HomeMy WebLinkAbout20092837.tiffREFERRAL LIST
Name: Tri-State Generation & Transmission Association, Inc Case #: USR-1711
County
Attorney
x Health Department
_Extension Office
_Emergency Mgt Office - Ed Herring
Sheriffs Office
x Public Works
_Housing Authority
_Airport Authority
x Building Inspection
x Code Compliance Beth
_ Kim Ogle (Landscape Plans)
_Lin (Addressing Change of Zone)
_Ambulance Services
State
_Div. of Water Resources
_Geological Survey
_Department of Health
_Department of Transportation
_Historical Society
Water Conservation Board
Oil & Gas Conservation Commission
Division of Wildlife
x South Hwy 66 (Loveland)
_North Hwy 66 (Greeley)
_Division of Minerals/Geology
Soil Conservation Districts
_Big Thompson/ FTC
_Boulder Valley/Longmont
Brighton/SE Weld
Centennial
Greeley/West Greeley
Platte Valley
x_ West Adams
_Little Thompson
Federal Government Agencies
x US Army Corps of Engrs
_USDA -APHIS Vet Service
_x_Federal Aviation Admin (Structures
over 200 ft or w/in 20000 ft of Pub
Airport
x_Federal Communications Comm
Towns & Cities
Ault
Berthoud
x Brighton
Dacono
Eaton
Erie
Evans
Firestone
x Fort Lupton
Frederick
_Garden City
Gilcrest
_Greeley
Grover
Hudson
Johnstown
Keenesburg
_Kersey
LaSalle
x Lochbuie
_Longmont
Mead
Milliken
_New Raymer
_Northglenn
Nunn
Pierce
Platteville
Severance
Thornton
Windsor
Counties
x Adams
Boulder
Broomfield
Larimer
Other
_School District RE -
_Central Cob. Water
_Left Hand Water
_Ditch Company
_Art Elmquist (MUD Area)
Fire Districts
Ault F-1
Berthoud F-2
_Briggsdale F-24
x Brighton F-3
Eaton F-4
_Fort Lupton F-5
Galeton F-6
Hudson F-7
Johnstown F-8
LaSalle F-9
_Mountain View F-10
Milliken F-11
Nunn F-12
Pawnee F-22
Platteville F-13
_Platte Valley F-14
_Poudre Valley F-15
_Raymer F-2
_Southeast Weld F-16
_Union Colony F-20
_Wiggins F-18
Windsor/Severance F-17
Commissioner
x Grand
EXHIBIT
I �
2009-2837
•
•
•
DEPARTMENT OF PLANNING SERVICES
918 10TH Street
GREELEY, CO 80631
PHONE: (970) 353-6100, Ext. 3540
FAX: (970) 304-6498
WUDc
COLORADO
September 16, 2009
NOTICE TO REFERRAL AGENCIES
CASE NUMBER: USR-1711
There will be a Public Hearing before the Weld County Planning Commission on Tuesday, October 6, 2009,
at 1:30 p.m., in the Weld County Planning Department Hearing Room, 918 10' Street, Greeley, Colorado.
A subsequent hearing will be held on October 28, 2009 at 10:00 a.m , in the Chambers of the Board of County
Commissioners of Weld County, Colorado, Weld County Centennial Center, 915 10'h Street, First Floor,
Greeley Colorado 80631.
NAME: Tri-State Generation & Transmission Association, Inc.
FOR: A Site Specific Development plan and Use by Special Review Permit for a Major Facility of a Public
Utility (a double -circuit 230 -kV transmission line extending 0.55 miles) in the A (Agricultural) Zone District.
LEGAL DESCRIPTION: NE4 and NE4SE4 of Section 27, Ti N, R66W of the 6th P.M., Weld County, Colorado.
LOCATION: Approximately 1/4 mile north of CR 4 and approximately 1 mile (5,000 feet) east of CR 31.
a
•
•
oh;
COLORADO
Weld County Planning Department
GREELEY OFFICE
crp 2 4 ?mg
MEMORANDUM RECEIVED
TO: Chris Gathman, Planning Services DATE: September 23, 2009
FROM: Donald Carroll, Engineering Administrator
SUBJECT: USR-1711, Henry Lake Tap
Tri-State Generation & Transmission Association, Inc.
The Weld County Public Works Department reviewed the submitted application for critical items,
including but not limited to Site Plan, Traffic Study, Preliminary Drainage Report, Geotechnical
Soils Report, and Flood Hazard Development Permit. A detailed review of these items was not
complete at this step in process. Comments made during this stage of the review process will
not be all inclusive, as revised materials are submitted other concerns or issues may arise. All
issues of concern and critical issues during further review must be resolved with the Public
Works Department.
COMMENTS:
Weld County Road Classification Plan (FHU): (June 2002) WCR 4 is a collector road and
requires an 80 -foot right-of-way at full build out. There is presently a 60 -foot right-of-way. This
road is maintained by City of Brighton. Pursuant to the definition of SETBACK in the Weld
County Zoning {23-1-90), the required setback is measured from the future right-of-way line.
The applicant shall reserve or dedicate an additional 10 -foot of right-of-way parallel to the WCR
4 right-of-way for future build -out.
Section Line Access: (right-of-way) (WCR 31) I have researched the right-of-way in the 1889
and the 1937 documents. Weld County only has right-of-way in Section 26, T1 N, R66W, only
30 feet. No right-of-way existing in Section 27 where the power line is being proposed.
Access: Tri-State Generation owns the property adjacent to WCR 4 and WCR 31 section line.
There is an existing substation on that piece of property. The line will be extended north'/ mile
to connect with the existing 230KV power line. The access exists at this site. Utilize the
existing access point.
Permit: An overweight and over width permit may be obtained from Amy Burry, Weld County
Public Works Department, (970)381-3779. Permits shall be in place prior to hauling.
Storm Water: A storm water permit for construction activities shall be required from the
Colorado Department of Public Health and Environment. Public Works is requiring a grading
permit, contact Clay Kimmi, at (970)304-6496, Ext. 3750.
Storm Water Drainage: The applicant must take into consideration storm water
capture/quantity and provide accordingly for best management practices.
Flood Hazard Development Standards: This area is not in a Special Flood Hazard Area
(SFHA) as determined by the Federal Emergency Management Agency (FEMA).
pc: USR-1711
Page 1 of 1
M:kPLANNING - DEVELOPMENT REVIEIMUSR-Use by Special RevievAUSR-1711 TuState.Joc
WE`D
. itAtt
COLORADO
•
•
Weld County Referral
r
II
8EP 2 3 1009 ! 1
WEH COUNTY Fu :L C 1.'C''.I'S nrPT
September 23, 2009
The Weld County Department of Planning Services has received the following item for review:
Applicant
Tri-State Generation & Case Number USR-1711
Transmission Association, Inc
Please Reply By August 29, 2009 Planner Chris Gathman
Project A Site Specific Development Plan and Use by Special Review Permit for a Major
Facility of a Public Utility (a double -circuit 230-KV Transmission Line extending .55
miles) in the A (Agricultural) Zone District.
:Legal NE4 and NE4SE4 of Section 27, Ti N, R66W of the 6th P.M., Weld County,
Colorado.
Location
Parcel Number
Approximately 1/4 mile North of CR 4 and approximately 1 mile (5,000 feet) East of
CR 31.
1471 27 000024
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request. Please note that
new information may be added to applications under review during the review process. If you
desire to examine or obtain this additional information, please call the Department of Planning
Services.
You will be notified in writing of the Planning Commission date once the date is determined.
❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan
because
❑ We have reviewed the request and find no conflicts with our interests.
See attached letter.
Comments:
Signature
Agency
Date 9' 3'07
._Weld County Planning Dept. I_918 10th Street, Greeley, CO. 80631 '.(970) 353-6100 ext.3540 ".(970) 304-6498 fax
•
•
•
AO)t:
WilDe
COLORADO
MEMORANDUM
TO: Chris Gathman, Planning Services
FROM: Lauren Light, Environmental Health
SUBJECT: USR-1711 Tri-State Generation
DATE: 10/22/2009
Environmental Health Services has reviewed this proposal for construction of a .55 mile
230 KV transmission line. Permanent water and sewer is not required as this is a
temporary construction use. Portable toilets, hand washing units and bottled water can
be utilized during construction of the pipeline. The application indicates that water will
be trucked in for dust control, as necessary. Waste will be kept in stored containers and
taken to a disposal facility.
We have no objections to the proposal; however, we recommend that the following
requirements be incorporated into the permit as development standards:
1. All liquid and solid wastes (as defined in the Solid Wastes Disposal Sites and
Facilities Act, 30-20-100.5, C.R.S., as amended) shall be stored and removed for
final disposal in a manner that protects against surface and groundwater
contamination.
2. No permanent disposal of wastes shall be permitted at this site. This is not
meant to include those wastes specifically excluded from the definition of a solid
waste in the Solid Wastes Disposal Sites and Facilities Act, 30-20-100.5, C.R.S.,
as amended.
3. Waste materials shall be handled, stored, and disposed in a manner that controls
fugitive dust, fugitive particulate emissions, blowing debris, and other potential
nuisance conditions.
4. Fugitive dust and fugitive particulate emissions shall be controlled along the
construction route.
5. Adequate toilet facilities (portable toilets) and handwashing units shall be
provided during construction of the project.
6. Bottled water shall be utilized for drinking during construction of the project.
•
•
•
7. Environmental Protection Measures for Construction Projects, as identified in
Appendix B of the application, shall be adhered to.
8. This facility shall adhere to the maximum permissible noise levels allowed in the
Industrial Zone as delineated in Section 14-9-30 of the Weld County Code.
9. If applicable, the applicant shall obtain a stormwater discharge permit from the
Colorado Department of Public Health & Environment, Water Quality Control
Division.
10.The operation shall comply with all applicable rules and regulations of the State
and Federal agencies and the Weld County Code.
�f
01:4
• WIiDc
COLORADO
•
•
DEPARTMENT OF PLANNING SERVICES
BUILDING INSPECTION
NORTH OFFICE
918 10`" Street
GREELEY, COLORADO 80631
PHONE (970) 353-6100, EXT.3540
FAX (970) 304-6498
September 17, 2009
Tri-State Generation & Transmission Association, Inc.
A Site Specific Development Plan and Use by Special Review Permit for a Major facility of a Public Utility
(a double -circuit 230-kv transmission Line extending .55 miles)) in the A (Agricultural) Zone Districts.
USR-1715
1. We have reviewed the request and find no conflicts with our interests. Section 105.2.3 of the 2006
International Building Code exempts the requirement for a building permit for the installation of
transmission lines by a Public service agency.
2. There is one building permit with final status and one withdrawn building permit on record for this parcel.
Sincerely,
Roger Vigil
Building Official
• S.
Wilk
•
•
COLORADO
Weld County Referral
July 30, 2009
The Weld County Department of Planning Services has received the following item for review:
Applicant
Tri-State Generation &
Transmission Association, Inc
Please Reply By August 29, 2009
Project
Case Number USR-1711
Planner Chris Gathman
A Site Specific Development Plan and Use by Special Review Permit for a Major
Facility of a Public Utility (a double -circuit 230-KV Transmission Line extending .55
miles) in the A (Agricultural) Zone District.
Legal NE4 and NE4SE4 of Section 27, Ti N, R66W of the 6th P.M., Weld County,
Colorado.
Location Approximately 1/4 mile North of CR 4 and approximately 1 mile (5,000 feet) East of
CR 31.
Parcel Number
1471 27 000024
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request. Please note that
new information may be added to applications under review during the review process. If you
desire to examine or obtain this additional information, please call the Department of Planning
Services.
You will be notified in writing of the Planning Commission date once the date is determined.
❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan
because
We have reviewed the request and find no conflicts with our interests.
❑ See attached letter. }
�(�)i' O (-CX\ €.L3 t5-€ '(�(�.l-` �.ciDC- t%LEDl lnv i Acr i no
Nola%cxt 1, t�rkd
+Weld County Planning Dept. 9918 10th Street, Greeley, CO. 80631 +(970) 353-6100 ext.3540 +(970) 304-6498 fax
Comments:
Signature
Agency
Date 1 -
•
•
Weld County Referral
October 22, 2009
The Weld County Department of Planning Services has received the following item for review:
Applicant
Please Reply By
Project
Legal
Location
Tri-State Generation & Case Number USR-1711
Transmission Association, Inc
August 29, 2009
Planner Chris Gathman
A Site Specific Development Plan and Use by Special Review Permit for a Major
Facility of a Public Utility (a double -circuit 230-KV Transmission Line extending .55
miles) in the A (Agricultural) Zone District.
NE4 and NE4SE4 of Section 27, Ti N, R66W of the 6th P.M., Weld County,
Colorado.
Approximately 1/4 mile North of CR 4 and approximately 1 mile (5,000 feet) East of
CR 31.
Parcel Number 1471 27 000024
The application is submitted to you for review and recommendation. Any comments or recommendation
you consider relevant to this request would be appreciated. Please reply by the above listed date so that
we may give full consideration to your recommendation. Any response not received before or on this date
may be deemed to be a positive response to the Department of Planning Services. If you have any further
questions regarding the application, please call the Planner associated with the request. Please note that
new information may be added to applications under review during the review process. If you
desire to examine or obtain this additional information, please call the Department of Planning
Services.
You will be notified in writing of the Planning Commission date once the date is determined.
❑ We have reviewed the request and find that it does / does not comply with our Comprehensive Plan
because
X We have reviewed the request and find no conflicts with our interests.
❑ See attached letter.
Comments: RE: Socioeconomic Impacts, page 36, 2n° Paragraph; This project is entirely within the
jurisdiction of the Greater Brighton Fire Protection District, and NOT the Frederick Firestone Fire District,
Signature Kris Krengel (signed),
Fire Marshal/Division Chief
Agency Greater Brighton Fire Protection District
Date July 30, 2009
-Weld County Planning Dept. -918 10th Street, Greeley, CO. 80631 (970) 353-6100 ext.3540 ❑(970) 304-6498 fax
Chris Gathman
om:
nt:
o:
Subject:
Hice-Idler, Gloria [Gloria.Hice-Idler@DOT.STATE.CO.US]
Thursday, August 06, 2009 8:31 AM
Chris Gathman
Referral
USR 1711 - If the utility crosses CDOT right-of-way, a CDOT utility permit must be
obtained.