Loading...
HomeMy WebLinkAbout20081864.tiff CHANGE ORDER NO.1 Bridge 87/42.5 Replacement Project Description: Replacement of existing steel bridge on WCR 87 over the South Platte River near Masters, Colorado. HNTB Corporation has completed the design of the new bridge with construction scheduled for July 2008. Owner: Weld County Public Works Department, PO Box 758, Greeley, Colorado 80632 Consultant: HNTB Corporation, 1600 Broadway, Suite 1300, Denver, CO 80202 The following change is hereby made to the Contract Documents: Contract Time Extension: The original Agreement for Professional Services is extended until such time that construction is completed including all required construction documentation or until such time that Weld County notifies HNTB in writing that services are no longer required. Change to Contract Scope: Engineering Construction Services shall be added to the Contract. A detailed description and cost breakdown of these services is attached. CHANGE TO CONTRACT PRICE: Original Contract Amount $338,822.00 Change OrderNo.1 Costs $114,527.15 Revised Contract Amount $453,349.15 CHANGE TO CONTRACT TIME: The Contract time will be increased as required. RECOMMENDED: Owner Representative: w i b-/� . Date: JUL 0 2 2008 William H. Jerke, Chair Engineer: di,,,, /D4141-‘, Date: APPROVALS: Consultant: HNTB Corporation By: / / � KC—k_ / Date: (y/LS/o8 Title: ( V ce._ /J-2_5f-0-0fri cc Pti-) I (.9-K c) D?- o-- o ,xt g /d'6,�/ HNTB Corporation Scope of Services Replacement of Weld County Bridge No.87/42.5 over the South Platte River June 25,2008 General The work consists of construction management services required to support Weld County (OWNER) in Construction Administration for the Weld County Road 87/42.5 Bridge replacement over the South Platte River. Parties involved include: Prime Consultant/Engineer of Record (CONSULTANT): HNTB Corporation Resident Project Representative (RPR): Yeh &Associates, Inc. Materials Testing: Yeh &Associates, Inc. Contractor(CONTRACTOR): American Civil Constructors 1. Project Coordination A. Project Management. The CONSULTANT will coordinate all the work tasks being accomplished described here in to ensure project work completion stages are on schedule. B. The CONSULTANT will prepare monthly invoice progress reports. 2. Construction Administration A. Project Management. The CONSULTANT will coordinate all the work tasks being accomplished as described herein to ensure project work completion stages are on schedule. Includes on-site attendance every other week at weekly construction meetings. B. CONSULTANT/Resident Project Representative Field inspection in conformance with CDOT protocol, including CDOT Local Agency Manual and CDOT Construction Manual, during the construction period of July 15, 2008 to November 15, 2008. Construction is anticipated to occur 12 hrs/day, 5 days/week with resident project representative on site an average of 6 hrs/day,5 days/week (an additional 2 hrs/day assumed for drive time). Duties, Responsibilities, and Limitations of Authority of CONSULTANT/Resident Project Representative: Through observations of CONTRACTOR's work in progress and field checks of materials and equipment by the RPR,CONSULTANT shall endeavor to determine if CONTRACTOR's work is in accordance with contract documents. However, CONSULTANT/RPR shall not,during such visits or as a result of such observations of CONTRACTOR's work in progress,supervise,direct,or have control over the CONTRACTOR's work nor shall CONSULTANT/RPR have authority over or responsibility for the means, methods,techniques,sequences,or procedures selected by CONTRACTOR,for safety precautions and programs incident to the CONTRACTOR's work in progress,for any failure of CONTRACTOR to comply with Laws and Regulations applicable to CONTRACTOR's performing and furnishing the Work,or responsibility of construction for CONTRACTOR's failure to furnish and perform the Work in accordance with the Contract Documents. The duties and responsibilities of the RPR are limited to those of CONSULTANT in the Agreement with the OWNER and in the Contract Documents,and are further limited and described as follows: i) General: WCR87 HNTB Job No.42678 Construction supplement Page 1 of 4 RPR is OWNER's agent at the Site,will act as directed by and under the supervision of CONSULTANT,and will confer with CONSULTANT regarding RPR's actions. RPR dealings in matters pertaining to the CONTRACTOR's work in progress shall in general be with CONSULTANT and CONTRACTOR, keeping OWNER advised as necessary. RPR shall generally communicate with OWNER with the knowledge of and under the direction of CONSULTANT. ii) Schedules: Review the CONTRACTOR'S progress schedule,schedule of Shop Drawing and Sample submittals,and schedule of values prepared by CONTRACTOR and consult with CONSULTANT concerning acceptability. Hi) Conferences and Meetings: Attend meetings with CONTRACTOR,such as preconstruction conferences,progress meetings,job conferences and other project-related meetings,and prepare and circulate copies of minutes thereof. iv) Liaison: • Serve as CONSULTANT's liaison with CONTRACTOR, coordinate with CONTRACTOR's superintendent and assist in understanding the intent of the Contract Documents. • Assist CONSULTANT in serving as OWNER's liaison with CONTRACTOR when CONTRACTOR's operations affect OWNER's on-Site operations. • Assist in obtaining from CONSULTANT additional details or information,when required for proper execution of the Work. v) Interpretation of Contract Documents: Report to CONSULTANT when clarifications and interpretations of the Contract Documents are needed and transmit to CONTRACTOR clarifications and interpretations as issued by Engineer. vi) Shop Drawings and Samples: ▪ Record date of receipt of Samples and Shop Drawing submittals. • Receive Samples which are furnished at the Site by CONTRACTOR, and notify CONSULTANT of availability of samples for examination. • Advise CONSULTANT and CONTRACTOR of the commencement of any portion of the Work requiring a Shop Drawing or Sample submittal for which RPR believes that the submittal has not been approved by Engineer. vii) Modifications: Consider and evaluate CONTRACTOR's suggestions for modifications in Drawings or Specifications and report with RPR's recommendations to CONSULTANT.Transmit to CONTRACTOR in writing decisions as issued by CONSULTANT. viii) Review of Work and Rejection of Defective Work: • Conduct on-Site inspection and testing of CONTRACTOR's work in progress to assist CONSULTANT in determining if the Work proceeding in general conformance with the Contract Documents. • Report to CONSULTANT and/or OWNER whenever RPR believes that any part of CONTRACTOR's work in progress will not produce a completed Project that conforms generally to the Contract Documents or will prejudice the integrity of the design concept of the completed Project as a functioning whole as indicated in the Contract Documents,or has been damaged,or does not meet the requirements of any inspection,test or approval required to be made;and advise Engineer of that WCRB7 FINIS Job No.42678 Construction supplement Page 2 of 4 part of work in progress that RPR believes should be corrected or rejected or should be uncovered for observation, or requires special testing,inspection or approval. ix) Inspections and Tests: • Observe,record and report to CONSULTANT appropriate details relative to the test procedures. • Accompany visiting inspectors representing public or other agencies having jurisdiction over the Project, record the results of these inspections,and report to CONSULTANT. x) Materials Testing • Provide and be responsible for materials testing for the project as outlined in the attached CDOT Form 250. xi) Records: All project records shall be in accordance with the CDOT Local Agency Manual. • Maintain orderly files for correspondence, reports of job conferences, reproductions of original Contract Documents including all Change Orders, Field Orders, Work Change Directives,Addenda,additional Drawings issued subsequent to the execution of the Contract,CONSULTANT clarifications and interpretations of the Contract Documents,progress reports,Shop Drawings and Sample submittals received from and delivered to CONTRACTOR,and other Project related documents. • Keep a diary or log book for each day that the RPR is present and construction services are performed on the project, recording CONTRACTOR's hours on the Site,weather conditions,data relative to questions of Change Orders, Field Orders, Work Change Directives,or changed conditions, Site visitors,daily activities, decisions,observations in general,and specific observations in more detail as in the case of observing test procedures;and send copies to CONSULTANT. • Record names,addresses and telephone numbers of all contractors, subcontractors,and major suppliers of materials and equipment. • Maintain records for use in preparing project documentation. • Upon completion of the Work and full project close out,furnish original set of all RPR Project documentation to CONSULTANT. Upon review and concurrence CONSULTANT to submit to OWNER. xii) Reports: • Furnish to CONSULTANT periodic reports (bi-weekly)as required of progress of the Work and of CONTRACTOR's compliance with the progress schedule and schedule of Shop Drawing and Sample submittals. • Draft and recommend to CONSULTANT proposed Change Orders,Work Change Directives,and Field Orders.Obtain backup material from CONTRACTOR. • Furnish to CONSULTANT copies of all inspection reports. • Report immediately to CONSULTANT and/or OWNER the occurrence of any Site accidents,any Hazardous Environmental Conditions, emergencies, or acts of God endangering the Work,and property damaged by fire or other causes. xiii)As-Built Drawings: Provide final "as-built"drawings,as red-lined by RPR in the field. Electronic CAD"as-built"drawings will not be provided. xiv)Payment Requests: Review Applications for Payment with CONTRACTOR for compliance with the established WCR87 HNTB Job No.42678 Construction supplement Page of procedure for their submission and forward with recommendations to CONSULTANT, noting particularly the relationship of the payment requested to the schedule of values,Work completed,and materials and equipment delivered at the Site but not incorporated in the Work. Upon concurrence CONSULTANT to submit to OWNER. xv) Certificates: During the course of the Work,verify that materials and other data required by the Specifications to be assembled and furnished by CONTRACTOR are applicable to the items actually installed and in accordance with the Contract Documents,and have these documents delivered to CONSULTANT for review and forwarding to OWNER prior to payment for that part of the Work. xvi)Completion: • Before CONSULTANT issues a Certificate of Substantial Completion,submit to CONTRACTOR a list of observed items requiring completion or corrections. • Observe whether CONTRACTOR has arranged for inspections required by Laws and Regulations,including but not limited to those to be performed by public agencies having jurisdiction over the Work. • Participate in a final inspection in the company of CONSULTANT,OWNER,and CONTRACTOR and prepare a final list of items to be completed or corrected. ➢ Determine whether all items on final list have been completed or corrected and make recommendations to CONSULTANT concerning acceptance and issuance of the Notice to Acceptability of the Work. xvi)Resident Project Representative shall not: • Authorize any deviation from the Contract Documents or substitution of materials for equipment(including "or-equal" items). • Exceed limitations of CONSULTANT's authority as set forth in the Agreement or the Contract Documents. • Undertake any of the responsibilities of CONTRACTOR,subcontractors,suppliers, or CONTRACTOR's superintendent. • Advise on, issue directions relative to or assume control over any aspect of the means, methods,techniques,sequences or procedures of CONTRACTOR's work unless such advice or directions are specifically required by the Contract Documents. • Advise on,issue directions regarding,or assume control over safety precautions and programs in connection with the activities or operations of OWNER or CONTRACTOR.Participate in specialized field or laboratory tests or inspections conducted off-site by others except as specifically authorized by CONSULTANT. • Accept Shop Drawing or Sample submittals from anyone other than CONTRACTOR. • Authorize OWNER to occupy the Project in whole or in part. • Be required to be on-site full time. C. Submit monthly progress reports including site visit diary entries and inspection logs to OWNER. D. Process periodic pay requests and submit to OWNER for payment. E. Review of submittals and RFI's. WCRB7 HNTB Job No.42678 Construction supplement Page 4 of 4 Weld County Road and Bridge Design Project-CONSTRUCTION Weld County Road 57/42.5 over the South Platte River Scone 8 Fee Estimate DESCRIPTION PIC PM_ TM SE E ST A TOTAL REMARKS I COMMENTS Mammal')week(-5 r a t)wstucpn A Project Management 5 77 5 57 B Monthly Inds Progress Reports 5 5 SUBTOTAL-Project Management 5 82 0 0 0 0 5 92 514,481 DESCRIPTION PIC PM TM SE E ST A TOTAL REMARKS/COMMENTS 1 fweelm.7/Isge-1615/08 A Project Management _ weedy meetings 72 72 l 3weeb,PM a nn eeyetherwrk 5aemy.mg Per 88880880801 agreement(kmf des management B Resident ProjectRepesemerwe oversight) $ 87,047 4 MaMbla Teslkg Per subronsudam egmement 5 12,416 xv8 Completion-final inspection 15 16 Per*pt.tSe:,final:an.me C Monthly Progress Reports 5 5 5..Mina*mos*PM I lrtnwrt D Process Pay Regi sb 5 5 5 e twin owed,PSI t liniment E Submittal Review 8 RFrs Roadway RFrs 8 8 _ 1 wunr a RFr.Ma',seven Bridge RFrs 16 1 flames II RFrs n2 Wirth Prestressed Concrete BT 12 1 Bridge Railing 3 ar.nm..4•w4a ww5kg dawns as top daeti2 Dipanehn Dot 1 1 meow ret.tg wvl5g da.5gs as tap*wigs Precast Panels 1 2 mama relMg aware dreams astwp dswgs - Reinforcing Steel Abutment&Wingwals 2 4 suns'Snip sang deµgsa*an ewuS5e Piers 2 6 meanies reviewing ev55gdsv4gs a t Jrw shop 5,ra Deck 2 6 .aen reviw:g wdig dadgan trop&wails Approach Slab 1 4 assumes,..tw,a aed5g dswgs a mop dawns Gkder Pre-Erection conference e Bridge Pre-Removal conference 6 Syndsopile submittals 4 8 1 SUBTOTAL-Construction 0 117 8 45 23 8 0 201 5107,645 f WORK HOUR SUMMARY DESCRIPTION PIC PM TM SE E ST A TOTAL REMARKS/COMMENTS Project Management S 82 0 0 0 0 5 92 514,481.04 Construction Adminisaelon(2008) 0 117 5 45 23 8 0 201 528.183.01 ResidentProfact RepesemaHre $6704585 — Malmbis Tasting 51241800 Other Direct Costs(Construction) 53,14925 CONSTRUCTION TOTAL - - 5125276.15 Construction Administration Labor 5 199 8 45 23 8 5 293 542.654.05 Other Direct Costs _ 53,14925 Subconsullants $79,46285 Credilfrom DESIGN'Other Professional Services'= (510,749.00) CONSTRUCTION ADMINISTRATION TOTAL a 5114,527.15 l _ WCR87/42.5 Fee Estimate Page t of 3 HNTB Weld County Road and Bridge Design Project-CONSTRUCTION Weld County Road 87142.5 over the South Platte River Scope&Fee Estimate 2008 Construction SPECIFIC CLASSIFICATION RATE Principal in Charge PIC $222.36 Project Manager PM $156.02 Task Manager TM $162.11 Senior Engineer SE $132.13 Engineer E $81.66 Senior Technician ST $100.97 Drafter D $78.25 Administration A $115.12 WCR87/42.5 Fee Estimate Page 2 of 3 HNTB Wetd County Road and Bridge Design Project-CONSTRUCTION Weld County Road 87/42.5 over the South Platte River Scope&Fee Estimate OTHER DIRECT COSTS-Construction DESCRIPTION UNIT COST QUANTITY TOTAL Mileage* $ 0.585 per mile 4450 miles $ 2,603.25 Telephone $ 100.00 per month months $ - Express Mail $ 20.00 per month 5 months $ 100.00 Postage/Freight $ 10.00 per month 5 months $ 50.00 Courier $ 60.00 per month 5 months $ 300.00 Plotting per foot feet $ - Reproductions, 8 1/2x11 $ 0.06 per copy 400 copies $ 24.00 Reproductions, 11x17 $ 0.18 per copy 400 copies $ 72.00 Reproductions, Drawings per copy copies $ - Exhibits $ 200.00 ea 0 ea $ - 'mileage rete effective July 1,2008 TOTAL ODC's Construction $ 3,149.25 WCR87/42.5 Fee Estimate Page 3 of 3 HNTB prig Yeh and Associates, Inc. Consulting Engineers&Scientist June 25,2008 Galina S.Leiphart,P.E. HNTB Corporation 1600 Broadway, Suite 1300 Denver,Colorado 80202 Re: Resident Project Representative and Quality Assurance Testing for Weld County Bridge on WCR 87 Dear Ms:Leiphart: Yeh and Associates is pleased to submit this proposal to provide the Resident Project Representative (RPR)and materials testing relative to the above referenced project. Our proposal includes an outline of the project information provided to us,the proposed scope of services,and our estimated fees. PROPOSED CONSTRUCTION We understand that the project will construct a new bridge replacing the existing bridge on Weld County Road 87,as well as new road approaches and pavement. We understand that the materials to be tested include 24,495 cubic yards of earthwork, 154 cubic yards of structural backfill,2,545 tons of aggregate base course(ABC),645 tons.of Hot Mix Asphalt(HMA)pavement,and structural concrete for the bridge structure;caissons,and gutter as well as other misr.ellaneous concrete. Flow fill will also be tested as part of the roadway improvements. RESIDENT PROJECT REPRESENTATIVE Yeh and Associates will provide one Resident Project Representative(RPR)to perform duties in accordance with the attached Scope of Services RPR Compensation Estimated Hours are seven-hundred-twenty(720)at$75.00/hour= 554,000.00 One RPR to provide the services delineated in the contract Scope of Services. Our estimate is that ninety (90)trips will be required at 130 miles per trip®$0.585/mile: $6,844.50 Subtotal $60,844.50 PROJECT OUALITY ASSURANCE TESTING Based on our understanding of the project,the following quality assurance material testing services may be required for the proposed construction. • Field density-compaction testing and laboratory testing of soils and aggregates for embankment, structural backfill and base course. • Field and laboratory testing of concrete and flow fill • Field and laboratory testing of Hot Mix Asphalt(HMA)pavement 5700 East Evans Avenue, Denver, CO 80222, (303) 781-9590, Fax (303) 781-9583 170 Mel Ray Road, Glenwood Springs, CO 81601, (970) 384-1500, Fax (970) 384-1501 570 Turner Drive, Suite D, Durango, CO 81303, (970) 382-9590, Fax (970) 382-9583 Field Density—Compaction Testing:An engineering technician will be provided on a part-time basis or as requested to perform materials testing services for earthwork. We understand that testing will consist of moisture-density relationships,one point checks,gradations,Atterberg Limits and compaction testing with a nuclear density gauge. Concrete: An engineering technician will be provided on a part-time or as requested basis to sample fresh concrete used during construction.The concrete will be tested for slump,air content,unit weight,and temperature at the time of placement. Test cylinders will be molded at the time of placement and compressive strength testing will be performed at the Yeh lab to determine compliance with the project specifications. Test results,will be provided in the field for review and compressive strength test results will be conveyed as available. The testing,frequency will be daily and as scheduled. The areas to be addressed are shuctu al concrete from the major structural elements,caissons,gutter and flow fill. Hot Mix Asphalt: Field density-compaction testing by nuclear methods will be provided by an engineering technician,on an as-scheduled basis,during placement of the Hot Mix Asphalt(IHMA) pavement. Test samples will be taken to supplement the quality control testing being performed by the asphalt supplier. A Yeh representative will obtain samples for laboratory tests as required. Daily reports of test results will be available on-site for review. Cores,if required will be taken by the contractor and tested for density in the lab by a Yeh engineering technician. All testing frequencies will be in accordance with the current Colorado Department of Transportation (CDOT)Field Materials Manual Quality Control Schedule and the form 250 for the project Engineering.Supervision and Clerical: Engineering,supervision and clerical services will be provided as required for the project and to prepare formal reports. Testing Cost: We understand the project will be completed over two years,starting in July of 2008 with a suspension in the early spring and completion in 2009.We anticipate that one technician will be required on.an on-call basis,and that the average technician work day will consist of six to eight hours including travel time.Those hours may increase dining an activity such as a bridge deck pour depending on the amount of testing required. Our estimated fee is as follows: Earthwork One field technician providing three trips with 2-3 density tests per trip as well as sampling soil for lab testing. We estimate that five(5)trips will be required. 6 hours per trip @$65/hour plus 130 miles per trip @$0.585/mile: $2,330.25 One Laboratory Technician: (See chart below) Description #of Tests Rate Subtotal Atterberg(Embankment) 2 $40 $80.00 Atterberg(ABC) 1 $40. $40.00 Atterberg(Str.Bkfl) 1 $40 $40.00 Proctor(Standard) 3 $60 $180.00 Proctor(Modified) 1 $70 $70.00 Gradation&One-point(Embanlnnent) 2 $50 $100.00 Gradation&One-point(ABC) 1 $50 $50.00 Gradation&One-point(Str.Bkfl) 1 $50 $50.00 Outside Lab R-value 1 $350 $350.00 Subtotal $960.00 Concrete and Flow Fill: One field technician providing thirteen trips with a minimum of one test per trip,but more when larger 2 pours are constructed. We estimate that thirteen(13)trips will be required. 7 hours per trip @$65/hour plus 130 miles per trip @$0.585/mile: (7 hours is an average,where one sample is required,the time will be less,and for large pours such as the bridge deck,more hours will be required) $6,903.65 Hot Mix Asphalt One field technician providing two(2)trips with 2-3 density tests per trip as well as samples for lab testing. We estimate that two(2)trips will be required. 6 hours per trip @$65/hour plus 130 miles per trip @$0.585/mile: $932.10 One Laboratory Technician: (See chart below) Description #of Tests Rate Subtotal. Outside Laboratory HMA Testing(Voids, 1 set Lump $1,290.00 VMA,Lottntam,see attached. Sum Subtotal $1,290.00 Subtotal $12.416.00 The fee and hourly based worksheet estimates were generated with the understanding that Yeh and Associates,Inc.would be performing the duties of Quality Assurance(QA)on the project. The'fees are based upon our understanding and requirements of the project,CDOT'sperifications,and our experience on similar projects. If services performed exceed the work described above,additional costs will be invoiced at the respective unit rates after written authorization from the client. The unit rate for services requited beyond the scope presented above will be in accordance with the 2008-2009 Yeh and Associates, Inc.standard rates. ENGINEERING MANAGEMENT OVERSIGHT: We anticipate that Engineering Management and Oversight for both the QA testing and the on-site manager will require 7 on site visits and a total of 42 hours. The anticipated cost of this service is based on seven(7)visits at 130 miles per visit,and forty-two(42) hours at$135.00/hour for a total of: Subtotal $6,20235 The total estimated costs for the services on the Weld County Road 87 B ridge Replacement is: Estimated Total Cost: $79.462.85 Thank you for the opportunity of submitting this.proposal and we are available to discuss the details with you. We appreciate your consideration of Yeh and Associates for this work and look forward to working together. Sincerely, Yeh and Associates Ro ert F.LaForce,P.E. Senior Materials Manager 3 June 25,2008 (28-074) Attachment for Outside Laboratory BMA Testing Weld County Bridge Hot Mix Asphalt Testing Proposal Laboratory Hot Mix Asphalt Testing Superpave Production #Sam Cost (Theo Max Sp Gr,Bulk Voids VMA,Voids filled) $340 /sample X 1 $340 Hveem Stability $100 /sample X 1 $100 Ingition Oven Calibration $350 /sample X 1 $350 Ingition Oven%AC $75 /sample X 1 $75 Washed Gradation $75 /sample X 1 $75 Lottman $350 /sample X 1 $350 Total $1,290 U. a) D N 01 Z , I o U O I a 0 co rn ( 7 , Q I 2 N a N N in E N d cn v-, �b ♦ l l ( ii N ci_ Lnui u) C S p -1 La ix `� N W CO O) CO of W CO CO CO CO CO LO e > J o 0 0 0 o 0 0 0 0 0 0 it CO Q O N O N in N N N N N N L Z k 2 N m n n C o J a) I oaZ J i_ 0 CO CO co CO co co CO co CO CO m a) m > R 00000000000 N CO N u) LU u) u) In LO LU N N LL 2 w al m co n N n n n n R N ? = 1-'1- 0 7 a) N N a) m N a) m " y C N 0 ¢ Z ~ )i H H )'- H H H H H m N E u y = o 0 E W0 0 _... H (n d fA 3 m c U a) H U 0 A a > a as E a) ai d C L c N N a) O a) a fA N O N N C a H O Q ¢ _co CO a '..p O U LT_ UI a `o U v a o 0- a c N v LC N O` O O U C T a, Td W ro o. a H V ._ N D C Q d G O CO Z O a N U d LL U) a a)co y N a U o N aN N > 0 0 '3 c E ._(o H 0 z O. 0 O Co- p 0 of D r N CO � N CO N- CO O) 0 O N itD MEMORANDUM TO: Clerk to the Board WI I DATE: June 27, 2008 C FROM: Wayne Howard, P.E., County Engineer/CIP COLORADO SUBJECT: Bridge 87/42.5— Change Order No. 1 Attached are two original Change Orders for our design engineer's current contract. HNTB designed the bridge project and our contract allows PW the option to include construction services if desired. PW does not the ability to inspect a federal grant project with its in-house resources and requires outside services for this CDOT type of inspection. The costs to perform these services are $114,527.15 which includes one full time inspector, materials testing, and part time management support as needed. A detailed breakdown of these fees is attached to the change order. PW is recommending approval for this change order. M:\-Active Projects\Bridge 87-42.5A\Construction\Correspondence\Letters\MEMORANDU1 HNTB CO1 .dot 2008-1864 [goo SP QBP NO. B0600049 RE: CONSULTING ENGINEERING SERVICES FOR THE REPLACEMENT OF THE WC BRIDGE NO. 87/42.5A OVER THE SOUTH PLATTE RIVER/ Public Works Department THE FOLLOWING PROPOSALS ARE TO BE PRESENTED ON MARCH 1ST, 2006. THE PROPOSALS ARE BEING REVIEWED BY THE PUBLIC WORKS DEPT. THIS QBP WAS APPROVED ON WED. JUNE 14TH, 2006 VENDORS HEDRICK& ASSOCIATES LLC WASHINGTON GROUP INTERNTATIONAL 2455 WEST MAIN STREET 7800 E UNION AVENUE SUITE#100 LITTLETON CO 80120-1910 DENVER CO 80237 HNTB CORPORATION TSIOUVARAS SIMMONS 1600 BROADWAY SUITE #1300 6021 S. SYRACUSE WAY SUITE #195 DENVER CO 80202 GREENWOOD VILLAGE CO 80111 LONCO INC. SUMMIT ENG. GROUP INC. 1700 BROADWAY SUITE #800 10394 W CHATFIELD AVE #110 DENVER CO 80290 LITTLETON CO 80127 RG CONSULTING ENG. INC. JF SATO & ASSOCIATES 1331 17TH STREET SUITE#710 5898 SOUTH RAPP STREET DENVER CO 80202 LITTLETON CO 80120 STANTEC CONSUTLING INC. KIRKHAM MICHAEL 2135 SOUTH CHERRY ST SUITE #310 5600 SOUTH QUEBEC STREET#200D DENVER CO 80222 GREENWOOD VILLAGE CO 80111 LORIS & ASSOCIATES INC. SHORT ELLIOT HENDRICKSON INC 2585 TRAIL RIDGE DRIVE EAST COLO CENTER, TOWER ONE, SUITE 6000 LAFAYETTE CO 80026 2000 SOUTH COLORADO BLVD DENVER CO 80222-7900 CENTENNIAL ENGINEERING INC 1726 COLE BLVD. SUITE#240 GOLDEN CO 80401 It was the decision of the Weld Board of County Commissioners to award the QBP for the ENGINEERING SERVICES FOR BRIDGE #87/42.5 A OVER THE SOUTH PLATTE RIVER to HNTB Corporation. WELD COUNTY COLORADO BY: PAT PERSICHINO DIRECTOR OF GENERAL SERVICES FEBRUARY 28TH, 2006 Hello