses, and the corresponding Parcel Identification
Number assigned by the County Assessor of the owners of property (the surface
estate) within five hundred (500) feet of the property lines of the parcel on which the
wind generator(s) shall be placed . The source of such list shall be the records of
the County Assessor, or an ownership update from a title or abstract company or
attorney, derived from such records or from the records of the County Clerk and
Recorder. If the list was assembled from the records of the County Assessor, the
applicant shall certify that such list was assembled within thirty (30) days of the
application submission date.
M . Notification responses of at least thirty percent (30% ) of surrounding property
owners within five hundred (500) feet of the subject property in opposition to the
location of the WIND GENERATOR(S ).
2008-3046
PAGE 4 ORD2008-16
Sec. 23-4-470. Delegation of authority.
The Board of County Commissioners delegates the authority to issue a zoning permit for
a wind generator which otherwise requires the approval of the Board of County Commissioners
through a public hearing process to the Department of Planning Services upon a determination by
the Department that:
A. The applicant is in compliance with the criteria identified in this Chapter for the
specific category of zoning permit for which application is being made.
B. The Department of Planning Services has sent notice and has not received signed
notification from at least thirty percent (30%) of surrounding property owners within
five hundred (500) feet of the subject property in opposition to the location of the
wind generator. If opposed , the petition shall indicate that the surrounding property
owners who have signed the notification have objections to the issuance of a zoning
permit for the wind generator.
BE IT FURTHER ORDAINED by the Board that the Clerk to the Board be, and hereby is,
directed to arrange for Colorado Code Publishing to supplement the Weld County Code with the
amendments contained herein, to coincide with chapters, articles, divisions, sections, and
sub sections as they currently exist within said Code; and to resolve any inconsistencies regarding
capitalization, grammar, and numbering or placement of chapters, articles, divisions, sections, and
sub-sections in said Code.
BE IT FURTHER ORDAINED by the Board if any section , subsection , paragraph , sentence,
clause, or phrase of this Ordinance is for any reason held or decided to be unconstitutional, such
decision shall not affect the validity of the remaining portions hereof. The Board of County
Commissioners hereby declares that it would have enacted this Ordinance in each and every
section, subsection, paragraph , sentence, clause, and phrase thereof irrespective of the fact that
any one or more sections, subsections, paragraphs, sentences, clauses, or phrases might be
declared to be unconstitutional or invalid .
2008-3046
PAGE 5 ORD2008-16
The above and foregoing Ordinance Number 2008-16 was , on motion duly made and
seconded , adopted by the following vote on the 8th day of December, A. D. , 2008.
BOARD OF COUNTY COMMISSIONERS
WELD COUNTY, COLORADO
ATTEST:
William H . Jerke, Chair
Weld County Clerk to the Board
Robert D. Masden , Pro-Tern
BY:
Deputy Clerk to the Board
William F. Garcia
APPROVED AS TO FORM:
David E. Long
County Attorney
Douglas Rademacher
Publication : October 17, 2008
First Reading : October 27, 2008
Publication : November 7, 2008, in the Greeley Tribune
Second Reading : November 17, 2008
Publication : November 28, 2008, in the Greeley Tribune
Final Reading : December 8, 2008
Publication : December 19, 2008, in the Greeley Tribune
Effective: December 24, 2008