Loading...
HomeMy WebLinkAbout20091031MEMORANDUM TO: Clerk to the Board DATE: April 24, 2009 FROM: Josh Holbrook, Public Works SUBJECT: Consent Agenda Item Work Order #9 with Terracon for Asphalt testing for the Weld County Public Works overlay program not to exceed $19,955.00 Enclosed are two original Work Order Forms #9. Please return one original to Public Works. M \Franciewgenda i(em-I doe )/7/1 f/9 /( 2009-1031 WORK ORDER FORM PURSUANT TO AN AGREEMENT BETWEEN WELD COUNTY AND TERRACON DATED: April 13th, 2009 Work Order Number: Terracon - 9 Project Title: Asphalt testing for Weld County Public Works overlay program. Commencement Date: April 30th, 2009 Completion Date: December 31st, 2009 Limitations on compensation: Not to exceed $19,955.50 Project Description: See proposal dated March 31st, 2009 Professional agrees to perform the services identified above and on the attached forms in accordance with the terms and conditions contained herein and in the Professional Services Agreement between the parties. hi the event of a conflict between or ambiguity in the terms of the Professional Services Agreement and this work order (including the attached forms) the Professional Services Agreement shall control. Professional Terra By: Title: Date: suiting Engineers R� zo1o? The attached forms are hereby accepted and incorporated herein, by this reference, and Notice to Proceed is hereby given. Weld County By: Project Manager Date: By: /G -3' a Department Head Date: -o grzi By: Director of Date: By: C Chairman, Well ountVCo missioners Date: L . inistration cYOC%/3i BOARD OF COUNTY COMMISSIONERS REVIEW/ WORK SESSION REQUEST RE: Terracon Work Order #9 DEPARTMENT: WELD COUNTY PUBLIC WORKS DATE: 4-13-2009 PERSON REQUESTING: Josh Holbrook, Weld County Public Works. Brief description of the problem/issue: Work Order No. 9 — Weld County Public Works will be placing approximately 72,000 tons of asphalt for the 2009 Overlay Program. This work order is designed to cover the testing of aggregate material/asphalt content. Testing will be performed at the asphalt plant prior to delivery to ensure that the asphalt meets our construction specifications. We have selected Terracon to perform these services under the On -Call Geotechnical Contract. Attached are Work Order #9 and the outlining scope of work proposed by Terracon. This work order will not exceed $19,955.50. What options exist for the Board? (Include consequences, impacts, costs, etc. of options) BOCC can either approve Work Order No. 9 or deny it. Recommendation to the Board: I recommend approval of Work Order No. 9 for Terracon under the On -Call Geotechnical Contract. William F. Garcia, Chair Douglas Rademacher Sean P. Conway Barbara Kirkmeyer David E. Long Attachments Approve Schedule Recommendation Work Session LAD Comments M:\ -Active Projects\Engineering On -Call Services \Geotechnical On-Call\Terracon \WO 9 - HMA Ovlerlay Testing\Work Session Request.doc March 31, 2009 Weld County Public Works 1111 H Street, P.O. Box 758 Greeley, Colorado 80632 - 0758 Attn: Josh Holbrook lierracon Consulting Engineers and Scientists 1289 1st Avenue Greeley, Colorado 80631 Phone (970) 351-0460 Fax (970) 353-8639 www.terracon.com Re: Proposal for Construction Materials Engineering and Testing Services 2009 Weld County Hot Mix Asphalt Projects Various Locations Weld County, Colorado Proposal No. P21090009 Terracon is pleased to submit this proposal to provide quality control testing, observation, and laboratory engineering services during new Hot Mix Asphalt (HMA) paving and overlay projects as scheduled by Weld County Public Works during the 2009 calendar year. All testing will be performed in our Greeley laboratory, but if required in the project specifications, Terracon's Fort Collins office is accredited by AASHTO/CCRL in bituminous mixtures, soils, aggregate and Portland cement concrete and meets ASTM E329 "Standard Specification for Agencies Engaged in the Testing and/or Inspection of Materials Used in Construction" criteria. R18 accreditation documentation is available upon request for your review or can be viewed by visiting their website at http://www.amrl.net for current accreditation status. This proposal outlines our understanding of the scope of services to be performed by Terracon for this project, our proposed schedule, and provides an estimated fee for our services. A. PROJECT INFORMATION Terracon understands that the proposed schedule of paving consists of approximately 72,000 total tons on fourteen (14) separate jobsites located in the Weld County area. The construction and improvements are assumed to consist of both new paving and existing milling overlay projects depending on location and condition. Construction activities for Terracon services may include, but not necessarily limited to: Asphalt sampling and laboratory asphalt testing including extraction -gradation, Lottman, fractured faces, maximum theoretical specific gravity (Rice) and reflux. Terracon is familiar with the planned construction testing criteria based upon similar work in the area and look forward to providing these services on your project. This proposal is to provide materials testing and observation services during construction activities only when specifically requested and scheduled to do so by our client and/or authorized representative during construction on the project site. Additional testing/observation services not referenced are not included in the scope of this proposal. The proposed scopes of services and estimated costs for the construction materials testing services are included herein. Delivering Success for Clients and Employees Since 1965 More than 95 Offices Nationwide 2009 Weld County Asphalt Projects Construction Weld County, Colorado Proposal No. 21090009 Page 2 B. SCOPE OF SERVICES lferracon Our scope is based on "take off' quantities provided to Terracon and review of typical project construction activities on similar projects and services estimated by Terracon for the proposed scope of services. It is requested that the scope be reviewed by our client, design team and contractor for meeting the project intent and construction schedule anticipated. If changes are necessary, it is requested that Terracon be notified so that appropriate changes can be implemented prior to and during the project duration. Terracon services will be provided only when specifically requested and scheduled to do so. The responsibility to call or schedule our services and direct Terracon will be by our client and/or designated authorized representative, herein referred to as "client". It is the client's responsibility to meet specified testing frequencies, and to review the Terracon estimated budget versus actual services performed with respect to the construction performed to -date. Since our personnel will not be at the site on a resident basis, it will be imperative that we be advised when to provide services on the project. Unless other arrangements are made, scheduling of personnel will be on an as available basis, which may require changes in personnel assigned to the project. The detailed scope of services envisioned to be performed is as follows: Hot -Mix Asphalt (HMA) Paving Testing: Field sampling for laboratory testing will be provided by an Engineering Technician, on an as -requested basis, during the placement of hot mix asphalt at the project. The HMA will be sampled and submitted to our laboratory for asphalt content, gradation analysis, and maximum theoretical specific gravity for determination of compliance with project requirements. HMA samples will be obtained at frequencies and locations as selected by the client during paving. Daily verbal reports of test results will be provided and a written report will be prepared at the completion of each day's laboratory testing for the project. The number of client requested laboratory tests are as follows: ➢ Ignition Method of Asphalt Binder Content Calibration (Colorado Procedure — Laboratory 5120) • It is anticipated that four (4) separate hot plant/suppliers with four (4) separate mixes will be utilized during paving operations and therefore calibration will be provided for the four (4) mix designs designated by Weld County Public Works. Each laboratory mix design calibration is estimated to include: Terracon Senior Field Technician personnel to sample the materials at the hot plant (2 hours/trip); prepare each aggregate by drying and manually prepare the test samples to the mix design blend proportions with the addition of liquid asphalt and then performing the ignition oven/aggregate gradation testing (3 hours/design) and to include review/coordination by the Department/Project Manager (1 hour). 2009 Weld County Asphalt Projects Construction Weld County, Colorado Proposal No. 21090009 Page 3 Y HMA and Aggregate Laboratory Testing lierracon • Determination of Bitumen Content by Extraction, Gradation Analysis of Extracted Aggregate — 40 tests sampled by consultant; • Maximum theoretical specific gravity for air voids (rice) — 30 tests to be delivered by client; • Lottman (TSR) — 8 tests to be delivered by client; • Fractured face determination — 8 tests to be delivered by client; and • Determination of HMA core bulk specific gravity/unit weight — 8 tests to be delivered by client. Project Management/Coordination • Department/Project Manager — 3 hours; • Field Engineer/Geologist-3 hours; and • Senior Field Technician — 3 hours. 'r Other/Additional Professional Services Anticipated • Based upon project contractor performance additional testing and/or consultation may be requested by Weld County and has been estimated to be included in the proposal for budgetary purposes. C. COMPENSATION The cost for our services including all field work, laboratory testing, engineering analyses and report preparation has been estimated on the basis of unit rates especially prepared for this project. For testing and observation services, our costs are based on the following rates as defined in the 2009 Weld County Department of Public Works On -Call Geotechnical Testing Services Cost Sheet: COMPENSATION SCHEDULE PERSONNEL/REPORTS Principal Engineer $103/hour Department/Project Manager $88/hour Field Engineer/Geologist $73.50/hour Senior Field Technician $49.50/hour Field Technician $49.50/hour 2009 Weld County Asphalt Projects Construction Weld County, Colorado Proposal No. 21090009 Page 4 LABORATORY TESTING lferraCon Determination of Bitumen content by Extraction, Gradation Analysis of Extraction $185 each Maximum Theoretical Specific Gravity (rice) $88 each Specific Gravity and Absorption $67 each Fractured Face Determination $46.50 each Lottman (TSR) Test $248 each HMA Core Bulk Specific Gravity/Unit Weight (1 hr technician time) $49.50 each Note: Items not addressed above will be invoiced per the negotiated, "2009 Weld County Public Works On - Call Geotechnical Testing Services Cost Sheet" (attached) The estimated cost for providing the above services on the project is as follows: ➢ Project Description Estimated Cost: • HMA / Oven Calibration $2,546 • Extraction Gradation $7,400 • Rice Specific Gravity $2,640 • Lottman $1,984 • Fractured Face Determination $372 • HMA Core Bulk Specific Gravity $396 • Project Management $2,617.50 • Other Professional Services $2,000 • Total Estimated Cost $19,955.50 The time required for construction services on the project will be directly related to the schedule and performance of the various contractors on the site. As a result, total estimated fees for the construction services would include only those services outlined in this proposal. Additional services required beyond the estimated times outlined above will be invoiced based on the applicable unit rates as presented in the Compensation Schedule above, 2009 Weld County Public Works On -Call Geotechnical Testing Services Cost Sheet; or, Professional Services Fee Schedule. Our estimated fees are based upon our understanding of the project based on the information provided. Additionally, the following assumptions were used in preparing our estimated fees: 2009 Weld County Asphalt Projects Construction Weld County, Colorado Proposal No. 21090009 Page 5 lierracon • Should additional services be required beyond the scope of work outlined above, our standard unit rates will be applicable; • If a change or request of services is made with same day notice, Terracon will make every reasonable effort to accommodate, but cannot guarantee having personnel available; • The contractor is responsible to perform the work in accordance with the plans and specifications, and our testing of the work does not relieve them of their responsibility to perform the work properly; • Unit rates will be applicable for Terracon service durations in excess of those outlined; and • Invoices for the project will be submitted on a minimum monthly basis, with the dollar amount of services performed to -date versus the project estimated amount or authorized amount with an amount remaining; if applicable, it is the client's responsibility to monitor this amount with respect to the construction performed to -date and future services anticipated. We appreciate your consideration of Terracon for this work and look forward to working as your materials consultant on this and future projects. Please forward copies of your Weld County Work Order Authorization for Services to Terracon for signature and return of one copy to Weld County if acceptable. Commencement of services by Terracon will be considered formal acceptance of this proposal. Please be aware that we will be unable to distribute field and laboratory reports until a signed contract is received. If you have any questions or need additional information, please contact us at your convenience. Sincerely, Terracon Consultants, Inc. -7 Fo Scott M. Gruenberger Project Manager Reviewed by: Mike L. Walker, CET Copies: (2) Addressee Enclosure: - 2009 Weld County Public Works, On -Call Geotechnical Testing Services Cost Sheet Jason Mapes, E.I. Geotechnical Staff Engineer Hello