Loading...
HomeMy WebLinkAbout20080573.tiff • • (4t MEMORANDUM • !silk TO: Planning Commission COLORADO DATE: December 4, 2007 FROM: Hannah Hippely SUBJECT: USR-1606 Continuance Gentleman: On behalf of Connell Resources Inc. Jennifer Torrey has requested a continuance of case USR-1606 to the January 8th, 2008 Planning Commission date. The applicant is unable to attend today's hearing as he is out of town attending to a business matter. This case is currently on the consent agenda however staff was going to request it be removed from the consent agenda and be heard as there are changes that staff would like to make to the Conditions of Approval and Development Standards. The applicant also had some concerns regarding the Conditions of Approval and Development Standards and also was also going to request that the case be pulled from the consent agenda. Staff is supportive of the continuance request. Thank you. • • EXHIBIT (Oa-. 2008-0573 Lief.; vv VI ii:ooa Jennifer Torrey 9702820141 p.2 • • • TORREY DESIGN STUDIO,LLC Imadscape Architecture Planning Graphic Design Urban Design Attn. Hannah Hippely Weld County— Department of Planning Services 918 10'b Street Greeley, CO 80631 December 4, 2007 Dear Hannah, On behalf of Connell Resources, Torrey Design Studio, LLC is requesting a continuance for the maintenance facility application, USR-1606: A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use by Right,Accessory Use, or Use by Special Review in the Commercial or Industrial Zone Districts • (highway construction equipment maintenance facility) in the A (Agricultural) Zone District. This continuance request is based on Mr. Ben Connell being out of town on business at the time of the scheduled Planning Commission Hearing. Sincerely, for Torrey Design Studio, LLC Niatiakv Jennifer Torrey, Principal • 3200 Note wd Court • Fort Collins CO 80525 • 970.282.0141 WINDSOR a.; Town of Windsor 301 Walnut Street • Windsor. Colorado 80550 • 970-686-7476 • Fax: 970-686-7180 • www.windsorgou.cwn COLO Weld County Planning Department GREELEY OFFICE DEC 3 0 2007 November 30,2007 Ms.Hannah Hippely,Weld County Planner RECEIVED Weld County Dept.of Planning Services 918 - 10th Street Greeley, Colorado 80631 Subject: Weld County referral—Use by Special Review(USR-1606)—Connell Resources maintenance facility for construction equipment including repair shop,vehicle maintenance shop and wash bay Dear Ms.Hippely: The Town of Windsor Planning Commission will review the updated referral for USR-1606 at its regular meeting of December 19,2007. As can be seen by the enclosed draft realignment of WCR 23, the applicant is cooperating with engineers from the Weld County Department of Public Works and the Town of Windsor Engineering Department and it appears as though a realignment that will be beneficial to all parties is in process. • As can also be seen by the enclosed letters dated October 25, 2007 from Mr. Richard"Ben" Connell to Mr. Kelly Arnold,Windsor Town Manager and Mr. Scot Lewis,Weld County Department of Public Works,there are several proposals to the Town and the County that require further discussion before entering into appropriate agreements. However, given the on-going cooperative efforts that are currently taking place, the Town does not wish to slow the applicant's Weld County process at this time, but will forward to you the Planning Commission's recommendation following the December 19'"meeting. The Town looks forward to continued work with the County and the applicant to resolve all of the respective issues. Thanks again for the opportunity to review this proposal. Please let me know if you have any questions. Sincerely, Scott Ballstadt, AICP Senior Planner enclosures: draft WCR 23 realignment; Connell letters of October 25,2007 pc: Gale Schick,Chairman,Windsor Planning Commission Kelly Arnold,Town Manager Joseph Plummer,AICP,Director of Planning Tom Honn,AICP,Weld County Director of Planning Richard"Ben"Connell,President,Connell Resources,Inc.,applicant • Will Welch,MC,CPC,Wm.T.Welch Company, LLC,applicant's representative Jennifer Torrey,Torrey Design Studio, LLC,applicant's representative EXHIBIT use Ikocrce I 1 1 PROEMS w,u¢ k- / DIETING MUM `X\ CEENLWpu) ID) I; i \ SPRINGS ESTATES I III • I ' I N `� 1/i It I' / ill• III /A /i 1 . 1 //• ,v• ■Ii . 77 //://// • i / " ) 1 / I; II //7,: / . I 1- /j ' rp:: --Z--::::__ Yit ti Li II II —� --------' II II II I'I 1 Ii •\ II III I \ II II PROPOSEDW4)zs \ • (OPTION 4)I� II 0 11 II 1 • October 25, 2007 Mr. Kelly Arnold ICMA-CM Town of Windsor, Colorado 301 Walnut Street a Windsor, CO 80550 f RE: Connell Resources, Inc. Shops Project Weld County, CO t 7/241 Dear Mr. Arnold, 4" 4 ` Connell Resources, Inc. has initiated a Use by Special Review (USR) process „ , Y in Weld County for an equipment maintenance facility. In preparing the e5ir 4 x project programming and design it became apparent that there are many " a areas where by working together on the project Connell, Windsor and .- K " ' k Weld County can all achieve significant advances toward their goals for the ,.. { " area. To achieve this benefit we are making the following offers and �w -„���`'tom -. „ requests to the Town of Windsor: ii - • Connell offers to: al" s a) Dedicate an 80-foot wide right-of-way across our property vf44 ). } (centered on the section line) to Weld County to realign Weld f s County Road (WCR) 23, which will improve traffic flow, and safety g0 a> , concerns from Eastman Parkway to SH392. kac c ?: e .,ts r ti b) Proceed immediately upon approval of the Weld County USR with rr " .lint annexation petition, rezone and subdivision applications for ,f,a'" industrial uses to the Town of Windsor for the property west of the e rNIVA4OFCy kileL proposed WCR 23 realignment. c) Not later than seven years from the date of recording of the initials annexation described above Connell will initiate an annexation s� � . petition to the Town of Windsor for the balance of the property 4. t east of the realigned WCR 23. i,zy d) Furnish, install and dedicate to the Town of Windsor a 16" water 4'?:4::-4"" ""'`t supply main northward along the proposed WCR 23 realignment t/..4,, ,, ./.....,,,,' , from the current termination point just south of the Great Western 'c" ,T Railway right-of-way to the north end of Connell's property. Gj, , a = Connell will be eligible for Town of Windsor reimbursement for '' " ' , waterline oversizing costs. 0'�f, -soy . tle If the Town of Windsor will agree to: r : p � a) Support Connell's Weld County Use by Special Review submittal ti 'i Y ' • currently pending. ��e;- CONNEL • Mr. Kelly Arnold Town of Windsor Colorado October 25, 2007 Page 2 b) Permit use of the proposed private drive from the existing WCR 23 alignment through the area annexed to Windsor to serve the equipment maintenance facility until access from the realigned WCR 23 is constructed. c) Provide domestic water supply service for the current Weld County USR and the ultimate development of the property. The current submittal assumes that the North Weld County Water District will provide the domestic water supply. d) Permit the septic sewer system included in the Weld County USR to serve the equipment maintenance facility until annexation of the property east of the proposed realigned WCR 23 or when the sewer main has been extended to allow installation of a building sewer service line, which ever is later. Please note that as requested by the Town of Windsor we have evaluated • several conceptual WCR 23 alignments connecting the existing WCR 23 from the south to the proposed WCR 23 section line alignment to the north diagonally across Connell's property and found that they create problems with owning, operating and ultimately developing the property and are therefore not acceptable. We are available to discuss these matters at your convenience. Sinc ly' Richard "Ben" Connell President CC: Town of Windsor, Colorado: Scott Ballstadt Torrey Design Studio: Jennifer Torrey North Star Design, Inc.: Patricia Kroetch • • October 25, 2007 Mr. Scot K. Lewis P.E. Weld County Colorado Department of Public Works P.O. Box 758 Greeley, CO 80632 '^z RE: Connell Resources, Inc. Shops Project Weld County, CO l , ^" ,i :i.' Dear Scot, �N - This letter shall confirm our recent conversations regarding the referenced 44�, � ::;, project submittal and provide confirmation of Connell Resources, Inc.'s with commitment to the re-alignment of Weld County Road 23. l G ', '1 , �cfq x i Connell submitted a Site Specific Development Plan and Use by Special c:▪iFM=; Review to Weld County in February 2007. After receipt of that submittal r`4.?7. �r` t` 4n Weld County Public Works and Planning Department's contacted us °it` as-• ,4.,,,,(4, requesting our consent to re-align Weld County Road ( WCR) 23 to its , • historic route along the section line between Weld County sections 23 and l' s ' ` 24. After due consideration of the request, Connell agreed to dedicate to Ir x• '' ..- Weld County an 80 foot wide right-of-way centered along the section line. ;,,45,2s". Our offer to willingly dedicate the right-of-way assumed: ; tx , itoy"/' a) Weld County would process a revised Use by Special Review t rz r submittal expeditiously with a staff recommendation of approval ,1 '- ; 2 b) Weld County would agree to adequate accesses to the Connell « d4"" : _ . Aye.�M� TS property on both sides of the proposed WCR 23 to facilitate rq. f r %.a ultimate development of each property l" �Y c) Right-of-way vacated along the current WCR 23 alignment that was F`^ -" 44,E .. historically part of the property now owned by Connell would be " „« -" returned. ... ,` e Irk -A c;.): w ,tgi . T.;xr+"� r As you are aware, this plan has become more complicated due to other ll p v5,,,0't ' eafi agencies and private parties proposing alignments connecting the current .,� , r ?":4 WCR 23 on the south to the section line alignment to northward across the • j"i A Connell property. We have diligently been trying to work with these other • x'(t ;^ '-� "iv s` parties but have achieved limited success. Please note that we have y "�y�xS evaluated these other conceptual WCR 23 alignments and found that they sr r create problems with owning, operating and ultimately developing the ,..17.4(,..•k•-.44,:r g• P g P� g � , ,sn property and are therefore not acceptable. ; � & .rir. ;tg`u y. { tti • -, (Fri . CONNE • Scot K. Lewis P.E. Weld County Colorado October 25, 2007 Page 2 Connell will willingly dedicate to Weld County an 80-foot of right-of-way centered on the section line to realign WCR 23 through our property. Alternatively, Connell is also willing to dedicate to Weld County such additional right-of-way across our current WCR 23 frontage to create a 40' half right-of-way. In consideration of either dedication, we expect that Weld County will process the current USR submittal on the agreed upon schedule and with a staff recommendation of approval and as discussed above. If you have any questions about the contents of this letter please contact this office. Sincere! • Richard "Ben" Connell President CC: Weld County Colorado, Mr. Thomas Honn Weld County Colorado, Ms. Hannah Hippely Torrey Design Studio, Ms. Jennifer Torrey • WINDSOR e ., Town of Windsor `_`=. ° - 301 Walnut Street• Windsor. Colorado 80550• 970-686-7476 •Fax: 97086-7180 • www.windsorgou.com COLO January 4,2008 Weld County Planning Department Cony faxed with original mailed GREF' ''Y OFFICE JAN 07 °beg Ms. Hannah Hippely, Planner Weld County Dept. of Planning Servica E L E I V E D 918- 10th Street Greeley, Colorado 80631 Subject: Weld County referral — Use by Special Review (USR-1606) — Connell Resources maintenance facility for construction equipment including repair shop, vehicle maintenance shop and wash bay Dear Ms.Hippely: The Windsor Planning Commission previously reviewed the initial version of this referral on May 16, 2007. Since that time, the applicant has been working with Weld County and Windsor staff to amend the application to address concerns that have been raised. The applicant is asking the Town • to support its current proposal to locate the maintenance facility improvements outside the Town's GMA in order to continue with the Weld County process to gain approval of USR-1606 and construct those improvements as soon as possible and in return the applicant will agree to annex the property in stages and will continue to work on other issues including, but not limited to, the realignment of WCR 23. Upon receiving this recent referral, the Windsor Planning Commission reviewed this subsequent referral at its regular meeting of January 3, 2008. Since there are ongoing discussions occurring between Weld County, Windsor and representatives from Connell Resources concerning the realignment of WCR 23 and between Windsor and representatives from Connell Resources concerning future annexations of both of Connell Resources' parcels over a phased-in period, at the January 3, 2008 planning commission meeting, the Windsor Planning Commission voted to recommend conditional approval of this Use by Special Review, subject to all of the following conditions continuing to be met. 1. The applicant shall submit an annexation petition and complete application for the property west of the section line (Weld County Parcel #080723000053) to the Town of Windsor within 180 days of USR approval by the Board of County Commissioners and shall complete the annexation within one(1)year of submittal to the Town. • EXHIBIT IJanuary 4 referral letter to Weld County—Connell Resources.doc (Oa • • Hannah Hippely Letter • January 4,2008 Page 2 2. The applicant shall submit an annexation petition and complete application for the property east of the section line (Weld County Parcel #080724000020) to the Town of Windsor within seven (7) years of USR approval by the Board of County Commissioners and shall complete the annexation within one (1) year of submittal to the Town. Windsor will serve the subject properties with water, and it is assumed that when such water service is extended to Connell it is perpetual. If the annexation east of the section line doesn't happen for any reason the water service should stay with the property. 3. The applicant shall continue to work with Windsor and Weld County in the design and dedication of right-of-way for the realignment of the WCR 23. 4. The applicant shall furnish, install and dedicate to Windsor a 16" water supply main running northward along the proposed WCR 23 realignment from its current termination point to the north end of the Connell property. It is the intention of the Town that, in accordance with the Town's over-sizing reimbursement policy, reimbursement for any over-sizing associated with the 16" water main shall occur within one (1) year of construction acceptance of the 16" water main, subject to (a)the annexation of the property on the west side of the section line (Weld County Parcel #080723000053) being fully completed, and (b) future • appropriations and availability of finds. 5. The maintenance facility shall connect to the Town's sanitary sewer system at such time that the property east of the section line(Weld County Parcel#080724000020)is annexed to the Town or at such time that the sewer line is extended to within four hundred(400) feet of the property, whichever occurs first. 6. The applicant shall extend sewer to serve annexation west of the section line and shall not utilize septic systems for those future uses. 7. All exterior light fixtures shall be "full cutoff' and shall not spill light outside the property lines; and 8. Westbound trucks leaving the maintenance facility that are traveling on the future private driveway that will intersect with the existing WCR 23 alignment shall not be allowed to turn right (north) onto the WCR 23 and only shall be allowed to turn left(south) onto WCR 23, and the applicant shall be required to post a"no right turn for trucks" sign where the private driveway intersects with WCR 23, with said sign and sign location being reviewed and approved by the Windsor Department of Public Works and Engineering prior to installation. • Hannah Hippely Letter January 4,2008 Page 3 As always, thank you very much for the opportunity to review this proposal, and please feel free to contact me with any questions. Sincerely, Joseph P. Plummer, AICP Director of Planning jplummer@windsorgov.com • pc: Gale Schick, Chairman Windsor Planning Commission Kelly Arnold, Town Manager Dennis Wagner,Director of Engineering Planning Department staff Ian D. McCargar, Town Attorney Richard"Ben" Connell, Connell Resources, Inc. property owner/applicant Jennifer Torrey, Torrey Design Studio,LLC applicant's representative • William T. Welch, Manager William T. Welch Company, LLC applicant's representative N N ,s k f vK • , E' i u& J,rx 4. Aftprth*V TORREY DESIGN STUDIO. LLC Landscape Architecture Planning Graphic Design Urban Design Attn. Hannah Hippely Weld County — Department of Planning Services 918 10th Street Greeley, CO 80631 June 20, 2007 Dear Hannah, On behalf of Connell Resources, Torrey Design Studio, LLC is requesting an indefinite continuance for the maintenance facility application, USR-1606: A Site Specific Development Plan and a Special Review Permit for a use permitted as a Use by • Right,Accessory Use, or Use by Special Review in the Commercial or Industrial Zone Districts (highway construction equipment maintenance facility) in the A (Agricultural) Zone District. This continuance request is based on the request by Weld County for a traffic study for the proposed development. Sincerely, for Torrey Design Studio, LLC Nv A Jennifer Torrey, Principal . (o EXHIBIT 3200 Norwood Court • Fort Collins CO 80525 • 970.282.0141 �- Hello