HomeMy WebLinkAbout790891.tiff i'1 �1 RESOLUTION RE: APPROVAL OF LETTER OF AGREEMENT BETWEEN WELD COUNTY, COLORADO AND MINER AND MINER, CONSULTING ENGINEERS, INC. FOR ELECTRI- CAL SERVICE INVESTIGATION FOR THE PIERCE ASPHALT PLANT. WHEREAS , the Board of County Commissioners of Weld County, Colorado, pursuant to Colorado statute and the Weld County Home Rule Charter, is vested with the authority of administering the affairs of Weld County, Colorado, and WHEREAS, a letter of agreement dated March 22 , 1979 between Weld County, Colorado and Miner and Miner, Consulting Engineers, Inc. has been presented to the Board of County Commissioners concerning electrical service investigation for the Pierce Asphalt plant, and WHEREAS, the compensation for said services is estimated to be approximately $1,500. 00, with a total not to exceed $2 , 000. 00, and WHEREAS, the Board of County Commissioners deems it advisable and in the best interests of Weld County to approve said letter of agreement. NOW, THEREFORE, BE IT RESOLVED by the Board of County Com- missioners of Weld County, Colorado that the letter of agreement dated March 22, 1979 between Weld County, Colorado and Miner and Miner, Consulting Engineers, Inc. for electrical service investi- gation for the Pierce Asphalt Plant, a copy of which is attached hereto and incorporated herein by reference, be, and hereby is, approved. The above and foregoing Resolution was , on motion duly made and seconded, adopted by the following vote on the 18th day of April, A.D. , 1979. BOARD YN COMMISSIONERS ATTEST: u (j ,,, gJjj g y1 ELD COUNTY, COLORADO ,r 'Q, Weld County lerk and Recorder ag- _ and Clerk to��yy��the Board4 ���a' n 2 tilDeputy Coun erk til J(,, PPR,O D AS TO FORM: c-;flej _g�j yye</_, County Attorney 790891 DATE PRESENTED: APRIL 18 , 1979 r• �. Ref: 1279-006 March 22, 1979 „„naii nfgNER� tonn Board of County Commissioners \, FitAR%5a \90 Weld County Colorado P. 0. Box 758 Greeley CO 80632 Subject: Electrical Service Investigation for Pierce Asphalt Plant Gentlemen: We are submitting this letter of agreement for your consideration. This agreement specifies the engineering services Miner and Miner is to provide Weld County. Project Scope Based on our discussions with Wayne Smyth, County Engineer, and a visit to the site on March 16, 1979, the engineering services will consist of the following: 1. Investigation of the problem of frequent blowing of fuses at main panel and transformer bank. 2. Recommendation of a solution to correct the problem. 3. Preparation of a cost estimate to correct the problem by contract. 4. Preparation of plans and specifications in sufficient detail to permit inclusion of said work in a County contract. 5. Perform necessary inspection of contractor work, including checking of shop drawings and final inspection, to insure conformance with plans and specifications. 6. Determination of feasibility of incorporating proposed electrical improvements into future asphalt plant installation. MINER AND MINER, CONSULTING ENGINEERS, INC. TELEPHONES: 910 27th AVENUE GREELEY (303) 352.3706 POST OFFICE BOX 548 DENVER (303) 6233119 GREELEY, COLORADO 80631 Board of County Commissioners March 22, 1979 Page -2- Data Required 1. Supplier transformer bank size. 2. Conductor size and type from supplier's transformer bank to main panel and each sub-panel . 3. Nameplate data from each motor. 4. Panel and sub-panel size in amps. 5. Size, type and style on each breaker, starter, fuse or other control apparatus. 6. Approximate distances from main panel to sub-panels and to motor location. Compensation Compensation payable by Weld County to the Engineer will be our normal two times the Engineer's payroll costs for time expended by employees of the Engineer performing these services plus the actual out-of-pocket expenses incurred by the Engineer. Out-of-pocket expenses include items such as printing, subsistence, toll telephone, transportation, etc. , and are charged on the basis of actual cost to the Engineer without any addition. Additional services beyond those described above would not be done without the approval of Weld County. If additional services are authorized, they will be performed at the Engineer's regular hourly rates . We estimate the compensation payable to the Engineer for these services to be $1,500, with a total not to exceed $2,000. Completion Date We will have the recommendations, plans, and specifications ready for review in approximately 14 days after receipt of the notice to proceed. Therefore, we should have plans and specifications ready for your review on about April 4, 1979. Board of County Commissioners March 22, 1979 Page -3- We appreciate the opportunity to prepare this study for Weld County. If this letter of agreement complies with your understanding of the project engineering, please return one signed and dated copy of the letter to us. Thank you for your consideration. Yours very truly, MINER A(VD MINER, CONSULTING ENGINEERS, INC. C-' � c Charles W. Meyers, P.E. President CWM:dw ACCEPTED: Board of County Commissioners By Norman Carlson Chairman of the Board Date a6, /979 Hello