HomeMy WebLinkAbout20082234.tiff MEMORANDUM TO: Clerk to the Board DATE: August 14, 2008 C. COLORADO FROM: Wayne Howard, County Engineer/CIP, Public Works SUBJECT: CONSENT AGENDA ITEM Change Order No. 3 with Felsburg Holt & Ullevig for On-Call Engineering Enclosed are two original Change Orders No. 3. Please return one original to Public Works. M:AFrancieAAgenda Wayne Howard.doc DOS? n Aciftria 2008-2234 I ad attS e ; 7Y-('{- tom- v3/mac,io <r r . CHANGE ORDER NO.3 Weld County On-Call Engineering Date: AUG 2 0 2008 Project: Weld County On-Call General Engineering generally consisting of transportation engineering including road&bridge design,traffic engineering, surveying,environmental studies,construction management and material testing. Owner: Weld County Public Works Department,PO Box 758, Greeley,Colorado 80632 Consultant: Felsbure Holt&Ullevig(FHU)6300 S. Syracuse Way, Suite 600 Centennial,CO 80111 The following change is hereby made to the Contract Documents: Contract Time Extension: The original Agreement for Professional Services is extended one full year as permitted by the contract. This extension is the fourth year of the four year term limit. Change to Original Rate Schedule: The 2005 Rate Schedule as shown on Exhibit B of the original contract shall be replaced with the attached Exhibit B, 2008 Rate Schedule. The limit of increase does not exceed the Denver Boulder CPI per the contract requirements. CHANGE TO CONTRACT PRICE: See attached Exhibit B,2008 Rate Schedule The limit of$50,000 compensation per work order is not modified by this change order and remains in effect. CHANGE TO CONTRACT TIME: The Contract time will be increased by 365 calendar days. RECOMMENDED: Owner Representative: Date: AUG 2 0 2008 ,[/,,�Willig7n H.Jerke,Chair Engineer: <4,..nt f r ellikt44//// Date: 00 P _ APPROVALS: Consultant: F sburg Holt Ullevig By: / C' F Date: 8 O Title: PY;hG 9 S ea cos? • • • •y@2' , a -;-,L-„,;;;..,:,.4,',;].;;;;;;;;4 ".''' . 4 '.' '' * Y' .r ". bum.' sl , } '' 3 •y '.'"j.: # .4:7:" 1 t / 'b Y •d'l b 9 �T 1 �� 'f„'.3 ..,,..4,4"/-0-;,:ii.,-.,,',4,,,,;14::".,-' sv ', 'S s 1.}3 ; z �, e n r+'$a. . r -k} Uriq;s The following hourly billing rates apply to all"Time and "contracts. W Staff Rates Reproductions Principal II $163.00 Plots TIE: Principal $147.00 Bond $0.24/sq ft Associate $135.50 Glossy $0.71/sq ft b Senior Engineer $ 98.00 Prints $125.00 Mylar $0.55/sq ft Engineer V $114.00 Vellum $0.39/sq ft Engineer IV $108.50 Engineer III Engineer II $ 87.00 Black and White $0.08/print 0? Engineer I $ 81.00 Color $0.19/print Senior Environmental Scientist $125.00 Environmental Scientist IV $108.50 $ 81.00 Presentation Boards Environmental Scientist III $ 98.00 Bond Foam Core Mounted HEnvironmental Scientist II $ 87.00 Glossy Foam Core Mounted $1.69/sq ft Environmental Scientist I Senior Transponation Planner $125.00 Computer Projector $100.00/meeting O Transpo tation Planner IV $108.50 Transportation Planner III $ 98.00 Travel Transportation Planner II $ 87.00 Mileage $0.585/Mile Transportation Planner $ 81.00 Senior Bridge Designer $ 98.00 Senior Designer $ 98.00 Designer IV $ 87.00 Designer III $ 76.00 N Designer II $ 70.50 F- Designer I $ 65.00 Administrative $ 65.00 CQ LTw • BOARD OF COUNTY COMMISSIONERS REVIEW/WORK SESSION REQUEST RE: On-Call Engineering Contracts DEPARTMENT: PUBLIC WORKS DATE: August 11, 2008 letPERSON REQUESTING: Wayne Howard, P.E., County Engineer Brief description of the problem/issue: Weld County Public Works currently has two contracts for On-Call Professional Engineering services. The contracts are held with Felsburg Holt&Ulliveg and Short Elliot Hendrickson. Both contracts were signed in 2005 and are limited to one year, renewable up to four years. The contracts expired on July 27, 2008. Provisions in the contract allow the consultants to increase their billable rates based upon the Denver-Boulder-Greeley Consumer Price Index(CPI). The allowable rate of increase is 3.50%based upon the comparison of the 2007 CPI and the 2008 CPI. Change Order#3 extends both contracts for an additional year and includes new 2008 hourly rate schedules. This is the last of the three extensions allowable in the contract. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) The Board can accept the change order which renews both contracts for an additional year with the allowable rate increases or not accept the change order. Acceptance would permit the Public Works Department to continue to utilize engineering services for smaller projects such as environmental clearances, development traffic study reviews, etc. To date,FHU has performed 13 work orders totaling$333,000 and SEH has performed 5 work orders totaling $208,000. Work Orders are limited to a maximum total of$50,000. Recommendation to the Board: I recommend the approval of both Change Orders extending the contracts for FHU and SEH for an additional year. Initial: Approve Schedule Recommendation Work Session Comments William H. Jerke,Chair `/ Robert D.Masden,Pro-Tern lF William F. Garcia �,./ / David E.Long V Douglas Rademacher --tii--- pc: M:\—Active Projects\Engineering On Call Services\Work Session Request Form CO 3.doc Hello