Loading...
HomeMy WebLinkAbout20090931.tiffSITE SPECIFI•EVELOPMENT PLAN AND USE S SPECIAL REVIEW (USR) APPLICATION FOR PLANNING DEPARTMENT USE 'RECEIPT # /AMOUNT # 1$ APPLICATION RECEIVED BY DATE RECEIVED: CASE # ASSIGNED: PLANNER ASSIGNED: Parcel Number [Ti n Lsi cl (12 digit number - found on Tax I D. information, obtainable at the Weld County Assessor's Office, or www.co.weld.co.us). Legal Description Cc1 f �i� r; -s,j C r , Section iL,, Township L) North, Range 16 West Flood Plain: Zone District: tiN0ut( Total Acreage: S3.11 , Overlay District: Geological Hazard: FEE OWNER(S) OF THE PROPERTY: OC �' M\taskiCQv4 L ' Name: Work Phone # 303-515-3331 Horrppe Phone # Address: 37O 1-146, _sit err City/State/Zip Code 13ryrvp1, co eolO), Email Address Name: Work Phone # Home Phone # Email Address Address: City/State/Zip Code Name: �ork Phone # Home Phone # Email Address Address: City/State/Zip Code APPLICANT OR AUTHORIZED AGENT (See Below: Authorization must accompany applications signed by Authorized Agent) Name: Z -n - It<.]C AAt v1i; Work Phone # `( IO- 3 18-/, %'5 Home Phone # Email Address J covet^ iN Address: \ 3211 'a!'1{"`' City/State/Zip Code G f r r( r / C C i PROPOSED USE: -c ex("5 ?Ia(4+- uSR S`1� I (We) hereby depose and state under penalties of perjury that all statements, proposals, and/or plans submitted with or contained within the application are true and correct to the best of my (our)knowledge. Signatures of all fee owners of property must sign this application. If an Authorized Agent signs, a letter of authorization from ail fee owners must be included with the application. If a corporation is the fee owner, notarized evidence must be included indicating that the signatory has to legal authority to sign for the corporation. le- 7-Oi- Owner or Authorized Agent Date Signature: Owner or Authorized Ag b EXHIBIT 2009-0931 • • FOR COMMERCIAL SITES, PLEASE COMPLETE THE FOLLOWING INFORMATION BUSINESS EMERGENCY INFORMATION: •BusinessName: DC �% � �� t'n Address: 1°P t b ,J Business Owner: V C ' i ` c� i C Home Address: 3Li ,UO/-iN City, ST, Zip: City, ST, Zip: Phone: r o 7 3 ?- 2; Li 9 c)1., yite., Lo '0"6 \ Phone:cl1C.?.6- 9 700 C rAt°. , C o E)0631 I List three persons in the order to be called in the event of an emergency: NAME TITLE ADDRESS f? t' VOC L i v1 ;— S tiot t o f Ib t t eecc f 1 :2 L i iV, i L' VvSs YNJC Areet p.ev ci��� �fe 404) t pJSc1— 1 2`1 /L7 el • Business Hours: Type of Alarm: Days: Burglar Holdup Fire Silent A'udlble Name and address of Alarm Company: Location of Safe: PHONE 910 -�? ~ 6 3 f S 9)o-531- 1SOO MISCELLANEOUS INFORMATION: Number of entry/exit doors in this building: Location(s): c-, s 1 At Is alcohol stored in building? N DLocation(s): Are drugs stored in building? /V `-' Location(s): Are weapons stored in building? () 0 Location(s): — ~ The following programs are offered as a public service of the Weld County Sheriff's Office. Please indicate the programs of interest. Physical Security Check Crime Prevention Presentation UTILITY SHUT OFF LOCATIONS: Main Electrical: M L f o o W\ Gas Shut Off: * 4 s ' Ae e E ct Exterior Water Shutoff: Interior Water Shutoff: 6-( ""('(''C -11- • • • • • Midstream.. October 9, 2008 Weld County Building Department 918 10th Street Greeley, CO 80631 RE: DCP Midstream / USR-542 DCP Midstream welcomes this opportunity to submit information concerning its proposed plans to expand the existing Mewbourn Gas Plant. This additional equipment will be used for processing the increased amount of well head gas in Weld County. The location of this additional equipment is highlighted on the enclosed building plans, and a brief narrative explaining the proposed project is attached. Thank you for your consideration, and 1 look forward to hearing from you. For any additional questions or information needed, please contact me at 970-539-1908. Respectfully submitted, Paul D. Park DCP Midstream Project Manager • • • Responses to Questionaire Mewbourn Plant Expansion 1. The proposed use of the property: DCP Midstream would like to expand its existing gas processing facility on the property. The equipment includes compressors associated with gas processing and other equipment to allow gas produced in Weld County to be transported to market and sold. 2. Consistency with Weld Comprehensive Plan: The proposed use is consistent with the Comprehensive Plan because it seeks to use the land to foster the development of the vast natural resources in Weld County. Moreover, given the property's size together with the absence of any water rights attached to the property, it is impractical to use this property for farming. 3. Consistency with the Intent of the Weld County Zoning Ordinance and the zone district: The proposed use is consistent with the intent of the Agricultural Zone District, as it will foster the development of oil and gas resources, and Section 31.2 of the Weld County Ordinance provides that oil and gas production facilities are allowed as a matter of right in the Agricultural Zone District. Further, it will not interfere with any agricultural operations. 4. Surrounding Uses: The site is surrounded by agricultural uses. 5. Details regarding use: a. Number of people at site? Two to three people will use site. b. Number of employees at site? One operator and one mechanic. c. Hours of operation? 24 d. Structures to be erected? Approximately 6 metal buildings. e. Animals? None f Vehicles (type, size, weight) to access site? Pickup truck for employees and 2 semi's for condensate. g. Fire Protection? Platteville h. Water source? Central Weld County Water District i. Sewage? Septic existing and a new septic for proposed facility. j. Storage or warehousing? None 6. Landscaping: Landscaping is not proposed at this time. 7. Reclamation: No reclamation procedures will be necessary. 8. Storm water drainage. Storm water will be collected at the north west corner of the facility. 9. Time frame for construction: DCP Midstream would like to begin construction as soon as possible, December, 2008 or January, 2009 with completion around July, 2009. • • 10. Storage of wastes: No storage will occur, all wastes will be removed from site in a timely manner by an appropriate method. • • • ENGINEERING & CONSTRUCTION SERVICES, INC. FINAL DRAINAGE REPORT FOR DCP Midstream Mewbourne Expansion Weld County, CO OWNER/DEVELOPER DCP Midstream, LP1050 1324 North 7th Avenue Greeley, Colorado 802631 Contact: Mr. Paul Park 970.378.6372 PREPARED BY ZAP Engineering, Inc. 12567 West Cedar Drive Lakewood, Colorado 80228 720.529.4430 Contact: Jeff Carter DATE October 3, 2008 ZAP PROJECT NUMBER 08022 125671. CEDAR DR • MITE 210 • LAKEWOOD, OO80228. 720.529.4430 MAX: 720.529.4437. zapecs.com • • • October 3, 2008 ENGINEERING & CONSTRUCTION SERVICES, INC. Mr. Chris Gathman Weld County Building Department 918 10th Street Greeley, Colorado 80631 Reference: Final Drainage Report for DCP Midstream Mewbourne Plant Expansion Project located in Weld County, Colorado Dear Mr. Gathman; ZAP Engineering and Construction Services, Inc. has been hired by DCP Midstream, LP to perform Civil Engineering services for the proposed 10.5 -acre industrial expansion development is located within unincorporated Weld County. It is out understanding that the proposed site will contain various compressor units, coolers, and a control center located within metal buildings. Additional equipment to be constructed at the facility include compressor cooling units, and inlet filter separator, miscellaneous small storage tanks, slug catchers, and miscellaneous related mechanical and electrical equipment. The site previously consisted of native grassed areas. Onsite grading and drainage has been carefully designed to promote drainage and access through the site while maintaining the required 1% slope for the proposed equipment. This Final Drainage Report for has been prepared in accordance with Weld County Requirements for a project of this type and scope. If you require further information regarding this report or design, or have questions regarding the drainage, please feel free to give me a call. Regards, Eric M. Riegel For and on behalf of Zap Engineering and Construction Services, Inc. /AP ENGINEERING AND CONSTRUCTION SERVICES. INC. • zapecs.com Page I of 8 Final Drainage Report DCP Midstream Mewboume Expansion - October 3, 2008 TABLE OF CONTENTS II GENERAL LOCATION AND DESCRIPTION 5 III DRAINAGE BASINS AND SUB -BASINS 5 IV DRAINAGE DESIGN CRITERIA 6 V STORMWATER MANAGEMENT FACILITY 6 VI CONCLUSIONS 8 VII REFERENCES 9 VIII APPENDICES 10 1. APPENDIX A- MAPS AND FIGURES 11- a. Vicinity Map b. FIRMETTE Panel 0802660770C Exhibit c. Figure 1 — Historic Drainage Map d. Figure 2 — Developed Drainage Plan and Details 2. APPENDIX B — HYDROLOGIC COMPUTATIONS a. NRCS Soils Map, Legend & Soils Hydrologic Group b. Historic Time of Concentrations & Runoff Coefficients c. Developed Time of Concentrations & Runoff Coefficients d. Historic 10-yr and 100-yr Rational Method Routing e. Developed 10-yr and 100-yr Rational Method Routing f. UDFCD Figures RA -3 and RA -6 Rainfall Depth Duration Frequencies_ g. UDFCD Recommended Percentage Impervious Values - Table RO-3_ h. UDFCD Runoff Coefficients - Table RO-5 3. APPENDIX C- HYDRAULIC COMPUTATIONS a. UDFCD Average Flow Velocities — Table RO-1 b. Pond, weir, and channel Calculations ZAP ENGINEERING AND CONSTRUCTION SERVICES, INC.. capecs.com Page 2 of 8 Final Drainage Report DCP Midstream Mewbourne Expansion — October 3. 2008 I CERTIFICATION • • "I hereby certify that this report for the final drainage design of the DCP Midstream Mewbourne Expansion was prepared by (me or under my direct supervision) in accordance with the provisions of the Weld County storm drainage criteria for the owners thereof." Pr 3 #V• r io 3 o$ 35793 Registered Professional Engineer II GENERAL LOCATION AND DESCRIPTION DCP Midstream, LP is proposing to expand an existing industrial facility by developing an additional 10.5 acres adjacent to the existing plant and located within Weld County. The parcel is located within Section 35, Township 4 North, Range 66 West of the 6th Principal Meridian. The 10.5 -acre development is part of a larger parcel located along WCR 35. The property is bounded to the north by an existing gas facility. To the west are existing agricultural lands. The site is bordered on the east by WCR 35. The parcel is bounded to the south by existing vacant land and a small gas facility. A vicinity map is included in the Appendix of this report. This development use and operations are related to industrial gas processing. The project consists of various compressor units, coolers, and a control center located within metal buildings as well as additional equipment such as compressor cooling units, inlet filter separator, miscellaneous small storage tanks, slug catchers, and miscellaneous related mechanical and electrical equipment. The site previously consisted of native prairie grasses. The site generally slopes to the northwest at low to moderate grades ultimately draining into Platte Valley Canal located approximately 700 feet north of the proposed development. Onsite grading and drainage has been carefully designed to promote drainage and access through the site while maintaining the required 1% slope for the proposed equipment. The majority of the soils on the site are classified as Valent sands with a smaller amount of Olney fine sandy loams and Vona loamy sands, and as depicted in the attached NRCS Soils classification map located in the Appendix. The hydrologic groups for the onsite soils are groups A and B, with the majority being group A. No portion of this project site was found to exist in any FEMA regulatory floodplains. The FEMA FIRM Panel No. FM0802660770C generated for the area near the site is included in the Appendix of this report. ZAP ENGINEERING AND CONSTRUCTION SERVICES, INC. • zapecs.com Page 3 of 8 • • Final Drainage Report DCP Midstream Mewboume Expansion — October 3. 2008 • • • No evidence of flooding or irrigation canals or ditched were present onsite or found from recorded easements. Significant geological features were not observed. III DRAINAGE BASINS AND SUB -BASINS MAJOR DRAINAGE DESCRIPTION The project site is generally tributary to the Platte Valley Canal. The existing land is vacant and consists of native grasses. The proposed land use is industrial gas processing. The site generally outfalls to the northwest following existing drainage located near the northwest corner of the project site. The Platte Valley Canal is located approximately 700 feet northwest of the project site. The enclosed historic drainage map depicts the existing site with three sub basins, Basins HA through HC. The historic site was assumed to be 2% impervious for the historic flow analysis. The change in impervious from historic to developed conditions is 80%, per UDFCD Table RO-3 Recommended Percentage Impervious Values for light industrial. MINOR DRAINAGE BASINS Sub -Basin HA consists of native undisturbed areas along with some agricultural areas located in the lower elevations of the basin that generally drain north into existing drainage swales that convey runoff north. Runoff continues north draining directly into the Platte Valley Canal. Sub -Basin HB consists of native undisturbed areas that generally drain northwest into sub -basin HC and ultimately draining into the Platte Valley Canal. Sub -Basin HC is a basin consisting of agricultural and native undisturbed areas located downstream from the northwest corner of the project site. Runoff is directed north to the Platte Valley Canal. Sub -Basin HD consists of the existing Mewboume Gas Processing Plant and drains north into an existing retention pond that allows the operator of the plant to control runoff from the site and as shown on the Historic Drainage Map included in the Appendix of this report. Time of concentration, and historic site flows have also been included in the attached Appendix. No known irrigation facilities exist within 200 feet of the property boundary. IV DRAINAGE DESIGN CRITERIA REGULATIONS The drainage design presented herein was prepared in accordance with the Weld County Storm Drainage Criteria for the drainage design. Erosion control details and documentation were prepared under a separate CASMP, and as directed by the State of Colorado and the EPA. Stormwater management details for this site will include sediment facilities, vehicle tracking control, concrete washout area, and silt fence installation at a minimum. DRAINAGE STUDIES AND SITE CONSTRAINTS ZAP ENGINEERING AND CONSTRUCTION SERVICES. INC. • rapccs.com Page 4 orb Final Drainage Report DCP Midstream Mewboume Expansion — October 3. 2008 No previous drainage studies or master plans are known regarding this site. Drainage studies from adjacent sites were also not available for review. The site constraints for the proposed development will provide little deviation from existing conditions, and the proposed conditions provide some water quality enhancements using the proposed retention facility that is not part of the existing site. A very small portion of existing upstream offsite areas draining into the project site and are directed through the site via sheet flow. HYDROLOGY The Rational Method (Q=CIA) was used to determine the site storm runoff (Q) for the storm events. Runoff coefficients (C) were taken from the enclosed UDOT table located in the Appendix. Contributing areas (A) have been calculated for Design Points in each Sub -Basin. Intensities (I) were calculated using Figures RA -3 and RA -6 to develop intensities for the 10 -year minor and 100 -year major storm event at intervals for all Sub - Basins impacted by the project (See Appendix). Pre and post development time of concentrations, corresponding rainfall intensities, composite post condition runoff coefficients and storm flows for the 10 -year and 100 -year storms for each Sub -Basin are provided in the Appendix. Design capacities were determined for the associated drainage features. HYDRAULICS Design capacities were determined for the associated drainage features using general engineering practice. Retention Pond calculations are provided in the Appendix. Emergency overflow is maintained to the northwest, consistent with historic patterns. GENERAL DRAINAGE DESIGN The enclosed developed drainage map depicts the proposed site with five sub -basins, onsite sub -basins B1 and B2 and offsite sub -basins A, C, and D. Basins A, B1, C, and D continue relatively unaltered from historic conditions. Developed sub -basin B2 represents the new basin configuration resultant from the development design. Runoff from sub -basin B2 generally sheet flows northwest either draining directly into the proposed retention pond or into proposed swales A and B that direct runoff into the proposed detention pond. The attached Appendix details the design process, tables, figures, charts, and computations used to complete the design. SPECIFIC DRAINAGE DETAILS The enclosed developed drainage map depicts the proposed site with five sub -basins one onsite sub -basin B1 and five offsite sub -basins A, B2, C, and D. The developed site was assumed to be light industrial in nature thus creating an overall imperviousness of 80% as compared with the historic 2% used for flow analysis. Offsite sub -basin A, consisting of 9.67 and 48.92cfs in the 10 and 100 -year storm events, respectively drains to Design Point 1. Sub -basin A consists of both agricultural areas and native undisturbed areas that generally drain northwest into the existing Platte /AP ENGINEERING AND CONSTRUCTION SERVICES. INC. • zapccs corn Pace 5 of 8 • Final Drainage Report DCP Midstream Mewboume Expansion - October 3. 2008 • • • Valley Canal located adjacent to the north end of the sub -basin. Runoff continues in the Platte Valley Canal ultimately, discharging into the South Platte River. Offsite sub -basin 81, consisting of 4.57 and 8.102cfs in the 10 and 100 -year storm events, respectively drains to Design Point 2. Sub -basin B1 consists of native undisturbed areas that generally drain north into sub -basin C and ultimately into the existing Platte Valley Canal located adjacent to sub -basin C. Develop sub -basin B2, consisting of 29.94 and 52.98cfs in the 10 and 100 -year storm events, respectively drains to Design Point 2. Sub -basin B2 consists of light industrial areas that generally drain north into the proposed swales or proposed retention facility designed to serve this basin. Runoff is released at allowable rates and continues north into sub -basin C and ultimately discharges into the existing Platte Valley Canal located north of the sub -basin and within sub -basin C. A proposed emergency overflow weir allows runoff to continue north form the proposed retention facility. Offsite sub -basin C, consisting of 3.87 and 19.53cfs in the 10 and 100 -year storm events, respectively drains to Design Point 3. Sub -basin C consists of both agricultural areas and native undisturbed areas that generally drain north into the existing Platte Valley Canal located along the north boundary of the sub -basin. Runoff continues in the Platte Valley Canal, ultimately discharging into the South Platte River. Offsite sub -basin D, consisting of 15.99 and 28.31 cfs in the 10 and 100 -year storm events, respectively drains to Design Point 4. Sub -basin D consists of the existing Mewbourne Plant and is considered a light industrial area. This sub -basin generally drains north into an existing retention facility located along the north boundary of the sub -basin. Runoff continues north draining into the Platte Valley Canal and ultimately discharging into the South Platte River. V STORMWATER MANAGEMENT FACILITY DESIGN STORMWATER CONVEYANCE FACILITIES The proposed site improvements utilize overland sheet flow and swales to convey runoff across the site to the proposed retention facility and as depicted on the enclosed drainage map. ST0RMWATER STORAGE FACILITIES The proposed onsite retention facility provides a level of water quality enhancement for the site. The attached Appendix includes calculations for this facility. WATER QUALITY ENHANCEMENT BEST MANAGEMENT PRACTICES The proposed onsite retention facility provides a level of water quality enhancement. ZAP ENGINEERING AND CONSTRUCTION SERVICES. INC.. rapecs corn Page 6 of 8 Final Drainage Report DCP Midstream Mewboume Expansion - October 3. 2008 FLOODPLAIN The project site is not located within or near a FEMA designated 100-yr floodplain or other known floodplain. The enclosed FIRM Panel 0802660770C, revised September 28, 1982, is located in the Appendix. GROUNDWATER There is no documentation or evidence of groundwater to our knowledge. ADDITIONAL PERMITTING REQUIREMENTS No additional permitting is anticipated at this time. VI CONCLUSIONS The design of the post development drainage for this site has been carefully completed to direct offsite flows through the site while directing onsite flows to the proposed retention facility. To the best of our knowledge, this Drainage Report complies with all local applicable standards and regulations and poses no threat to the life safety or welfare of the public. The attached Developed Drainage Map depicts the drainage Design Points and configuration of the storm drainage system. Other reference materials including a vicinity map, capacities and design information have been included in the attached Appendix. VII REFERENCES "Weld County Storm Drainage Criteria Addendum to the Urban Storm Drainage Criteria Manuals Vol. 1-3", Weld County Public Works Department, Colorado, October 2006. "Urban Storm Drainage Criteria Manuals Vol. 1-3", Urban Drainage Flood Control District, April 2008. /AP ENGINEERING AND CONSTRUCTION SERVICES. INC. • zapecs.com Page 7 of 8 • • Final Drainage Report DCP Midstream Mewboume Expansion - October 3, 2008 VIII APPENDICES ZAP ENGINEERING ANI) CONSTRUCTION SERVICES. INC. • tapecs.com Pain 8 0l 8 • • J 6J Oton/ 2003 ft 1500 m I a y 'y 1 • ♦ —. . ,I :•� =/ 4€ �' /' Y1 7,1 eongt rr- Liberty .Hark r' B Giicrest n K A) O to w f til PROJECT SITE ot General Location Map Lat: N 40.264365 W 104.736561 • • • • 8 ZONE C 27 U I75. 25 I L___ To ro_ � APPROXIMATE SCALE 2000 0 38 ![![ l L.� ! NATIONAL FlA0A YIENAYC[ PA0LAAN - ox I o - -- !, I I II If If' II hh'N I� I., ,lpyl� FIRM FLOOD INSURANCE RATE MAP WELD COUNTY, COLORADO UNINCORPORATED AREA PANEL 750 OF 1075mei mar .i.o..4 FOP PANELS MOT ray o COMMUNITY -PANEL NUMBER 080266 0750 C INI MAP REVISED: - SEPTEMBER 28. 1982 AedwN amnpwcy nengmmtapm:P RIG) _I_ _I 34 /i 7 -- -- 35 ' 361- //�� / /�- �. �./ -/ It — / `-� 'o. �. J 3 % l lit 2 L. — --J ny TM1x,x mo rat copy of a portion of ere aboe,ekrencee flood mapIt w cted using FNIT On-line. The map does aca reflect changes or atlendments wwMh may have been made subsequent w the date on the block Far the latent product information about Neupnm Flood insurance Program hood maps check the FEMA Flood Map Shore Al w,uwmsc ferns gov --IF— -- • • • • DCP Midstream MEWBOURNE PLANT EXPANSION Historic Composite Runoff Coefficients & Time Of Concentration Calculations Job No Hydrologic Soil Type Minor Storm 10 Major Storm 100 Sc EMR Checked by EMR Date October 3.2005 Reorsed Soil Type A Undev area Paved Area elArea Rod Area Root Runoff Coefficients Impervious C2 05 C10 CtW 000 001 007 022 2% 009 090 092 096 100% 0.19 025 0.30 041 40% 069 0.71 073 079 90% Basn Design Data Composite Runoff Geoff c,,, en (0 858D 0 78640 7 41+0.041 8 O'A Values Initial Overland Time t=0 1-C lL'°5 " Travel Time pleegIM10eloulyx6o1 10 Competed 6 Urbanized Check I, Urbanized Check 1< Final Design Area Area Area Area Area Runoff Runoff Upper Time of Total Design Paint Undee Paved Gavel Roof Total % Coefl C'A Coeff C'A Length Slope r Length Slope Velooly L Copp Length Egl/160N10 Mint Rain Outran (AC) IAC1 LAC) (AC) (AC) Impery 10yr 10yr 100yr 100yr (ft) (MI) (min) 1111 101111 lrpe) (min) thereto 101 (mm) l6 min1 HA I 518 00 00 CO 518 002 007 363 022 1140 400 002 300 2800 0011 2 233 533 3200 278 278 HO 2 142 00 00 R0 102 002 007 099 022 3.12 400 005 201 600 0027 85 29 229 1000 156 156 HC 3 106 00 00 00 146 002 007 100 022 326 300 005 179 600 0010 2 50 220 900 150 150 HD 4 65 000 060 390 066 429 400 001 174 00 174 400 122 122 Hatanc TOG • • • • DCP Midstream MEWBOURNE PLANT EXPANSION Developed Composite Runoff Coefficients & Time Of Concentration Calculations Job No Hydrologic Son Type A Minor Storm 10 Major Storm 100 9y: PAR Checked by EMR Dale: October 3. 2000 Reused. • • Sou Type A unaev area Paved Area Gravelraa Ar ea Runoff Coefficients % Impervious C2 CO Cm Clot 000 001 007 022 2°4 089 050 092 096 100% 019 025 030 0.41 40% 069 071 073 0.79 90% Basin Design Data Composite Runoff Coell C,=I(... to 958e -D 796(;070.0041 & CA Values Initial Overland Time ¢036511 uJC°9°, Travel Time IpLenor%Veicntya 60) p Computed k Urbanized Check kuroanced Check k Final Design Area Area Area Area Area Runoff Runoff Upper Time of Total Design Demt Undev Paved Gravel Roof Total % Coen CA Coe C'A Length Slope h Length Slope Velocity 4 Conn Length huR1180y10 Min Basin 0u11a11 (AC) (AC) (AC) (AC) (AC) Impery Ioyr WY, 100yr 100yr (11) (NR) (min) (R) (5151 (fps) I min) ti p tl=lc (al )min) (5 mm) A 1 510 00 00 00 510 002 0D7 3.57 022 1172 400 002 300 2000 0011 2 233 533 3200 270 278 Bl 2 20 000 060 120 Oho 132 400 002 138 400 0010 2 33 17.1 000 144 144 B2 2 136 0 8 060 816 066 898 400 002 133 650 0032 33 33 166 1050 150 158 C 3 148 00 00 00 148 002 007 104 022 326 300 005 178 600 0010 2 50 228 900 150 150 D 4 65 000 060 390 066 429 400 001 174 00 174 400 122 122 Developed • • • STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA Standard Form SF -2. Storm Drainage System Design (Rational Method Procedural APPENDIX A CALCULATED BY: 64 JOB NO.: DATE: to -2- O s PROJECT: 1)c -r 1.0 i r?STi0.C4W Kt 30.Jll-9Jg- E-%? CHECKED BY: DESIGN STORM: 10 4- i u o N Z. I-i! STo . c DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME REMARKS AREA DESIGN AREA (A) RUNOFF COEFF. (C) .v 6— o s o- W a g y STREET FLOW DESIGN FI (lW SLOPE PIPE SIZE LENGTH VELOCITY -y ac min in/hr cfs min in/hr cis °/p ds ds % in fl 1Vsec min to --IR.. I N A 51.% 0.07 27.4 1./.3 VII %,33 • • Z. l'i i4.2 0.07 KA. 0.99 ;.Li 3.44 S Nc. 14,% 4.07 Ku I•U'I 7„7Z 5.57 U H) (.1.S 0.4° ri.i 3.clo 05 /5.99 joo_sgz. ) %.i,, 5 i.i Co- r i j.4 4.54 Y?7 Z. hr'l p1.2 a22 '•:.t 3.+L 5.13 ap ', )-IC /q.f 0,1Z r^.8 ^y.Z 6.-,1t7,55 "_f " (C.5 044 77.z 4.24 6,61; a31 5-1R Z >43 ,'.g G.Gl Z7.$ 4.52 '.7e ( sii roc ,7e1..r.,,i (tEttA1A 01/2006 • • • • • • STORM DRAINAGE DESIGN AND TECHNICAL CRITERIA Standard Form SF -2. Storm Drainage System Design (Rational Method Procedure] APPENDIX A CALCULATED BY: EA JOB NO: DATE: It.) - Z. - O k PROJECT: '24. ? vi.., J 577cfAl.+ i4( •✓ goue - E7r?. CHECKED BY: DESIGN STORM: 1O . fc o -+r R. 7E 9eviD E MOW DESIGN POINT DIRECT RUNOFF TOTAL RUNOFF STREET PIPE TRAVEL TIME REMARKS AREA (A) RUNOFF COEFF. .9 6 — a .9 . 4J --75) SLOPE STREET FLOW v�-i C W -, � -. PIPE SIZE i7 W J {8 a ec min Infir cfs min in/hr cfa % cfs cfs % in ft ft/sec min 1O - 'I R k A 5►.o 0.01 0.8 3,57 ill 1,O z Si Z.o O.(,0 i'1.l. iv 3,8( i,57 P,Z 13.6 (}.6o 15,6 VI, 3.47 19,1O5.i 9.36 3, e,1 31,35 7, C it -,8 1./Y Is.O kill 5.72 3.87 4 9 6,5 0.40 12,1 ;Po I. /o 16:t bp -+12 1 A .1.e o,21,77.t Il.tt .4,36 yaz 2 T1I e.0 0.&('' Iil `1 I,3z 6.14 g.ro ?)2 f3.6 t),:":1, I'4,'b $.`I) 590 5i.yg ls,$ 10.! 5.90 do,71 3 G /q.5 0.21 I5.. 1.1; S•` /1.53 y D 6.5 aG& iz.z 4t' u.4. z131 01/2006 • • • DRAINAGE CRITERIA MANUAL (V. 1) Rev. 01/2004 Urban Drainage and Flood Control District Figure RA -3 —Rainfall Depth -Duration -Frequency: 10 -Year, 1 -Hour Rainfall RA -15 • • • RAINFALL Figure RA -6 —Rainfall Depth -Duration -Frequency: 100 -Year, 1 -Hour Rainfall RA -18 DRAINAGE CRITERIA MANUAL (V. 1) too -Ma--= 2.66 01/2004 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) RUNOFF Table RO-3—Recommended Percentage Imperviousness Values Land Use or Surface Characteristics Percentage Imperviousness Business: Commercial areas 95 Neighborhood areas 85 Residential: Single-family Multi -unit (detached) 60 Multi -unit (attached) 75 Half -acre lot or larger Apartments 80 Industrial: Light areas 80 Heavy areas 90 Parks, cemeteries 5 Playgrounds 10 Schools 50 Railroad yard areas 15 Undeveloped Areas: Historic flow analysis 2 Greenbelts, agricultural 2 Off -site flow analysis (when land use not defined) 45 Streets: Paved 100 Gravel (packed) 40 Drive and walks 90 Roofs 90 Lawns, sandy soil 0 Lawns, clayey soil 0 "'See Figures RO-3 through RO-5 for percentage imperviousness. Based in part on the data collected by the District since 1969, an empirical relationship between C and the percentage imperviousness for various storm return periods was developed. Thus, values for C can be determined using the following equations (Urbonas, Guo and Tucker 1990). CA = Kq +0.311 - I.44i' + I.135i - 0.12 for CA ≥ 0, otherwise CA= 0 (RO-6) 06/2002 Urban Drainage and Flood Control District RO-9 RUNOFF RO-12 DRAINAGE CRITERIA MANUAL (V. 1) TABLE RO-5 (Continued) -Runoff Coefficients, C Percentage Imperviousness Type A NRCS Hydrologic Soils Group 2-yr 5-yr 10-yr 25-yr 50-yr 100-yr 0% 0.00 0.00 0.05 0.12 0.16 0.20 5% 0.00 0.02 0.10 0.16 0.20 0.24 10% 0.00 0.06 0.14 0.20 0.24 0.28 15% 0.02 0.10 0.17 0.23 0.27 0.30 20% 0.06 0.13 0.20 0.26 0.30 0.33 25% 0.09 0.16 0.23 0.29 0.32 0.35 30% 0.13 0.19 0.25 0.31 0.34 0.37 35% 0.16 0.22 0.28 0.33 0.36 0.39 40% 0.19 0.25 0.30 0.35 0.38 0.41 45% 0.22 0.27 0.33 0.37 0.40 0.43 50% 0.25 0.30 0.35 0.40 0.42 0.45 55% 0.29 0.33 0.38 0.42 0.45 0.47 60% 0.33 0.37 0.41 0.45 0.47 0.50 65% 0.37 0.41 0.45 0.49 0.51 0.53 70% 0.42 0.45 0.49 0.53 0.54 0.56 75% 0.47 0.50 0.54 0.57 0.59 0.61 80% 0.54 0.56 0.60 0.63 0.64 0.66 85% 0.61 0.63 0.66 0.69 0.70 0.72 90% 0.69 0.71 0.73 0.76 0.77 0.79 95% 0.78 0.80 0.82 0.84 0.85 0.86 100% 0.89 0.90 0.92 0.94 0.95 0.96 2007-01 Urban Drainage and Flood Control District DRAINAGE CRITERIA MANUAL (V. 1) WATERCOURSE SLOPE IN PERCENT 50 30 20 10 5 3 2 1 .5 RUNOFF Aill t 4 3 o ; v • % w • 4.' e r ar ` 4 `r r0 a ft 0 f eW �? wWt a= d'r Co .p a' r 0 fv QIt r n 0 3 W� = tZF i ba, a ♦' id 41u �O O VW=w04.:iw 71/ Wy Q 4p 4t � f p .1 .2 .3 .5 1 2 3 5 VELOCITY IN FEET PER SECOND 10 20 Figure RO-1—Estimate of Average Overland Flow Velocity for Use With the Rational Formula 06/2002 RO-13 Urban Drainage and Flood Control District • • • • • 100-YR Historic release 18.50 cfs weir Calculator Given Input Data: weir Type Rectangular Equation Suppressed solving for Depth of Flow Flowrate 18.5000 cfs Coefficient 0.6500 Height 24.0000 in Computed Results: Depth of Flow 11.0782 in Full Flow 58.9910 cfs velocity 3.3399 fps width 72.0000 in Area 12.0000 ft2 Perimeter 120.0000 in wet Perimeter 94.1564 in wet Area 5.5391 ft2 Percent Full 46.1591 • • • • • 100-yr EMERGENCY OVERFLOW WEIR weir Calculator Given Input Data: weir Type Rectangular Equation suppressed Solving for Depth of Flow Flowrate 34.4800 cfs Coefficient 0.6500 Height 12.0000 in Computed Results: Depth of Flow 11.9353 in Full Flow 34.7608 cfs velocity 3.4667 fps width 120.0000 in Area 10.0000 ft2 Perimeter 144.0000 in wet Perimeter 143.8706 in Wet Area 9.9461 ft2 Percent Full 99.4608 % • • The proposed Mewbourn Plant expansion is not located within an Intergovernmental Agreement boundary. • • • Response to TRAFFIC IMPACT from proposed Mewbourn Expansion Vehicle traffic from the proposed Mewbourn expansion will remain the same, or be reduced, compared to the existing Mewbourn facility. The entrance gate at the existing facility will be closed and locked upon start up of the proposed facility, and vehicle traffic will be diverted to an entrance gate south of the existing entrance. Current total vehicle traffic along Weld County Road 35 is approximately 130 vehicles per day (see attached). DCP Midstream currently averages approximately 2 pickup trucks and 3 big trucks per day. Due to pipeline delivery of natural gas liquids from the proposed new plant, instead of trucking the liquids out of the existing plant, DCP Midstreams contribution to the traffic count will be reduced. The majority of vehicle traffic from existing and proposed facilities will travel north on Weld County Road 35 to Highway 85, occasionally vehicles will travel south on Weld County Road 35 to WCR 32. Vehicle traffic at the proposed facility will be passing through an entrance gate which will be approximately 50 feet wide, allowing for easy access. Additionally, the location of the proposed gate will allow facility vehicle traffic excellent visibility for any oncoming traffic on Weld County road 35. • • Page 1 of 2 • • Park, Paul D From: Jerry Steinbar Usteinbar@co.weld.co.us] Sent: Friday, October 03, 2008 3:20 PM To: Park, Paul D Subject: RE: Website Inquiry Paul, These are the most recent counts I have for CR 35. Road Name From To Date 1 AADT 1 Hour; 1 35 32 34 7/28/2006 97 72:0C 35 34 36 7/28/2006 95 72:0C 35 36 38 7/28/2006 145 72:0C 35 -* 38 40 6/26/2008 129 72:0C 35 40 42 6/26/2008 128 72:0C 35 42 44 6/26/2008 133 72:0C Sincerely, Jerry Steinbar Weld County Public Works Traffic Division 970-304-6496 ext. 3789 970 -301 -2621 -Cell jsteinbar@co.weld.co.us • • • The proposed Mewbourn Plant expansion is not located within a Flood Hazard. • • r The proposed Mewbourn Plant expansion is not located within a Geologic Hazard. Hello