HomeMy WebLinkAbout20082908.tiff •
At4,4ir1 MEMORANDUM
V Iwine
TO: Board of County Commissioners
COLORADO FROM: Jacqueline Hatch-Drouillard
DATE: November 4, 2008
SUBJECT: AMUSR-1614, SemCrude
The Department of Planning Services is requesting that the following Conditions of
Approval be removed from the resolution since these items have been addressed by the
applicant.
1. Prior to recording the plat:
B. The applicant shall submit evidence of an Air Pollution Emission Notice
(A.P.E.N.) and Emissions Permit application from the Air Pollution Control
Division (APCD), Colorado Department of Health and Environment.
Alternately, the applicant can provide evidence from the APCD that they
• are not subject to these requirements. Evidence of Department of Public
Health and Environment approval shall be submitted to the Department of
Planning Services. (Department of Public Health and Environment)
C. The applicant shall submit a dust abatement plan for all driving and
parking areas for review and approval, to the Environmental Health
Services, Weld County Department of Public Health & Environment.
Evidence of Department of Public Health and Environment approval shall
be submitted to the Department of Planning Services. (Department of
Public Health and Environment)
D. A recorded agreement allowing utilization of SemCrudes water and
sanitation facilities shall be provided to the Department of Public Health
and Environment. The reception number shall be noted on the plat.
Evidence of Department of Public Health and Environment approval shall
be submitted to the Department of Planning Services. (Department of
Public Health and Environment)
E. The applicant shall submit evidence of a Colorado Discharge Permit
System (CDPS) from the Water Quality Control Division of the Colorado
Department of Health and Environment for any proposed discharge into
State Waterways, if applicable. (Department of Public Health and
Environment)
•
a j.
�a02-0190?
F. The applicant shall submit evidence of an Aboveground Storage Tank
• permit from the Colorado Department of Labor and Employment
(CDL&E), Oil Inspection Section for any aboveground storage tanks
located on the site. Alternately, the applicant can provide evidence from
the (CDL&E), Oil Inspection Section that they are not subject to these
requirements. Evidence of Department of Public Health and Environment
approval shall be submitted to the Department of Planning Services.
(Department of Public Health and Environment)
G. A detailed design and operations plan for the truck washout building shall
be submitted to WCDPHE for review and approval. The design shall
demonstrate how all spilled waste, stormwater and wash down water will
be contained. The design shall also include the method to prevent
leakage. A leak detection system shall be designed and installed
beneath the washout bay. The truck washout shall be constructed and
operated in accordance with the approved design. Evidence of
Department of Public Health and Environment approval shall be
submitted to the Department of Planning Services. (Department of Public
Health and Environment)
H. A Spill Prevention Control and Countermeasure plan, for the Noble
facility, shall be submitted to Department of Public Health and
Environment. Evidence of Department of Public Health and Environment
approval shall be submitted to the Department of Planning Services.
(Department of Public Health and Environment)
• . The applicant shall submit an updated waste handling plan, for approval,
to the Environmental Health Services Division of the Weld County
Department of Public Health & Environment. Evidence of Department of
Public Health and Environment approval shall be submitted to the
Department of Planning Services. The plan shall include at a minimum,
the following:
1) A list of wastes which are expected to be generated on site (this
should include expected volumes and types of waste generated).
2) A list of the type and volume of chemicals expected to be stored
on site.
3) The waste handler and facility where the waste will be disposed
(including the facility name, address, and phone number).
(Department of Public Health and Environment)
L. The applicant shall address the requirements (concerns) of the State of
Colorado Division of Wildlife, as stated in the referral response dated
September 2, 2008. Evidence of such shall be submitted in writing to the
Weld County Department of Planning Services. (Weld County
Department of Planning Services)
•
F
•
Amended Use by Special Review
Crude Oil Unloading&Oil Polishing
Facility
Weld County
Rest of Commissioners November 5,2005
OTETRA TEC. ,,m. 4rnda#r' ratty,.
Introductions
Tetra Tech Anadarko Petroleum Corporation
• Julie Cozad • Joe Auwin
Land Plannng Manager Sr Fac,imea Eng,ma•
• Cameron Fowlkes,P.E..
LEED AP Noble Energy
Engineenng Manager • Greg Pickerel
• Sten Blander,P . Families Engine.,
Traffic Report
• •SemCrudelennC Consultants
• Glenn ollum Enw Enrico Science,LTD
Manager,EnvimnmenM andlmd Envvmrironmental ntalStom er
saramea LT Environmental
sYwmwenr Discharge Con:
SemCrude Company Overview
• SemCrude purchases crude oil and condensates from
2,000+independent producers,operators,&aggregators
• Sells crude oil to independent refiners
• Predominately stores crude oil at the Cushing,
Oklahoma Interchange,with additional storage in Weld
County
• Operates&maintains pipelines in Colorado,Oklahoma,
Kansas,Texas&New Mexico
• Headquartered in Tulsa,Oklahoma
—Offices in Oklahoma City.Houston,Wichita,Abilene,Dumas.
end Denver
- r
1
•
• Anadarko Company Overview
• Anadarko Petroleum Corporation is among the largest independent al
and gas exploration and production companies in the world,with 2.43
billion barrels of al equivalent(BOE)of proved reserves as of
December 31,2007.
• As of December 31,2001,Anadarko had proved reserves of 8.5 trillion
cubic feet(TM)of natural gas and 1,0 billion barrels of crude oil.
conderuate and NGLs.Combined,these proved reserves are
equivalent to 2,43 billion barrels of oil or 14.6 Tcf of gas.
• Anadarko's portfolio encompasses premier positions in ten major U.S.
onshore natural gas resource plays.The company also is the largest
independent deepwater producer in the Gulf of Mexico.and has
production and/or exploration in Alaska,Age'ia.Brazil.China,
Indonesia,Mozambique and West Africa,as well as executing strategic
exploration programs in several other countries.
• Anadarko actively markets natural gas,dl and natural gas liquids
(NGLs)and owns and operates gas gathering and prooMeirg systems.
Noble Energy Company Overview
• Noble Energy has been engaged In crude oil and natural gas exploration
and development'activities throughout the onshore Us since 1932 and in
the Gulf of Mexico since 1968.Total United states production In 2007
averaged 111.000 barrels of oil equivalent per day.
• wettenberq Field—The Wittenberg field,Noble Energy,'s largest domestic
east,continue.to grow production and reserve..In 2007.sales from this
field enraged epproximetely 240 minion cubic feet equivalent per day.
• The Company acquired working interests in the Wallenberg field through
the Patine Merger in 2005 end the accluisition of U.S.Exploration in 2008.
• In addition,the Company has added 7,000 additional acres in early 2009.
Located In the 04 basin of f north central Colorado.jec WaNny Mid
with
provides Noble Energy with a suba20Mial future project inventory,with
multiple productive felt'half represent
In onto plans m 10 the remaining
em1,25
projects,approximately half reptewnt new drills and the n continued
Is
.h• ancementssiand
dtlning and completion primary
res. on
Summary of Existing USR-1614
•
•
•
•
•
=a -
•
2
• Summary of Amendment
L..wr raisoropewgi r. 15
s ti
• ��
In 2L.
,j —q' 1 ri�I'
Li sl-
Imo. s
ww
Construction Process & Schedule
• Building pennnns approved for:
[tamps
-- SCnona are. arm.+°.,d Rmie
Some mica
n.In Truck u.o-Ns n
-- iv%thew Wil.V In Anadarko
• Building permits in proc•s.:
.,,..arm«...submitted to Roble
utl°.e�ing ounddoto,nod nno*fee nonnCwa
• - Truck
a be rg Senn
ow.
Tor .ulu.n.
- Gficebapiry n,5ndCrule
• Road design and construction:
••tum Ion rw WCR 41nd WCR 30 ne•secbcn
• other construction end permits
- Sept.5001°1 for dd[.•.rnws
- P•Ps••••Buddop permd.ronsered for wp..nn
Economics of Oil & Gas in Colorado
• Significant reserves in Weld County
• Over 1000 wells have been shut in due to
overcapacity and limited storage,pipelines and
refineries in the area
• Pipelines and associated facilities reduce truck traffic
and air quality issues
• More demand of oil and less supply
• Oil and Gas industry contribute$21 Billion to
Colorado(2005 statistics)
• 90%due to extraction activities
• Oil and Gas industry employs 71,000 people in
Colorado(2005 statistics)
•
3
•
• Regulatory Agencies, Permits &
Reports
• Stormwater Management Plan
• Federal Energy Regulatory Commission(FERC)
• Department of Transportation(DOT)
• Nationwide 12 permit
• Wetland delineation
• Threatened&endangered species
• Archeological study
• Air Pollution Emissions Notice(APEN)
• Floodplain construction permit
Closing Comments
• SemCrude, LP along with Anadarko
Petroleum Corporation and Noble Energy
have cooperated on this important facility to
deliver Crude Oil to the market
• We appreciate the level of efforts of all of the
• County Staff, including Planning&Building
Inspection;Public Works and Public Health
and Environment
• Questions?
Amended Use by Special Review
Crude Oil Unloading&Oil Polishing Facility
Weld County
Beard of Commissioners November 5.2018
Q
N"--- that' 4 flop Mtn
•
4
•
Exhibit G is pdf. Version
(CD) of the Waste Plan
(416 pages)
•
Please see original in file
•
BOARD OF COUNTY COMMISSIONERS' SIGN POSTING
CERTIFICATE
• THE LAST DAY TO POST THE SIGN IS October 25, 2008 THE SIGN SHALL BE POSTED
ADJACENT TO AND VISIBLE FROM A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY.
IN THE EVENT THE PROPERTY BEING CONSIDERED FOR A SPECIAL REVIEW IS NOT
ADJACENT TO A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY, THE DEPARTMENT
OF PLANNING SERVICES SHALL POST ONE SIGN IN THE MOST PROMINENT PLACE ON
THE PROPERTY AND POST A SECOND SIGN AT THE POINT AT WHICH THE DRIVEWAY
(ACCESS DRIVE) INTERSECTS A PUBLICALLY MAINTAINED ROAD RIGHT-OF-WAY.
I, Jacqueline Hatch-Drouillard, HEREBY CERTIFY UNDER PENALTIES OF PERJURY THAT
THE SIGN WAS POSTED ON THE PROPERTY AT LEAST TEN DAYS BEFORE THE BOARD
OF COMMISSIONERS HEARING FOR AMUSR-1614 IN THE AGRICULTURAL ZONE
DISTRICT.
Jacqueline Hatch-Drouillard
Name of Person Posting Sign —Jacqueline Hatch-Drouillard
• Signature of Peon Posting Sign
STATE OF COLORADO
)ss.
COUNTY OF WELD
The foregoing instrument was subscribed and sworn to me this ; Yalay of Dt tt yy , 2008.
WITNESS my hand and official seal.
BETHANY ti
SALZMAN It*
otary Public �9 '•.............'•�Q
E0F C0N-
My Commission Expires: My Cnmmiccjon Expires
10-14-2011
• z
i zf
tit
"'4 [��} x f•
wry,,,. {a
fiF , +may '�it [/ \ ° t .`' {�' _ 1°'r .y� --
yalf lc: CO ° 43/44) (S) Q) , , ., .. ,ity.:,millooti Z. 1:r ()
"fir 4> r +' p �n , R e1
1
p b.
YMyyt't b�,.�F�� d �. pt f F k 3 �kF A
yB'.9'6N[llr i.....\
4 1 'T 444� �� �S
4 Ni'4 40.ft�� r�� 3 is 7. 4 r
'^�' P' NI t fr ft d R' *W1::•::::,- :.2,:e1;
S tCI' x't
C >rni,
ve
Pt ISM ims Le cio)
R i �,. rvi x ,' .
Lim
iC
F `
O 4.2, r \i") ch. •I 0. 'am n -112 .;::: .?.. ...:•,. .4 d
t -� � h Y
O n of) o E ' S_,
zno v.
t Ufa # a
li allille al O plie • >
iv
E2 '°
ao.„ • 10 . .. 0 • �veb• • ' E
�g.0) (.04,,.. .fiI •. .
if
1.[� 1,,,c7. 3„:04,070iiic.lit:4*,0,72t44401;?:;„
t� otstaktittoltitioany,rc
xi '{s � .. 2...ynt.,;- :„.„,_.:4, .„,szwig,„ Air; ',,,,i. 'tc ilt
• . „ . gloom .O •
,•• . •.• . .....,.;....1.,,..,„. .. , j{'�yy1 5y
RII - I^" a rt:; 47 74rit r' R i�^..l Fay.
,4„,
:555'5i 5 5:'''''.5-15(,:$.5V 11 $"^yv • • • i 'Y^ d 1 GeFFY�¢' A.^.Y d�:saP
• 4,14$1055:
..t '� 547 t t.�.� PS NJSS JS ::i. Y !�%-.
it i, a
$u y� � q "*i ',�S ]'tl 2
I� .J.& �h 4 Ya } •
..
43 ^ ,{ �` jm`t V�'v'�j t
Esther Gesick
From: Bruce Barker
ant: Wednesday, December 10, 2008 4:13 PM
Cozad, Julie
Cc: Don Dunker; Jacqueline Hatch; Esther Gesick; Collum, Glenn; Aucoin, Joseph;
GPickerel@nobleenergyinc.com
Subject: RE: Condition 1.A. for AmUSR-1614
Attachments: Sem Crude Condition 1A.doc
Sem Crude
nndition 1A.doc(29.
Julie:
See the attached. We cannot accommodate your request as to the second paragraph, because
the required improvements, the acceleration and deceleration lanes, are solely for use by
the applicant (Sem Crude) . I believe what is highlighted in the attached accomplishes
what your language intends to do in the third paragraph.
Let me know your thoughts.
Bruce.
Original Message
From: Cozad, Julie [mailto:Julie.Cozad@tetratech.com]
Sent: Monday, November 17, 2008 11:56 AM
0P
o: Bruce Barker
Don Dunker; Jacqueline Hatch; Esther Gesick; Collum, Glenn; Aucoin, Joseph;
ickerel@nobleenergyinc.com
Subject: RE: Condition 1.A. for AmUSR-1614
Hi Bruce,
I have talked to all of my clients and we had some minor language
suggestions, based on the discussion at the hearing:
In the second paragraph we would like to see some language regarding the
applicant paying a proportionate share of the improvements.
In the third paragraph, we would like to add language that says "an
update traffic study may be completed by the applicant to show an
accurate number of vehicles utilizing the SemCrude facility to determine
a proportionate share of improvements required" .
I think that is it for now. Thank you for taking the time on this. We
appreciate it.
Julie
Julie A. Cozad I Land Planning Manager
Civil Engineering and Land Planning Department
Main: 303 .772.5282 I FAX: 303 .772 .7039 I Cell 303-709-3319 1, EXHIBIT
�irect line: 720-864-4564 i
ulie.cozad@tetratech.com
ku U.S2 4H .14
1
Tetra Tech Engineering and Architectural Services (EAS)
1900 South Sunset Street, Suite 1-F Longmont, CO 80501
liprw.tetratech.com
PLEASE NOTE: This message, including any attachments, may include
privileged, confidential and/or inside information. Any distribution or
use of this communication by anyone other than the intended recipient is
strictly prohibited and may be unlawful. If you are not the intended
recipient, please notify the sender by replying to this message and then
delete it from your system.
Original Message
From: Bruce Barker [mailto:bbarker@co.weld.co.us]
Sent: Thursday, November 06, 2008 3 :30 PM
To: Cozad, Julie
Cc: Don Dunker; Jacqueline Hatch; Esther Gesick
Subject: Condition 1.A. for AmUSR-1614
Julie:
Please review the language for Condition 1.A. for AmUSR-1614 which is
attached. Let us know your thoughts.
Thanks!
•uce.
•
2
1. Prior to recording the plat:
• A. The applicant shall either enter into a new improvements agreement, or
amend the existing improvements agreements for USR-1614, and post
adequate collateral only for improvements required to be constructed
immediately. The new or amended improvements agreement(s) and the
form of any necessary collateral shall be reviewed by County staff and
accepted by the Board of County Commissioners prior to recording the
plat, and shall include the following provisions:
Upon being presented with evidence that traffic counts conducted by
Weld County on Weld County Road ("WCR") 30, west of WCR 49,
exceed 1,000 ADT, the applicant shall design and construct acceleration
and deceleration lanes on WCR 30 to serve each of its approved access
points. The cost for design and construction of such acceleration and
deceleration lanes shall be paid entirely by the applicant. The Weld
County Public Works Department shall have final approval of the design.
Sufficient collateral for the construction of such acceleration and
deceleration lanes shall be posted with Weld County immediately prior to
the commencement of such construction.
Additionally, the applicant shall pay its proportional share of the cost of
improvements and upgrades to WCR 30 along its frontage and at the
intersection with WCR 49 at such time as Weld County upgrades that
roadway. The applicant's proportional share of WCR 30 improvement
• costs shall be determined to be the applicant's percentage of the total
traffic on WCR 30 west of WCR 49, as determined by traffic counts
conducted by Weld County and an updated traffic study completed by the
applicant.
Hello