MEMORANDUM
1
CTO: Clerk to the Board DATE: September 19, 2008
•
COLORADO FROM: Wayne Howard, County Engineer/CIP, Public Works
SUBJECT: CONSENT AGENDA ITEM
Work Order Form No. 6 with Short Elliot Hendrickson for the Bridge 13/54A Replacement Project in
the amount of$49,347.70.
Attached are two original Work Order Form No. 6 documents. Please return one signed original to
Public Works.
pc: Mike Bedell,Public works
M:\Francie\Agenda Wayne Howard.doc
•.,1
OO
L E00.54)Cvow �lvt1 a 2008-2579
bbl d(l : /Id( r-t.; r
WORK ORDER FORM
PURSUANT TO AN AGREEMENT BETWEEN
WELD COUNTY AND
SHORT ELLIOTT HENDRICKSON INC.
DATED: 9-03-08
Work Order Number: SEH-6
Project Title: Bridge 13/54A Replacement
Commencement Date: November 1,2008
Completion Date: July I, 2009
Limitations on compensation: Total Contract Not to Exceed $49,347.70. (Weld County Cost-Share
portion of this project is approximately 10%).
Project Description: Assisting Weld County with Construction Inspection services. This Federal-Aid
project requires the services of an inspector with sufficient knowledge and certifications to fulfill all of
the required duties. The same inspector will be assisting Weld County with the construction of Bridge
27/66A. It is anticipated that both projects will follow similar schedules starting in December, 2008 and
completion by the summer of 2009.
Scope of Services: See attached Construction Services Estimate
Professional agrees to perform the services
identified above and on the attached forms in The attached forms are hereby accepted and
accordance with the terms and conditions incorporated herein, by this reference, and
contained herein and in the Professional Notice to Proceed is hereby given.
Services Agreement between the parties. In the
event of a conflict between or ambiguity in the
terms of the Professional Services Agreement Weld County
and this work order (including the attached
forms) the Professional Services Agreement By: Michael Bedell P.E.-Senior Engineer
shall control. Date: `'13 O8
Professional By: / Y Ozr
Depa tment Head
Short Elliott Hendrickson Inc. Date: • r+ —"re'
2000 South Colorado Blvd., 6000 ��
Colorado Center Tower One By:
Denver, CO 22-79 Direct r f inane and Administration
Date: 09 24/2008
By: /J�/
/'"/'t//1/CiA•¢L By:Chairman,
O< n Z�
Titl Chairman, Weld County Commissioners (Pro—Tern)
Date: 09/24/2008
Date: D 9. 9• Ff
c200d-a6-2 '
c
Weld County 7/31/2008
WCB 13/54A
Weld County Road 13 over Big Thompson River
Construction Services Estimate
Construction Inspection
Assume 150 days construction duration =>21 weeks
Include 1 week before and after for Project Start-Up and Closeout
Michael Shrout will be working nearby on WCB 27/66A for 19 weeks.
23 weeks @ 20 hr/wk = 460 hours
Michael Shrout's Billing Rate = 87.00 $/hour
Total: $40,020.00
This includes pre-bid meeting, pre-construction meeting, and
substantial completion inspection.
PM, Review, &Admin
PM Review Admin
Hildahl Davis Osmanovic
Hours 15 15 5
Rate $153.82 $166.95 $85.58
$2,307.30 $2,504.25 $427.90 Total: $5,239.45
Michael lives nearby, so no per diem is needed.
Vehicle: $4.50 /hour + Mileage: 3450 miles (15 miles each
460 hours $0.585 /mile way per day)
$2,070.00 $2,018.25 Total: $4,088.25
Material Testing
Material Testing will be provided under a separate contract, and is not included.
Shop Drawing Review &Technical Assistance
It is assumed that shop drawing review and technical assistance will be provided
by the design engineer, and are not included.
Total Construction Management Estimate: $49,347.70
r
Michael Shrout
Senior Designer/Construction Inspector
Experience
Education Stantec Consulting,Fort Collins Co- Senior Designer.
University of Colorado Boulder, Primary duties—creation of plans for roadway projects, and water
co utility/storm drainage pipelines for Environmental Infrastructure and
Urban Land projects
Certifications/Training
ACI Concrete Field Testing Colorado Dept of Transportation,Durango& Greeley, Colorado-
Technician—Grade t Engineering/Physical Sciences Technician III.Primary duties—
ACI Concrete Transportation creation of complete plans/specs packages for advertised highway
Construction Inspector
RMAEC Asphalt Technician A- construction projects, including: resurfacing,minor and major widening,
Laydown &Asphalt Inspector minor and major reconstruction,bridge replacement with detours,
Level ICDOT Erosion Control complete virgin alignments, realignments, intersection design,
Supervisor Training
interchange layout,grade and superelevation improvements, safety
improvements,drainage, irrigation, cost estimates.
8 Mile Major New Alignment,US 34 at Dearfield.Design and
Construction.Design and Construction.This was a complete major
new alignment with a bridge over a canal. Michael performed
construction inspection on the bridge, canal realignment,many irrigation
structures,asphalt pavement, and wrote a large percentage of the CDOT
Form 266s that measured work, allowing payment to the Contractor.
8 Mile Overlay,I-25,SH 52 to SH 66.Design and
Construction/Assistant Project Engineer.This was a night paving
project. Michael performed reviews of the traffic control,performed
asphalt inspection,and wrote most of the CDOT Form 266s that
documented work,allowing payment to the Contractor.
Bridge Replacement with Detour,SH 392 E of Windsor.Design and
Construction/Assistant Project Engineer.This was a bridge
replacement over a canal. Michael was de facto Project Engineer and
performed reviews of traffic control,performed inspection of the detour
and new bridge,performed asphalt inspection, and wrote nearly all of the
CDOT Form 266s that documented work, allowing payment to the
Contractor.
8 Mile Overlay,1-76,Lochbuie To Hudson.Design and
Construction/Assistant Project Engineer.This was a resurfacing
project. Michael performed reviews of the traffic control,performed
asphalt inspection,and wrote most of the CDOT Form 266s that
documented work,allowing payment to the Contractor.
Bridge Replacement with Detour,US 36 W/O Last Chance.Design
and Construction/Assistant Project Engineer.This was a bridge
replacement over a draw. Michael performed reviews of traffic control,
performed inspection of the detour and new structure,performed asphalt
inspection,and wrote nearly all of the CDOT Form 266s that documented
SEli Michael Shrout I Senior Designer/Construction Inspector I page 1
work,allowing payment to the Contractor.
Additional Experience
• Construction Inspector and Assistant Project Engineer
• Proficient in AutoCAD,Eagle Point,COGO,etc.
• Gaining experience with Bentley MicroStation and InRoads
• Proficient with most Microsoft Office applications
• Familiar with CDOT specifications and practices,AASHTO
standards, MUTCD
SEEMichael Shrout I Senior Designer/Construction Inspector I page 2
BOARD OF COUNTY COMMISSIONERS
REVIEW/WORK SESSION REQUEST
RE: Bridge 13/54A Construction Services
DEPARTMENT: PUBLIC WORKS DATE: 9/12/08
PERSON REQUESTING: Wayne Howard, P.E., County Engineer/CIP
Brief description of the problem/issue:
The 13/54A Bridge over the Big Thompson River is scheduled for construction in November 2008 through May
2009. This Federal-Aid project requires the services of an inspector with sufficient knowledge and
certifications to fulfill all of the required duties. We recommend using our current On-Call Engineering
Consultant (Short Elliott Hendrickson Inc.) for these services since they have qualified staff located in the
Greeley area. The same inspector will be assisting Weld County with the construction of Bridge 27/66A
simultaneously, which will reduce the overall inspection costs. Weld County cost-share portion of this project
is approximately 10%.
What options exist for the Board? (Include consequences, impacts, costs, etc. of options)
The Board could choose to not approve this Work Order. The Public Works Department would then have to
seek out professional services from another consultant. Approval of the Work Order will allow the construction
to proceed on schedule, and ensure that a qualified individual is overseeing the construction.
Recommendation to the Board:
Attached is Work Order No. 6 with S.E.H. whom would perform the work. I recommend approval of the Work
Order. The hourly rates and associated costs are reasonable.
Approve Schedule
Recommendation Work Session Comments
William H. Jerke, Chair \1v
Robert D. Masden, Pro-Tem
William F. Garcia CAA
David E. Long J
Douglas Rademacher
Attachments: Work Order No. 6