(4t MEMORANDUM
• !silk TO: Planning Commission
COLORADO DATE: December 4, 2007
FROM: Hannah Hippely
SUBJECT: USR-1606 Continuance
Gentleman:
On behalf of Connell Resources Inc. Jennifer Torrey has requested a continuance of case USR-1606 to
the January 8th, 2008 Planning Commission date.
The applicant is unable to attend today's hearing as he is out of town attending to a business matter.
This case is currently on the consent agenda however staff was going to request it be removed from the
consent agenda and be heard as there are changes that staff would like to make to the Conditions of
Approval and Development Standards. The applicant also had some concerns regarding the Conditions
of Approval and Development Standards and also was also going to request that the case be pulled from
the consent agenda.
Staff is supportive of the continuance request.
Thank you.
•
• EXHIBIT
(Oa-.
2008-0573
Lief.; vv VI ii:ooa Jennifer Torrey 9702820141 p.2
• •
•
TORREY DESIGN STUDIO,LLC
Imadscape Architecture
Planning
Graphic Design
Urban Design
Attn. Hannah Hippely
Weld County— Department of Planning Services
918 10'b Street
Greeley, CO 80631
December 4, 2007
Dear Hannah,
On behalf of Connell Resources, Torrey Design Studio, LLC is requesting a continuance for
the maintenance facility application, USR-1606:
A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use by
Right,Accessory Use, or Use by Special Review in the Commercial or Industrial Zone Districts
• (highway construction equipment maintenance facility) in the A (Agricultural) Zone District.
This continuance request is based on Mr. Ben Connell being out of town on business at the
time of the scheduled Planning Commission Hearing.
Sincerely,
for Torrey Design Studio, LLC
Niatiakv
Jennifer Torrey, Principal
•
3200 Note wd Court • Fort Collins CO 80525 • 970.282.0141
WINDSOR
a.; Town of Windsor
301 Walnut Street • Windsor. Colorado 80550 • 970-686-7476 • Fax: 970-686-7180 • www.windsorgou.cwn
COLO Weld County Planning Department
GREELEY OFFICE
DEC 3 0 2007
November 30,2007
Ms.Hannah Hippely,Weld County Planner RECEIVED
Weld County Dept.of Planning Services
918 - 10th Street
Greeley, Colorado 80631
Subject: Weld County referral—Use by Special Review(USR-1606)—Connell Resources
maintenance facility for construction equipment including repair shop,vehicle maintenance
shop and wash bay
Dear Ms.Hippely:
The Town of Windsor Planning Commission will review the updated referral for USR-1606 at its regular
meeting of December 19,2007.
As can be seen by the enclosed draft realignment of WCR 23, the applicant is cooperating with engineers
from the Weld County Department of Public Works and the Town of Windsor Engineering Department and
it appears as though a realignment that will be beneficial to all parties is in process.
• As can also be seen by the enclosed letters dated October 25, 2007 from Mr. Richard"Ben" Connell to Mr.
Kelly Arnold,Windsor Town Manager and Mr. Scot Lewis,Weld County Department of Public Works,there
are several proposals to the Town and the County that require further discussion before entering into
appropriate agreements. However, given the on-going cooperative efforts that are currently taking place, the
Town does not wish to slow the applicant's Weld County process at this time, but will forward to you the
Planning Commission's recommendation following the December 19'"meeting.
The Town looks forward to continued work with the County and the applicant to resolve all of the respective
issues. Thanks again for the opportunity to review this proposal. Please let me know if you have any
questions.
Sincerely,
Scott Ballstadt, AICP
Senior Planner
enclosures: draft WCR 23 realignment; Connell letters of October 25,2007
pc: Gale Schick,Chairman,Windsor Planning Commission
Kelly Arnold,Town Manager
Joseph Plummer,AICP,Director of Planning
Tom Honn,AICP,Weld County Director of Planning
Richard"Ben"Connell,President,Connell Resources,Inc.,applicant
• Will Welch,MC,CPC,Wm.T.Welch Company, LLC,applicant's representative
Jennifer Torrey,Torrey Design Studio, LLC,applicant's representative EXHIBIT
use Ikocrce
I
1
1
PROEMS w,u¢ k-
/ DIETING MUM
`X\ CEENLWpu) ID) I; i \ SPRINGS ESTATES I III
• I ' I N
`�
1/i
It I' / ill•
III /A /i
1 . 1
//• ,v• ■Ii . 77
//:////
• i / "
) 1 /
I; II //7,: / .
I 1-
/j '
rp:: --Z--::::__
Yit
ti Li
II II —� --------'
II II
II I'I
1 Ii
•\
II III
I \
II II
PROPOSEDW4)zs \
•
(OPTION 4)I� II 0
11 II
1
• October 25, 2007
Mr. Kelly Arnold ICMA-CM
Town of Windsor, Colorado
301 Walnut Street a
Windsor, CO 80550
f
RE: Connell Resources, Inc. Shops Project
Weld County, CO t
7/241
Dear Mr. Arnold, 4"
4 `
Connell Resources, Inc. has initiated a Use by Special Review (USR) process „ , Y
in Weld County for an equipment maintenance facility. In preparing the e5ir 4 x
project programming and design it became apparent that there are many " a
areas where by working together on the project Connell, Windsor and .- K
" ' k Weld County can all achieve significant advances toward their goals for the ,.. { "
area. To achieve this benefit we are making the following offers and �w -„���`'tom -. „
requests to the Town of Windsor: ii -
• Connell offers to: al" s
a) Dedicate an 80-foot wide right-of-way across our property vf44 ). }
(centered on the section line) to Weld County to realign Weld f s
County Road (WCR) 23, which will improve traffic flow, and safety g0 a> ,
concerns from Eastman Parkway to SH392. kac c ?: e .,ts r
ti
b) Proceed immediately upon approval of the Weld County USR with rr " .lint
annexation petition, rezone and subdivision applications for ,f,a'"
industrial uses to the Town of Windsor for the property west of the e rNIVA4OFCy
kileL
proposed WCR 23 realignment.
c) Not later than seven years from the date of recording of the initials
annexation described above Connell will initiate an annexation s� � .
petition to the Town of Windsor for the balance of the property 4. t
east of the realigned WCR 23. i,zy
d) Furnish, install and dedicate to the Town of Windsor a 16" water 4'?:4::-4"" ""'`t
supply main northward along the proposed WCR 23 realignment t/..4,, ,, ./.....,,,,' ,
from the current termination point just south of the Great Western 'c" ,T
Railway right-of-way to the north end of Connell's property. Gj, , a =
Connell will be eligible for Town of Windsor reimbursement for '' " ' ,
waterline oversizing costs. 0'�f, -soy
.
tle
If the Town of Windsor will agree to: r : p �
a) Support Connell's Weld County Use by Special Review submittal
ti 'i Y '
• currently pending. ��e;-
CONNEL
• Mr. Kelly Arnold
Town of Windsor Colorado
October 25, 2007
Page 2
b) Permit use of the proposed private drive from the existing WCR 23
alignment through the area annexed to Windsor to serve the
equipment maintenance facility until access from the realigned WCR
23 is constructed.
c) Provide domestic water supply service for the current Weld County
USR and the ultimate development of the property. The current
submittal assumes that the North Weld County Water District will
provide the domestic water supply.
d) Permit the septic sewer system included in the Weld County USR to
serve the equipment maintenance facility until annexation of the
property east of the proposed realigned WCR 23 or when the sewer
main has been extended to allow installation of a building sewer
service line, which ever is later.
Please note that as requested by the Town of Windsor we have evaluated
• several conceptual WCR 23 alignments connecting the existing WCR 23
from the south to the proposed WCR 23 section line alignment to the
north diagonally across Connell's property and found that they create
problems with owning, operating and ultimately developing the property
and are therefore not acceptable.
We are available to discuss these matters at your convenience.
Sinc ly'
Richard "Ben" Connell
President
CC: Town of Windsor, Colorado: Scott Ballstadt
Torrey Design Studio: Jennifer Torrey
North Star Design, Inc.: Patricia Kroetch
•
• October 25, 2007
Mr. Scot K. Lewis P.E.
Weld County Colorado
Department of Public Works
P.O. Box 758
Greeley, CO 80632
'^z
RE: Connell Resources, Inc. Shops Project
Weld County, CO l , ^" ,i
:i.'
Dear Scot, �N -
This letter shall confirm our recent conversations regarding the referenced 44�, � ::;,
project submittal and provide confirmation of Connell Resources, Inc.'s with
commitment to the re-alignment of Weld County Road 23. l G ', '1 ,
�cfq x i
Connell submitted a Site Specific Development Plan and Use by Special c:▪iFM=;
Review to Weld County in February 2007. After receipt of that submittal r`4.?7. �r` t` 4n
Weld County Public Works and Planning Department's contacted us °it` as-• ,4.,,,,(4,
requesting our consent to re-align Weld County Road ( WCR) 23 to its ,
• historic route along the section line between Weld County sections 23 and l' s ' `
24. After due consideration of the request, Connell agreed to dedicate to Ir x• '' ..-
Weld County an 80 foot wide right-of-way centered along the section line. ;,,45,2s".
Our offer to willingly dedicate the right-of-way assumed: ; tx , itoy"/'
a) Weld County would process a revised Use by Special Review t rz r
submittal expeditiously with a staff recommendation of approval ,1 '- ; 2
b) Weld County would agree to adequate accesses to the Connell « d4"" : _ .
Aye.�M� TS
property on both sides of the proposed WCR 23 to facilitate rq. f r %.a
ultimate development of each property l" �Y
c) Right-of-way vacated along the current WCR 23 alignment that was F`^ -" 44,E ..
historically part of the property now owned by Connell would be " „« -"
returned. ... ,` e
Irk -A c;.): w ,tgi .
T.;xr+"� r
As you are aware, this plan has become more complicated due to other ll
p v5,,,0't ' eafi
agencies and private parties proposing alignments connecting the current .,� , r ?":4
WCR 23 on the south to the section line alignment to northward across the • j"i A
Connell property. We have diligently been trying to work with these other • x'(t ;^ '-� "iv
s`
parties but have achieved limited success. Please note that we have y "�y�xS
evaluated these other conceptual WCR 23 alignments and found that they sr r
create problems with owning, operating and ultimately developing the ,..17.4(,..•k•-.44,:r
g• P g P� g � , ,sn
property and are therefore not acceptable. ; � &
.rir. ;tg`u y. { tti
• -,
(Fri .
CONNE
• Scot K. Lewis P.E.
Weld County Colorado
October 25, 2007
Page 2
Connell will willingly dedicate to Weld County an 80-foot of right-of-way
centered on the section line to realign WCR 23 through our property.
Alternatively, Connell is also willing to dedicate to Weld County such
additional right-of-way across our current WCR 23 frontage to create a 40'
half right-of-way. In consideration of either dedication, we expect that
Weld County will process the current USR submittal on the agreed upon
schedule and with a staff recommendation of approval and as discussed
above.
If you have any questions about the contents of this letter please contact
this office.
Sincere!
• Richard "Ben" Connell
President
CC: Weld County Colorado, Mr. Thomas Honn
Weld County Colorado, Ms. Hannah Hippely
Torrey Design Studio, Ms. Jennifer Torrey
•
WINDSOR
e ., Town of Windsor
`_`=.
° - 301 Walnut Street• Windsor. Colorado 80550• 970-686-7476 •Fax: 97086-7180 • www.windsorgou.com
COLO
January 4,2008 Weld County Planning Department
Cony faxed with original mailed GREF' ''Y OFFICE
JAN 07 °beg
Ms. Hannah Hippely, Planner
Weld County Dept. of Planning Servica E L E I V E D
918- 10th Street
Greeley, Colorado 80631
Subject: Weld County referral — Use by Special Review (USR-1606) — Connell Resources
maintenance facility for construction equipment including repair shop, vehicle
maintenance shop and wash bay
Dear Ms.Hippely:
The Windsor Planning Commission previously reviewed the initial version of this referral on May
16, 2007. Since that time, the applicant has been working with Weld County and Windsor staff to
amend the application to address concerns that have been raised. The applicant is asking the Town
• to support its current proposal to locate the maintenance facility improvements outside the Town's
GMA in order to continue with the Weld County process to gain approval of USR-1606 and
construct those improvements as soon as possible and in return the applicant will agree to annex the
property in stages and will continue to work on other issues including, but not limited to, the
realignment of WCR 23.
Upon receiving this recent referral, the Windsor Planning Commission reviewed this subsequent
referral at its regular meeting of January 3, 2008. Since there are ongoing discussions occurring
between Weld County, Windsor and representatives from Connell Resources concerning the
realignment of WCR 23 and between Windsor and representatives from Connell Resources
concerning future annexations of both of Connell Resources' parcels over a phased-in period, at the
January 3, 2008 planning commission meeting, the Windsor Planning Commission voted to
recommend conditional approval of this Use by Special Review, subject to all of the following
conditions continuing to be met.
1. The applicant shall submit an annexation petition and complete application for the property
west of the section line (Weld County Parcel #080723000053) to the Town of Windsor
within 180 days of USR approval by the Board of County Commissioners and shall
complete the annexation within one(1)year of submittal to the Town.
• EXHIBIT
IJanuary 4 referral letter to Weld County—Connell Resources.doc (Oa •
•
Hannah Hippely Letter
• January 4,2008
Page 2
2. The applicant shall submit an annexation petition and complete application for the property
east of the section line (Weld County Parcel #080724000020) to the Town of Windsor
within seven (7) years of USR approval by the Board of County Commissioners and shall
complete the annexation within one (1) year of submittal to the Town. Windsor will serve
the subject properties with water, and it is assumed that when such water service is extended
to Connell it is perpetual. If the annexation east of the section line doesn't happen for any
reason the water service should stay with the property.
3. The applicant shall continue to work with Windsor and Weld County in the design and
dedication of right-of-way for the realignment of the WCR 23.
4. The applicant shall furnish, install and dedicate to Windsor a 16" water supply main running
northward along the proposed WCR 23 realignment from its current termination point to the
north end of the Connell property. It is the intention of the Town that, in accordance with
the Town's over-sizing reimbursement policy, reimbursement for any over-sizing associated
with the 16" water main shall occur within one (1) year of construction acceptance of the
16" water main, subject to (a)the annexation of the property on the west side of the section
line (Weld County Parcel #080723000053) being fully completed, and (b) future
• appropriations and availability of finds.
5. The maintenance facility shall connect to the Town's sanitary sewer system at such time that
the property east of the section line(Weld County Parcel#080724000020)is annexed to the
Town or at such time that the sewer line is extended to within four hundred(400) feet of the
property, whichever occurs first.
6. The applicant shall extend sewer to serve annexation west of the section line and shall not
utilize septic systems for those future uses.
7. All exterior light fixtures shall be "full cutoff' and shall not spill light outside the property
lines; and
8. Westbound trucks leaving the maintenance facility that are traveling on the future private
driveway that will intersect with the existing WCR 23 alignment shall not be allowed to turn
right (north) onto the WCR 23 and only shall be allowed to turn left(south) onto WCR 23,
and the applicant shall be required to post a"no right turn for trucks" sign where the private
driveway intersects with WCR 23, with said sign and sign location being reviewed and
approved by the Windsor Department of Public Works and Engineering prior to installation.
•
Hannah Hippely Letter
January 4,2008
Page 3
As always, thank you very much for the opportunity to review this proposal, and please feel free to
contact me with any questions.
Sincerely,
Joseph P. Plummer, AICP
Director of Planning
jplummer@windsorgov.com
•
pc: Gale Schick, Chairman
Windsor Planning Commission
Kelly Arnold, Town Manager
Dennis Wagner,Director of Engineering
Planning Department staff
Ian D. McCargar, Town Attorney
Richard"Ben" Connell, Connell Resources, Inc.
property owner/applicant
Jennifer Torrey, Torrey Design Studio,LLC
applicant's representative
• William T. Welch, Manager
William T. Welch Company, LLC
applicant's representative
N N
,s k f vK
• , E' i u&
J,rx
4. Aftprth*V
TORREY DESIGN STUDIO. LLC
Landscape Architecture
Planning
Graphic Design
Urban Design
Attn. Hannah Hippely
Weld County — Department of Planning Services
918 10th Street
Greeley, CO 80631
June 20, 2007
Dear Hannah,
On behalf of Connell Resources, Torrey Design Studio, LLC is requesting an indefinite
continuance for the maintenance facility application, USR-1606:
A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use by
• Right,Accessory Use, or Use by Special Review in the Commercial or Industrial Zone Districts
(highway construction equipment maintenance facility) in the A (Agricultural) Zone District.
This continuance request is based on the request by Weld County for a traffic study for the
proposed development.
Sincerely,
for Torrey Design Studio, LLC